This document is a Questions and Answers document for the GAOA McCall Area Barracks Replacement project dated 10 August 2025. The document addresses 16 contractor inquiries regarding engineering requirements, project performance, accessibility standards, design submissions, and permit needs. Key details include: the project requires an Idaho-licensed engineer for prefabricated buildings and foundations, has a base bid contract time of 365 calendar days with potential option for an additional 365 days, and involves modular bunkhouses requiring a complete delegated design submission. The contractor is responsible for specific design elements including engineered calculations for building envelope, structure, foundations, fire protection, plumbing, mechanical, and electrical systems. Permit requirements are minimal, with only a city right-of-way, water permit, potential NPDES permit, and landfill disposal permit needed, along with state inspections for mechanical, electrical, and plumbing systems.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GAOA McCall Area Barracks Replacement

Questions and Answers

10 August 2025

1. It was mentioned during the job walk that engineering was required. Does this mean that the entire Project documents/drawings need to be stamped by a licensed engineer?

Answer: No, engineering is only required for prefabricated buildings and foundations. Nothing else on the drawings is required to be stamped by an engineer.

2. Will an engineer from out of Idaho, licensed in another state be allowed?

Answer: Only an engineer with a license in Idaho will be allowed.

3. The laundry room appears to be a complete design; would this also require an engineering stamp before it could be started?

Answer: No, no engineering stamp is required for this building.

4. Can we assume that a topographical survey is required? Or does the government have one that can be provided to the contractor?

Answer: No topographical survey is required. The government can provide CAD files to the contractor after award.

5. Please confirm that the Period of Performance indicated will be changed based upon the actual Contract Award and Notice to Proceed. As stated, the Base Bid Contract time is 365 Calendar Days and if the Options are awarded the total period of performance will be 730 Calendar Days. If this is true will the options be awarded concurrently to the base bid contract award? If not is there another period of time for the option pricing greater than 60 days?

Answer: When the option bid is awarded, it will be for 365 days for its award date.

6. Please define the Method of Meas terms: LSQ, AQ, and DQ. Please clarify how they relate to Contractor pricing.

Answer: Please see specification 011250 measurement and payment

7. Item Number 1001 unit is ea. and the quantity is 1, but there are two taps required 1 @ 1 1/2" and 1 @ 4” or 2 each. Should this quantity be 2 or should the unit be LS for the work?

Answer: It should be LS for the work.

8. Note #19 indicates that all construction shall comply with the ADA and ABA guidelines. If is our understanding that the only cabin that this applies to is in Optional Bid Item 2. Please clarify the intent of this note. Additionally does this apply to site grading and building access to all new buildings, walks and roadways?

Answer: Yes, the only building is Optional Bid Item 2. See the plans for what is required.

9. Will the ADA Accessible Cabin require a ramp at each point of egress? Additionally, will the Kitchen be constructed to ADA / ABA Standards?

Answer: See the plans for what is required.

10. Please confirm that the Contractor is responsible to provide a complete Delegated Design Submission for the Modular Bunkhouses to include: engineered calculations and stamped plans by a Licensed Design Professional n the State of Idaho for the modular units including but not limited to: building envelope, building structure, foundations, fire protection, plumbing, mechanical, and electrical systems.

Answer: Yes, that is correct.

11. Will the contractor be required to provide soil boring to confirm the Design Soil Bearing identified in the specification section as 2500 PSF as part of the Delegated Design Submission?

Answer:No, it is to be assumed that the bearing pressure is 2500 psf.

12. Does the Government have a Hydrant Flow Test for the waterline being used for the 4" line? If so, please provide. Otherwise, will the contractor be required to perform a Hydrant Flow test as a portion of the project delegated design efforts required by the specifications?

Answer: The requirements in the water specification are required to be followed.

13. Paragraph 3.1.A indicates that the Contractor is to provide a radon mitigation system as indicated on the plans, please provide the plans referenced by this section. Does the Contractor have any responsibility regarding the design delegation of this system similar to the bunkhouse construction? The contractor is to design/install a radon mitigation system following the specifications. An engineer stamp is not required for the radon mitigation system. Will the laundry building require Radon Mitigation?

Answer: The laundry building does not require radon mitigation.

14. Project Permit Requirements on Federal Property - Other than a City ROW and water Permit for Bid Option #1, a possible NPDES permit for project areas greater than 1 Acre, and a landfill disposal permit, are there any other permits required, or other Authorities having Jurisdiction that the contractor is required to coordinate with during construction?

Answer: No, no other permits are required other than state inspections for MEP.

15. Will a copy of the site visit attendee sign-in sheet be available to all that attend the site visit? (Will contractors be permitted to take a picture of the sign-in sheet?)

Answer: The sign-in sheet has been uploaded to SAM.

16. Contact for Idaho Power:

SHERI STALEY

DISTRIBUTION DESIGNER

Idaho Power | Customer Operations sstaley@idahopower.com 30 W Lake Fork Rd| McCall, ID | 83638 mailto:sstaley@idahopower.com