Attachment 3 - Elkhorn Trail Bridge Plans (8 Pages).pdf
PDF 6 MB Posted
- Attached to
- Elkhorn Trail Bridge
- Solicitation number
- 1240LP27Q0002
- Issued by
-
Department of Agriculture Forest Service
About this file
This document comprises the construction plans for the Elkhorn Trail Bridge Replacement project located on the Medicine Bow Routt National Forest in Routt County, Colorado, administered by the USDA Forest Service Rocky Mountain Region, Hahns Peak/Bears Ears Ranger District.
The project involves replacing an existing bridge with a new 85-foot-long prefabricated truss superstructure designed to accommodate pedestrian and equestrian traffic with a 90 PSF pedestrian live load and 200 PSF snow load. The superstructure may be constructed from either weathering steel or fiber-reinforced polymer (FRP), with design compliance required per AASHTO LRFD specifications and FP-24 standards. The bridge must maintain 3.7 feet of freeboard above the 100-year storm event and include a minimum 60-inch clear deck width with safety railings. Construction requires precast concrete grade beams (3' x 3' x 6'), geocell and gabion basket abutment foundations, riprap slope protection (42 cubic yards total), and trail material placement (36 cubic yards). Key specifications mandate no field welding, all concrete precast, helicopter and ATV-only site access with components under 50 inches wide, and construction compliance with FSM-H 6700 and 29 CFR 1926 safety standards. The contractor must coordinate with the Regional Bridge Engineer regarding final elevations, obtain manufacturer's representative certification during superstructure installation, and coordinate construction timing with applicable resource specialists. The existing bridge superstructure, pier, and south abutment require complete removal and proper disposal. Dewatering during abutment construction and comprehensive erosion control measures are required, with all disturbed areas reclaimed per District Ranger approval.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA
United States Department of Agriculture Forest Service
COLORADO
ROUTT COUNTY
R02 ROCKY MOUNTAIN REGION
MEDICINE BOW ROUTT NATIONAL FOREST
HAHNS PEAK/BEARS EARS RANGER DISTRICT
ELKHORN TRAIL BRIDGE REPLACEMENT PLANS
O N_H __ - --
*--- • knstPnxlumlatlDrMllry
PROJECT LOCATION MAP
TRAVEL DIRECTIONS:
FROM THE TOWN OF HAHNS PEAK VILLAGE, HEAD NORTH ON CO-129 (5.2 Ml).
TURN RIGHT ONTO NFSR 550 (3.8 Ml). TURN LEFT ONTO NFSR 501 (1.8 Ml). TURN RIGHT TO STAY ON NFSR 501 (1.0 Ml). TURN LEFT ONTO NFSR 502.1A (0.5 Ml).
TURN LEFT ONTO NFSR 502 (1.8 Ml). TAKE NFST 1149.1 TO BRIDGE SITE (0.8 Ml).
PROJECT SITE: 40.951625, -106.946277
FOREST LOCATION MAP
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
ROCKY MOUNTAIN REGION
PROJECT NAME & LOCATION
ELKHORN TRAIL BRIDGE REPLACEMENT
MEDICINE BOW ROUTT NATIONAL FOREST
HAHNS PEAK/BEARS EARS RANGER DISTRICT
DRAWING NAME
TITLE
INDEX OF SHEETS
SHEET NO. DESCRIPTION
1 TITLE SHEET
2 GENERAL NOTES AND QUANTITIES
3 SITE PLAN AND PROFILE
4 ABUlMENTS PLAN AND PROFILE
5 PREF AB RICA TED SUPERSTRUCTURE
6 GRADE BEAMS DETAILS
7 NORTH ABUlMENT DETAILS
8 SOUTH ABUTMENT DETAILS
RE~EWED & RECOMMENDED B~
REGIONAL BRIDGE ENGINEER DATE:
LOREN Digitally signed by LOREN
REIMER
REIMER Date: 2026.01.23 08:26:42 -07'00'
FOREST ENGINEER DATE:
APPROVED BY:
DISTRICT RANGER DATE:
DIRECTOR OF ENGINEERING DATE:
REVISION DATE SHEET
12/10/25 1 OF 8
Appendix II: Little Snake River - Elkhorn Trail Bridge Plans
GENERAL NOTES:
SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS PROJECT SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-24), STANDARD SPECIFICATIONS FOR CONSTRUCTION OF TRAILS AND TRAIL BRIDGES ON FOREST SERVICE PROJECTS, AND USDA FOREST SERVICE STANDARD TRAIL PLANS. WHERE CONFLICTS EXIST, FP-24 SHALL CONTROL.
TRANSPORTATION: ACCESS TO THE SITE IS LIMITED TO HELICOPTER AND ATV <50" WIDE. COORDINATE SIZES AND TRANSPORTATION CONFIGURATIONS OF ALL PREFABRICATED COMPONENTS WITH THE TRANSPORTATION AGENT PRIOR TO
FABRICATION.
GEOTECHNICAL REPORT: A GEOTECHNICAL REPORT IS NOT AVAILABLE. ALL EXCAVATIONS SHALL BE APPROVED BY A QUALIFIED ENGINEER WITH USFS NATIONAL CONSTRUCTION CERTIFICATION PROGRAM CREDENTIALS OR A LICENSED
PROFESSIONAL ENGINEER PRIOR TO PLACING BRIDGE FOUNDATIONS.
HYDROLOGY & HYDRAULICS: THE BRIDGE IS DESIGNED FOR A 100-YEAR STORM EVENT PLUS 3' OF FREEBOARD. ANY CHANGES THAT AFFECT THE ELEVATION OF THE LOW MEMBER OF THE SUPERSTRUCTURE SHALL BE COORDINATED WITH
THE REGIONAL BRIDGE ENGINEER PRIOR TO CONSTRUCTION.
SURVEY & STAKING: CONSTRUCTON SURVEYING AND STAKING SHALL BE APPROVED BY THE ENGINEER PRIOR TO EXCAVATION AND/OR CONSTRUCTION AND COMPLY WITH FS STANDARD SPECIFICATION FOR TRAILS 908.
UTILITIES: THE CONSTRUCTION AGENT IS RESPONSIBLE FOR LOCATING, PROTECTING, MAINTAINING SERVICE, AND
COORDINATING OUTAGES FOR ANY UTILITIES IN THE PROJECT AREA.
DEMOLITION: THE EXISTING BRIDGE SUPERSTRUCTURE, PIER, AND SOUTH ABUTMENT SHALL BE REMOVED IN THEIR ENTIRETY. PROPERLY TRANSPORT AND DISPOSE OF ALL MATERIALS IN ACCORDANCE WITH ALL FEDERAL LAWS, STATE LAWS, LOCAL LAWS, AND FOREST STANDARDS.
DEWATERING: FOUNDATION EXCAVATION SHALL BE DEWATERED DURING ABUTMENT CONSTRUCTION. DISCHARGE LOCATION
SHALL BE AT A LOCATION APPROVED BY THE HAHNS PEAK/BEARS EARS DISTRICT RANGER.
TRAFFIC CONTROL: THE HAHNS PEAK/BEARS EARS RANGER DISTRICT IS RESPONSIBLE FOR ALL TRAFFIC CONTROL FOR
THE DURATION OF CONSTRUCTION.
SAFETY: PERFORM ALL ACTIVITIES IN ACCORDANCE WITH FSM-H 6700 AND 29 CFR 1926 AS APPLICABLE.
STRUCTURAL STABILITY: THE CONSTRUCTION AGENT IS RESPONSIBLE FOR STRUCTURAL STABILITY THROUGHOUT CONSTRUCTION. THIS INCLUDES STABILITY OF THE EXISTING BRIDGE DURING REMOVAL AND STABILITY OF THE NEW BRIDGE THROUGHOUT INSTALLATION. THE EXISTING BRIDGE IS IN POOR CONDITION AND HAS AN UNKNOWN LOAD CAPACITY. USE
OF THIS STRUCTURE IS AT THE CONSTRUCTION AGENT'S OWN RISK.
CONSTRUCTION TIMING: THE CONSTRUCTION AGENT IS RESPONSIBLE FOR COORDINATING CONSTRUCTION TIMING WITH ALL
APPLICABLE RESOURCE SPECIALISTS.
FIELD WELDING: FIELD WELDING IS NOT PERMITTED ON THIS PROJECT.
CONCRETE: ALL CONCRETE ELEMENTS SHALL BE PRECAST CONCRETE.
EXCAVATION: ALL EXCAVATIONS SHALL COMPLY WITH 29 CFR 1926. ANY EXCESS OR UNSUITABLE MATERIAL SHALL BE DISPOSED OF OUT OF WETLANDS AND APPROVED BY THE HAHNS PEAK/BEARS EARS DISTRICT RANGER.
TOPSOIL/SEEDING: ALL DISTURBED AREAS SHALL BE RECLAIMED AS APPROVED BY THE HAHNS PEAK/BEARS EARS
DISTRICT RANGER.
EQUIPMENT: ALL EQUIPMENT SHALL BE OPERATED AND MAINTAINED IN ACCORDANCE WITH US FOREST SERVICE STANDARDS. ANY IN-STREAM EQUIPMENT USAGE SHALL BE APPROVED BY THE HAHNS PEAK/BEARS EARS RANGER
DISTRICT.
APPROACH DRAINAGE: DRAINAGE SHALL BE PROVIDED BETWEEN THE EAST AND WEST SIDES OF THE SOUTH APPROACH.
DESIGN SHALL BE COORDINATED WITH THE DISTRICT HYDROLOGIST. POTENTIAL SOLUTIONS SHOWN AS OPTIONAL IN THE
SCHEDULE OF ITEMS.
SITE, BORROW, DISPOSAL, AND STAGING AREAS: SITE, BORROW, DISPOSAL, AND STAGING AREA LOCATIONS SHALL BE APPROVED BY THE HAHNS PEAK/BEARS EARS DISTRICT RANGER AND PROVIDE EROSION CONTROL MEASURES CONSISTENT
WITH FS STANDARD TRAIL SPECIFICATION 982.
PROJECT NAME & LOCATION
ITEM NO.
90701
91103
91105
91107
91119
91203
91308
91318
92112
92101
92401
92404
96402
96404
96502
98102
98202
U.S. DEPARTMENT OF AGRICULTURE
t'fi FOREST SERVICE
~ ROCKY MOUNTAIN REGION
ELKHORN TRAIL BRIDGE REPLACEMENT
MEDICINE BOW ROUTT NATIONAL FOREST
HAHNS PEAK/BEARS EARS RANGER DISTRICT
SCHEDULE OF ITEMS
DESCRIPTION METHOD OF TOTAL MEASUREMENT
MOBILIZATION LS 1
EXCAVATION LS 1
BORROW LS 1
EXISTING TRAIL RESTORATION - INCLUDES ANY WORK ON THE TRAIL BETWEEN STAGING AREA LS 1
AND BRIDGE TO FACILITATE MATERIAL TRANSPORTATION
DRAINAGE STRUCTURES, REMOVAL EA 1
CLEARING AND GRUBBING LS 1
BASE COURSE AND AGGREGATE SURFACING - INCLUDES ALL MATERIAL TO CONSTRUCT APPROACHES LS 1
COMPACTION METHOD A OR B
RIPRAP SURFACING CLASS 1 - INCLUDES ALL RIPRAP TO PROTECT APPROACH SLOPES AND
ABUTMENTS INCLUDES GEOTEXTILE AND ALL ANCILLARY COMPONENTS SF 500
BOTTOMLESS ARCH CULVERT - OPTIONAL, DESIGNED BY OTHERS
CULVERT - OPTIONAL, DESIGNED BY OTHERS
ROCK UNDERDRAIN - OPTIONAL, DESIGNED BY OTHERS
SHEET UNDERDRAIN - OPTIONAL, DESIGNED BY OTHERS
PREFABRICATED TRAIL BRIDGE - FRP OR STEEL, INCLUDES GRADE BEAMS, MANUFACTURER'S LS 1
REPRESENTATIVE, ALL ANCILLARY ITEMS, AND ROAD TRANSPORTATION TO STAGING AREA.
HELICOPTER TRANSPORTATION - OPTIONAL. INCLUDES ALL COSTS ASSOCIATED WITH TRANSPORTATION
OF COMPONENTS BY HELICOPTER FROM STAGING AREA TO PROJECT SITE. LS 1
TRAIL BRIDGE SUBSTRUCTURE - INCLUDES GABION BASKETS, GEOCELL, AND GEOTEXTILE. LS 1
SEEDING LS 1
EROSION CONTROL LS 1
DRAWING NAME REVISION DATE SHEET
12/10/2025
GENERAL NOTES & QUANTITIES 2 OF 8
NOTTO SCALE
0+00 NORTH REBAR
ELEVATION 100'.
NEW TRUSS
SUPERSTRUCTURE
NOTES:
RIPRAP (32 CY)
1.5: 1 FILL SLOPES
BRIDGE APPROACH TO BE DESIGNED AND CONSTRUCTED BY CONSTRUCTION AGENT. LAYOUT AND
QUANTITIES SHOWN ARE FOR ESTIMATION PURPOSES ONLY. FILL SLOPES SHALL BE COVERED BY RIPRAP
TO STABILIZE SOIL AND PREVENT EROSION DURING HIGH FLOWS.
PLAN
CONSTRUCT SLOPE TO
TRAIL MATERIAL
(36 CY)
------------------- 85.0' -------------------
TMO AND FS STANDARD TRAIL
SPECIFICATIONS.
6" GEOCELL
NORTH ABUTMENT
TO REMAIN IN PLACE.
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
STANDARD TRAIL PLAN
EXISTING
BRIDGE PROFILE
PROJECT NAME & LOCATION
3.7'
FREEBOARD
EXISTING PIER TO
BE REMOVED RIPRAP APRON
BOTH ABUTMENTS SOUTH ABUTMENT
TO BE REOVED
ROUND WATER 1.25
ELOW SURFACE.
GABION BASKET
RIPRAP (10 CY)
PROFILE
~ DRAWING NAME
SITE PLAN AND PROFILE
SECTION TYPICAL ID
OPTIONAL SHEET
UNDERDRAIN PER FS
STANDARD SPEC 920.
REVISION DATE
12/1/25
OPTIONAL CULVERT
PER FS STANDARD
SPEC 920.
SHEET
ELKHORN TRAIL BRIDGE REPLACEMENT
MEDICINE BOW ROUTT NATIONAL FOREST
HAHNS PEAK/BEARS EARS RANGER DISTRICT 900 - GENERAL PP1 NO SCALE
NOTES:
FINAL ELEVATIONS AND
STATIONING WILL BE DETERMINED
AFTER PROCUREMENT OF THE
SUPERSTRUCTURE AND
MANUFACTURER'S SUBMITTALS.
CONSULT WITH THE REGIONAL
BRIDGE ENGINEER TO FINALIZE
COORDINATES.
EXCAVATION SHALL APPROVED
BY THE ENGINEER PRIOR TO
PLACING GABIONS AND GEOCELL.
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
STANDARD TRAIL PLAN
--m g"
LO 9"
I"')
Ol
GRADE BEAM
3' X 3' X 6'
GABION BASKETS
AND
f X 3' X 6'
GABION BASKETS.
3.0'
3.0'
3.0'
3.0'
6" GEOCELL. EXTEND OUTSIDE
OF GRADE BEAM 9" ALL
SIDES.
r-- 6.0' -----1
NORTH ABUTMENT PLAN
~ 0+00 NORTH REBAR
ELEVATION 100'.
EL. 96.6'
EL. 94.1'
6" GEOCELL
GRADE BEAM SEE
SHEET
6 FOR DETAILS
NORTH ABUTMENT
TO REMAIN IN PLACE.
EST. EL. 90.2'
LOW
STREAMBED
SOUTH ABUTMENT PLAN
CLASS 2 SEPARATION
EST. EL. 85.4' ~~ GEOTEXTILE FILTER, I I BOTH ABUTMENTS
~ 2.5' i-9.9' ---
NORTH ABUTMENT PROFILE SOUTH ABUTMENT PROFILE
PROJECT NAME & LOCATION
ELKHORN TRAIL BRIDGE REPLACEMENT
MEDICINE BOW ROUTT NATIONAL FOREST
HAHNS PEAK/BEARS EARS RANGER DISTRICT
~ DRAWING NAME ~ ~ REVISION DATE ~
ABUTMENT PLAN AND PROFILE 12/1/25
SECTION TYPICAL ID
900 - GENERAL PP1 NO SCALE
~"==================~A ~ A
EL. 96.6'
1.0'
EL. 94.1'
EL. 90.1'
3.0'
SHEET
._,. ____ BRIDGE TOTAL WIDTH, ------i
SEE GRADE BEAMS
,__ __ 60" MINIMUM CLEAR WIDTH ------1_,
NOTES:
~::i:~ ::> ::> ::i:
T
3" X 8" MINIMUM,
ROUGH SAWN DECK a:::
I-
PLANKS 0
w
3" X 8" MINIMUM !;.i:
ROUGH SAWN RUNNING (.)
a:: PLANKS CD w a:::
a..
J_
PROVIDE SAFETY RAILS TO PREVENT A 4"
SPHERE FROM PASSING THROUGH THE TRUSS
IN ACCORDANCE WITH MSHTO REQUIREMENTS
TYPICAL STEEL TRUSS SECTION
f a:::
I-w !;.i:
a::
CD
w a:::
a..
i----- BRIDGE TOTAL WIDTH, -----i
SEE GRADE BEAMS
60" MINIMUM CLEAR WIDTH
~ 3" X 8" MINIMUM,
~ ROUGH SAWN DECK
PLANKS
3" X 8" MINIMUM
ROUGH SAWN RUNNING
PLANKS
PROVIDE SAFETY RAILS TO PREVENT A
4" SPHERE FROM PASSING THROUGH
THE TRUSS IN ACCORDANCE WITH
MSHTO REQUIREMENTS
TYPICAL FRP TRUSS SECTION
SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-24) AND STANDARD SPECIFICATIONS FOR CONSTRUCTION OF
TRAILS AND TRAIL BRIDGES ON FOREST SERVICE PROJECTS.
DESIGN: THE DESIGN OF ALL PREFABRICATED BRIDGE SUPERSTRUCTURE ELEMENTS SHALL COMPLY WITH THE MSHTO LRFD GUIDE SPECIFICATION FOR DESIGN OF PEDESTRIAN BRIDGES, CURRENT EDITION; MSHTO LRFD BRIDGE DESIGN SPECIFICATIONS, CURRENT EDITION; AND MSHTO LRFD GUIDE
SPECIFICATIONS FOR THE DESIGN OF FRP PEDESTRIAN BRIDGES, CURRENT EDITION.
SUMBITTALS: THE PREFABRICATED BRIDGE SUPERSTRUCTURE, ABUTMENT (GRADE BEAM) FOUNDATIONS, AND ASSOCIATED DETAILS INCLUDING TIMBER COMPONENTS SHALL BE DESIGNED AND STAMPED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF COLORADO. OBTAIN CONCURRENCE FROM THE REGIONAL BRIDGE ENGINEER AND APPROVAL BY THE CONTRACTING OFFICER FOR THE COMPLETED DESIGN, DRAWINGS, CALCULATIONS, AND
SPECIFICATION PACKAGE. SUBMITTALS MUST BE APPROVED PRIOR TO FABRICATION.
LOADING: 90 PSF PEDESTRIAN LIVE LOAD. 200 PSF SNOW LOAD PER ASCE 7-22. USE DEAD AND SNOW LOADS AS SPECIFIED IN MSHTO LRFD FRP SPECIFICATIONS FOR ALL BRIDGE SUPERSTRUCTURE MATERIALS. WIND LOADS, EQUESTRIAN LOADS, AND VIBRATIONS SHALL BE CONSIDERED. CONSIDER
ANY UNIQUE LOADING DUE TO TRANSPORTATION CONDITIONS.
DEFLECTION: LIVE LOAD DEFLECTION SHALL NOT EXCEED L/360. SNOW LOAD DEFLECTION SHALL NOT EXCEED L/240.
TRANSPORTATION: ACCESS TO THE SITE IS LIMITED TO HELICOPTER AND ATV <50" WIDE. SUPERSTRUCTURE DESIGNER SHALL COORDINATE WITH TRANSPORTER TO ENSURE BRIDGE COMPONENTS ARE SIZED FOR TRANSPORT AND ANY SPECIAL TRANSPORTATION PROVISIONS ARE INCORPORATED.
SHOW TRANSPORTATION CONFIGURATIONS AND WEIGHTS ON SHOP DRAWINGS.
CAMBER: PROVIDE CAMBER FOR 100% OF THE FULL DEAD LOAD DEFLECTION PLUS 1 % OF BRIDGE SPAN.
SUBSTRUCTURE: THE SUBSTRUCTURE WAS DESIGNED BASED ON AN ASSUMED SUPERSTRUCTURE DEAD LOAD. PROVIDE UNFACTORED SUPERSTRUCTURE
DEAD LOADS TO THE REGIONAL BRIDGE ENGINEER.
ERECTION PLAN: THE CONTRACTOR SHALL SUBMIT AN ERECTION PLAN FOR THE PREFABRICATED BRIDGE SUPERSTRUCTURE TO THE C.O. FOR APPROVAL 14 DAYS BEFORE ERECTION IS SCHEDULED. IF ALLOWED BY THE DISTRICT RANGER, TEMPORARY IN-STREAM SUPPORT BENTS MAY BE USED FOR THE ERECTION OF THE PREFABRICATED TRUSS SUPERSTRUCTURE. THE IN-STREAM BENTS SHALL BE CRIBBING, SILLS, CONCRETE BLOCKS OR OTHER SUPPORTS AND SHALL BE PLACED WITH MINIMAL DISTURBANCE WITHIN THE STREAM. ALL MATERIALS TO CONSTRUCT THE TEMPORARY IN-STREAM BENTS SHALL BE REMOVED. THE SUBMITTALS SHALL INCLUDE DRAWINGS INDICATING TEMPORARY BENT LOCATIONS AND DETAILS. THE SUPERSTRUCTURE INSTALLER SHALL INDICATE THE EQUIPMENT AND METHODS PROPOSED TO INSTALL AND REMOVE THE TEMPORARY BENTS AND
ERECT THE NEW PREFABRICATED TRUSS SUPERSTRUCTURE.
PREFABRICATED BRIDGE SUPERSTRUCTURE: PREFABRICATED SUPERSTRUCTURE DESIGN MUST BE A TRUSS CONFIGURATION SIMILAR TO THAT SHOWN ON THE DRAWINGS. ALTERNATE TRUSS CONFIGURATIONS REQUIRE CONCURRENCE BY THE REGIONAL BRIDGE ENGINEER AND APPROVAL BY THE CONTRACTING OFFICER. THE BRIDGE SHALL MAINTAIN THE CLEARANCES ABOVE HIGH WATER INDICATED ON THE BRIDGE ELEVATION. THE BRIDGE CROSS-SECTION SHALL BE DETERMINED BY THE CONTRACTOR BUT SHALL PROVIDE THE WIDTH AND RAILING DETAILS INDICATED ON THE BRIDGE TYPICAL SECTION. THE CONTRACTOR SHALL DETERMINE TRUSS HEIGHT AND THE LOCATION OF THE DECK WITH RESPECT TO THE TOP AND BOTTOM CHORDS (U FRAME VS. H FRAME). OVERHEAD LATERAL BRACING IS UNACCEPTABLE. ALL RELATED DETAILS SUCH AS PROFILE, ABUTMENT DETAILS, BEARINGS, AND TIMBER DECKING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO FINALIZE AND CONSTRUCT.
DRAINAGE: TUBULAR MEMBERS SHALL HAVE WEEP HOLES OR OTHER DRAINAGE MEASURES INCORPORATED AT THE
LOW POINT OF THE MEMBER.
MATERIALS: THE SUPERSTRUCTURE MAY BE CONSTRUCTED FROM STEEL OR FIBER-REINFORCED POLYMER (FRP).
STEEL: USE STEEL SHAPES, PLATES AND BARS OF WEATHERING STEEL CONFORMING TO MSHTO M270, GRADE 50W (ASTM A588 OR ASTM A242) OR ASTM A847 FOR SQUARE AND RECTANGULAR TUBING. USE HIGH STRENGTH BOLTS CONFORMING TO MSHTO M164, (ASTM A325), TYP 3, UNLESS NOTED OTHERWISE. USE MALLEABLE IRON WASHERS
AGAINST WOOD. FOLLOW FP-24, SECTION 555.
FRP: ULTRAVIOLET (UY) LIGHT PROTECTION IS REQUIRED. OBTAIN CONCURRENCE FROM THE REGIONAL BRIDGE ENGINEER FOR THE UV PROTECTION USED. FRP COLOR SHALL BE APPROVED BY THE CONTRACTING OFFICER. USE ERECTION TOLERANCES PER TABLE C9.3.2-1. ENVIRONMENTAL ADJUSTMENT FACTORS - SEVERE EXPOSURE. FOLLOW
FP-24, SECTION 577.
TIMBER & LUMBER: SOLID SAWN TIMBER MEMBERS SHALL CONFORM TO THE REQUIREMENTS OF THE
GRADING RULES AGENCY FOR THE SPECIES, TYPE, AND GRADE SPECIFIED BELOW.
DECK PLANKS AND BACKING PLANKS: COASTAL REGION DOUGLAS FIR - LARCH ROUGH SAWN N0.1 GRADE, GRADING RULES AGENCY - WWPA, WCLIB
RUNNING PLANKS AND RUB RAIL: COASTAL REGION DOUGLAS FIR - LARCH ROUGH SAWN N0.2 GRADE, GRADING RULES AGENCY - WWPA, WCLIB
RAILS, HANDRAILS: TREATED, HEM - FIR/DOUGLAS FIR, S4S, N0.1 GRADE GRADING RULES AGENCY -
WWPA, WCLIB
TIMBER TREATMENT: PRESERVATIVE TREATMENT SHALL BE IN ACCORDANCE WITH THE CURRENT AMERICAN WOOD PROTECTION ASSOCIATION (AWPA) SPECIFICATIONS USING THE TREATMENT MATERIALS LISTED BELOW. TREATMENT WILL COMPLY WITH THE REQUIREMENTS OF THE CURRENT EDITION OF WESTERN WOOD PRESERVERS INSTITUTE (WWPI) "BEST MANAGEMENT PRACTICES FOR THE USE OF TREATED WOOD
IN AQUATIC ENVIRONMENTS".
DECKING, RUNNING PLANKS, BACKING PLANKS, CRIBS, TIMBER WALLS, TREATED:
AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 4C (UC4C)
COPPER NAPHTHENATE (CuN) IN HYDROCARBON (TYPE A SOLVENT)
RAILINGS, TREATED:
AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 4A (UC4A)
COPPER NAPHTHENATE (CuN) IN HYDROCARBON (TYPE A SOLVENT)
FIELD TREATMENT: FURNISH COPPER NAPHTHENATE (2% SOLUTION) FOR FIELD TREATING TIMBER COMPONENTS. ALL ABRASIONS AND FIELD CUTS SHALL BE CAREFULLY TRIMMED AND GIVEN THREE BRUSH COATS OF THE FIELD TREATMENT SOLUTION. WHERE APPROVED FIELD DRILLING OF BOLT OR NAIL HOLES IS REQUIRED, THE HOLES SHALL BE FILLED WITH PRESERVATIVE PRIOR TO INSERTING THE
FASTENERS.
TIMBER FABRICATION: SUBMIT SHOP DRAWINGS FOR ALL TIMBER BRIDGE COMPONENTS (EXCEPT TIMBER RUNNING PLANKS). SHOW ALL DIMENSIONS AND FABRICATION DETAILS FOR ALL CUT OR BORED TIMBER.
FIELD DRILLING OF HOLES SHALL NOT BE ALLOWED UNLESS OTHERWISE NOTED ON THE PLANS.
INSTALLATION: A MANUFACTURER'S REPRESENTATIVE SHALL BE PRESENT ON-SITE TO OVERSEE SUPERSTRUCTURE INSTALLATION AND SHALL CERTIFY IN WRITING THAT THE INSTALLED SUPERSTRUCTURE CONFORMS TO ALL
MANUFACTURER'S REQUIREMENTS.
U.S. DEPARTMENT OF AGRICULTURE PROJECT NAME & LOCATION DRAWING NAME REVISION DATE SHEET f.fi FOREST SERVICE
~ ROCKY MOUNTAIN REGION
ELKHORN TRAIL BRIDGE REPLACEMENT
MEDICINE BOW ROUTT NATIONAL FOREST
HAHNS PEAK/BEARS EARS RANGER DISTRICT
PREFABRICATED SUPERSTRUCTURE
12/10/2025
3" X 10" OR
3" X 12"
TREATED TIMBER
ROUGH SAWN
BACKING
PLANKS
APPROACH
FILL SLOPE
12" ANCHOR
BOLT
NOTES:
non 1 '-0"
BACKWALL WIDTH OUT - TO-OUT
(BRIDGE TOTAL WIDTH + 2' -0" + 2*0)
1 '-0" "o" i---------,-1-----i--------- BRIDGE TOTAL WIDTH ------------1------.i
3"
STRUCTURE
(2)-ANCHOR BOLTS MINIMUM
AT EACH BEARING LOCATION
#4 HOOPS #4 CONTINUOUS EACH FACE
i------------ SPACE #4 HOOPS @ 12" ± ----------.i
OUT-TO-OUT CONCRETE GRADE BEAM
i----------- (BRIDGE TOTAL WIDTH + 3'-0") -------..-i
* STEEL SUPERSTRUCTURE SHOWN. ANNOTATIONS APPLY TO STEEL & FRP.
ELEVATION - GRADE BEAM
3"
RUNNING
ATTACH BACKING
PLANK TO
SUPERSTRUCTURE
FINISH
BACKFILL W/SUITABLE
MATERIAL
3" X 1 O" OR 3" X 12"
TREATED TIMBER ROUGH
SAWN BACKING PLANKS
TOTAL BACKWALL HEIGHT, "D"
AND CONNECTION DETAILS TO
DETERMINED BY CONTRACTOR
3" DIMENSIONAL LUMBER
COMPRESSIBLE JOINT
FILLER AS REQUIRED
FILL SLOPE AT EXTERIOR
FACE OF BACKING PLANKS
ELASTOMERIC
BEARING PAD
(50 DUROMETER)
(4)-#6 CONTINUOUS
TOP AND BOTTOM
(2)-3/4"¢ a307 ANCHOR BOLTS AT EACH
BEARING LOCATION MINIMUM. EMBED 12"
MINIMUM INTO GRADE BEAM.
SLOPE TOP SURFACE OF GRADE
BEAM AS REQUIRED FOR UNIFORM
BEARING. VERIFY CONFIGURATION
WITH TRUSS FABRICATOR.
SPECIFICATIONS: GRADE BEAMS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-24, SECTION 578) AND STANDARD SPECIFICATIONS FOR CONSTRUCTION OF TRAILS AND TRAIL BRIDGES ON
FOREST SERVICE PROJECTS.
PRECAST CONCRETE: USE CLASS A(AE) FOR CONCRETE, f'c = 4000 PSI AT 28 DAYS WITH AN ENTRAINED AIR CONTENT OF 5% ±1%. PROVIDE ALL CONCRETE IN ACCORDANCE WITH AN APPROVED MIX DESIGN. CHAMFER ALL EXPOSED EDGES OF CONCRETE 3/4-INCH.
REINFORCING STEEL: USE REINFORCING STEEL OF THE DEFORMED TYPE CONFORMING TO AASHTO M31 (ASTM A615), GRADE 60. CONCRETE COVER SHALL BE AS SHOWN, WHERE NOT SHOWN IT SHALL CONFORM TO AASHTO. CUT AND BEND STEEL IN ACCORDANCE WITH ACI 315.
GRADE BEAMS: ALTERNATE GRADE BEAMS MAY BE PROPOSED. SPLICES MAY BE ALLOWED TO FACILITATE TRANSPORTATION. COORDINATE WITH REGIONAL BRIDGE ENGINEER WHEN ALTERNATE DESIGNS INCLUDE SPLICES OR CHANGE ELEVATIONS. PREPARE AND SUBMIT SHOP DRAWINGS CONCURRENTLY WITH THE SUPERSTRUCTURE DESIGN. OBTAIN CONCURRENCE FROM THE REGIONAL BRIDGE ENGINEER AND APPROVAL FROM THE CONTRACTING OFFICER PRIOR
TO FABRICATION.
U.S. DEPARTMENT OF AGRICULTURE PROJECT NAME & LOCATION DRAWING NAME
TRUSS END POST
TOE KICK
DECK PLANKS
STRINGER
BOTTOM CHORD
BEARING
ASSEMBLY
BEARING DETAIL
THREAD
PROJECTION
(4)-#6 CONTINUOUS
EQUALLY SPACED
2'-3"
~ 2'-6"
TYPICAL SECTION
#4 HOOPS
@ 12" ±
#4 CONTINUOUS
AT EACH FACE
(4)-#6 CONTINUOUS
EQUALLY SPACED
4 1/2"
REVISION DATE SHEET
12/10/2025 f.fi FOREST SERVICE
~ ROCKY MOUNTAIN REGION
ELKHORN TRAIL BRIDGE REPLACEMENT
MEDICINE BOW ROUTT NATIONAL FOREST
HAHNS PEAK/BEARS EARS RANGER DISTRICT
GRADE BEAM DETAILS 6 OF 8
I
• (X)
FOUNDATION NOTES:
SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN
ACCORDANCE WITH THE STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS AND
BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-24) AND STANDARD SPECIFICATIONS FOR
CONSTRUCTION OF TRAILS AND TRAIL BRIDGES ON FEDERAL PROJECTS,
HARDWARE AND STRUCTURAL STEEL: SEE SUPERSTRUCTURE DRAWINGS FOR PROJECT
DESIGN CRITERIA AND GENERAL NOTES.
GEOCELL ABUTMENT STABILIZATION: REFER TO THE SPECIFICATION 994 FOR GEOTEXTILE
AND GEOCELL SPECIFICATIONS. A
g" g" i----------- OUT-TO-OUT SILL -------------i i------------ OUT-TO-OUT GEOCELL FOUNDATION --------------a--i
ELEVATION - GEOCELL FOUNDATION
* SILL MATERIAL AND DIMENSIONS WILL VARY. REFER TO
SUPERSTRUCTURE SHEETS FOR ACTUAL SILL
DIMENSIONS AND ADJUST GEOCELL AS NEEDED.
SEE BEARING BRACKET AND
ANCHOR BOLT DETAIL
GRADE
BEAM
PLACE GEOCELL ON
UNDISTURBED SOIL PLACE
TYPE IV-A GEOTEXTILE
FABRIC UNDER GEOCELL AND
WRAP OVER TOP AFTER
FILLING WITH SUITABLE
BACKFILL MATERIAL
8"
ABUTMENT
i
SILL
OUT-OUT
GEOCELL
9"
SECTION A-A
3/4" HEX NUT
3/4" PLAIN
WASHER
CONCRETE
ANCHOR BOLT DETAIL
HEAVY HEX NUT
MALLEABLE
IRON WASHER
l 4" .........._____
~ 4" ....::::::::--...:::::::::::-..::::::::=-.=::::: _J_ -------..-_J_ 13/16"(1)
HOLE
METAL STRAP\
U.S.
PLAN
112·T
(TYP)
END VIEW
BEARING BRACKET DETAIL
MATERIAL = A36 L 8" X 8" X 1 /2"
SIDE VIEW
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
PROJECT NAME & LOCATION
ELKHORN TRAIL BRIDGE REPLACEMENT
MEDICINE BOW ROUTT NATIONAL FOREST
HAHNS PEAK/BEARS EARS RANGER DISTRICT
STANDARD TRAIL PLAN
HEAVY HEX NUT
1 1 / 4" X 1 / 4" METAL STRAP
~ DRAWING NAME
NORTH ABUTMENT DETAILS
SECTION lYPICAL ID
965 - TRAIL BRIDGE SUBSTRUCTURES GEO
~ A
REVISION DATE
12/23/25
GEOCELL
ANCHOR BOLT
DETAIL
SHEET 1 OF 1
SHEET
ABUTMENT
SEE BEARING BRACKET AND
ANCHOR BOLT DETAIL
~-~GRADE
---~ BEAM
GABION
ABUTMENT
I
FOUNDATION ~~~--e ..._t-_,_~...,e --t-~~~ ,,,.."' ~~,.-. t-~ ~~'1"11..,_,, t "·1 II" TTTn:-~~,.:i.,.rl""'<..:i~~-,.:i..,.,,,o""',.:i....""""~~~~=--~"'~""",.:i.~~:--~,~~,.:i.,.~,.:i~~-,.:i..,.,,,o"v,: :n::~~,..:i.ll-,~,.:i.,.~,.:i..,-1"t,-;,I 11; iii 3' MIN.
rI11
III
I11 III =~:::::::::::::::::::::::::~:::::::::::::::::~ =ill :::~::::::: 111 114' MAX.
Tl Ill I II Ill I I~ti::~~t---'~~.?-;&._'--'f"\Q._'--',r,c..._'--,f-"'c._Y~c..._'---:P=;:'~r=;:'ti::+=,:~::--'.rw,t-,--'~~.?;;&._'--'f"\Q._~,c._'-flit-'c..._Y~c._'---:H-!' = I 11111 ~~:--'.rxo:~r'\l:l~r'\i5:_'--'A~'-f.L..!:111111~1.I !
,11111 I I I II I I I ~~~~~~~~~~~~~~~~~~~~~~ I 11Tr llI II f'i<::::::f,I~~~~~ 111M!Tr
=Ill Ill - - I Ill Ill Ill 111- I Ill Ill Ill Ill I -111 Ill= Ill =Ill - IW 11 .. 111, 11 111 111 111 111 111 111 111 111 111,, ,111,, ,111,, ,111. .. 111. .. 111 I I I-I I l-III-III-III-I I I-I I l.,..,..,I I I:-:-:-III-III-I I I-I I I-I I I-I =I~cE GABIONS 0 ' 1= 111 _I 11 111. .. 111 III=-
1 1/4" X 1/4"
METAL STRAP
B_J UNDISTURBED SOI
OR COMPACTED FILL ,__ __ 6' __ __,
,__ __________ GABION FOUNDATION --------------i SECTION B-B
ELEVATION - GABION FOUNDATION
t
• co
! 4" ~ ~ 4" 4" ~ _l_
112 .. T
(TYP)
-+- 7~ ~ 7,, 76.,.
~.0' I 1" O;- '-.. k-- 8" =h___
SLOT =h-I t 8 11
~~ _J_
HEAVY HEX NUT
MALLEABLE
IRON WASHER
METAL STRAP \
PLAN END VIEW SIDE VIEW HEAVY HEX NUT t
BEARING BRACKET DETAIL
MATERIAL = A36 L 811 X 8" X 1 /2"
3/4" HEX NUT
3/4" PLAIN
WASHER
PROJECT NAME & LOCATION
CONCRETE
ANCHOR BOLT DETAIL
GABION ANCHOR
BOLT DETAIL
~ DRAWING NAME
FOUNDATION NOTES:
SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS
STRUCTURE SHALL BE IN ACCORDANCE WITH THE STANDARD
SPECIFICATION FOR CONSTRUCTION OF ROADS AND BRIDGES ON
FEDERAL HIGHWAY PROJECTS (FP-24) AND STANDARD
SPECIFICATIONS FOR CONSTRUCTION OF TRAILS AND TRAIL BRIDGES
ON FEDERAL PROJECTS,
HARDWARE AND STRUCTURAL STEEL: SEE SUPERSTRUCTURE
DRAWINGS FOR PROJECT DESIGN CRITERIA AND GENERAL NOTES.
GABION ABUTMENT STABILIZATION: REFER TO THE SPECIAL PROJECT
SPECIFICATIONS FOR A DESCRIPTION OF THE WORK, MATERIALS, AND
INSTALLATION PROCEDURES.
GABION FOUNDATIONS: REFER TO GABION FOUNDATION NOTES.
GABION FOUNDATION NOTES:
1. GABION BASKETS SHALL BE CONSTRUCTED USING WIRE MESH
(U.S. STANDARD GAGE 9). BASKETS CONSTRUCTED USING
TWISTED WIRE MESH WILL NOT BE ALLOWED. WELDED WIRE MESH
SHALL BE POLYVINYL CHLORIDE COATED (PVC) WHERE BASKETS
ARE EXPOSED TO CORROSIVE SOILS.
2. MATERIAL USED TO FILL THE GABION SHALL BE 4-INCH TO
8-INCH HARD, DURABLE, ANGULAR ROCK.
3. ROCK MAY BE PLACED MECHANICALLY PROVIDED CARE IS TAKEN
TO ENSURE THAT IT IS TIGHTLY PACKED WITH A MINIMUM OF
VOIDS. FOR EXPOSED FACES, HAND LABOR SHALL BE USED TO
KEEP THE MESH VERTICAL, PREVENT BULGING, AND TO PRODUCE
AN ATTRACTIVE APPEARANCE.
4. ALL GABIONS SHALL BE PLACED ON UNDISTURBED SOIL OR A
FOUNDATION OF SUITABLE MATERIAL. REMOVE AND REPLACE
UNSUITABLE SOILS WITH A MINIMUM OF 12-INCHES OF COARSE
GRANULAR BACKFILL. COMPACT BACKFILL MATERIAL AT AN
OPTIMUM MOISTURE CONTENT WITH A VIBRATING COMPACTOR.
OPERATE COMPACTION EQUIPMENT OVER THE FULL WIDTH OF THE
FOUNDATION AREA UNTIL VISIBLE DEFORMATION OF THE BACKFILL
CEASES.
5. BACKFILL WITH SUITABLE MATERIAL BEHIND GABIONS
CONCURRENTLY WITH THE CELL FILLING OPERATION. BACKFILL
THE AREA BEHIND GABIONS WITH A COARSE GRANULAR MATERIAL.
COMPACT BACKFILL MATERIAL AT AN OPTIMUM MOISTURE
CONTENT WITH A VIBRATOR COMPACTOR. OPERATE COMPACTION
EQUIPMENT OVER THE FULL WIDTH OF THE IN-FILL AREA UNTIL
VISIBLE DEFORMATION OF THE BACKFILL CEASES.
1/4" 5/8"
T
1 / 4" X 1 / 4" METAL STRAP
REVISION DATE
13/16"¢
HOLE
SHEET
U.S.
DEPARTMENT OF AGRICULTURE
FOREST SERVICE ELKHORN TRAIL BRIDGE REPLACEMENT
MEDICINE BOW ROUTT NATIONAL FOREST
HAHNS PEAK/BEARS EARS RANGER DISTRICT
SOUTH ABUTMENT DETAILS 12/23/25
STANDARD TRAIL PLAN
SECTION TYPICAL ID
965 - TRAIL BRIDGE SUBSTRUCTURES GAB NOTTO SCALE
~ A
File details come from the government source that posted it. Updated .