This document comprises the construction plans for the Elkhorn Trail Bridge Replacement project located on the Medicine Bow Routt National Forest in Routt County, Colorado, administered by the USDA Forest Service Rocky Mountain Region, Hahns Peak/Bears Ears Ranger District.

The project involves replacing an existing bridge with a new 85-foot-long prefabricated truss superstructure designed to accommodate pedestrian and equestrian traffic with a 90 PSF pedestrian live load and 200 PSF snow load. The superstructure may be constructed from either weathering steel or fiber-reinforced polymer (FRP), with design compliance required per AASHTO LRFD specifications and FP-24 standards. The bridge must maintain 3.7 feet of freeboard above the 100-year storm event and include a minimum 60-inch clear deck width with safety railings. Construction requires precast concrete grade beams (3' x 3' x 6'), geocell and gabion basket abutment foundations, riprap slope protection (42 cubic yards total), and trail material placement (36 cubic yards). Key specifications mandate no field welding, all concrete precast, helicopter and ATV-only site access with components under 50 inches wide, and construction compliance with FSM-H 6700 and 29 CFR 1926 safety standards. The contractor must coordinate with the Regional Bridge Engineer regarding final elevations, obtain manufacturer's representative certification during superstructure installation, and coordinate construction timing with applicable resource specialists. The existing bridge superstructure, pier, and south abutment require complete removal and proper disposal. Dewatering during abutment construction and comprehensive erosion control measures are required, with all disturbed areas reclaimed per District Ranger approval.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA

United States Department of Agriculture Forest Service

COLORADO

ROUTT COUNTY

R02 ROCKY MOUNTAIN REGION

MEDICINE BOW ROUTT NATIONAL FOREST

HAHNS PEAK/BEARS EARS RANGER DISTRICT

ELKHORN TRAIL BRIDGE REPLACEMENT PLANS

O N_H __ - --

*--- • knstPnxlumlatlDrMllry

PROJECT LOCATION MAP

TRAVEL DIRECTIONS:

FROM THE TOWN OF HAHNS PEAK VILLAGE, HEAD NORTH ON CO-129 (5.2 Ml).

TURN RIGHT ONTO NFSR 550 (3.8 Ml). TURN LEFT ONTO NFSR 501 (1.8 Ml). TURN RIGHT TO STAY ON NFSR 501 (1.0 Ml). TURN LEFT ONTO NFSR 502.1A (0.5 Ml).

TURN LEFT ONTO NFSR 502 (1.8 Ml). TAKE NFST 1149.1 TO BRIDGE SITE (0.8 Ml).

PROJECT SITE: 40.951625, -106.946277

FOREST LOCATION MAP

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

ROCKY MOUNTAIN REGION

PROJECT NAME & LOCATION

ELKHORN TRAIL BRIDGE REPLACEMENT

MEDICINE BOW ROUTT NATIONAL FOREST

HAHNS PEAK/BEARS EARS RANGER DISTRICT

DRAWING NAME

TITLE

INDEX OF SHEETS

SHEET NO. DESCRIPTION

1 TITLE SHEET

2 GENERAL NOTES AND QUANTITIES

3 SITE PLAN AND PROFILE

4 ABUlMENTS PLAN AND PROFILE

5 PREF AB RICA TED SUPERSTRUCTURE

6 GRADE BEAMS DETAILS

7 NORTH ABUlMENT DETAILS

8 SOUTH ABUTMENT DETAILS

RE~EWED & RECOMMENDED B~

REGIONAL BRIDGE ENGINEER DATE:

LOREN Digitally signed by LOREN

REIMER

REIMER Date: 2026.01.23 08:26:42 -07'00'

FOREST ENGINEER DATE:

APPROVED BY:

DISTRICT RANGER DATE:

DIRECTOR OF ENGINEERING DATE:

REVISION DATE SHEET

12/10/25 1 OF 8

Appendix II: Little Snake River - Elkhorn Trail Bridge Plans

GENERAL NOTES:

SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS PROJECT SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-24), STANDARD SPECIFICATIONS FOR CONSTRUCTION OF TRAILS AND TRAIL BRIDGES ON FOREST SERVICE PROJECTS, AND USDA FOREST SERVICE STANDARD TRAIL PLANS. WHERE CONFLICTS EXIST, FP-24 SHALL CONTROL.

TRANSPORTATION: ACCESS TO THE SITE IS LIMITED TO HELICOPTER AND ATV <50" WIDE. COORDINATE SIZES AND TRANSPORTATION CONFIGURATIONS OF ALL PREFABRICATED COMPONENTS WITH THE TRANSPORTATION AGENT PRIOR TO

FABRICATION.

GEOTECHNICAL REPORT: A GEOTECHNICAL REPORT IS NOT AVAILABLE. ALL EXCAVATIONS SHALL BE APPROVED BY A QUALIFIED ENGINEER WITH USFS NATIONAL CONSTRUCTION CERTIFICATION PROGRAM CREDENTIALS OR A LICENSED

PROFESSIONAL ENGINEER PRIOR TO PLACING BRIDGE FOUNDATIONS.

HYDROLOGY & HYDRAULICS: THE BRIDGE IS DESIGNED FOR A 100-YEAR STORM EVENT PLUS 3' OF FREEBOARD. ANY CHANGES THAT AFFECT THE ELEVATION OF THE LOW MEMBER OF THE SUPERSTRUCTURE SHALL BE COORDINATED WITH

THE REGIONAL BRIDGE ENGINEER PRIOR TO CONSTRUCTION.

SURVEY & STAKING: CONSTRUCTON SURVEYING AND STAKING SHALL BE APPROVED BY THE ENGINEER PRIOR TO EXCAVATION AND/OR CONSTRUCTION AND COMPLY WITH FS STANDARD SPECIFICATION FOR TRAILS 908.

UTILITIES: THE CONSTRUCTION AGENT IS RESPONSIBLE FOR LOCATING, PROTECTING, MAINTAINING SERVICE, AND

COORDINATING OUTAGES FOR ANY UTILITIES IN THE PROJECT AREA.

DEMOLITION: THE EXISTING BRIDGE SUPERSTRUCTURE, PIER, AND SOUTH ABUTMENT SHALL BE REMOVED IN THEIR ENTIRETY. PROPERLY TRANSPORT AND DISPOSE OF ALL MATERIALS IN ACCORDANCE WITH ALL FEDERAL LAWS, STATE LAWS, LOCAL LAWS, AND FOREST STANDARDS.

DEWATERING: FOUNDATION EXCAVATION SHALL BE DEWATERED DURING ABUTMENT CONSTRUCTION. DISCHARGE LOCATION

SHALL BE AT A LOCATION APPROVED BY THE HAHNS PEAK/BEARS EARS DISTRICT RANGER.

TRAFFIC CONTROL: THE HAHNS PEAK/BEARS EARS RANGER DISTRICT IS RESPONSIBLE FOR ALL TRAFFIC CONTROL FOR

THE DURATION OF CONSTRUCTION.

SAFETY: PERFORM ALL ACTIVITIES IN ACCORDANCE WITH FSM-H 6700 AND 29 CFR 1926 AS APPLICABLE.

STRUCTURAL STABILITY: THE CONSTRUCTION AGENT IS RESPONSIBLE FOR STRUCTURAL STABILITY THROUGHOUT CONSTRUCTION. THIS INCLUDES STABILITY OF THE EXISTING BRIDGE DURING REMOVAL AND STABILITY OF THE NEW BRIDGE THROUGHOUT INSTALLATION. THE EXISTING BRIDGE IS IN POOR CONDITION AND HAS AN UNKNOWN LOAD CAPACITY. USE

OF THIS STRUCTURE IS AT THE CONSTRUCTION AGENT'S OWN RISK.

CONSTRUCTION TIMING: THE CONSTRUCTION AGENT IS RESPONSIBLE FOR COORDINATING CONSTRUCTION TIMING WITH ALL

APPLICABLE RESOURCE SPECIALISTS.

FIELD WELDING: FIELD WELDING IS NOT PERMITTED ON THIS PROJECT.

CONCRETE: ALL CONCRETE ELEMENTS SHALL BE PRECAST CONCRETE.

EXCAVATION: ALL EXCAVATIONS SHALL COMPLY WITH 29 CFR 1926. ANY EXCESS OR UNSUITABLE MATERIAL SHALL BE DISPOSED OF OUT OF WETLANDS AND APPROVED BY THE HAHNS PEAK/BEARS EARS DISTRICT RANGER.

TOPSOIL/SEEDING: ALL DISTURBED AREAS SHALL BE RECLAIMED AS APPROVED BY THE HAHNS PEAK/BEARS EARS

DISTRICT RANGER.

EQUIPMENT: ALL EQUIPMENT SHALL BE OPERATED AND MAINTAINED IN ACCORDANCE WITH US FOREST SERVICE STANDARDS. ANY IN-STREAM EQUIPMENT USAGE SHALL BE APPROVED BY THE HAHNS PEAK/BEARS EARS RANGER

DISTRICT.

APPROACH DRAINAGE: DRAINAGE SHALL BE PROVIDED BETWEEN THE EAST AND WEST SIDES OF THE SOUTH APPROACH.

DESIGN SHALL BE COORDINATED WITH THE DISTRICT HYDROLOGIST. POTENTIAL SOLUTIONS SHOWN AS OPTIONAL IN THE

SCHEDULE OF ITEMS.

SITE, BORROW, DISPOSAL, AND STAGING AREAS: SITE, BORROW, DISPOSAL, AND STAGING AREA LOCATIONS SHALL BE APPROVED BY THE HAHNS PEAK/BEARS EARS DISTRICT RANGER AND PROVIDE EROSION CONTROL MEASURES CONSISTENT

WITH FS STANDARD TRAIL SPECIFICATION 982.

PROJECT NAME & LOCATION

ITEM NO.

90701

91103

91105

91107

91119

91203

91308

91318

92112

92101

92401

92404

96402

96404

96502

98102

98202

U.S. DEPARTMENT OF AGRICULTURE

t'fi FOREST SERVICE

~ ROCKY MOUNTAIN REGION

ELKHORN TRAIL BRIDGE REPLACEMENT

MEDICINE BOW ROUTT NATIONAL FOREST

HAHNS PEAK/BEARS EARS RANGER DISTRICT

SCHEDULE OF ITEMS

DESCRIPTION METHOD OF TOTAL MEASUREMENT

MOBILIZATION LS 1

EXCAVATION LS 1

BORROW LS 1

EXISTING TRAIL RESTORATION - INCLUDES ANY WORK ON THE TRAIL BETWEEN STAGING AREA LS 1

AND BRIDGE TO FACILITATE MATERIAL TRANSPORTATION

DRAINAGE STRUCTURES, REMOVAL EA 1

CLEARING AND GRUBBING LS 1

BASE COURSE AND AGGREGATE SURFACING - INCLUDES ALL MATERIAL TO CONSTRUCT APPROACHES LS 1

COMPACTION METHOD A OR B

RIPRAP SURFACING CLASS 1 - INCLUDES ALL RIPRAP TO PROTECT APPROACH SLOPES AND

ABUTMENTS INCLUDES GEOTEXTILE AND ALL ANCILLARY COMPONENTS SF 500

BOTTOMLESS ARCH CULVERT - OPTIONAL, DESIGNED BY OTHERS

CULVERT - OPTIONAL, DESIGNED BY OTHERS

ROCK UNDERDRAIN - OPTIONAL, DESIGNED BY OTHERS

SHEET UNDERDRAIN - OPTIONAL, DESIGNED BY OTHERS

PREFABRICATED TRAIL BRIDGE - FRP OR STEEL, INCLUDES GRADE BEAMS, MANUFACTURER'S LS 1

REPRESENTATIVE, ALL ANCILLARY ITEMS, AND ROAD TRANSPORTATION TO STAGING AREA.

HELICOPTER TRANSPORTATION - OPTIONAL. INCLUDES ALL COSTS ASSOCIATED WITH TRANSPORTATION

OF COMPONENTS BY HELICOPTER FROM STAGING AREA TO PROJECT SITE. LS 1

TRAIL BRIDGE SUBSTRUCTURE - INCLUDES GABION BASKETS, GEOCELL, AND GEOTEXTILE. LS 1

SEEDING LS 1

EROSION CONTROL LS 1

DRAWING NAME REVISION DATE SHEET

12/10/2025

GENERAL NOTES & QUANTITIES 2 OF 8

NOTTO SCALE

0+00 NORTH REBAR

ELEVATION 100'.

NEW TRUSS

SUPERSTRUCTURE

NOTES:

RIPRAP (32 CY)

1.5: 1 FILL SLOPES

BRIDGE APPROACH TO BE DESIGNED AND CONSTRUCTED BY CONSTRUCTION AGENT. LAYOUT AND

QUANTITIES SHOWN ARE FOR ESTIMATION PURPOSES ONLY. FILL SLOPES SHALL BE COVERED BY RIPRAP

TO STABILIZE SOIL AND PREVENT EROSION DURING HIGH FLOWS.

PLAN

CONSTRUCT SLOPE TO

TRAIL MATERIAL

(36 CY)

------------------- 85.0' -------------------

TMO AND FS STANDARD TRAIL

SPECIFICATIONS.

6" GEOCELL

NORTH ABUTMENT

TO REMAIN IN PLACE.

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

STANDARD TRAIL PLAN

EXISTING

BRIDGE PROFILE

PROJECT NAME & LOCATION

3.7'

FREEBOARD

EXISTING PIER TO

BE REMOVED RIPRAP APRON

BOTH ABUTMENTS SOUTH ABUTMENT

TO BE REOVED

ROUND WATER 1.25

ELOW SURFACE.

GABION BASKET

RIPRAP (10 CY)

PROFILE

~ DRAWING NAME

SITE PLAN AND PROFILE

SECTION TYPICAL ID

OPTIONAL SHEET

UNDERDRAIN PER FS

STANDARD SPEC 920.

REVISION DATE

12/1/25

OPTIONAL CULVERT

PER FS STANDARD

SPEC 920.

SHEET

ELKHORN TRAIL BRIDGE REPLACEMENT

MEDICINE BOW ROUTT NATIONAL FOREST

HAHNS PEAK/BEARS EARS RANGER DISTRICT 900 - GENERAL PP1 NO SCALE

NOTES:

FINAL ELEVATIONS AND

STATIONING WILL BE DETERMINED

AFTER PROCUREMENT OF THE

SUPERSTRUCTURE AND

MANUFACTURER'S SUBMITTALS.

CONSULT WITH THE REGIONAL

BRIDGE ENGINEER TO FINALIZE

COORDINATES.

EXCAVATION SHALL APPROVED

BY THE ENGINEER PRIOR TO

PLACING GABIONS AND GEOCELL.

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

STANDARD TRAIL PLAN

--m g"

LO 9"

I"')

Ol

GRADE BEAM

3' X 3' X 6'

GABION BASKETS

AND

f X 3' X 6'

GABION BASKETS.

3.0'

3.0'

3.0'

3.0'

6" GEOCELL. EXTEND OUTSIDE

OF GRADE BEAM 9" ALL

SIDES.

r-- 6.0' -----1

NORTH ABUTMENT PLAN

~ 0+00 NORTH REBAR

ELEVATION 100'.

EL. 96.6'

EL. 94.1'

6" GEOCELL

GRADE BEAM SEE

SHEET

6 FOR DETAILS

NORTH ABUTMENT

TO REMAIN IN PLACE.

EST. EL. 90.2'

LOW

STREAMBED

SOUTH ABUTMENT PLAN

CLASS 2 SEPARATION

EST. EL. 85.4' ~~ GEOTEXTILE FILTER, I I BOTH ABUTMENTS

~ 2.5' i-9.9' ---

NORTH ABUTMENT PROFILE SOUTH ABUTMENT PROFILE

PROJECT NAME & LOCATION

ELKHORN TRAIL BRIDGE REPLACEMENT

MEDICINE BOW ROUTT NATIONAL FOREST

HAHNS PEAK/BEARS EARS RANGER DISTRICT

~ DRAWING NAME ~ ~ REVISION DATE ~

ABUTMENT PLAN AND PROFILE 12/1/25

SECTION TYPICAL ID

900 - GENERAL PP1 NO SCALE

~"==================~A ~ A

EL. 96.6'

1.0'

EL. 94.1'

EL. 90.1'

3.0'

SHEET

._,. ____ BRIDGE TOTAL WIDTH, ------i

SEE GRADE BEAMS

,__ __ 60" MINIMUM CLEAR WIDTH ------1_,

NOTES:

~::i:~ ::> ::> ::i:

T

3" X 8" MINIMUM,

ROUGH SAWN DECK a:::

I-

PLANKS 0

w

3" X 8" MINIMUM !;.i:

ROUGH SAWN RUNNING (.)

a:: PLANKS CD w a:::

a..

J_

PROVIDE SAFETY RAILS TO PREVENT A 4"

SPHERE FROM PASSING THROUGH THE TRUSS

IN ACCORDANCE WITH MSHTO REQUIREMENTS

TYPICAL STEEL TRUSS SECTION

f a:::

I-w !;.i:

a::

CD

w a:::

a..

i----- BRIDGE TOTAL WIDTH, -----i

SEE GRADE BEAMS

60" MINIMUM CLEAR WIDTH

~ 3" X 8" MINIMUM,

~ ROUGH SAWN DECK

PLANKS

3" X 8" MINIMUM

ROUGH SAWN RUNNING

PLANKS

PROVIDE SAFETY RAILS TO PREVENT A

4" SPHERE FROM PASSING THROUGH

THE TRUSS IN ACCORDANCE WITH

MSHTO REQUIREMENTS

TYPICAL FRP TRUSS SECTION

SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-24) AND STANDARD SPECIFICATIONS FOR CONSTRUCTION OF

TRAILS AND TRAIL BRIDGES ON FOREST SERVICE PROJECTS.

DESIGN: THE DESIGN OF ALL PREFABRICATED BRIDGE SUPERSTRUCTURE ELEMENTS SHALL COMPLY WITH THE MSHTO LRFD GUIDE SPECIFICATION FOR DESIGN OF PEDESTRIAN BRIDGES, CURRENT EDITION; MSHTO LRFD BRIDGE DESIGN SPECIFICATIONS, CURRENT EDITION; AND MSHTO LRFD GUIDE

SPECIFICATIONS FOR THE DESIGN OF FRP PEDESTRIAN BRIDGES, CURRENT EDITION.

SUMBITTALS: THE PREFABRICATED BRIDGE SUPERSTRUCTURE, ABUTMENT (GRADE BEAM) FOUNDATIONS, AND ASSOCIATED DETAILS INCLUDING TIMBER COMPONENTS SHALL BE DESIGNED AND STAMPED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF COLORADO. OBTAIN CONCURRENCE FROM THE REGIONAL BRIDGE ENGINEER AND APPROVAL BY THE CONTRACTING OFFICER FOR THE COMPLETED DESIGN, DRAWINGS, CALCULATIONS, AND

SPECIFICATION PACKAGE. SUBMITTALS MUST BE APPROVED PRIOR TO FABRICATION.

LOADING: 90 PSF PEDESTRIAN LIVE LOAD. 200 PSF SNOW LOAD PER ASCE 7-22. USE DEAD AND SNOW LOADS AS SPECIFIED IN MSHTO LRFD FRP SPECIFICATIONS FOR ALL BRIDGE SUPERSTRUCTURE MATERIALS. WIND LOADS, EQUESTRIAN LOADS, AND VIBRATIONS SHALL BE CONSIDERED. CONSIDER

ANY UNIQUE LOADING DUE TO TRANSPORTATION CONDITIONS.

DEFLECTION: LIVE LOAD DEFLECTION SHALL NOT EXCEED L/360. SNOW LOAD DEFLECTION SHALL NOT EXCEED L/240.

TRANSPORTATION: ACCESS TO THE SITE IS LIMITED TO HELICOPTER AND ATV <50" WIDE. SUPERSTRUCTURE DESIGNER SHALL COORDINATE WITH TRANSPORTER TO ENSURE BRIDGE COMPONENTS ARE SIZED FOR TRANSPORT AND ANY SPECIAL TRANSPORTATION PROVISIONS ARE INCORPORATED.

SHOW TRANSPORTATION CONFIGURATIONS AND WEIGHTS ON SHOP DRAWINGS.

CAMBER: PROVIDE CAMBER FOR 100% OF THE FULL DEAD LOAD DEFLECTION PLUS 1 % OF BRIDGE SPAN.

SUBSTRUCTURE: THE SUBSTRUCTURE WAS DESIGNED BASED ON AN ASSUMED SUPERSTRUCTURE DEAD LOAD. PROVIDE UNFACTORED SUPERSTRUCTURE

DEAD LOADS TO THE REGIONAL BRIDGE ENGINEER.

ERECTION PLAN: THE CONTRACTOR SHALL SUBMIT AN ERECTION PLAN FOR THE PREFABRICATED BRIDGE SUPERSTRUCTURE TO THE C.O. FOR APPROVAL 14 DAYS BEFORE ERECTION IS SCHEDULED. IF ALLOWED BY THE DISTRICT RANGER, TEMPORARY IN-STREAM SUPPORT BENTS MAY BE USED FOR THE ERECTION OF THE PREFABRICATED TRUSS SUPERSTRUCTURE. THE IN-STREAM BENTS SHALL BE CRIBBING, SILLS, CONCRETE BLOCKS OR OTHER SUPPORTS AND SHALL BE PLACED WITH MINIMAL DISTURBANCE WITHIN THE STREAM. ALL MATERIALS TO CONSTRUCT THE TEMPORARY IN-STREAM BENTS SHALL BE REMOVED. THE SUBMITTALS SHALL INCLUDE DRAWINGS INDICATING TEMPORARY BENT LOCATIONS AND DETAILS. THE SUPERSTRUCTURE INSTALLER SHALL INDICATE THE EQUIPMENT AND METHODS PROPOSED TO INSTALL AND REMOVE THE TEMPORARY BENTS AND

ERECT THE NEW PREFABRICATED TRUSS SUPERSTRUCTURE.

PREFABRICATED BRIDGE SUPERSTRUCTURE: PREFABRICATED SUPERSTRUCTURE DESIGN MUST BE A TRUSS CONFIGURATION SIMILAR TO THAT SHOWN ON THE DRAWINGS. ALTERNATE TRUSS CONFIGURATIONS REQUIRE CONCURRENCE BY THE REGIONAL BRIDGE ENGINEER AND APPROVAL BY THE CONTRACTING OFFICER. THE BRIDGE SHALL MAINTAIN THE CLEARANCES ABOVE HIGH WATER INDICATED ON THE BRIDGE ELEVATION. THE BRIDGE CROSS-SECTION SHALL BE DETERMINED BY THE CONTRACTOR BUT SHALL PROVIDE THE WIDTH AND RAILING DETAILS INDICATED ON THE BRIDGE TYPICAL SECTION. THE CONTRACTOR SHALL DETERMINE TRUSS HEIGHT AND THE LOCATION OF THE DECK WITH RESPECT TO THE TOP AND BOTTOM CHORDS (U FRAME VS. H FRAME). OVERHEAD LATERAL BRACING IS UNACCEPTABLE. ALL RELATED DETAILS SUCH AS PROFILE, ABUTMENT DETAILS, BEARINGS, AND TIMBER DECKING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO FINALIZE AND CONSTRUCT.

DRAINAGE: TUBULAR MEMBERS SHALL HAVE WEEP HOLES OR OTHER DRAINAGE MEASURES INCORPORATED AT THE

LOW POINT OF THE MEMBER.

MATERIALS: THE SUPERSTRUCTURE MAY BE CONSTRUCTED FROM STEEL OR FIBER-REINFORCED POLYMER (FRP).

STEEL: USE STEEL SHAPES, PLATES AND BARS OF WEATHERING STEEL CONFORMING TO MSHTO M270, GRADE 50W (ASTM A588 OR ASTM A242) OR ASTM A847 FOR SQUARE AND RECTANGULAR TUBING. USE HIGH STRENGTH BOLTS CONFORMING TO MSHTO M164, (ASTM A325), TYP 3, UNLESS NOTED OTHERWISE. USE MALLEABLE IRON WASHERS

AGAINST WOOD. FOLLOW FP-24, SECTION 555.

FRP: ULTRAVIOLET (UY) LIGHT PROTECTION IS REQUIRED. OBTAIN CONCURRENCE FROM THE REGIONAL BRIDGE ENGINEER FOR THE UV PROTECTION USED. FRP COLOR SHALL BE APPROVED BY THE CONTRACTING OFFICER. USE ERECTION TOLERANCES PER TABLE C9.3.2-1. ENVIRONMENTAL ADJUSTMENT FACTORS - SEVERE EXPOSURE. FOLLOW

FP-24, SECTION 577.

TIMBER & LUMBER: SOLID SAWN TIMBER MEMBERS SHALL CONFORM TO THE REQUIREMENTS OF THE

GRADING RULES AGENCY FOR THE SPECIES, TYPE, AND GRADE SPECIFIED BELOW.

DECK PLANKS AND BACKING PLANKS: COASTAL REGION DOUGLAS FIR - LARCH ROUGH SAWN N0.1 GRADE, GRADING RULES AGENCY - WWPA, WCLIB

RUNNING PLANKS AND RUB RAIL: COASTAL REGION DOUGLAS FIR - LARCH ROUGH SAWN N0.2 GRADE, GRADING RULES AGENCY - WWPA, WCLIB

RAILS, HANDRAILS: TREATED, HEM - FIR/DOUGLAS FIR, S4S, N0.1 GRADE GRADING RULES AGENCY -

WWPA, WCLIB

TIMBER TREATMENT: PRESERVATIVE TREATMENT SHALL BE IN ACCORDANCE WITH THE CURRENT AMERICAN WOOD PROTECTION ASSOCIATION (AWPA) SPECIFICATIONS USING THE TREATMENT MATERIALS LISTED BELOW. TREATMENT WILL COMPLY WITH THE REQUIREMENTS OF THE CURRENT EDITION OF WESTERN WOOD PRESERVERS INSTITUTE (WWPI) "BEST MANAGEMENT PRACTICES FOR THE USE OF TREATED WOOD

IN AQUATIC ENVIRONMENTS".

DECKING, RUNNING PLANKS, BACKING PLANKS, CRIBS, TIMBER WALLS, TREATED:

AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 4C (UC4C)

COPPER NAPHTHENATE (CuN) IN HYDROCARBON (TYPE A SOLVENT)

RAILINGS, TREATED:

AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 4A (UC4A)

COPPER NAPHTHENATE (CuN) IN HYDROCARBON (TYPE A SOLVENT)

FIELD TREATMENT: FURNISH COPPER NAPHTHENATE (2% SOLUTION) FOR FIELD TREATING TIMBER COMPONENTS. ALL ABRASIONS AND FIELD CUTS SHALL BE CAREFULLY TRIMMED AND GIVEN THREE BRUSH COATS OF THE FIELD TREATMENT SOLUTION. WHERE APPROVED FIELD DRILLING OF BOLT OR NAIL HOLES IS REQUIRED, THE HOLES SHALL BE FILLED WITH PRESERVATIVE PRIOR TO INSERTING THE

FASTENERS.

TIMBER FABRICATION: SUBMIT SHOP DRAWINGS FOR ALL TIMBER BRIDGE COMPONENTS (EXCEPT TIMBER RUNNING PLANKS). SHOW ALL DIMENSIONS AND FABRICATION DETAILS FOR ALL CUT OR BORED TIMBER.

FIELD DRILLING OF HOLES SHALL NOT BE ALLOWED UNLESS OTHERWISE NOTED ON THE PLANS.

INSTALLATION: A MANUFACTURER'S REPRESENTATIVE SHALL BE PRESENT ON-SITE TO OVERSEE SUPERSTRUCTURE INSTALLATION AND SHALL CERTIFY IN WRITING THAT THE INSTALLED SUPERSTRUCTURE CONFORMS TO ALL

MANUFACTURER'S REQUIREMENTS.

U.S. DEPARTMENT OF AGRICULTURE PROJECT NAME & LOCATION DRAWING NAME REVISION DATE SHEET f.fi FOREST SERVICE

~ ROCKY MOUNTAIN REGION

ELKHORN TRAIL BRIDGE REPLACEMENT

MEDICINE BOW ROUTT NATIONAL FOREST

HAHNS PEAK/BEARS EARS RANGER DISTRICT

PREFABRICATED SUPERSTRUCTURE

12/10/2025

3" X 10" OR

3" X 12"

TREATED TIMBER

ROUGH SAWN

BACKING

PLANKS

APPROACH

FILL SLOPE

12" ANCHOR

BOLT

NOTES:

non 1 '-0"

BACKWALL WIDTH OUT - TO-OUT

(BRIDGE TOTAL WIDTH + 2' -0" + 2*0)

1 '-0" "o" i---------,-1-----i--------- BRIDGE TOTAL WIDTH ------------1------.i

3"

STRUCTURE

(2)-ANCHOR BOLTS MINIMUM

AT EACH BEARING LOCATION

#4 HOOPS #4 CONTINUOUS EACH FACE

i------------ SPACE #4 HOOPS @ 12" ± ----------.i

OUT-TO-OUT CONCRETE GRADE BEAM

i----------- (BRIDGE TOTAL WIDTH + 3'-0") -------..-i

* STEEL SUPERSTRUCTURE SHOWN. ANNOTATIONS APPLY TO STEEL & FRP.

ELEVATION - GRADE BEAM

3"

RUNNING

ATTACH BACKING

PLANK TO

SUPERSTRUCTURE

FINISH

BACKFILL W/SUITABLE

MATERIAL

3" X 1 O" OR 3" X 12"

TREATED TIMBER ROUGH

SAWN BACKING PLANKS

TOTAL BACKWALL HEIGHT, "D"

AND CONNECTION DETAILS TO

DETERMINED BY CONTRACTOR

3" DIMENSIONAL LUMBER

COMPRESSIBLE JOINT

FILLER AS REQUIRED

FILL SLOPE AT EXTERIOR

FACE OF BACKING PLANKS

ELASTOMERIC

BEARING PAD

(50 DUROMETER)

(4)-#6 CONTINUOUS

TOP AND BOTTOM

(2)-3/4"¢ a307 ANCHOR BOLTS AT EACH

BEARING LOCATION MINIMUM. EMBED 12"

MINIMUM INTO GRADE BEAM.

SLOPE TOP SURFACE OF GRADE

BEAM AS REQUIRED FOR UNIFORM

BEARING. VERIFY CONFIGURATION

WITH TRUSS FABRICATOR.

SPECIFICATIONS: GRADE BEAMS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-24, SECTION 578) AND STANDARD SPECIFICATIONS FOR CONSTRUCTION OF TRAILS AND TRAIL BRIDGES ON

FOREST SERVICE PROJECTS.

PRECAST CONCRETE: USE CLASS A(AE) FOR CONCRETE, f'c = 4000 PSI AT 28 DAYS WITH AN ENTRAINED AIR CONTENT OF 5% ±1%. PROVIDE ALL CONCRETE IN ACCORDANCE WITH AN APPROVED MIX DESIGN. CHAMFER ALL EXPOSED EDGES OF CONCRETE 3/4-INCH.

REINFORCING STEEL: USE REINFORCING STEEL OF THE DEFORMED TYPE CONFORMING TO AASHTO M31 (ASTM A615), GRADE 60. CONCRETE COVER SHALL BE AS SHOWN, WHERE NOT SHOWN IT SHALL CONFORM TO AASHTO. CUT AND BEND STEEL IN ACCORDANCE WITH ACI 315.

GRADE BEAMS: ALTERNATE GRADE BEAMS MAY BE PROPOSED. SPLICES MAY BE ALLOWED TO FACILITATE TRANSPORTATION. COORDINATE WITH REGIONAL BRIDGE ENGINEER WHEN ALTERNATE DESIGNS INCLUDE SPLICES OR CHANGE ELEVATIONS. PREPARE AND SUBMIT SHOP DRAWINGS CONCURRENTLY WITH THE SUPERSTRUCTURE DESIGN. OBTAIN CONCURRENCE FROM THE REGIONAL BRIDGE ENGINEER AND APPROVAL FROM THE CONTRACTING OFFICER PRIOR

TO FABRICATION.

U.S. DEPARTMENT OF AGRICULTURE PROJECT NAME & LOCATION DRAWING NAME

TRUSS END POST

TOE KICK

DECK PLANKS

STRINGER

BOTTOM CHORD

BEARING

ASSEMBLY

BEARING DETAIL

THREAD

PROJECTION

(4)-#6 CONTINUOUS

EQUALLY SPACED

2'-3"

~ 2'-6"

TYPICAL SECTION

#4 HOOPS

@ 12" ±

#4 CONTINUOUS

AT EACH FACE

(4)-#6 CONTINUOUS

EQUALLY SPACED

4 1/2"

REVISION DATE SHEET

12/10/2025 f.fi FOREST SERVICE

~ ROCKY MOUNTAIN REGION

ELKHORN TRAIL BRIDGE REPLACEMENT

MEDICINE BOW ROUTT NATIONAL FOREST

HAHNS PEAK/BEARS EARS RANGER DISTRICT

GRADE BEAM DETAILS 6 OF 8

I

• (X)

FOUNDATION NOTES:

SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN

ACCORDANCE WITH THE STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS AND

BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-24) AND STANDARD SPECIFICATIONS FOR

CONSTRUCTION OF TRAILS AND TRAIL BRIDGES ON FEDERAL PROJECTS,

HARDWARE AND STRUCTURAL STEEL: SEE SUPERSTRUCTURE DRAWINGS FOR PROJECT

DESIGN CRITERIA AND GENERAL NOTES.

GEOCELL ABUTMENT STABILIZATION: REFER TO THE SPECIFICATION 994 FOR GEOTEXTILE

AND GEOCELL SPECIFICATIONS. A

g" g" i----------- OUT-TO-OUT SILL -------------i i------------ OUT-TO-OUT GEOCELL FOUNDATION --------------a--i

ELEVATION - GEOCELL FOUNDATION

* SILL MATERIAL AND DIMENSIONS WILL VARY. REFER TO

SUPERSTRUCTURE SHEETS FOR ACTUAL SILL

DIMENSIONS AND ADJUST GEOCELL AS NEEDED.

SEE BEARING BRACKET AND

ANCHOR BOLT DETAIL

GRADE

BEAM

PLACE GEOCELL ON

UNDISTURBED SOIL PLACE

TYPE IV-A GEOTEXTILE

FABRIC UNDER GEOCELL AND

WRAP OVER TOP AFTER

FILLING WITH SUITABLE

BACKFILL MATERIAL

8"

ABUTMENT

i

SILL

OUT-OUT

GEOCELL

9"

SECTION A-A

3/4" HEX NUT

3/4" PLAIN

WASHER

CONCRETE

ANCHOR BOLT DETAIL

HEAVY HEX NUT

MALLEABLE

IRON WASHER

l 4" .........._____

~ 4" ....::::::::--...:::::::::::-..::::::::=-.=::::: _J_ -------..-_J_ 13/16"(1)

HOLE

METAL STRAP\

U.S.

PLAN

112·T

(TYP)

END VIEW

BEARING BRACKET DETAIL

MATERIAL = A36 L 8" X 8" X 1 /2"

SIDE VIEW

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

PROJECT NAME & LOCATION

ELKHORN TRAIL BRIDGE REPLACEMENT

MEDICINE BOW ROUTT NATIONAL FOREST

HAHNS PEAK/BEARS EARS RANGER DISTRICT

STANDARD TRAIL PLAN

HEAVY HEX NUT

1 1 / 4" X 1 / 4" METAL STRAP

~ DRAWING NAME

NORTH ABUTMENT DETAILS

SECTION lYPICAL ID

965 - TRAIL BRIDGE SUBSTRUCTURES GEO

~ A

REVISION DATE

12/23/25

GEOCELL

ANCHOR BOLT

DETAIL

SHEET 1 OF 1

SHEET

ABUTMENT

SEE BEARING BRACKET AND

ANCHOR BOLT DETAIL

~-~GRADE

---~ BEAM

GABION

ABUTMENT

I

FOUNDATION ~~~--e ..._t-_,_~...,e --t-~~~ ,,,.."' ~~,.-. t-~ ~~'1"11..,_,, t "·1 II" TTTn:-~~,.:i.,.rl""'<..:i~~-,.:i..,.,,,o""',.:i....""""~~~~=--~"'~""",.:i.~~:--~,~~,.:i.,.~,.:i~~-,.:i..,.,,,o"v,: :n::~~,..:i.ll-,~,.:i.,.~,.:i..,-1"t,-;,I 11; iii 3' MIN.

rI11

III

I11 III =~:::::::::::::::::::::::::~:::::::::::::::::~ =ill :::~::::::: 111 114' MAX.

Tl Ill I II Ill I I~ti::~~t---'~~.?-;&._'--'f"\Q._'--',r,c..._'--,f-"'c._Y~c..._'---:P=;:'~r=;:'ti::+=,:~::--'.rw,t-,--'~~.?;;&._'--'f"\Q._~,c._'-flit-'c..._Y~c._'---:H-!' = I 11111 ~~:--'.rxo:~r'\l:l~r'\i5:_'--'A~'-f.L..!:111111~1.I !

,11111 I I I II I I I ~~~~~~~~~~~~~~~~~~~~~~ I 11Tr llI II f'i<::::::f,I~~~~~ 111M!Tr

=Ill Ill - - I Ill Ill Ill 111- I Ill Ill Ill Ill I -111 Ill= Ill =Ill - IW 11 .. 111, 11 111 111 111 111 111 111 111 111 111,, ,111,, ,111,, ,111. .. 111. .. 111 I I I-I I l-III-III-III-I I I-I I l.,..,..,I I I:-:-:-III-III-I I I-I I I-I I I-I =I~cE GABIONS 0 ' 1= 111 _I 11 111. .. 111 III=-

1 1/4" X 1/4"

METAL STRAP

B_J UNDISTURBED SOI

OR COMPACTED FILL ,__ __ 6' __ __,

,__ __________ GABION FOUNDATION --------------i SECTION B-B

ELEVATION - GABION FOUNDATION

t

• co

! 4" ~ ~ 4" 4" ~ _l_

112 .. T

(TYP)

-+- 7~ ~ 7,, 76.,.

~.0' I 1" O;- '-.. k-- 8" =h___

SLOT =h-I t 8 11

~~ _J_

HEAVY HEX NUT

MALLEABLE

IRON WASHER

METAL STRAP \

PLAN END VIEW SIDE VIEW HEAVY HEX NUT t

BEARING BRACKET DETAIL

MATERIAL = A36 L 811 X 8" X 1 /2"

3/4" HEX NUT

3/4" PLAIN

WASHER

PROJECT NAME & LOCATION

CONCRETE

ANCHOR BOLT DETAIL

GABION ANCHOR

BOLT DETAIL

~ DRAWING NAME

FOUNDATION NOTES:

SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS

STRUCTURE SHALL BE IN ACCORDANCE WITH THE STANDARD

SPECIFICATION FOR CONSTRUCTION OF ROADS AND BRIDGES ON

FEDERAL HIGHWAY PROJECTS (FP-24) AND STANDARD

SPECIFICATIONS FOR CONSTRUCTION OF TRAILS AND TRAIL BRIDGES

ON FEDERAL PROJECTS,

HARDWARE AND STRUCTURAL STEEL: SEE SUPERSTRUCTURE

DRAWINGS FOR PROJECT DESIGN CRITERIA AND GENERAL NOTES.

GABION ABUTMENT STABILIZATION: REFER TO THE SPECIAL PROJECT

SPECIFICATIONS FOR A DESCRIPTION OF THE WORK, MATERIALS, AND

INSTALLATION PROCEDURES.

GABION FOUNDATIONS: REFER TO GABION FOUNDATION NOTES.

GABION FOUNDATION NOTES:

1. GABION BASKETS SHALL BE CONSTRUCTED USING WIRE MESH

(U.S. STANDARD GAGE 9). BASKETS CONSTRUCTED USING

TWISTED WIRE MESH WILL NOT BE ALLOWED. WELDED WIRE MESH

SHALL BE POLYVINYL CHLORIDE COATED (PVC) WHERE BASKETS

ARE EXPOSED TO CORROSIVE SOILS.

2. MATERIAL USED TO FILL THE GABION SHALL BE 4-INCH TO

8-INCH HARD, DURABLE, ANGULAR ROCK.

3. ROCK MAY BE PLACED MECHANICALLY PROVIDED CARE IS TAKEN

TO ENSURE THAT IT IS TIGHTLY PACKED WITH A MINIMUM OF

VOIDS. FOR EXPOSED FACES, HAND LABOR SHALL BE USED TO

KEEP THE MESH VERTICAL, PREVENT BULGING, AND TO PRODUCE

AN ATTRACTIVE APPEARANCE.

4. ALL GABIONS SHALL BE PLACED ON UNDISTURBED SOIL OR A

FOUNDATION OF SUITABLE MATERIAL. REMOVE AND REPLACE

UNSUITABLE SOILS WITH A MINIMUM OF 12-INCHES OF COARSE

GRANULAR BACKFILL. COMPACT BACKFILL MATERIAL AT AN

OPTIMUM MOISTURE CONTENT WITH A VIBRATING COMPACTOR.

OPERATE COMPACTION EQUIPMENT OVER THE FULL WIDTH OF THE

FOUNDATION AREA UNTIL VISIBLE DEFORMATION OF THE BACKFILL

CEASES.

5. BACKFILL WITH SUITABLE MATERIAL BEHIND GABIONS

CONCURRENTLY WITH THE CELL FILLING OPERATION. BACKFILL

THE AREA BEHIND GABIONS WITH A COARSE GRANULAR MATERIAL.

COMPACT BACKFILL MATERIAL AT AN OPTIMUM MOISTURE

CONTENT WITH A VIBRATOR COMPACTOR. OPERATE COMPACTION

EQUIPMENT OVER THE FULL WIDTH OF THE IN-FILL AREA UNTIL

VISIBLE DEFORMATION OF THE BACKFILL CEASES.

1/4" 5/8"

T

1 / 4" X 1 / 4" METAL STRAP

REVISION DATE

13/16"¢

HOLE

SHEET

U.S.

DEPARTMENT OF AGRICULTURE

FOREST SERVICE ELKHORN TRAIL BRIDGE REPLACEMENT

MEDICINE BOW ROUTT NATIONAL FOREST

HAHNS PEAK/BEARS EARS RANGER DISTRICT

SOUTH ABUTMENT DETAILS 12/23/25

STANDARD TRAIL PLAN

SECTION TYPICAL ID

965 - TRAIL BRIDGE SUBSTRUCTURES GAB NOTTO SCALE

~ A