This document is a Request for Quotation (RFQ) Solicitation Package for the Willamette NF Detroit Ranger Station Detroit Gym Septic System Replacement project.
The scope of work includes removing and replacing the existing 1000-gallon concrete septic tank and drain field at the Detroit Ranger Station in Detroit, OR. The work involves installing a new septic tank with a dosing pump system and a new drain field that meets the approved site plan. The contractor must coordinate the septic drain field location with the Contracting Officer Representative, dig test pits, and obtain the necessary Marion County septic permits. The total estimated value of the contract is between $25,000 and $100,000, and it will be awarded as a Firm Fixed-Price contract with a period of performance of 14 calendar days. This acquisition is a 100% Small Business set-aside, with the applicable NAICS code being 238910 - Site Preparation Contractors. Offerors will be evaluated on past performance, relevant experience, technical approach, and price, and the Government intends to award without discussions, though it reserves the right to conduct discussions. Contractors must be registered in the System for Award Management (SAM) to be eligible for award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 4.pdf | ||
| Questions and answers for Detroit Septic System Replacement_SF.pdf | ||
| 1240BH24Q0045 Amendment 3 SF 30.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
1124748
USDA-FS CSA NORTHWEST 6
1220 SW 3RD AVE
STE 310
PORTLAND OR 97204-2829
40BH
ATTENTION:
Loren Mein loren.mein@usda.gov
LOREN MEIN 218-302-4863
108/13/2024
1240BH24Q0045
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Detroit Gym Building Replace Septic System
Email Offers to: loren.mein@usda.gov CC: stevonne.fuller@usda.gov
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 calendar days and complete it within ________________ 13 _______________ calendar days after receiving
08/27/2024
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 8/2014)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d) lmein Line
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA-FS CSA NORTHWEST 6
1220 SW 3RD AVE
STE 310
PORTLAND OR 97204-2829
40BH
STEVONNE C. FULLER
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 8/2014) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 51
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
1240BH24Q0045
Detroit Gym Building Replace Septic System
Email Offers to: loren.mein@usda.gov
Delivery: 10/03/2024
Delivery Location Code: 04SS
USDA FOREST SERVICE
DETROIT RANGER DISTRICT
HC 73 HIGHWAY 22
MILL CITY OR 97342 US
Period of Performance: 09/30/2024 to 10/14/2024
Replace Septic System for Detroit Gym Building
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
(x)
1240BH24Q0045
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40BH
PORTLAND OR 97204-2829
STE 310
1220 SW 3RD AVE
USDA-FS CSA NORTHWEST 6
08/13/20240002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/05/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Detroit Gym Building Replace Septic System
Email Offers to: loren.mein@usda.gov and CC: stevonne.fuller@usda.gov
FOB: Destination
Period of Performance: 09/30/2024 to 10/14/2024
This amendment 2 is to put this solicitation out on the open market instead of previously solicited MATOC. Amendment 1 was connected to the solicitation on the MATOC and it does not impact amendment 2 or the project moving forward. Responses are due Aug 27, 2024, by 4PM Pacific Time.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STEVONNE C. FULLER
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation No: 1240BH24Q0045 Project Name: Detroit RD Gym Building 1405 Septic Replacement
FAC 2024-05 May 22, 2024
Table of Contents
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SCHEDULE OF ITEMS
B.2 SCHEDULE NOTES
C.1 SCOPE OF CONTRACT
C.2 PROJECT LOCATION
C.3 MAGNITUDE OF CONSTRUCTION PROJECT
C.4 TECHNICAL SPECIFICATIONS
C.5 PRODUCTS
C.6 SUBMITTALS
C.7 EXECUTION
C.8 PREPARATION
C.9 DEMOLITION / REMOVAL OF EXISTING SEPTIC SYSTEM
C.10 CONSTRUCTION
C.11 FINISHING AND CLEANUP
SECTION D--PACKAGING AND MARKING
D.1 PACKING AND MARKING
D.2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE
SECTION E--INSPECTION AND ACCEPTANCE
E.1 CLAUSES
SECTION F--DELIVERIES OR PERFORMANCE
F.1 CLAUSES
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 CLAUSES
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 CLAUSES
H.2 OTHER REQUIREMENTS
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 CLAUSES
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
FAC 2024-05 May 22, 2024
J.1 ATTACHMENTS
PART IV--REPRESENTATIONS AND INSTRUCTIONS
SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND
OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
K.1 PROVISIONS
SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR
RESPONDENTS
L.1 PROVISIONS
L.2 QUOTE PREPARATION INSTRUCTIONS:
SECTION M--EVALUATION FACTORS FOR AWARD
M.1 PROVISIONS
M.2 QUOTE EVALUATION
M.3 TECHNICAL EVALUATION FACTORS
FAC 2024-05 May 22, 2024
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SCHEDULE OF ITEMS
SCHEDULE OF ITEMS
Willamette NF, Detroit Ranger Station
PROJECT TITLE: Detroit RD Gym Bldg 1405 Septic Replacement
Period of Performance: 09/30/2024-10/14/2024
Item Number Description Qty Pay Unit Unit Cost Total Price
0001 Remove Existing Septic System 1 LS $ $ 0002 Install New Septic System 1 LS $ $ 0003 Marion County Septic Permit 1 LS $ $ 0004 Provide Site Drawings/Plan 1 LS $ $
Project Total: $
EA - EACH
LS - LUMP SUM
B.2 SCHEDULE NOTES
1. Anticipated award shall be firm fixed price.
2. This work will commence around September 30, 2024, with 14 days to complete the project.
3. Mobilization - This work shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, labor, and incidentals to the project site, and for bonding costs and all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.
4. Incidentals – All incidental costs associated with this project are to be included in the provided line item pricing and will not be paid separately.
Any and all work associated with this project not included in the listed Schedule of Items shall be considered incidental, including mobilization.
FAC 2024-05 May 22, 2024
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT
The work of this Contract includes all labor and materials required to replace the existing residential septic system at USFS Detroit Ranger Station. This project will remove and replace the existing 1000-gallon concrete septic tank and drain field built during the 1960 era, install a new septic tank with dosing pump system and new drain field that meets the completed and approved, permitted Site Plan provided by Contractor. Contractor will coordinate septic drain field location with Contracting Officer Representative, dig test pits, and obtain Marion County septic permits. Contractor shall submit certifications to Marion County Public Works for the decommissioning of the existing septic system and construction of the new septic system.
Contractors are strongly encouraged to visit this project site prior to submitting their bid to verify the details of the scope of work, including the location of the project and proposed improvements, existing conditions, actual distances, feasibility of the work as described, etc. Contact Roger Bell @ 541 228-2528 for site visits if necessary.
C.2 PROJECT LOCATION
44125 Santiam Hwy SE. Detroit, OR .97342 From Interstate 5 take exit 253 and follow Hwy 22 East approximately 53 miles in Marion County, Oregon.
C.3 MAGNITUDE OF CONSTRUCTION PROJECT
The Government’s estimate is:
between $25,000 and $100,000
C.4 TECHNICAL SPECIFICATIONS
The following photo is included only to give a general idea of the existing conditions.
Contractors are strongly encouraged to visit the project site prior to submitting their bid.
AGAR 452.211-72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)
FAC 2024-05 May 22, 2024
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
Photo #1 – Forest Service Gym Building 1405 Shown from the Front.
Existing system serves a single residence type building that was converted into a Gym for USFS employees. Septic system was built in the 1960s era and includes one 1000-gallon (approximately) concrete septic tank and drain field.
Building is connected to a private water system. All existing water line connections to the building are located on the west side of property, which should not interfere with construction and demolition operations.
Prior to any excavation contractor is responsible for all utility locates.
Property appears nearly level.
Soils are typical of area. Refer to USDA National Cooperative Soil Survey (NCSS) for soil survey information available online https://websoilsurvey.nrcs.usda.gov. No specific site geotechnical reports available.
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
FAC 2024-05 May 22, 2024
REFERENCES
Marion County Onsite Sewage Disposal Program https://www.co.marion.or.us/PW/BuildingInspection/Pages/onsite.aspx Oregon Administrative Rules (OAR) Chapter 340,-Division 71 and 73.
2018 Uniform Plumbing Code (UPC). (Most recent edition) 2017 National Electrical Code (NEC).
C.5 PRODUCTS
GENERAL
All products must be approved by COR before use.
Provide submittals as specified.
Contractor shall be responsible for assuring compatibility between products from different manufacturers.
Refer to and comply with Marion County Sanitation Permit 509-SP19-07142 and Site Plan which shows approved design information and- Technical Specifications (As-applicable). These specifications shall apply to this project except as modified in this SOW.
Refer to and comply with Oregon Administrative Rules (OAR) Chapter 340,-Division 71 and 73
C.6 SUBMITTALS
1. Work Schedule
a. Submit a proposed work schedule detailing the work in sufficient detail to show the approximate days that significant work items and septic system down days, days requiring building access (i.e. mobilization, existing septic system removal and disposal, new septic system excavation and installation, electrical service to control panel (access to residence) for each portion of the project.
b. The Contractor shall complete and pay fees for Marion County Site Evaluation Application, dig test pits and other necessary work for evaluation. Submit completed application copy (pdf format) with fee receipt to CO.
c. The Contractor shall complete and pay fees for Marion County Onsite Sewage Disposal Application. Submit completed application copy (pdf format) with fee receipt to CO.
d. The Contractor shall complete/obtain and pay fees for Marion County Construction- Installation Permit. Submit approved copy (pdf format) with any fee receipt to CO.
e. The Contractor shall allow enough time for review and approval of the schedule at least 7 days in advance of schedule dates (unless otherwise approved) to give Forest Service personnel https://www.co.marion.or.us/PW/BuildingInspection/Pages/onsite.aspx
FAC 2024-05 May 22, 2024 time to prepare for partial closures and other disruptions and access to building.
f. Contractor should plan work schedule to reduce down-time of Gym water supply and sewage system (ie. have parts delivered, unpackaged, assembled, accessories installed, extend new electrical circuit for control panel and install control panel, install new drain field and tanks ready for connection to existing sewage pipe, old system prepared for removal and ready for a quick septic tank change over).
The following shall be submitted on this project:
Title Referenced by
Specification No.
Time of Government Approval After Submittal
Septic Site Plan SOW 14 Days Project Schedule SOW 7 days Product Information SOW (see below) 10 days
(INSERT APPLICABLE TITLE, REFERENCE, AND TIME)
Site Drawings The following site drawings shall be submitted on this project:
Title Referenced by
Specification No.
Time of Government Approval After Submittal
Dosing Tank Locations SOW 7 days Pumping System Location SOW 7 days Distribution Box and Cleanout locations SOW 7 days Drain Field Layout and Location SOW 7 days
(INSERT APPLICABLE TITLE, REFERENCE, AND TIME)
Material Certifications and Testing Reports The following material certifications and/or testing reports shall be submitted on this project:
Title Referenced by
Specification No.
Test pits SOW
(INSERT APPLICABLE TITLE AND REFERENCE)
Product Information
a. Submit manufacturer's product information and installation recommendations for the materials and equipment proposed for use in this Contract.
b. Submit to the Contractor Office Representative (COR) two (2) sets of product data/catalog cut sheets in hard copy or submit a single electronic (pdf) copy of clean, easy to read product sheets.
Product submittals shall include the material data for the product and the manufacturer's installation, operating, and maintenance instructions for all material and equipment that is
FAC 2024-05 May 22, 2024 proposed to be used for this Work.
c. Allow ten (10) working days for Government review of submittals. If resubmittals are necessary, allow ten (10) working days for review of the resubmittals, and so on.
d. Obtain written approval for the above submittals prior to construction, assembly, and delivery.
e. Furnish complete material submittals where possible. Partial submittals will be considered only to allow timely ordering of equipment.
f. Submittals shall have sufficient detail to determine if ratings, characteristics, and physical construction are equivalent to those specified.
g. Where manufacturer's catalog sheets are used, indicate the specific items to be supplied in ink either by arrow, encircled on the sheet, or the inapplicable portion blocked out. List manufacturer's name, contract, section and drawing sheet reference number on each catalog sheet. Identify where equipment is to be used.
h. Submittals shall show any changes to be made resulting from proposed substitution of equipment or materials for those that are specified.
Contractor’s Representation & Responsibility
A. In making formal requests for substitution the Contractor represents he/she:
1. Have investigated proposed products for compatibility with each other.
2. Will provide warranties and bond for products as provided.
3. Will coordinate installation of accepted products into the work and will make such changes as may be required for the work to be complete in all respects.
4. Will waive claims for additional costs for substitutions, which may subsequently become apparent.
5. Cost data is complete and includes related costs under the contract, but not:
a. Costs under separate contracts.
b. Contracting Officer costs for redesign or revision of contract documents.
B. The Contractor assumes full responsibility that the products and procedures proposed will meet the job requirements.
C. The Contractor is solely responsible for the cost of redesign and modifications to this, and other parts of the work caused by the products or alternates furnished.
DOSING SEPTIC TANK
Provide and install ONE 1000-gallon (minimum) double-chamber concrete tank. 1000-gallon minimum septic tank with 500-gallon minimum dosing pump chamber with TWO access risers and lids as shown on detail sheet 1. Contractor has the option to install TWO separate concrete tanks for septic and dosing.
Tank shall be manufactured precast concrete listed and approved by Oregon DEQ.
Contractor shall coordinate delivery and installation of tanks with the manufacturer and CO.
Loads
a. Top = 400 psf
b. Lateral Load = 62.4 pcf
c. Concentrated Wheel Load = 2500 lb
d. The tank shall be capable of withstanding long-term hydrostatic loading, in addition to the soil loading, due to a water table maintained at the ground surface.
e. Soil Bearing = 1500 psf (ensure equal soil bearing).
Concrete
a. The walls and bottom slab shall be poured monolithically.
b. Reinforcing steel shall be ASTM A-615 Grade 60, yield strength of 60,000 psi.
c. Shall have a minimum compressive strength of 4,000 psi in 28 days.
d. Concrete shall be ready mix with cement conforming to ASTM C-150, Type II, and a content of not less than 6.5 sacks per cubic yard and maximum aggregate size of ¾”.
e. Water/cement ratio shall be kept below 0.4.
f. Tanks shall not be moved from the manufacturing site to the job site until the tank has cured for seven (7) days under proper conditions or has reached two –thirds of the design strength.
Proper curing techniques must be used to ensure water tightness.
Riser, Lids, and adapter.
a. Supply black or green lids with bolts; fastening adapters; one (1) 24”- diameter Fiberglass/PVC riser and one (1) 30”-diameter Fiberglass/PVC riser on each tank; tank adapters;
FAC 2024-05 May 22, 2024 bolt down kits; structural adhesives; and other miscellaneous accessories as recommended by the manufacturer and/or needed to yield a proper installation.
b. Risers and Lids shall be watertight and made out of non-corrosive materials. Install stainless steel Tamper Resistant bolts on covers.
PUMPING SYSTEM
Biotube Propak Pump Package.
a. Control Panel. Simplex, Demand Dosing. Weather rated. Building external wall mount.
b. External splice box. Wires from the control panel are spliced with the cords from the pump and float switches.
c. Biotube Pump Vault. Houses float switch assembly, Biotube filter, turbine effluent pump and discharge plumbing assembly.
Float switch assembly.
Float switches affixed via float collars to a quick disconnect float stem are mounted onto the Biotube filter to monitor and control the liquid level inside the tank.
d. Biotube filter. Effluent filter with 1/8-in. (3.2-mm) mesh that removes approximately two-thirds of suspended solids. The Biotube filter can be removed for cleaning without the need to remove the pump or pump vault.
e. 4-inch turbine effluent pump. Select size to meet design flow. The turbine pump moves the filtered effluent to the distribution point. Discharge plumbing assembly. Discharge plumbing assembly connects the pump to the transport line.
f. 5-year manufacturer warranty on pump package.
DISTRIBUTION BOXES
1. Drop boxes must be constructed of durable, watertight materials resistant to deterioration and be designed to accommodate watertight connections for the effluent sewer and header pipes. The top, walls, and bottom of concrete drop boxes must be at least 1-1/2 inches thick. All drop boxes must be able to support an earth load of at least 200 pounds per square foot.
2. Boxes shall be manufactured listed and approved by Oregon DEQ
SITEWORK SEWER PIPE AND FITTINGS
1. Gravity sewer pipe and fittings shall be PVC Schedule 40 DWV pipe meeting ASTM
FAC 2024-05 May 22, 2024
D2665.
2. Pressure sewer pipe and fittings shall be PVC Schedule 80 meeting ASTM D1785.
3. Flexible Couplings.
DRAIN FIELD PIPING, FABRIC, DRAIN MEDIA
1. Materials and products approved by Oregon DEQ for permitted discharge flow.
C.7 EXECUTION
GENERAL
1. Contractor shall provide and install all products, materials, and appurtenances with labor needed to complete the system and work described in accordance with this SOW, Technical Specifications (As Applicable) and/or the manufacturer’s recommendations; Federal, State, and local building codes; and industry standards. In the event of discrepancies between these requirements, the most stringent requirements shall apply, unless otherwise approved in writing by the CO.
2. Complete forms and pay fees for Marion County Site Evaluation Application, Marion County Onsite Sewage Disposal Application, (after application review and approval) Obtain appropriate Septic Permit prior to construction of septic system.
3. There are two steps involved. Step 1 is a Site Evaluation. A Site Evaluation must be done to determine which type and size of system is suitable for your property and circumstances. Once a completed Site Evaluation application is received, an Onsite Wastewater Specialist will evaluate the property. Please allow 2-3 weeks for this part of the process. You will receive a Site Evaluation Report specifying the type and size of septic system required and any special instructions.
4. After you receive a favorable Site Evaluation, Step 2 is submitting an Onsite Sewage Disposal Application for the appropriate permit. This includes submitting additional information depending on the type of system. A permit is required before installing the system. After submitting a complete application, the documents will be reviewed. If approved, a Construction- Installation Permit will be issued. When issued, the property owner or DEQ-licensed septic installer may begin installation according to the permit specifications. After the system is inspected, and receives final approval, a Certificate of Satisfactory Completion will be issued, and you may begin using the system.
5. Please note each step in this process has a separate application and fees, depending on the type of system. The applications, forms and additional information are listed below. To prevent delay, fully complete the application and include any additional documentation as required.
6. Obtain the required inspections and upon completion of construction, submit Septic Site Plan
FAC 2024-05 May 22, 2024 and certifications required by Marion County.
7. Wet weather construction may require erosion and sediment control. Contractor shall comply with Oregon DEQ 1200-C permit requirements if applicable.
C.8 PREPARATION
1. Complete Marion County Site Evaluation to determine septic tank locations and septic drain field layout.
2. The Contractor shall verify the existing site conditions, including indicated dimensions, elevations, and pipe sizes, prior to ordering materials or beginning construction.
3. Coordinate sizes and locations of all work to ensure that the finished product looks and functions properly.
4. Locate and protect all underground utilities that are not designated to be replaced. Consult with Forest Service personnel to locate water pipes and valves, and ensure they are functioning properly, to allow for quick shutoff in case a waterline is damaged during the work.
5. Perform selective demolition in stages as necessary, to allow the existing septic system to remain in service as long as possible. Take reasonable measures to minimize downtime of existing utilities and coordinate expected downtimes.
6. Provide, erect, and maintain orange safety fencing and other security measures, including traffic controls, as necessary to minimize potential safety hazards created by construction activities. The Contractor shall be responsible for maintaining safety measures at all times during the Contract.
C.9 DEMOLITION / REMOVAL OF EXISTING SEPTIC SYSTEM
1. Remove and dispose of existing septic tank as required by Oregon DEQ. Coordinate with CO for inspection of tank after cleaning and prior to backfilling. Pump and clean tank, break bottom for drainage, crush top of tank into base, back fill with clean sand or approved material to eliminate all voids, cover surface with 6-inch-thick compacted topsoil. Provide uniform grading to match surrounding elevations and ensure surface drainage.
2. Abandon existing drain field as required by Oregon DEQ. Remove and dispose (off-site) any existing piping/structures interfering with new construction.
3. Remove and dispose (off-site) of any cleanouts or distribution boxes.
4. Remove and dispose (off-site) of any excavated unsuitable sewage contaminated soil or rock.
FAC 2024-05 May 22, 2024
C.10 CONSTRUCTION
DOSING SEPTIC TANK
a. Install tank in approximate location approved by Marion County Site Evaluation. Contractor shall provide construction staking for horizontal and vertical control of piping.
b. Tank inlet pipe elevation and slope shall align with residence sewer discharge pipe. Connect with flexible coupling.
c. Stockpile excavated soil in approved location. Separate topsoil to be reused.
d. Place tank on 6-inch minimum thick ½ inch minus crushed rock leveling course over undisturbed / compacted soil subgrade approved by CO.
e. Provide dewatering and fill tank to lower buoyancy if needed.
f. Install tank and pump system per manufacturer recommendations / requirements.
g. Install pump system, connect all piping, and pump wiring.
h. Install control panel on exterior wall of residence visible from tank. Extend new dedicated electrical circuit from house control panel to pump control panel.
i. Provide compacted backfill in 24-inch max lifts with 6-inch minimum topsoil.
j. Provide uniform grading to match surrounding elevations and ensure surface drainage away from lids.
SEWER PIPE / DRAIN FIELD
a. Install sewer lines in the approximate alignment, size and lengths approved by Marion County Site Evaluation. Contractor shall provide construction staking for horizontal and vertical control of piping.
b. Stockpile excavated soil in approved location by CO. Separate topsoil to be reused.
c. Support pipe to ensure true alignment and an invert which is smooth and free from roughness or irregularity. When the pipe is in place, fine grade the pipe bedding with hand tools. Support pipe by placing and tamping sufficient pipe bedding along the sides of the pipe to prevent movement.
d. Close open pipe end(s) with a watertight stopper at the end of each workday until system is complete.
FAC 2024-05 May 22, 2024
e. Clean sewer lines of all rocks, dirt, and other debris at the completion of construction.
f. Install piping and clean-outs according manufacturer’s instructions, and code requirements.
g. Do not begin backfilling until pipeline installation is accepted, in writing, by the CO.
h. Marking Tape. Place metallic core marking tape vertically above all buried sewer lines, 8” - 12” below the ground surface during backfilling.
i. Backfill trenching with compacted native backfill, filter fabric, drain media (As Applicable) and 6-inch-thick topsoil. Provide uniform grading to match surrounding elevations and ensure surface drainage.
C.11 FINISHING AND CLEANUP
1. Regrade and restore all areas of excavations and other ground disturbance to approximately match conditions in the immediate vicinity. Spread grass lawn seed over all disturbed areas at rate stated by manufacturer.
2. Dispose of all construction debris legally off Forest Service land.
3. Leave the work site in a safe, clean condition at the end of each workday.
SECTION D--PACKAGING AND MARKING
D.1 PACKING AND MARKING
All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.
D.2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE
The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.
SECTION E--INSPECTION AND ACCEPTANCE
E.1 CLAUSES
FAR 52.246-12 Inspection of Construction (AUG 1996)
SECTION F--DELIVERIES OR PERFORMANCE
F.1 CLAUSES
FAR 52.211-13 Time Extensions (SEP 2000) FAR 52.242-14 Suspension of Work (APR 1984)
FAR 52.211.10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within __14_ calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 10/14/2024. The time stated for completion shall include final cleanup of the premises.
F.2 OTHER REQUIREMENTS
QUALITY ASSURANCE
1. Provide and install all materials in accordance with the product manufacturer’s recommendations; Federal, State, and local building/plumbing/electrical codes; and industry standards.
2. Contractor shall pay and obtain all permits and inspection(s) to complete and make operational, the Onsite Sewage Disposal System, as required through Marion County Land Management Division. Deliver a copy of the Construction-Installation Permit and Certificate of Satisfactory Completion to the COR prior to final payment.
3. Contractor shall complete pipe and tank testing for leaks required by UPC and Oregon DEQ.
4. Contractor shall complete and sign Decommissioned Septic Tank Certification form, Septic Site Plan (As-Built) form, Material List form. Submit all forms to Marion County Public Works for approval and recording, and any other forms required by permit or needed to make system operational. Submit copy to CO.
WARRANTY
Contractor shall be responsible for assembling all applicable warranty information and delivering to the CO prior to final payment. A 1-year construction warranty shall be given to the forest Service for the Septic System.
CONTRACT CLOSEOUT
Prior to final payment, the Contractor shall demonstrate to the CO that the new pump system is working properly.
Prior to final payment, the Contractor shall submit to the CO documentation showing that the
FAC 2024-05 May 22, 2024 installation passed the electrical inspection. Contractor must provide a 1-hour operation instruction training. Also submit applicable documentation on the materials installed, including operation and maintenance manuals, warranties, as-built drawings, permit closeout letters, etc.
MEASUREMENT AND PAYMENT
METHOD OF MEASUREMENT
This Contract involves Base Bid Items. The Contractor shall note that they are required to bid on Base Bid items only.
The method of measurement shall be the Lump Sum Quantity for all work, parts, materials, appearances, labor needed to complete and make system operational and accepted according to SOW All incidental costs associated with this project are to be included in the provided line item pricing and will not be paid separately. Any and all work associated with this project not included in the listed Schedule of Items shall be considered incidental, including mobilization.
Conformity with Drawings and Specifications
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.
A. Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
B. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
C. Government inspections and tests are for the sole benefit of the Government and do not--
1. Relieve the Contractor of responsibility for providing adequate quality control measures.
2. Relieve the Contractor of responsibility for damage to or loss of the material before acceptance.
3. Constitute or imply acceptance; or
4. Affect the continuing rights of the Government after acceptance of the completed work under paragraph (I) below.
D. The presence or absence of a Government inspector does not relieve the Contractor from any
FAC 2024-05 May 22, 2024 contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
E. The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary.
The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
F. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
G. If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.
H. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction.
However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
I. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 CLAUSES
AGAR 452.204-70 Modification for Contract Closeout (DEVIATION JUN 2024)
AGAR 452.215-73 Post Award Conference (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within __7__days after the date of contract award. The conference will be held on Microsoft Teams.
https://www.usda.gov/sites/default/files/documents/agar-class-deviation-contract-closeout-clause.pdf
FAC 2024-05 May 22, 2024
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 CLAUSES
AGAR 452.228-71 Insurance Coverage (NOV 1996)- Alternate I (NOV 1996)
Pursuant to FAR clause FAR 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:
(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.
(b) General Liability. (1) The Contractor shall have bodily injury liability coverage written on a comprehensive form of policy of at least $500,000 per occurrence. (2) The Contractor shall have property damage liability insurance shall be required in the amount of $250,000 per occurrence.
(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.
(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
H.2 OTHER REQUIREMENTS
SAFETY
All work shall be done in accordance with Occupational Safety and Health Act (OSHA) regulations, and all Oregon OSHA requirements.
Identify inherently hazardous conditions that could lead to serious injury or loss of life.
Identify and describe inherently hazardous conditions.
Recognize hazards when contracting for inherently hazardous working conditions.
FAC 2024-05 May 22, 2024
When inherently hazardous conditions exist, the contract should require a written, job-specific safety plan for information and discussion at the post award meeting.
Plan to reduce safety hazards and the costs of litigation.
Make sure that inherently hazardous conditions are documented and are written up in a job-specific Job Hazard Analysis (JHA) for Forest Service employees involved. This will help identify hazards involved in the job.
For each contract evaluate working conditions to determine if specific inherently hazardous conditions will be encountered as part of the needed construction work. If these conditions do exist, they need to be listed in the contract.
PROTECTION OF EXISTING FACILITIES
1. The Contractor shall be responsible for locating and protecting existing structures, trees, and utilities that are not designated for removal during construction operations. In the event of damage to existing structures, trees, or utilities, stop all work associated with the damage, and immediately notify the COR. Repair the damage as directed by the COR at the Contractor’s expense.
2. Contractor shall be given access to the residence for the portions of work identified on work schedule. Gates, doors, and panels shall remain locked when contactor is not present.
3. Vehicles shall remain on roadways. Any operation that will result in soil disturbance that can contribute to the introduction and spread of invasive plants. Mitigations (Executive Order 13112) to reduce this risk include:
a. Reduce ground disturbance to the minimum necessary to complete project.
b. All heavy equipment (excluding passenger vehicles) shall be clean and free of soil, vegetative matter, or other debris that may contain, or hold weed seeds prior to entering National Forest System lands (WO-B/BT 6.36).
LANDSCAPE PRESERVATION
The Contractor shall give attention to the effect of contract operation upon the landscape, shall take care to maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following requirements.
a. Prevention of the Landscape Defacement. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or other natural features or any other improvements in the work area unless specifically authorized by the Contracting Officer. Unless otherwise provided herein, the Contractor shall confine contract operations to within the areas designated in contract documents.
b. Protection of Streams, Lakes, and Reservoirs. The Contractor shall take sufficient precautions
FAC 2024-05 May 22, 2024 to prevent pollution of streams, lakes, small ponds, and reservoirs with fuels, oils, bitumens, calcium chloride, silt, or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the Contracting Officer.
USE OF PREMISES
(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.
(b) Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.
ARCHAEOLOGICAL OR HISTORIC SITES
If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.
CONTROL OF EROSION, SEDIMENTATION, AND POLLUTION
(a) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
(b) Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged on the ground; into or nearby rivers, streams, or impoundments; or into natural or man-made channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
(c) Mechanized equipment shall not be operated in flowing streams without written approval by the Contracting Officer.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 CLAUSES
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR): https://www.acquisition.gov/browse/index/far (Clauses are located at FAR part 52 and begin with 52)
Department of Agriculture Acquisition Regulation (AGAR):https://www.acquisition.gov/agar (Clauses are located at AGAR part 452 and begin with 452)
Deviations to clauses may be viewed at: Policies & Regulations | USDA
FAR 52.203-17 Contractor Employee Whistleblower Rights (NOV 2023) (Whistleblower
Guidance to contractor employees) FAR 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (JAN 2017) FAR 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
(JUN 2020)
FAR 52.204-13 System for Award Management Maintenance (OCT 2018) FAR 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) FAR 52.204-19 Incorporation by Reference of Representations and Certifications (DEC
2014) FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems (NOV
2021) FAR 52.204-23 Prohibition on Contracting for Hardware, Software, and Services
Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) FAR 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment (NOV 2021) FAR 52.204-27 Prohibition on a ByteDance Covered Application (JUN 2023) FAR 52.204-30 Federal Acquisition Supply Chain Security Act Orders—Prohibition (Dec
2023) FAR 52.209-6 Protecting the Government's Interest when Subcontracting with
Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) FAR 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV
2015) FAR 52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) FAR 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/far/part-52 https://www.acquisition.gov/agar…