Attachment 4 - REVISED Veteran Point Drawings.pdf
PDF 6 MB Posted
- Attached to
- Veterans Point Trail Rehabilitation
- Solicitation number
- 1240LT24R0057
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a set of engineering drawings and plans for the Veterans Point Trail Rehabilitation project on the Black Hills National Forest in South Dakota. The drawings provide detailed specifications for trail repair work, including removing and disposing of existing benches, tables, and grills, repairing railings, addressing trail heave and potholes, and applying crack seal and seal coat treatments. The drawings have been reviewed and approved by the Forest Service engineering team. This project is the subject of a current solicitation by the United States Forest Service, Solicitation Number 1240LT24R0057, for the rehabilitation of the Veterans Point Trail.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLACK HILLS NATIONAL FOREST
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
ROCKY MOUNTAIN REGION
Pennnington County
SOUTH DAKOTA
DRAWINGS FOR
SHEET NUMBER DESCRIPTION
1 ••••••••••••••••••••••• Title Sheet and Index
2 •······················ Forest Location Mop, Estimate of Quantities and Notes
GAOA Veterans Point Trail Rehabilitation
4-13
Site Pion
Trail Repair Sites
Timber Retaining Wall
Materials List Mystic Ranger District
I HAVE REVIEWED THE TECHNICAL ASPECTS OF THESE DRAWINGS
PAUL BOSWORTH PAUL BOSWORTH (Affiliate)
(Affiliate) 2024.03.27 13:26:57 -06'00'
PROJECT ENGINEER
ALBERTA SETTLE
Digitally signed by ALBERTA SETTLE
Date: 2024.03.2714:07:01 -06'00'
PROJECT MANAGER
RALPH ADAM
FOREST ENGINEER
Digitally signed by RALPH ADAM Date: 2024.03.29 14:11 :03 -06'00'
THESE DRAWINGS COMPLY WITH THE FOREST PLAN AND PROJECT
SPECIFIC NEPA DUCUMENTATION
RALPH A DAM
Digitally signed by RALPH ADAM
Date: 2024.03.29 14:16:51 -06'00'
FOREST SUPERVISOR
RECOMMENDED BY:
CH RI ST' NE LABERGE
Digitally signed by CHRISTINE LABERGE Date: 2024.04.23 10:40:38 -06'00'
ENGINEERING /REGIONAL SPECIALIST
Do U GLAS WISE Digitally signed by DOUGLAS WISE
Date: 2024.04.23 10:54:48 -06'00'
REGIONAL ENGINEER
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
R-2
ROCKY MOUNTAIN REGION
DATE
DATE
DATE
DATE
DATE
DATE
v Forest
14 • • • • • • • • •• • • • • • • • • • • • • •
1 5 • • • • • • • • • • • • • • • • • • • • •• •
Black Hills National Forest Project Nome
""-GAOA Veterans Point Trail Rehabilitation✓.:l v Sheet Title
Title Sheet and Index Scole Sheet
I No Scale 1 15 of ..J
Referred to as Shoreline Loop asettle Typewritten Text Remove existing Benches and Tables and Grills including concrete bases/footings.
Dispose of off Forest.
Included in Base Item 203(05) asettle Text Box 3-3 asettle Text Box 3-1 asettle Typewritten Text
SEAL COAT IS OPTION ITEM
asettle Text Box 3-2 asettle Typewritten Text
CRACK SEAL IS BASE ITEM
asettle Typewritten Text
REFER TO SHEET 9 FOR NEW OPTION ITEM
HEAVE AND POTHOLE REPAIR DESCRIPTION
asettle Polygon asettle Typewritten Text Repair Railing using steel railing salvaged from Site 9.
Make all welds smooth.
Apply primer to welded areas extending 12" all directions asettle Line asettle Line asettle Text Box 3-4 asettle Line asettle Text Box Rev.10/2024 ALS
Typewritten Text
Line
Polygonal Line asettle Line asettle Typewritten Text Remove existing Tables and Grills and concrete bases.
Dispose off Forest. This also includes removal of benches, tables and grills at other locations on trail - ref. Sheet 3.
asettle Typewritten Text Asphalt Cut Line asettle Polygonal Line asettle Line asettle Typewritten Text All references to Asphalt cutting, removal, and grinding include Asphalt and Base Course Material asettle Typewritten Text asettle Text Box 12-1 asettle Text Box 12-2 asettle Text Box 12-3 asettle Typewritten Text Remove asphalt and base material from this area asettle Typewritten Text Shape back to natural after Asphalt and Base Removal asettle Text Box 12-6 asettle Text Box 12-5 asettle Text Box 12-4 asettle Typewritten Text Reuse steel railing to connect to existing rail to create railing on back edge of asphalt.
Make all welds smooth.
Apply primer to welded areas extending 12" all directions.
asettle Typewritten Text
TRAIL HEAVE AND POTHOLE REPAIRS
Cut asphalt full trail width at locations of heave and pothole as directed by Engineer Remove asphalt, base material and roots.
Place 6" Base Course Material topped with 2" asphalt.
Seal cut edges as Crack Seal
NEW OPTION ITEM
asettle Polygon asettle Text Box
REV. 10/24 ALS
13-2 asettle Typewritten Text Remove benches from site and dispose off Forest asettle Typewritten Text Repair Railing using steel railing salvaged from Site 9.
Make all welds smooth.
Apply primer to welded areas extending 12" all directions
13-1
Line asettle Line asettle Text Box
REV. 10/24 ALS
Stamp
| doc08146220241009181227.pdf |
| Binder3.pdf |
| doc08146120241009180711.pdf |
| Binder2.pdf |
| Binder1.pdf |
| Revised Sheet 3 Veterans Pt Trail.pdf |
| Pages from Attachment+4+Veteran+Point+Drawings.pdf |
| Revised Sheet 12 Veterans Pt Trail.pdf |
| Revised Sheet 13 Veterans Pt Trail.pdf |
File details come from the government source that posted it. Updated .