Attachment 1 - Schedule of Items REVISED.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Veterans Point Trail Rehabilitation
- Solicitation number
- 1240LT24R0057
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Schedule of Items for the Veterans Point Trail Rehabilitation project, Solicitation Number 1240LT24R0057, issued by the U.S. Forest Service. It includes a list of base bid items and optional bid items required for the trail rehabilitation work. The base bid items cover mobilization, removal of structures and obstructions, crack cleaning and sealing, treated structural timber and lumber repairs, and installation of a closure barrier. The optional bid items include additional removal, retaining wall construction, asphalt seal coat, and trail repair work. Unit quantities, unit prices, and total proposed prices are provided for each bid item. The solicitation is for a project located on the Black Hills National Forest in South Dakota.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| SCHEDULE OF ITEMS | ||||||||
| 1240LT24R0057 | ||||||||
| GAOA Veterans Point Trail Rehabilitation | ||||||||
| REVISED: 10/09/2022 | ||||||||
| BASE BID ITEMS | ||||||||
| Item No. | Section No. | Supplies\Services | Meth of Meas | Unit | Qty. | Unit Price | Total | |
| 0001 | 151(01) | Mobilization | L.S.Q. | L.S. | 1 | $ | $ | |
| 0002 | 203(05) | Removal of Structures and | ||||||
| Obstructions, Site 9 and others | L.S.Q. | L.S. | 1 | $ | $ | |||
| 0003 | 414(09) | Crack cleaning and sealing | C.Q. | Foot | 1000 | $ | $ | |
| 0004 | 557(04)C | Treated structural timber and | ||||||
| lumber, Repair sites 1-8 | C.Q. | Each | 8 | $ | $ | |||
| 0005 | 640(03) | Furnish and install closure barrier, | ||||||
| type rock, size 0.3 C.Y. Site 10 | L.S.Q. | L.S. | 1 | $ | $ | |||
| TOTAL BASE PROPOSED PRICE: | ||||||||
| OPTIONAL BID ITEMS | ||||||||
| 1001 | 203(05)A | Removal of Structures and Obstructions, Grind asphalt | ||||||
| shoreline loop of trail | L.S.Q. | L.S. | 1 | $ | $ | |||
| 1002 | 557(04)A | Treated structural timber and | ||||||
| lumber, Retaining Wall 32" Height | C.Q. | L.F. | 144 | $ | $ | |||
| 1003 | 557(04)B | Treated structural timber and | ||||||
| lumber, Retaining Wall 24" Height | C.Q. | L.F. | 150 | $ | $ | |||
| 1004 | 557(04)D | Treated structural timber and | ||||||
| lumber, Retaining Wall 24" Height | C.Q. | L.F. | 168 | $ | $ | |||
| 1005 | 557(04)E | Treated structural timber and | ||||||
| lumber, Retaining Wall 24" Height | C.Q. | L.F. | 24 | $ | $ | |||
| 1006 | 557(04)F | Treated structural timber and | ||||||
| lumber, Retaining Wall 24" Height | C.Q. | L.F. | 150 | $ | $ | |||
| 1007 | 410(16)A | Asphalt Seal Coat, main part of trail | C.Q. | S.Y. | 1600 | $ | $ | |
| 1008 | 410(16)B | Asphalt Seal Coat, shoreline loop of | ||||||
| trail | C.Q. | S.Y. | 700 | $ | $ | |||
| 1009 | 915 | Trail Heave and Pothole Repair | A.Q. | SF | 900 | $ | $ | |
| TOTAL OPTIONAL PROPOSED PRICE: |
PROPOSED TOTAL, INCLUDING BASE AND ALL OPTIONS: $