This is a Statement of Work (SOW) for the Libby Tree Cooler HVAC Replacement project issued by the U.S. Department of Agriculture (USDA) Forest Service. The contract number is 1240LS26Q0028.
The project involves replacing HVAC systems for two tree coolers located at the Libby Ranger District on the Kootenai National Forest in Montana. The Base Item encompasses Tree Cooler 1 at the Libby Fire Cache (1263 Highway 37, Libby MT 59923), while Option Item 1 covers Tree Cooler 2 at the Canoe Gulch location at the Libby District office complex (12557 Highway 37, Libby MT 59923), approximately 12 miles from the Fire Cache. Both coolers are identical in size (18.5 feet wide, 20.5 feet long, 10.8 feet high) with Bally Case and Cooler wall and ceiling construction. Work is anticipated to begin July 1, 2026, and continue through early fall, weather permitting. The tree coolers are used to maintain frozen tree seedlings at temperatures between 28–40 degrees Fahrenheit for the USFS reforestation program.
The contractor must provide a complete HVAC system replacement including: removal and disposal of existing equipment, sizing and installation of a condenser with digital thermostat capable of ±2 degree Fahrenheit accuracy with 1-degree increments, indoor evaporator fans/coils, refrigeration lines, centrifugal humidifier maintaining 85–95% humidity, and environmental controller with warning alarms. The compressor must be compatible with R-404A or R-448A refrigerant. Key personnel required include a certified HVAC technician and certified electrician. Deliverables include submittal sheets with offer and maintenance plans and technical manuals after commissioning. No Government Furnished Equipment is provided. The contractor must coordinate site access with the government, comply with all federal and state codes including proper refrigerant disposal, and provide owner training for system operation and maintenance.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1240LS26Q0028 – Libby Tree Cooler HVAC Replacement Attachment 2 – Statement of Work
US Department of Agriculture (USDA)
Statement of Work
Contents
Project
General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards
Attachment
Project Libby District Priority Planting Tree Cooler Repair
General Information
1.0 Scope of Work
This project is to replace the HVAC systems for two tree coolers located at the Libby Ranger District on the Kootenai National Forest. Both tree coolers have dated HVAC systems that cannot be easily repaired and do not meet modern energy efficiency standards. The goal of this project is to provide fully functioning tree cooler HVAC systems with associated evaporator fans and necessary materials for the refrigeration system.
The tree coolers will be in use through the end of June 2026. It is anticipated that work for this project can begin 7/1/2026, and proceed through early fall, weather permitting.
Base Item: Tree cooler 1 is located at the Libby Fire Cache within a mile outside of town at 1263 Highway 37, Libby MT 59923.
Option Item 1: Tree cooler 2 – Canoe Gulch - is located at the Libby District office complex, 13 miles out of town, at 12557 Highway 37, Libby MT 59923. Cell service is available at the Fire Cache but there is no cell service at the Libby District office complex.
2.0 Background
The USFS has a tree planting program to replant seedlings in the forest after tree harvest or wildfire events.
Seedlings are grown at the nursery in Coeur d’ Alene Idaho and transported frozen to forests across the Northwest. Tree coolers located at Forest Service Districts are utilized to keep tree seedlings frozen until they are ready to be slowly thawed. It is critical to keep seedlings frozen so they do not come out of dormancy before they are ready to be planted. Thawing too early negatively impacts survival rates.
Tree coolers are utilized for a few months out of the year, usually in spring and fall. Below freezing temperatures are needed for a few weeks of the year between seedling arrival until thawing begins. Seedlings do not begin thawing until tree planting crews are scheduled and prepared to plant them in the woods.
Contractor Requirements
3.0 Technical Requirements / Tasks
Two separate tree coolers are at two locations, about 12 miles apart. Tree coolers are referenced as Tree Cooler 1 (Base Item) at the Libby Fire Cache and Tree Cooler 2 (Option Item 1) at the Libby District office complex Canoe Gulch. Both tree coolers have the same requirements.
• Prepare all required permits.
• Remove and dispose of existing equipment and associated parts/pieces of infrastructure that will not be used.
• Size the condenser needed to establish a reliable cooler and related system.
o Able to maintain even temperature (plus or minus 2 degrees F) that can be set and adjusted, at a minimum, between 28-degree F and 40 degrees F o Provide a digital thermostat mounted on the interior wall by the door. Adjust and set temperature accurately by a maximum of 1 degree F increments.
o Preference given to systems that are able to control temperatures remotely o Compressors must be compatible with and utilize R-404A or R-448A Refrigerant
• The tree coolers are the same size, 18.5 feet wide, 20.5 feet long and 10.8 feet high.
• The walls and ceiling of the tree cooler are Bally Case and Cooler. A picture of the wall plate is within the attachments.
• Provide indoor evaporator fans/coils sized to work with the compressor.
• Install drain lines from evaporator coils/fans to an exterior drain.
• Install refrigeration lines to manufacture’s specifications.
• Provide centrifugal humidifier. Before planting, seedlings (especially bare-root) require 85–95% humidity to keep them alive and dormant, particularly if stored at 33–40°F.
o Humidifiers must be able to maintain humidity between 85%- 95%, not be located above doorway, and not create ice buildup on cooler surfaces.
o Connect humidifier to existing water line.
• Install environmental controller for temperature and humidity.
o Warning alarm when temp is outside of a settable acceptable range, (need to be able to set range by increments of 1 degree).
• Utilize existing electrical panels. Everything from the panel to the compressor can be replaced as needed.
• Start, test, and commission all new equipment to confirm refrigeration capabilities within proposed work.
• Cleanup site work area and perform any need restoration for ground disturbance from installation efforts.
• Provide owner training for new system operation and maintenance.
• The proposed work will comply with all Federal and State codes, including removal and proper disposal of freon or other coolant.
• The personnel needed to complete the work will include an HVAC mechanic and electrician.
4.0 Government Furnished
No Government Furnished Equipment is provided in this contract.
5.0 Deliverables / Schedule
Key Deliverables
Item No.
Deliverable Objective Due
1 Submittal Sheets Allow government review and concurrence with equipment being purchased for installation.
With Offer
2 Maintenance Plans & Technical Manuals
Provide the government with applicable maintenance schedules and technical manuals for the new equipment.
After commissioning of the equipment.
6.0 Travel
Overnight travel is not anticipated.
7.0 Contractor’s Key Personnel
Certified HVAC technician Certified Electrician
8.0 Security Requirements
Contractor shall coordinate with the government for site access and hours of operation.
9.0 Data Rights
Maintenance schedule and technical manuals for equipment shall be provided to the government upon completion.
10.0 Section 508 – Electronic and Information Technology Standards Section 508 shall be applied.
Attachment Pictures of the tree coolers for reference.
Project Vicinity Map
Libby Tree Cooler
Fire Cache 1240 Highway 37, Libby, MT 59923 & Cane Gulch 12557 Highway 37, Libby, MT 59923
L i b b
L i
Canoe Gulch
Fire Cache
Fire Cache Tree Cooler Location
Tree Cooler
Fire Cache Tree Cooler # 1 North Side
North Side
Canoe Gulch Tree Cooler Location
Tree Cool