Amendment 2 - 1240BH21Q0008.pdf
PDF 288 KB Posted
- Attached to
- GAOA Lava River Cave Trail Construction Federal contract opportunity
- Solicitation number
- 1240BH21Q0008
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 6 - 1240BH21Q0008.pdf | ||
| Amendment 5 - 1240BH21Q0008.pdf | ||
| Amendment 4 - 1240BH21Q0008.pdf | ||
| Amendment 3 - 1240BH21Q0008.pdf | ||
| Amendment 1 - 1240BH21Q0008.pdf | ||
| 1240BH21Q0008-SolicitationPacket.pdf | ||
| SF24-BidBondForm.pdf | ||
| 1240BHQ210008-WageDetermination.pdf | ||
| R6-FS-6300-52_FireProtectionSuppression.pdf | ||
| 1240BH21Q0008-ProjectDrawings.pdf | ||
| 1240BH21Q0008-ProjectSpecifications.pdf | ||
| 1240BH21Q0008-RelevantPastPerformance.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
Amendment Two (2)
JANET PAUL, Contracting Officer
GAOA Lava River Cave Trail Construction, Deschutes National Forest
The above referenced solicitation is amended to answer additional questions received to date.
--Please see Page 2 for Q&A document
USDA Forest Service Siuslaw National Forest ATTN: Janet Paul, Contracting 3200 SW Jefferson Way Corvallis, OR 97331
1027247
1240BH21Q0008
1 2
03/18/2021
03/08/2021
JANET PAUL Digitally signed by JANET PAUL Date: 2021.03.18 15:18:54 -07'00'
03/18/2021
Solicitation #: 1240BH21Q0008; Amendment #2, Page 2 of 2 GAOA Lava River Cave Trail Construction
Deschutes National Forest (Deschutes County, Oregon)
Q5: Will the cave be open to the public? If not, can construction begin earlier?
A5: As stated in the solicitation (Section C-6: Project Schedule) the cave is planned to be open to the public until August 23. Bid according to timelines stated in solicitation.
However, in the event the cave is again closed for the season due to COVID, construction may be allowed to start earlier as approved by the CO.
Q6: Will existing wood fence posts at entrance station exit gate be replaced along with the wooden gate being replaced with chainlink?
A6: Yes, replace wood gate posts with new posts, utilizing existing post holes.
Q7: From my fencing subcontractor - per OSHA anytime there is a vertical drop of more than 6' with no guardrail, fall protection is required. Once the existing fence is removed, that situation will occur. The options for tie-offs/anchor points would be trees or drill and set steel posts in concrete, in the rock. The question is whether tying off to trees will be allowed or whether anchors in the ground will be allowed or some combination thereof. And if anchors in the ground are allowed, what will be the rehab requirements? Cutting of posts and leaving in place?
Removing all post and concrete? Something else?
A7: None of the existing fence posts around the top of the sink are being removed.
Your fencing subcontractor will be required to meet OSHA requirements for a tie point. Tying off to trees (outside of the cave sink) is preferable to installing permanent or temporary anchors to keep ground disturbance to a minimum.