This is a Request for Proposal (RFP) for road maintenance, brushing, and logging services on the Umpqua National Forest in Oregon.

The USDA Forest Service seeks a single contractor to provide surface maintenance including blading, rolling, and compaction of forest roads; roadside vegetation cutting; and hazard/obstruction removal (logging out) from July 30, 2026 through December 30, 2026. The contract is firm-fixed-price for commercial services. Specific work includes: 90.60 miles of single-lane road surface maintenance with scarification (Item 0001); 44.82 miles of roller compaction (Item 0002); 39.62 miles of low-volume roadside vegetation cutting with slash reduction (Item 0003); 46.68 miles of high-volume roadside vegetation cutting with slash reduction (Item 0004); 73.54 miles of logging out on primary and secondary roads (Item 0005); and one lump-sum mobilization item (Item 0006). Payment for mobilization is contingent on completion of Items 0001 and 0002. Work will be performed across three ranger districts near Roseburg, Dorena, and Tiller, Oregon. The solicitation is unrestricted and set aside 100% for small business. The NAICS code is 237310 with a $45 size standard. Offer deadline is July 15, 2026 at 1700 PT, with questions due by July 8, 2026 at 1400 PT. Contractors must submit pricing for all items to be considered responsive. Evaluation criteria include relevant past performance, technical capability, traffic control/public safety planning, quality control approach, project schedule, and price. The government will award to the offeror providing the most advantageous proposal considering price and technical factors. All work must comply with the detailed Performance Work Statement specifications regarding road maintenance standards, debris removal, drainage, equipment cleaning, safety, and environmental protection requirements.

View the file

Other files

File Type Posted
C04-5 Fire Plan.doc DOC document
C04-4 Commercial Road Rules Update.pdf PDF
C04-2a Wage Rates Douglas County.pdf PDF
C04-3 Vicinity Maps.pdf PDF
C04-2b Wage Rate Lane County.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

40BE

PORTLAND OR 97204-2829

STE 310

1220 SW 3RD AVE

USDA-FS CSA NORTHWEST 3

04T1 CODE 16. ADMINISTERED BYCODE

X

X

X

237310

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED OR40BE

REQUEST FOR

PROPOSAL

(RFP)

INVITATION

FOR BID (IFB)

10. THIS ACQUISITION ISCODE

REQUEST FOR

QUOTE (RFQ)

14. METHOD OF SOLICITATION

13b. RATING

NORTH AMERICAN INDUSTRY

CLASSIFICATION STANDARD

(NAICS):

SMALL BUSINESS

06/29/2026

458-212-6064JARED MACHGAN

(No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIME

07/15/2026 1700 PT

b. TELEPHONE NUMBERa. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

1240BE26Q0076

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 231167209OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

ROSEBURG OR 97470

2900 NW STEWART PKWY

UMPQUA NATIONAL FOREST

15. DELIVER TO

PORTLAND OR 97204-2829

STE 310

1220 SW 3RD AVE

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$45

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

11.

SEE SCHEDULE

12. DISCOUNT TERMS THIS CONTRACT IS A RATED

ORDER UNDER THE DEFENSE

PRIORITIES AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

8(A)

USDA-FS CSA NORTHWEST 3

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

Surface Blading with rolling, Roadside veg removal and logout on the Umpqua NF

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

XX

DATED

JARED D. MACHGAN

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Government Use Only)

OFFER

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT: REFERENCE

1240BE26Q0076 Umpqua NF Road Maintenance, Brushing and Log Out

Item Supplies/Services Qty Unit of Issue

Unit Price Total Price

0001 811(2) Surface Maint: Single Lane Roads, Scarification required

90.60 Miles

0002 811(5) Roller Compaction: Single Lane Road

44.82 Miles

00003 842(2) Cutting Roadway Veg Low Volume Slash Reduction Required

39.62 Miles

004 842(4) Cutting Roadway Veg High Volume Slash Reduction Required

46.68 Miles

0005** 851(1) Logging Out: Primary and Secondary Roads

73.54 Miles

0006 881(1) Mobilization 1 Lump Sum

Total

Schedule Notes:

a) One award will be made from this solicitation, contractors must submit pricing for all items

b) **Tree DBH and quantity is currently unknown. Highly recommended interested parties perform a self-guided site visit.

c) Period of performance July 30, 2026, to December 30, 2026

d) Water may be required for proper compaction and processing during surface maintenance or rolling. Contractors should consider their timing of these line items and include water if performing this operation in the dry season.

Performance Work Statement

1.0 General Information

1.0 General

This is a non-personal services contract to provide Roadside Brushing and Logging out to the Umpqua National Forest. The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers will be accountable solely to the Contractor who, in turn, is responsible to the Government. Interested parties are highly encouraged to visit the site(s) before submitting an offer.

2.0 Purpose

The purpose of this Contract is for a single Contractor to provide maintenance of forest roads and administrative use roads of the Umpqua National Forest.

3.0 Description of Services

This work includes furnishing labor, equipment, supervision, transportation, operating supplies, and all incidentals necessary to provide road surface maintenance including watering and compaction, removal and end haul of materials, roadside brushing and logout services. The Contractor will provide services in accordance with this Performance Work Statement (PWS), and all applicable federal, state and local laws and regulations.

4.0 Place of performance and Accessibility

Work will be performed on the Umpqua National Forest:

North Umpqua Ranger Station is located in Glide, Oregon, 17 miles east of Roseburg, OR. This office also manages the Diamond Lake Ranger District.

Cottage Grove Ranger Station is located in Dorena, OR, 5 miles east of Cottage Grove, OR.

Tiller Ranger Station is located in Tiller, Oregon, 23 miles east of Canyonville, OR

Vicinity maps are attached to this contract and MVUM maps are available at the Forest Web page https://www.fs.usda.gov/r06/umpqua/maps-guides/motor-vehicle-use-maps

Work areas may be reached by Forest roads that are accessible by a standard two-wheel drive pickup equipped with snow tires and chains, if needed, during normal operating seasons, unless otherwise indicated on Project Maps. Vehicles will not operate off-system roads without prior written approval of the Contracting Officer Representative (COR).

Inaccessibility due to snow, fallen trees, slides or washouts on roads may or may not be corrected at the option of the Government. If road access is blocked, the Government may: (1) provide an alternate access route; (2) delete the inaccessible sub items (s) or; (3) substitute similar sub item(s).

Roads shown on unit maps indicate access to units and do not suggest the roads are open within units or for any further travel.

Use of motorized equipment other than handheld equipment such as power saws and brush cutters will not be permitted off designated roads in the project area without approval of the COR or as hereinafter provided.

No vehicle will bypass any officially blocked road (barriers, locked gates, posted signs, rock/log/dirt, etc.)

without approval of the CO or their representative.

All equipment (brush cutters, loaders, excavators, rollers, etc.) moved to the job site will be cleaned of weeds and their seeds prior to each entrance onto the National Forest lands. Cleaning will consist of the removal of all dirt, grease, debris, and materials that may harbor noxious weeds and their seeds. This may require the use of a pressure hose.

Equipment will be made available for visual inspection by the Forest Service prior to entering National Forest lands. The Contractor will advise of a proposed date for mobilization.

Inspections will take place at mutually agreeable enroute locations in advance of entry onto National Forest lands.

The Contractor will take special care under this Contract to prevent contamination of water at the work sites with any petroleum residues from mechanical equipment operations. This will include daily inspection and cleaning as appropriate.

5.0 Period of Performance

The period of performance will be from July 30, 2026 to December 30, 2026

6.0 Contract Type

The Government will award a Firm-Fixed Price (FFP), Stand-Alone, Service Contract. Contractor will furnish to the Government all services specified in the Schedule of Items and called for by the contract.

7.0 Government Regular Working Hours

The Government's regular working hours are Monday through Friday from 0700 to 1700, except federal holidays or when the government installation is closed due to local or national emergencies, administrative closings, or similar government directed closings.

8.0 Federal Observed Holidays

When a federal holiday occurs on a Saturday, federal employees are normally granted the previous Friday as the holiday observance. When a federal holiday occurs on a Sunday, federal employees are normally granted the following Monday as the holiday observance. Below is the list of recognized federal holidays during the period of performance:

Labor Day – September 7, 2026 Columbus Day – October 12, 2026 Veteran’s Day – November 11, 2026 Thanksgiving Day – November 26, 2026 Christmas Day – December 25, 2026

9.0 Contractor Key Personnel

Contract Manager: The Contractor will provide a Contract Manager or designated alternate, as applicable, who has full authority to act for the Contractor on all contract matters relating to this contract. The Contract Manager or alternate will be available during the Government's regular working hours.

Quality Control Representative: The Contractor will provide a Quality Control Representative who will be responsible for the Contractor’s Quality Control Plan (QCP) to ensure services are performed IAW the PWS.

The Quality Control Representative will implement and maintain full compliance of the QCP throughout the contract period.

10.0 Government Key Personnel

Contracting Officer (CO): The CO is the only person with the authority to: enter into, administer, or terminate contracts; make related determinations and findings on behalf of the government; and legally bind the government. The CO will ensure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO will determine and document the final assessment of the contractor's performance in the government’s past performance tracking system.

Contracting Officer’s Representative (COR): A COR may be assigned to this contract to monitor all technical aspects and assist in contract administration. The COR may be authorized to perform the following functions:

assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communication with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements (without increasing or decreasing contract scope), including Government drawings designs, and specifications; monitor Contractor's performance and notify both the CO and Contractor of deficiencies; and provide site entry of Contractor personnel. The COR is not authorized to change any of the terms and conditions of the contract.

11.0 Post-Award Conference and Periodic Progress Meetings

The Contractor agrees to attend any post award conference convened by the CO and or COR. The CO and/or COR will meet periodically with the Contractor to review the contractor's performance. At these meetings the CO will appraise the Contractor of how the Government views the contractor's performance and the contractor will appraise the Government of problems, if any, being experienced. Appropriate action will be taken to resolve outstanding issues.

12.0 Changes

The government reserves the right to add, remove, or change the items and quantities to be serviced under this contract, as required. Price adjustments for these changes will be based on the rates specified in the Schedule of Items for identical or similar items. Changes will only be authorized by a warranted CO.

13.0 Inspection and Acceptance

Any inspection and acceptance will be at the location specified in the contract. The designated COR will act as the representative of the CO for purposes of inspection and acceptance of services to ensure compliance with the terms, conditions, and specifications of the subject contract. The COR has no authority to make any changes to the terms and conditions of the contract.

14.0 Invoicing and Payment

All contractor invoices will be submitted via the Invoice Processing Platform (IPP) using contract line item numbers (CLINs). The contractor will be required to establish account(s), access method(s), log-in(s), and necessary training in order to submit invoices through IPP. Invoices not submitted via IPP will not be accepted or paid.

Note: The contractor will only invoice for work performed and as authorized by the contract. Payment will be made only for those items listed on the Schedule of Items. All other work is incidental to those pay items.

Security and Safety Requirements

15.0 Security

The contractor will be responsible for safeguarding all government property provided to the contractor for contractor use under this contract. At the close of each work period, all government property will be secured.

16.0 Conduct of Contractor Personnel

The CO may require the contractor to remove from the work site any employee working under this contract for reasons of misconduct, security, or found to be or suspected to be under the influence of alcohol, drugs, or other incapacitating agent. Contractor employees will be subject to dismissal from the premises upon determination by the CO that such action is in the best interests of the government. Such removal from the work site or dismissal from the premises will not relieve the contractor of the requirement to provide sufficient personnel to perform the services as required by this PWS.

17.0 Safety

Contractor activities will be conducted in a safe manner that minimizes accidents as well as any impact on Government operations and members of the public. Contractor will comply with applicable federal, state, and local codes and standards, including safety and occupational health requirements, as well as any additional specific requirement contained in this PWS.

Technical Requirements

18.0 Specific Tasks

The Contractor will provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items and non-personal services necessary to provide roadside brushing and log out to Umpqua NF road systems. The following establishes the required tasks and the minimum acceptable levels of service.

Item 0001 – 811-2 Surface Maintenance, Single Lane, Scarification required Item 0002 – 811-5 Roller Compaction, single lane road

811 Surface Maintenance

Roller compaction will be required on bladed Primary or Secondary Roads when listed as a separate pay item.

Watering of roads in conjunction with blading or rolling of Primary or Secondary Roads may be required if performed during dry season. If water is used, it will be applied to loose, already bladed or scarified materials to enhance compaction. If needed the Contractor is responsible for supplying the water and should be reflected in the Firm Fixed pricing.

Turnouts are typically located and spaced closely enough apart to be intervisible on single lane Primary Roads, and spacing averages between 400 feet and 800 feet apart. Turnout spacing on double lane Primary roads will average between 1000 feet and 1500 feet apart. Turnout spacing on

Secondary and Other Roads will average between 500 feet and 1000 feet apart.

881.05 PAYMENT:

Payment for mobilization will be authorized after line items 0001 and 0002 are completed.

Some turnouts may not have been routinely bladed in past cycles of road blading, and therefore require more shaping, smoothing, and removal of unsuitable materials than the adjacent traveled way.

Turnouts will be shaped and maintained to the full dimensions shown on the Plans wherever practicable.

811.01 SERVICE REQUIRED:

Smooth and shape native or aggregate surfaced roads including traveled way, shoulders, turnouts and intersections. Surface maintenance includes reshaping the crown or slope of traveled way, berms, and drainage dips. Scarification, compaction, or both may be required when shown on the ROAD LISTING.

811.02 PERFORMANCE STANDARD:

Roads

A road surface is maintained to standard when the travel way is free of washboards, potholes, or other irregularities. The surfacing material has been thoroughly loosened to no less than 2-inches depth or the depth of potholes or corrugations. The surface is smooth, and compact, without segregation of the surfacing materials. The surface is crowned or cross-sloped as indicated by the character of the existing subgrade, to at least ½-inch per foot of width, but not more than 1-inch per foot of width. Suitable materials have been recovered and incorporated.

Crowned or insloped road surfaces allow water to flow directly into ditches. Shoulders beyond the edges of the traveled way and turnouts have been shaped to allow drainage off and away from the road surface. Unsuitable materials have been removed from the traveled way and shoulders, placed outside the roadbed without concentration and without obstructing drainage ways or structures. When specified in the ROAD LISTING, unsuitable materials have been hauled and placed in designated disposal areas.

When specified in the ROAD LISTING, aggregate surfacing has been scarified to a depth of 4-inches to 6-inches prior to final shaping as described above.

When specified in the ROAD LISTING, water has been hauled and incorporated into the surfacing material to reduce segregation and/or to improve required compaction.

When specified in the ROAD LISTING, aggregate surfacing has been roller compacted following final shaping so that no visual displacement occurs from hauling or spreading equipment.

Shoulders along paved roads are maintained to standard when unsuitable material (soil, moss, gravel, and other debris) has been removed from paved surfaces within 3-feet of pavement edges on both sides of the road. Unpaved shoulders adjacent to paved surfaces have been maintained and shaped to provide a smooth transition from the paved surface and to allow drainage off and away from the road surface or into ditches. Shoulders without ditches are shaped for a minimum of 2-feet, up to 6-feet, from the pavement edge as necessary for drainage. Unsuitable materials have been removed from the shoulders. All unsuitable materials removed from paved surfaces and shoulders have been placed outside the roadbed without concentrations, without obstructing drainage ways or structures, and are not located where erosion can allow sediment delivery to streams. When specified in the ROAD LISTING, unsuitable materials have been hauled and placed in designated disposal areas.

811.03 LOCATION OF WORK:

As specified on roads listed on the ROAD LISTING BELOW or SHOWN ON THE PLANS.

Item 0001 - 811(2):Surface Maintenance: Single Lane Roads, scarification required Road Number From To Miles

2700-000 End Double Lane (MP 11.84, JCT 2715) Rd 28 (MP 29.6) 17.76

2814-000 JCT 2800-000 JCT 2715-000 9.81

2924-000 JCT 2900-000 JCT 2900-000 11.45

2925-000 JCT 2900-000 JCT 3100-000 14.25

3200-000 County Rd 36 County Rd 1 13.33

3800-000 end asphalt (16.71) JCT 5850-000 (MP 23.97) 7.62

2715-530 JCT 2715-000 End (MP 4.63) 4.63

2925-700 JCT 2925-000 MP 1 1.00

3401-800 JCT 3401-000 JCT 3401-000 3.59

3401-840 JCT 3401-800 End (MP 0.2) 0.20

2800-003 2800-000 End 0.14

2800-004 2800-003 End 0.05

2800-052 2800-000 2800-000 0.10

2800-304 2800-000 End 0.20

4712-000 End of Asphalt MP 0.15) JCT 4714-000 6.47 total miles 90.60

Item 0002 - 811(5):Roller Compaction: Single Lane Roads

Road Number From To Miles

2700-000 End of Double Lane (MP 11.3) JCT 2800-000 17.76

3200-000 County Rd 36 End (MP 13.33) 13.33

3800-000 End of asphalt (MP 16.71) JCT 5850-000 (MP 23.97) 7.26

4712-000 End of asphalt (MP 0.15) JCT 4714-000 6.47

2800-003 2800-000 End 0.14

2800-004 2800-003 End 0.05

2800-052 2800-000 2800-000 0.10

2800-304 2800-000 End 0.20 total miles 45.31

811.04 MEASUREMENT:

Measurement under this Section will be made by the total number of units for each item in the SCHEDULE OF ITEMS completed and accepted.

A. Single Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one- hundredth (0.01) mile.

B. Double Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Measurement will be to the nearest one-hundredth (0.01) mile.

C. Road Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.

811.05 ACCEPTABLE QUALITY LEVELS:

Description Major Defect Minor Defect Allowable Defects Required Action

Major Minor Major Minor

Aggregate Surface Quality

Gradation of surface aggregate is degraded by more than 10%

Gradation of surface aggregate is degraded by less than 10%

0 per pay unit

1per pay unit

Rework Rework if greater than 2 minor defects

A loss of more than 10 CY/mile

A loss of more than 10 CY/mile

0 per pay unit

0 per pay unit

Replace or recover lost material

Accept the loss of material

Surfacing is segregated over more than a 100 square yard area per 1000 linear feet of road and traffic safety is compromised

Surfacing is segregated over more than a 100 square yard area per 1000 linear feet of road and traffic safety is not compromised

0 per pay unit

2 per pay unit

Rework Accept the loss of surface quality

Roller Visible displacement N/A 0 per N/A Rework N/A Compaction Occurs under hauling pay or spreading equipment unit

Ditches and Road Impeded flow or <20% impeded, but 0 per 1 per Rework Rework if Drainage water diverted out water will stay in pay pay unit greater than Structures of drainage channel unit 1 minor structure defect Backslopes Undercut Undercut backslope 0 per 1 per Repair and Revegetate if backslope will will not result in pay pay unit Stabilize greater than result in destabilization of unit 1 minor destabilization of slope defect slope

Shoulder Maintenance (Paved Roads)

Elevation difference between pavement and shoulder is greater than 1- inch

N/A 0 per pay unit

N/A Rework N/A

Material greater than ¼-inch diameter remaining on the road surface

N/A 0 per pay unit

N/A Rework N/A

Surface Irregularities

Potholes greater than 1-inch deep and wider than 1- foot

N/A 0 per pay unit

N/A Rework N/A

Washboards greater than 1- inch deep and greater than 20 feet in length along road

N/A 0 per unit

N/A Rework N/A

Road Cross Crown or cross N/A 0 per N/A Rework to N/A

Section slope is not within pay unit achieve less on more than 5 % of than 10% length out of range.

Road per pay unit or Rework for Does not drain properly 100 percent does not drain drainage

1240BE26Q0076 Surface Blading with rolling, Roadside veg removal and logout on the Umpqua NF

Item 0003 – 842 Roadside Brushing, Low Volume, Slash reduction required Item 0004 – 842 Roadside Brushing, High volume, Slash Reduction required

842 Roadway Vegetation Maintenance

Pay items for cutting roadway vegetation are categorized as having either high volumes or low volumes of vegetation requiring treatment. The specific applicable pay item for each road in the Road Listing will be established by the Contracting Officer at the time of award.

o Typically, high volume vegetation roads have not been treated for more than seven years, have severely restricted sight distance due to vegetation encroachment, may have vegetation encroachment that contacts the sides of standard-sized highway vehicles, and may have small trees growing from within the traveled way.

o Typically, low volume vegetation roads have been treated within the last seven years, have only moderately or slightly restricted sight distance, or do not have any of the other typical conditions described for high volume vegetation roads for more than ten-percent of the road segment.

842.01 SERVICE REQUIRED:

Cutting all vegetative growth, including trees and other vegetation less than 5 inches in diameter measured 6 inches above the ground, on roadway surfaces and roadsides.

842.02 PERFORMANCE STANDARD:

A. General

1. Brush, trees and other vegetation are cut within each area treated to a maximum height of 6 inches above the ground surface or obstruction such as rocks or existing stumps. All limbs which extend into the treated area, or over the roadbed, to a height of 14 feet above the traveled way surface elevation have been removed.

2. Items to remain will be DESIGNATED ON THE GROUND.

3. Self-propelled equipment is not allowed on cut and fill slopes or in ditches.

4. Trees within the cutting limits, but outside the roadbed and ditch, which are over 5 inches measured at 6 inches above the ground have been limbed in lieu of cutting.

5. Limbed trees have limbs cut within 4 inches of the trunk.

6. There is minimal or no damage to trunks of remaining trees.

B. Cutting Side Vegetation

1. The treated area includes the road bed measured from the center line to each defined road edge, or to the bottom of the ditch on ditched road segments, plus an additional 4 feet on each side. Where there is no defined road edge or ditch, the treated area extends 12 feet from each side of the road center line.

2. Transitions between differing increments of cutting width have tapered lengths of not less than

50 feet and not more than 70 feet.

C. Debris

1. Materials resulting from the cutting operation in excess of 12 inches in length or 3 inches in diameter do not remain on roadway slopes within the treated area, in ditches, or within water courses.

2. Limbs and chunks in excess of 3 inches in any dimension do not remain on the traveled way or shoulders.

3. For road segments where slash reduction is identified in the ROAD LISTING as not required, materials are scattered beyond the roadbed, outside of the work area and drainages.

4. For road segments where slash reduction is identified in the ROAD LISTING as required, all materials are reduced in size to less than 12 inches in length and 3 inches in diameter by use of a masticator, mechanical chipper, or similar means. Resultant material is placed on cut slopes or outside of the work area but not in ditches or drainages. There are no accumulations of chips on steep cut slopes where the material will ravel into ditches.

842.03

LOCATION OF WORK:

As specified on roads listed on the ROAD LISTING below or SHOWN ON THE MAPS.

Item 0003 - 842(2): Cutting Roadway Veg low Volume Slash Reduction Required

Road Number From To Miles

2814-000 JCT 2800-000 JCT 2715-000 9.81

3200-000 County Rd 36 County Rd 1 13.33

4712-009 JCT 4712-000 End 0.55

6800-000 JCT 2900-000 MP 15.93 (Umpqua NF boundary) 15.93 total miles 39.62

Item 0004 - 842(4): Cutting Roadway Veg High Volume Slash Reduction Required

2924-000 JCT 2900-000 JCT 2900-000 11.45

2938-000 JCT 2900-000 JCT 2924-000 6.48

3800-000 JCT 3828-000 (MP16.59) JCT 5850-000 (MP 23.97) 7.38

4711-000 JCT HWY 138 JCT 2703-000 11.40

4712-000 JCT HWY 138 JCT 4714-000 6.47

2980-100 JCT 2980-000 JCT 2924-000 3.50

total miles 46.68

842.04 MEASUREMENT:

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.

842.05 - ACCEPTABLE QUALITY LEVELS:

Description Major Defect Minor Defect Allowable

Defects Required Action

Major Minor Major Minor

Tree damage Damage to more than 30% of the tree bole

Damage to less than 30% of the tree bole

2 per pay unit

5 per pay unit

Remove or treat

Treat

Horizontal Clearance

More than 20% not cleared to limits

20% or less not cleared to limits

0 per pay unit

1 per pay unit

Rework Rework if greater than 1 minor defects.

Vertical Clearance More than 20% not cleared to limits

20% or less not cleared to limits

0 per pay unit

1 per pay unit

Rework Rework if greater than 1 minor defects

Height above ground surface

More than 20% not cleared to limits

20% or less not cleared to limits

0 per pay unit

1 per pay unit

Rework Rework if greater than 1 minor defects

Drainage Impeded flow or water diverted out of drainage structures

20% or less impeded, but water will stay in the channel

0 per pay unit

1 per pay unit

Rework Rework if greater than 1 minor defects

Oversized Material

Concentrations of material greater than 3” in any dimension remaining on traveled way or shoulders

Isolated pieces of material greater than 3” in any dimension remaining on traveled way or shoulders

0 per pay unit

10 per pay unit

Rework Rework if greater than 2 minor defects

Material greater than 3” diameter and 12” in length remaining on roadway slopes, ditches or water courses.

N/A 0 per pay unit

N/A Rework N/A

Work Area Management

Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures

Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures

0 per pay unit

0 per pay unit

Suspend work until in compliance

Suspend work until in compliance

Item 0005 – 851 Logging Out, Primary and Secondary roads

851 Hazard or Obstruction Removal

Logging out includes removal of log segments within the travel way and ditch line. See drawing 851-1 for the area to be treated.

Chainsaw work may be required if the log being removed is hung up on the cut bank.

This work does NOT include moving large rocks from the roadway, slides, abandoned RVs etc. If those are found during the contract, inform the COR for them to be addressed.

851.01 Service Required

Remove and/or stabilize hazards and obstructions.

851.02 Performance Standard

Work is complete when hazards have been removed or stabilized and when the road is passable by the intended traffic.

851.03 Location of Work

As specified on roads listed on the ROAD LISTING or SHOWN ON THE MAPS.

Item 851(1): Logging Out: Primary and Secondary Roads

2814-000 JCT 2800-000 JCT 2715-000 9.81

2924-000 JCT 2900-000 JCT 2900-000 11.45

2938-000 JCT 2900-000 JCT 2924-000 6.48

3200-000 County Rd 36 County Rd 1 13.33

3401-840 JCT 3401-800 End (MP 0.2) 0.20

4711-000 JCT HWY 138 JCT 2703-000 11.40

4712-000 JCT HWY 138 JCT 4714-000 6.47

2980-100 JCT 2980-000 JCT 2924-000 3.50

3100-600 JCT 3100-000 Road Failure (MP 7.31) 7.31

3401-800 JCT 3401-000 JCT 3401-000 3.59

total miles 73.54

851.04 Measurement

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.

851.05 -Acceptable Quality Levels

Description Major Minor Allowable Defects Required Action Defect Defect Major Minor Major Minor

Utilization of Timber

Log lengths do not meet utilization standards (see Call)

N/A

Charge for loss of stumpage or Recut to acceptable length

Stump Heights

Exceed Specified Height by more than 12 inches

Exceed Specified Height by up to 6 inches

0 per pay unit

2 per pay unit

Rework

Rework if greater than 4 minor defects Tree damage caused by Service Provider's operations

Damage to more than 30% of the tree bole

Damage to 30% or less of the tree bole

Remove or

Treat

Treat

Impeded flow for ditches, inlet/outlet channels, and catch basins caused by Service Provider's Operations

Water will be diverted out of the drainage structure or system

20% or less impeded, but water will stay in the channel.

2 per pay unit greater than 2 minor defects

Hazards that interfere with the use of the road (Primary and Secondary Roads)

Unstable hazards that remain in the Clearing Limits

Hazards that interfere with the use of the road (Other Roads)

Unstable hazards that remain within the Traveled way

Log Out

Horizontal clearance - more than 20% not cleared to specified distance

Horizontal clearance - 20% or less not cleared to specified distance

1 per pay unit greater than 1 minor defect

Vertical clearance -more than 20% not cleared to specified distance

Vertical clearance - 20% or less not cleared to specified distance

1 per pay unit greater than 1 minor defect

Work Area Management

Not following approved safety plan which may include signs, flaggers, & other temporary traffic control measures

Suspend work until in compliance

Item 0006 – 881 Mobilization:

881.01 Service Required

A. Mobilization of personnel, equipment, and material to the project site.

881.02

PERFORMANCE STANDARD:

Equipment will be clean and weed free prior to moving it to the project area. This cleaning will remove all soil, plant parts, seeds, vegetative matter, or other debris that could contain or hold seeds. All subsequent move-ins of equipment to the project area will be treated in the same manner as the initial move-in.

Equipment will be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. This requirement does not apply to service vehicles, water trucks, pickups, cars, and/or similar vehicles.

Additional equipment washing is applicable to all equipment on site requiring washing, NOT individual pieces of equipment.

Unless otherwise agreed, the Forest Service will be given a minimum of 24 hours notice when equipment is ready for inspection. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning

881.03 Measurement:

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

Each: Measured by the total number of units for each item in the schedule of items completed and accepted.

881.04 Acceptable Quality Levels

881.05 PAYMENT:

Payment for mobilization will be authorized after line items 0001 and 0002 are completed.

19.0 Invoicing and Payment

All contractor invoices shall be submitted via the Invoice Processing Platform (IPP) using contract line-item numbers (CLINs). The contractor shall be required to establish account(s), access method(s), log-in(s), and necessary training in order to submit invoices through IPP. Invoices not submitted via IPP shall not be accepted or paid.

The contractor shall only invoice for work performed and authorized by the contract. Payment will be made only for those items listed on the Schedule of Items at the contract price per unit of measurement.

Payment will be authorized once a line item is completed, inspected and accepted. All invoices will be submitted no later than 10 days after inspection is carried out.

All accepted quantities will be paid at the contract price per unit of measurement for the per line items in the schedule of items. All invoices will be submitted no later than 10 days after final inspection is carried out.

20.0 Activity Report

The contractor will maintain an activity report for all services performed on each road covered under this contract.

At a minimum, the report will include road number, road name, beginning milepost, ending milepost, total miles, type of work performed, date of performance, and final status. Reports will be submitted with their corresponding invoice for payment.

21.0 Safety and Traffic Control Plan

The contractor will develop a work-specific safety plan that addresses all possible hazards that may exist on the work site, ensures the safety and convenience of the public, and protects the residents and property adjacent to the work site. The plan will include accommodating public traffic on roads adjacent to and within the work site until the work is completed and accepted by the government. Warning signs will be placed IAW the standards of the Manual on Uniform Traffic Control Devices (MUTCD), current edition, while work is in progress. This will include “Slow Moving Equipment” signs attached to all road surface equipment. The contractor will submit the plan to the CO and COR NLT 5 business days after contract award. An updated copy will be provided to the CO and COR as changes occur.

The Contractor will provide adequate two-way communication as to report a fire to Forest Service within 15 minutes of detection. FCC Regulations prohibit commercial use of Citizen Band (CB) radios. (CB’s are not considered adequate two-way communication).

Such communication will be operable during periods of operation of power-driven equipment, including the time fire security is required.

22.0 Contractor Furnished Equipment

All contractor furnished equipment and vehicles to be used at the work site will be cleaned and free of invasive species (noxious weeds), seeds, external grease and oil and will be inspected at an approved location prior to entrance onto federal government lands. The restriction will include equipment and vehicles intended for off-road use, whether they are owned, leased, or borrowed by the contractor or subcontractor. All protective plating and armoring will be intact and properly functioning on the equipment to reduce the potential for damaging hydraulic hoses or the undercarriage. Spill kit approved by OSHA for petroleum product leaks will be on-site at all times.

23.0 Special Qualifications

The contractor will, at no additional cost to the government, obtain all licenses and permits required for performance of work and for complying with all applicable local, state, and federal laws and regulations.

24.0 Service Interruptions

If any services must be interrupted (even temporarily) due to maintenance of contract work, the Contractor will notify the CO and COR at least 3 business days in advance. If the service is due to an emergency breakdown, the Contractor will notify the CO and COR as soon as practicable.

Performance Requirements Measures

25.0 Contractor’s Performance

The government expects the contractor to work at an acceptable performance level throughout the life of the contract, and the contractor’s performance will be given significant consideration when evaluating recommendations for future government contracts and/or awards.

26.0 Acceptable Performance

Acceptable performance is achieved if 95% of the requirement is successfully satisfied. The Contractor’s acceptable performance will be rated in COR reports and in the Contractor Performance Assessment Reporting System (CPARS) as Satisfactory, Very Good, or Exceptional.

27.0 Unacceptable Performance

Unacceptable performance is achieved if less than 95% of the requirement is satisfied (e.g., work specified by contract is incomplete or work is not IAW the PWS and manufacturer’s specifications). If the performance is deemed unacceptable for any objective (required task), the COR will determine the possible cause of this unacceptable performance. Unacceptable performance caused by actions of the Contractor will be reported to the Contractor’s on-site representative and request its signature on documentation acknowledging notification.

Unacceptable performance caused by actions of the Government will not be held against the Contractor. If the Contractor disputes the results of surveillance, the COR must refer the Contractor to the CO for resolution. The Contractor’s unacceptable performance will be rated in COR reports and in CPARS as Marginal or Unsatisfactory.

Government-Furnished Property and Utilities

28.0 Government-Furnished Property

Unsuitable material disposal areas will be designated as needed after award.

29.0 Government-Furnished Utilities

None

Definitions, Acronyms, and Applicable Laws, Regulations and Guidance

30.0 Definitions

Appurtenance: A structure along the road of value such as guard rails, bridge rails, culverts, and signage.

Base Course: The layer or layers of specified or selected material of designed thickness placed on a subbase or a subgrade to support a surface course. (See Illustration of Road Maintenance Terms.)

Berm: A curb or dike that controls roadway runoff water, or delineates traffic direction

Calendar Day: Refers to the period of elapse time, using Coordinated Universal Time or local time that begins at midnight and ends 24 hours later at the next midnight.

Channel: A natural waterway leading into or away from a culvert or bridge.

Cross ditch: A willow ditch placed across the roadbed to remove water from the roadbed surface that can be driven across by full-size pickups or other high clearance vehicles; usually placed diagonal to the centerline.

Culvert: Any structure that provides a passageway, drain, or waterway under a road or embankment.

Day: Unless otherwise specified, it means a calendar day.

Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.

Deliverable: Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

Ditch: A relatively long narrow excavation placed to collect or disperse water.

Drainage dip: A drainage structure that was previously constructed within the roadbed surface to form a uniform depression that allows routine passage of vehicles while diverting water from the traveled way.

Drainage ditch: A ditch located parallel to and abutting the roadbed.

Drainage structure: A term identifying manufactured devices placed to control water movements.

Equipment: A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale, and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.

Foreslope: The slope of the ditch section nearest to the traveled way.

Grade: The vertical alignment of the top surface of the road.

High Clearance Vehicles: Vehicles such as pickups, 4x4s, and log trucks.

Highway Vehicles: Vehicles such as passenger cars, High and low high clearance vehicles.

Hydrologic Function: Physical properties of the occurrence and movement of water on the earth’s surface and in particular that part which crosses transportation systems.

Invoice: A contractor’s bill or written request for payment under the contract for supplies delivered or services performed.

Lead-off ditch: A ditch used to remove water from roadside drainage ditches, the roadway, cattleguards, or drainage structures such as culverts and drainage dips.

Low Clearance Vehicles: Vehicles such as passenger cars, non 4x4 pickups, vans and other highway vehicles.

Materials: Any substances specified for use in the performance of the work.

Measurement: Method of determining and expressing the quantities of work.

Nominal Dimensions or Weights: The numerical values shown on the drawings or in the specifications as measurements for the work.

Patching: Minor repairs.

Paved Surface or Pavement: Denotes asphalt, concrete, or other stabilized materials excluding natural aggregates. Dust palliative treatments are not considered as pavement.

Reasonably Close Conformity: Means compliance with customary maintenance tolerances where working tolerances are not specified.

Right-of-Way: A general term denoting land, property, or interest therein acquired for or devoted to a road.

Roadbed: The portion of a road between the intersection of the subgrade and side slopes, excluding that portion of the ditch below the subgrade.

Road Listing: A preliminary listing of road locations and any established work priorities.

Serviceable Condition: Refers to items that are usable; ready for use; in proper operating condition; durable; clean and in good condition; usable for its intended purpose.

Shoulder: The portion of the roadway continuous to the traveled way for accommodation of stopped vehicles, emergency use, and lateral support of travel way structure.

Slough or Slide: Material deposited on the roadway that may need to be repositioned or removed.

Slump: A localized portion of the roadbed that has slipped, or otherwise become lower than the adjacent roadbed, and constitutes a hazard to traffic.

Subgrade: Top surface of roadbed upon which subbase, base course, or surface course was constructed.

Supplemental Specifications: Specifications that detail conditions and requirements peculiar to the individual project.

Traveled Way: The portion of the roadway for the movement of vehicles. For purpose of this contract, traveled way includes turnouts and curve widening.

Turnout: A short auxiliary lane on a one-lane road provided for passage of meeting vehicles.

Unsuitable Material: Material removed during maintenance which must be disposed of in designated locations.

Includes material with substantial amounts of vegetation or other objectionable material.

Waterbar: A deeper type of cross ditch which is not intended for the passage of low clearance passenger vehicles.

Industrial Fire Precaution Levels terms:

a. Cable yarding systems: A yarding system employing cables and winches in a fixed position.

b. Closed season (Fire Precautionary Period): That season of the year when a fire hazard exists as declared by the responsible agency official.

c. Loading sites/woods site/project area: A place where any product or material (including but not limited to logs, firewood, slash, soil, rock, poles, posts, etc.) is placed in or upon a truck or other vehicle.

d. Low hazard area: Means any area where the responsible agency representative (WDNR, ORF, BIA, BLM) determines the combination of elements reduces the probability of fire starting and/or spreading.

e. Tractor/skidder operations: Include a harvesting operation, or portion of a harvesting operation, where tractors, skidders, or other harvesting equipment capable of constructing fireline, are actively yarding forest products and can quickly reach and effectively attack a fire start.

32.0 Applicable Laws, Regulations, and Guidance

The contractor will perform the required services IAW the specifications in this PWS, and all applicable federal, state and local laws and regulations. Additional requirements and information may be found from the following sources:

EPA: Environmental Protection Agency (https://www.epa.gov)

MUTCD: Manual on Uniform Traffic Control Devices (https://mutcd.fhwa.dot.gov/)

NEPA: National Environmental Policy Act (https://www.epa.gov/nepa)

OSHA: Occupational Safety and Health Administration (https://www.osha.gov)

EM 7100-15: Sign and Poster Guidelines for the Forest Service (available here:

https://www.fs.usda.gov/Internet/FSE_DOCUMENTS/stelprd3810021.pdf );

1071 2812P: Forest Service Sign Installation Guide (available here: https://www.fs.fed.us/t-d/pubs/pdfpubs/pdf10712812/pdf10712812dpi72.pdf

33. Attachments

C04-2a Wage Rates for Douglas County

C04-2b Lane County Oregon

C04-3 Vicinity Map

C04-4 Commercial Road Rules

C04-5 Fire Protection Plan FS-6500-52

1240BE26Q0076 Surface Blading with rolling, Roadside veg removal and logout on the Umpqua FS

Federal Acquisition Regulation (FAR) and United States Department of Agriculture Acquisition Regulation (AGAR) Clauses and Provisions The clauses and provisions contained herein are applicable to any order awarded as a result of this solicitation. The terms and conditions set forth herein supersede all other terms and conditions.

Acceptance of the order in accordance with (IAW) FAR 12.201-1(b)(2) constitutes acceptance of all terms and conditions contained herein.

As part of the Revolutionary FAR Overhaul (RFO), system updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in this solicitation. Contracting officers will rely on representations from offers based on provisions in the solicitation. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

52.252-2 Clauses Incorporated by Reference Feb 1998 This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also the full text of the clause may be accessed electronically at Internet address https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

52.212-4 Terms and Conditions—Commercial Products and Commercial Services (Nov 2025) ☐ Alternate I (Nov 2025) of 52.212-4

52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements

(Jan 2017) 52.222-50 Combating Trafficking in Persons (Nov 2025)

☐ Alternate I (Nov 2025) of 52.222-50 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-3 Protest After Award (Sep 2025) 52.233-4 Applicable Law for Breach of Contract Claim (Sep 2025) 52.240-91 Security Prohibitions and Exclusions (Nov 2025)

☐ Alternate I (Nov 2025) of 52.240-91 52.244-6 Subcontracts for Commercial Products and Commercial Services (Nov 2025)

The following clauses are applicable if checked:

☐ 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) with Alternate I (Nov 2021) of 52.203-6

☐ 52.203-13 Contractor Code of Business Ethics and Conduct (Nov 2021) ☐ 52.204-9 Personal Identity Verification of Contractor Personnel Jan 2011 ☒ 52.204-13 System for Award Management—Maintenance (Nov 2025) ☐ 52.204-91 Contractor identification (Nov 2025) ☒ 52.209-6 Protecting the Government’s Interest When Subcontracting with

Contractors Debarred, Suspended, or Proposed for Debarment (Sep 2025)

☐ 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Sep 2025)

☒ 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Sep 2025) ☐ 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Nov

2025) ☒ 52.219-6 Notice of Total Small Business Aside (Nov 2025)

☐ Alternate I (Mar 2020).

☐ 52.219-8 Utilization of Small Business Concerns (Nov 2025) ☐ 52.219-9 Small Business Subcontracting Plan (Nov 2025)

☐ Alternate III (Nov 2025) of 52.219-9.

☐ Alternate IV (Nov 2025) of 52.219-9

☐ 52.219-14 Limitations on Subcontracting (Nov 2025) ☐ 52.219-16 Liquidated Damages—Subcontracting Plan (Nov 2025) ☐ 52.219-33 Nonmanufacturer Rule (Nov 2025) ☒ 52.222-3 Convict Labor (June 2003) ☒ 52.222-19 Child…