This is Amendment 0001 to Solicitation 1240LT26Q0073 for Greys River Road Dust Abatement services on the Bridger-Teton National Forest, issued by USDA-FS CSA Intermountain 8 (located in Ogden, UT). The amendment is dated June 9, 2026, with an effective date of June 24, 2026, and establishes a period of performance from July 15, 2026 to July 14, 2027.
The amendment provides clarifications through eight questions and answers addressing contractor responsibilities and application requirements. Key clarifications include: (1) one application per calendar year is required; (2) the Government (Forest Service Road Crew) is responsible for pre-application road preparation including grading, blading, and pre-watering the surface; (3) the magnesium chloride application rate of 0.3 gallons per square yard is acceptable per Federal Highway Project specifications, with rates between 0.25 to 0.5 gallons per square yard allowable; (4) contractors must establish a thorough schedule coordinating with Forest Service for pre-work preparations; (5) the Forest Service applies water for surface adhesion, not the contractor; (6) the contractor is responsible for purchasing and supplying magnesium chloride; and (7) contractors must use a dissolved magnesium chloride solution, not dry flakes. All other terms and conditions of the original solicitation remain unchanged, and offers must acknowledge receipt of this amendment prior to the specified deadline to avoid rejection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C05 Attach 2 - Amended SOI Greys Rv.xlsx | XLSX spreadsheet | |
| C05 Amendment 02 Greys River.pdf | ||
| C04 Attachment 2 - SOI_GreysDustAbatement.xlsx | XLSX spreadsheet | |
| C04 Attachment 4 - SCA WD2015-5409 051326.pdf | ||
| C04 Attachment 3 - FS Project Specifications.pdf | ||
| C04 Attachment 6 - Certificate of Compliance.pdf | ||
| C04 Attachment 2 - SOI_GreysDustAbatement.xlsx | XLSX spreadsheet | |
| C04 Attachment 1 - Solicitation Greys River.pdf | ||
| C04 Attachment 5 - QASP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240LT26Q0073
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40LT
OGDEN UT 84401-2310
324 25TH ST
USDA-FS CSA INTERMOUNTAIN 8
GAOA06/24/20260001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/09/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Solicitation 1240LT26Q0073, Greys River Road Dust Abatement, Bridger-Teton National Forest, is amended as follows:
The following questions and answers are being provided for informational or clarification purposes only.
1. I wanted to verify that this solicitation is for just 1 application per year?
A: Yes, it's just one application per calendar year.
2. The solicitation provides that the Government performs pre-application road preparation.
Does that preparation include pre-watering or conditioning the road surface prior to the Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
TANYA I. SPANFELLNER
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240LT26Q0073/0001
magnesium chloride application, or is surface moisture the contractor's responsibility?
A: Yes, preparation includes the Government (in this case, the Forest Service Road Crew) to not only blade/grade the road so there's an even surface for magnesium chloride application but also apply water so the magnesium chloride solution can adhere to the road base more effectively.
3. The provided document stated that there is an application rate of 0.3 gallons per square yard.
This is below the manufactures' recommended rate of 0.5 gallons per square yard. Is there a reason or qualifying data to support this change?
A: 0.5 gallons per square yard is also an acceptable application rate. Per Section 312.04 of the 2024 Standard Specifications for Construction of Roads and Bridges on Federal High Way Projects (FP-24), if the contractor is applying a single application, magnesium chloride shall be applied at an approved rate from 0.25 to
0.5 gallons per square yard. 0.3 gallons falls within that range, which is why it's shown on the table.
4. Also, in the next section it states that we need to schedule the application to the COR so that "preapplication road preparation" can commence. What does the pre-preparation entail, and whom is doing it?
A: Depending on award dates and Notice To Proceed, the Forest Service Road Crew will grade and blade the road, as necessary, so the contractor has an even surface for the magnesium chloride application. As such, when the Notice to Proceed is approved, the Contractor shall have an established and thorough schedule so the Forest Service can properly coordinate with their road crew to make those pre-work preparations.
5. It is in our normal practice to soak the roadway material with water prior to the MAG application for better adhesion to the sub-strait material. We would like to know if we need to include that into our quote.
A: The Forest Service Road Crew will apply water so there is a wet surface for the magnesium chloride to more effectively adhere to the road surface.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240LT26Q0073/0001
6. If it is required for us to provide pre-wetting before application of the MAG, can we draft water out of the Greys River or do we need to haul it in?
A: The Forest Service Road Crew will apply water so there is a wet surface for the magnesium chloride to more effectively adhere to the road surface.
7. Is the government or the contractor responsible for purchase and supply of Magnesium
Chloride?
A: The Contractor is responsible for purchase and supply of Magnesium Chloride.
8. Does the government have a preference on whether dry flakes or a dissolved solution is used?
A: The Contractor shall use a dissolved solution.
All other terms and conditions remain unchanged.
Period of Performance: 07/15/2026 to 07/14/2027