This document is a Schedule of Items (SOI) Attachment for the GAOA McCall Area Housing Barracks Replacement project, detailing three distinct bid options. Base Bid A and Base Bid B are identical, encompassing construction of 3 modular barracks (1,560 sq ft each), a laundry building, trailer pad construction, site demolition, utility infrastructure (including water pipelines, sewer systems, and electrical services), and site preparation. The Optional Bid Item 2 includes constructing one additional accessible pre-fabricated barracks with specific accessibility features.
The project is a Forest Service solicitation (Solicitation Number: 1240LT25R0011) set aside as a Total Small Business Set-Aside with a construction magnitude between $1,000,000 and $5,000,000. Key dates include a site visit on July 30, 2025, questions due by August 22, 2025, and proposal submissions due by 4:00 PM Mountain Standard Time on August 29, 2025. Proposals should be submitted to Paula Sales and Lonnie Root at their USDA email addresses. The comprehensive scope involves extensive site infrastructure work, modular building installation, and systematic demolition and replacement of existing housing facilities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 27 August 25 Questions and Answers.pdf | ||
| 25 August Questions and Answers.pdf | ||
| Attach 6 2236200 Packaged Compressor and Condenser Units.DOC | DOC document | |
| 1240LT25R0011 McCalls Barracks Amendment 1.pdf | ||
| 10 August 2025 GAOA McCall Area Barracks Replacement Questions and Answers.pdf | ||
| Pre-BidSignInSheet-McCallAreaHousingBarracksReplace(2025.7.30).pdf | ||
| 1240LT25R0011 Solicitation.pdf | ||
| Attachment 1-SOW.pdf | ||
| Attachment 2 Schedule of Items.xlsx | XLSX spreadsheet | |
| Attachment 5 Drawings Maps.pdf | ||
| 1240LT25R0011 Solicitation.pdf | ||
| Attachment 3 Specifications.pdf | ||
| Attachment 4 Wage Determination.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI
| Attachment 2 GAOA McCall Area Housing Barracks Replacement | |||||||
| Base Bid A | |||||||
| ITEM NUMBER | PROJECT NUMBER | DESCRIPTION | METHOD OF MEAS | UNIT | QTY | PRICE | TOTAL |
| 0001 | 000050-1 | Modular Barracks (1560sf) (Includes Concrete foundation, transportation, crane set and utility connections) | LSQ | EA | 3 | $ - 0 | |
| 0002 | 0000501 | Laundry Building | LSQ | LS | 1 | $ - 0 | |
| 0003 | 0000502 | Trailer Pad Construction | LSQ | LS | 1 | $ - 0 | |
| 0004 | 010250 | Construction Staking | LSQ | LS | 1 | $ - 0 | |
| 0005 | 011900 | Mobilization | LSQ | LS | 1 | $ - 0 | |
| 0006 | 022210-1 | Demolition of Wash House | LSQ | EA | 1 | $ - 0 | |
| 0007 | 022210-2 | Demolition of Existing Barracks | LSQ | EA | 2 | $ - 0 | |
| 0008 | 221100-1 | Pipeline, 1" HDPE, Including Trench and Fittings | DQ | LF | 245 | $ - 0 | |
| 0009 | 221100-2 | Pipeline, 1.5" HDPE, Including Trench and Fittings | DQ | LF | 479 | $ - 0 | |
| 0010 | 221100-3 | Pipeline, 4" HDPE, Including Trench and Fittings | DQ | LF | 479 | $ - 0 | |
| 0011 | 221100-4 | Blowouts, 1", including Trench and Fittings | AQ | EA | 12 | $ - 0 | |
| 0012 | 221102-1 | Curb Valve and Box - 2-Inch Metal | AQ | EA | 9 | $ - 0 | |
| 0013 | 221102-2 | Curb Valve and Box - 4-Inch Cast Iron | AQ | EA | 6 | $ - 0 | |
| 0014 | 221300-1 | Sewer Systems - 6" PVC Sewerline | DQ | LF | 295 | $ - 0 | |
| 0015 | 221300-2 | Sewer Systems - Clean Outs | AQ | EA | 8 | $ - 0 | |
| 0016 | 260000-1 | Power Company Fees | LSQ | LS | 1 | $ - 0 | |
| 0017 | 260000-2 | Electrical Demolition, Site | LSQ | LS | 1 | $ - 0 | |
| 0018 | 260000-3 | Electrical Service System (3 Switchboards) | LSQ | LS | 1 | $ - 0 | |
| 0019 | 260000-4 | Electrical Feeders to Fawn Hall and Green Bunkhouse | LSQ | LS | 1 | $ - 0 | |
| 0020 | 260000-5 | Communications Conduit | DQ | LF | 1 | $ - 0 | |
| 0021 | 260000-6 | Electrical Feeder to Laundry Building | LSQ | LS | 1 | $ - 0 | |
| 0022 | 312100 | Project Site Preparation and Grading (Roads, Laundry, Etc.) | LSQ | LS | 1 | $ - 0 | |
| BASE Bid A Total: | $ - 0 | ||||||
| Base Bid B (Sequencing of Barrack Construction) | |||||||
| ITEM NUMBER | PROJECT NUMBER | DESCRIPTION | METHOD OF MEAS | UNIT | QTY | PRICE | TOTAL |
| 0001 | 000050-1 | Modular Barracks (1560sf) (Includes Concrete foundation, transportation, crane set and utility connections) | LSQ | EA | 3 | $ - 0 | |
| 0002 | 0000501 | Laundry Building | LSQ | LS | 1 | $ - 0 | |
| 0003 | 0000502 | Trailer Pad Construction | LSQ | LS | 1 | $ - 0 | |
| 0004 | 010250 | Construction Staking | LSQ | LS | 1 | $ - 0 | |
| 0005 | 011900 | Mobilization | LSQ | LS | 1 | $ - 0 | |
| 0006 | 022210-1 | Demolition of Wash House | LSQ | EA | 1 | $ - 0 | |
| 0007 | 022210-2 | Demolition of Existing Barracks | LSQ | EA | 2 | $ - 0 | |
| 0008 | 221100-1 | Pipeline, 1" HDPE, Including Trench and Fittings | DQ | LF | 245 | $ - 0 | |
| 0009 | 221100-2 | Pipeline, 1.5" HDPE, Including Trench and Fittings | DQ | LF | 479 | $ - 0 | |
| 0010 | 221100-3 | Pipeline, 4" HDPE, Including Trench and Fittings | DQ | LF | 479 | $ - 0 | |
| 0011 | 221100-4 | Blowouts, 1", including Trench and Fittings | AQ | EA | 12 | $ - 0 | |
| 0012 | 221102-1 | Curb Valve and Box - 2-Inch Metal | AQ | EA | 9 | $ - 0 | |
| 0013 | 221102-2 | Curb Valve and Box - 4-Inch Cast Iron | AQ | EA | 6 | $ - 0 | |
| 0014 | 221300-1 | Sewer Systems - 6" PVC Sewerline | DQ | LF | 295 | $ - 0 | |
| 0015 | 221300-2 | Sewer Systems - Clean Outs | AQ | EA | 8 | $ - 0 | |
| 0016 | 260000-1 | Power Company Fees | LSQ | LS | 1 | $ - 0 | |
| 0017 | 260000-2 | Electrical Demolition, Site | LSQ | LS | 1 | $ - 0 | |
| 0018 | 260000-3 | Electrical Service System (3 Switchboards) | LSQ | LS | 1 | $ - 0 | |
| 0019 | 260000-4 | Electrical Feeders to Fawn Hall and Green Bunkhouse | LSQ | LS | 1 | $ - 0 | |
| 0020 | 260000-5 | Communications Conduit | DQ | LF | 1 | $ - 0 | |
| 0021 | 260000-6 | Electrical Feeder to Laundry Building | LSQ | LS | 1 | $ - 0 | |
| 0022 | 312100 | Project Site Preparation and Grading (Roads, Laundry, Etc.) | LSQ | LS | 1 | $ - 0 | |
| BASE Bid B Total: | $ - 0 | ||||||
| Optional Bid Item 2 (Construct New Accessible Pre-Fabricated Barracks) | |||||||
| ITEM NUMBER | PROJECT NUMBER | DESCRIPTION | METHOD OF MEAS | UNIT | QTY | PRICE | TOTAL |
| 2001 | 000050-2 | Accessible Modular Barracks (1560sf) (Includes Concrete foundation, accessible access, transportation, crane set and utility connection) | LSQ | EA | 1 | $ - 0 | |
| Option #2 Total: | $ - 0 |
| LSQ | Least Squares | LF | Linear Feet |
| AQ | Average Flow Rate | LS | Lump Sum |
| DQ | Discharge Flow Rate | EA | Each |