Attachment 4 - REVISED Veteran Point Drawings.pdf

PDF 6 MB Posted

Attached to
Veterans Point Trail Rehabilitation
Solicitation number
1240LT24R0057
Issued by

About this file

This document is a set of engineering drawings and plans for the Veterans Point Trail Rehabilitation project on the Black Hills National Forest in South Dakota. The drawings provide detailed specifications for trail repair work, including removing and disposing of existing benches, tables, and grills, repairing railings, addressing trail heave and potholes, and applying crack seal and seal coat treatments. The drawings have been reviewed and approved by the Forest Service engineering team. This project is the subject of a current solicitation by the United States Forest Service, Solicitation Number 1240LT24R0057, for the rehabilitation of the Veterans Point Trail.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLACK HILLS NATIONAL FOREST

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

ROCKY MOUNTAIN REGION

Pennnington County

SOUTH DAKOTA

DRAWINGS FOR

SHEET NUMBER DESCRIPTION

1 ••••••••••••••••••••••• Title Sheet and Index

2 •······················ Forest Location Mop, Estimate of Quantities and Notes

GAOA Veterans Point Trail Rehabilitation

4-13

Site Pion

Trail Repair Sites

Timber Retaining Wall

Materials List Mystic Ranger District

I HAVE REVIEWED THE TECHNICAL ASPECTS OF THESE DRAWINGS

PAUL BOSWORTH PAUL BOSWORTH (Affiliate)

(Affiliate) 2024.03.27 13:26:57 -06'00'

PROJECT ENGINEER

ALBERTA SETTLE

Digitally signed by ALBERTA SETTLE

Date: 2024.03.2714:07:01 -06'00'

PROJECT MANAGER

RALPH ADAM

FOREST ENGINEER

Digitally signed by RALPH ADAM Date: 2024.03.29 14:11 :03 -06'00'

THESE DRAWINGS COMPLY WITH THE FOREST PLAN AND PROJECT

SPECIFIC NEPA DUCUMENTATION

RALPH A DAM

Digitally signed by RALPH ADAM

Date: 2024.03.29 14:16:51 -06'00'

FOREST SUPERVISOR

RECOMMENDED BY:

CH RI ST' NE LABERGE

Digitally signed by CHRISTINE LABERGE Date: 2024.04.23 10:40:38 -06'00'

ENGINEERING /REGIONAL SPECIALIST

Do U GLAS WISE Digitally signed by DOUGLAS WISE

Date: 2024.04.23 10:54:48 -06'00'

REGIONAL ENGINEER

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

R-2

ROCKY MOUNTAIN REGION

DATE

DATE

DATE

DATE

DATE

DATE

v Forest

14 • • • • • • • • •• • • • • • • • • • • • • •

1 5 • • • • • • • • • • • • • • • • • • • • •• •

Black Hills National Forest Project Nome

""-GAOA Veterans Point Trail Rehabilitation✓.:l v Sheet Title

Title Sheet and Index Scole Sheet

I No Scale 1 15 of ..J

Referred to as Shoreline Loop asettle Typewritten Text Remove existing Benches and Tables and Grills including concrete bases/footings.

Dispose of off Forest.

Included in Base Item 203(05) asettle Text Box 3-3 asettle Text Box 3-1 asettle Typewritten Text

SEAL COAT IS OPTION ITEM

asettle Text Box 3-2 asettle Typewritten Text

CRACK SEAL IS BASE ITEM

asettle Typewritten Text

REFER TO SHEET 9 FOR NEW OPTION ITEM

HEAVE AND POTHOLE REPAIR DESCRIPTION

asettle Polygon asettle Typewritten Text Repair Railing using steel railing salvaged from Site 9.

Make all welds smooth.

Apply primer to welded areas extending 12" all directions asettle Line asettle Line asettle Text Box 3-4 asettle Line asettle Text Box Rev.10/2024 ALS

Typewritten Text

Line

Polygonal Line asettle Line asettle Typewritten Text Remove existing Tables and Grills and concrete bases.

Dispose off Forest. This also includes removal of benches, tables and grills at other locations on trail - ref. Sheet 3.

asettle Typewritten Text Asphalt Cut Line asettle Polygonal Line asettle Line asettle Typewritten Text All references to Asphalt cutting, removal, and grinding include Asphalt and Base Course Material asettle Typewritten Text asettle Text Box 12-1 asettle Text Box 12-2 asettle Text Box 12-3 asettle Typewritten Text Remove asphalt and base material from this area asettle Typewritten Text Shape back to natural after Asphalt and Base Removal asettle Text Box 12-6 asettle Text Box 12-5 asettle Text Box 12-4 asettle Typewritten Text Reuse steel railing to connect to existing rail to create railing on back edge of asphalt.

Make all welds smooth.

Apply primer to welded areas extending 12" all directions.

asettle Typewritten Text

TRAIL HEAVE AND POTHOLE REPAIRS

Cut asphalt full trail width at locations of heave and pothole as directed by Engineer Remove asphalt, base material and roots.

Place 6" Base Course Material topped with 2" asphalt.

Seal cut edges as Crack Seal

NEW OPTION ITEM

asettle Polygon asettle Text Box

REV. 10/24 ALS

13-2 asettle Typewritten Text Remove benches from site and dispose off Forest asettle Typewritten Text Repair Railing using steel railing salvaged from Site 9.

Make all welds smooth.

Apply primer to welded areas extending 12" all directions

13-1

Line asettle Line asettle Text Box

REV. 10/24 ALS

Stamp

doc08146220241009181227.pdf
Binder3.pdf
doc08146120241009180711.pdf
Binder2.pdf
Binder1.pdf
Revised Sheet 3 Veterans Pt Trail.pdf
Pages from Attachment+4+Veteran+Point+Drawings.pdf
Revised Sheet 12 Veterans Pt Trail.pdf
Revised Sheet 13 Veterans Pt Trail.pdf

File details come from the government source that posted it. Updated .