This is a Request for Information (RFI) from the Nez Perce-Clearwater National Forest for an Integrated Resource Service Contract (IRSC) called the "End of the World Stewardship G-Z IRSC" for forest management and timber removal. The draft solicitation covers five contract areas (Jungle Bird, Wooly Bully, Ski Bird, Cold Fir, and Free Bird) with estimated timber removal quantities ranging from approximately 9,974 to 198,128 tons using tractor and skyline/tether logging methods. The contract will involve mandatory and optional work activities including timber cutting and removal, road reconstruction and maintenance, fuels work, erosion control, and reforestation, with a total contract period from award through 10/15/2036.

The government contemplates a firm-fixed price contract with economic adjustments, using NAICS code 115310 for Fuels Management Services with a $34 million size standard. The RFI is for informational purposes only, and no proposals will be accepted at this stage. Contractors must be registered in the System for Award Management (SAM) and will be evaluated on their ability to perform forest restoration treatments to mitigate catastrophic wildfire risks. A second site visit is scheduled for 10/30/25 to meet with project management staff, view the project area, and discuss contract objectives. The contract areas are located approximately 8 air miles south of Grangeville, Idaho.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

End of the World Stewardship G-Z IRSC Nez Perce-Clearwater National Forest Request for Information 12363N25R4014

DRAFT DOCUMENT – FOR INFORMATIONAL PURPOSES ONLY – NOT OPEN FOR PROPOSALS

End of the World Stewardship G-Z IRSC

The Nez Perce-Clearwater National Forest is pleased to share this draft solicitation document for the upcoming End of the World Stewardship Integrated Resource Service Contract. These materials are being provided for information and review purposes only. This is supplemental information to the Request for Information published on August 15, 2025. This is NOT a Solicitation Announcement, nor is it a Request for Proposal. This request does not obligate the Government to any contract award.

Please note the following important points:

• These documents are drafts and are subject to revision.

• Quantities in the proposed schedule are still being determined in most contract areas

• Draft appendices with specific work requirements are still in development.

• At this stage, no proposals or offers will be accepted.

• Feedback, comments, or questions are welcome and may be submitted to Matthew Daigle, Acquisition Program Support Officer at matthew.daigle@usda.gov.

Your input will help ensure that the final solicitation is clear, comprehensive, and aligned with best practices in the industry. We value your expertise and look forward to your constructive feedback. Thank you for your attention and cooperation.

mailto:matthew.daigle@usda.gov

1. GENERAL INFORMATION:

The Government does not intend to award a contract on the basis of this RFI or otherwise pay for information requested; Responses will be treated as information only and not as a proposal.

All Offerors must be actively registered in the System for Award Management (SAM) https://SAM.gov to be eligible for award under this solicitation. If your registration is not active, you will not be considered for award.

2. SCHEDULE OF ITEMS

PROPOSED MANDATORY WORK ACTIVITIES

Item No.

Description of Proposaed Mandatory Work Activities Unit Estimated

Quantity

Contract Area A-Jungle Bird

4a

Cut and Remove Included Timber:Tractor (including road maintenance)

Units: 54A, 145A, 54C, 146A, 146B, 54E, 54D, 54B, 48, 63A, 63B, 69B, 87E, 58D,147, 169, 58E, 58A, 58C, 58B, 62B, 62C, 87C, 50A, 50B and portions of Units: 49, 87A, 145B, 62A

Ton 18,062

5a

Cut and Remove Included Timber: Skyline/Tether (including road maintenance)

Units: 47C, 47D, 47A, 87D, 47B, 57, 47E, 87B, 69A and portions of Units: 49, 87A, 145B 62A

Ton 73,062

9a Road Reconstruction Mile 32

10a Fuels Work Acre TBD

11a Temporary Road Construction and Obliteration Mile TBD

12A Erosion Control Acre TBD

13A Reforestation Acre TBD

PROPOSED OPTIONAL WORK ACTIVITES

Item No.

Description of Proposed Optional Work Activities Unit Estimated

Quantity

Contract Area A- Jungle Bird

1a Identify and GPS harvest units Acre TBD

2a Road Survey Mile TBD

4a Cut and Remove Included Timber: Tractor Units Ton TBD

5a Cut and Remove Included Timber: Skyline/Tether Units Ton TBD

6a Road Maintenance: Pre-Haul Mile TBD

7a Road maintenance: During Mile TBD https://sam.gov/

No.

Description of Proposed Optional Work Activities Unit Estimated

Quantity

8a Road Maintenance: Post-Haul Mile TBD

9a Road Reconstruction Mile TBD

10a Fuels Work Acre TBD

11a Temporary Road Construction and Obliteration Mile TBD

12a Erosion Control Acre TBD

13a Reforestation Acre TBD

Contract Area B- Wooly Bully

1b Identify and GPS harvest units Acre TBD

2b Road Survey Mile 36

3b Cruise Design Plan and Cruise Acre TBD

4b Cut and Remove Included Timber: Tractor Units Ton 77,573

5b Cut and Remove Included Timber: Skyline/Tether Units Ton 9,974

6b Road Maintenance: Pre-Haul Mile 36

7b Road maintenance: During Mile 36

8b Road Maintenance: Post-Haul Mile 36

9b Road Reconstruction Mile 36

10b Fuels Work Acre TBD

11b Temporary Road Construction and Obliteration Mile TBD

12b Erosion Control Acre TBD

13b Reforestation Acre TBD

Contract Area C- Ski Bird

1c Identify and GPS harvest units Acre TBD

2c Road Survey Mile 61

3c Cruise Design Plan and Cruise Acre TBD

4c Cut and Remove Included Timber: Tractor Units Ton 160,262

5c Cut and Remove Included Timber: Skyline/Tether Units Ton 27,826

6c Road Maintenance: Pre-Haul Mile 61

7c Road maintenance: During Mile 61

8c Road Maintenance: Post-Haul Mile 61

9c Road Reconstruction Mile 61

Description of Proposed Optional Work Activities Unit Estimated

Quantity

10c Fuels Work Acre TBD

11c Temporary Road Construction and Obliteration Mile TBD

12c Erosion Control Acre TBD

13c Reforestation Acre TBD

Contract Area D- Cold Fir

1d Identify and GPS harvest units Acre TBD

2d Road Survey Mile 69

3d Cruise Design Plan and Cruise Acre TBD

4d Cut and Remove Included Timber: Tractor Units Ton 142,599

5d Cut and Remove Included Timber: Skyline/Tether Units Ton 30,996

6d Road Maintenance: Pre-Haul Mile 69

7d Road maintenance: During Mile 69

8d Road Maintenance: Post-Haul Mile 69

9d Road Reconstruction Mile 69

10d Fuels Work Acre TBD

11d Temporary Road Construction and Obliteration Mile TBD

12d Erosion Control Acre TBD

13d Reforestation Acre TBD

Contract Area E- Free Bird

1e Identify and GPS harvest units Acre TBD

2e Road Survey Mile 74

3e Cruise Design Plan and Cruise Acre TBD

4e Cut and Remove Included Timber: Tractor Units Ton 198,128

5e Cut and Remove Included Timber: Skyline/Tether Units Ton 17,381

6e Road Maintenance: Pre-Haul Mile 74

7e Road maintenance: During Mile 74

8e Road Maintenance: Post-Haul Mile 74

9e Road Reconstruction Mile 74

10e Fuels Work Acre TBD

11e Temporary Road Construction and Obliteration Mile TBD

Description of Proposed Optional Work Activities Unit Estimated

Quantity

12e Erosion Control Acre TBD

13e Reforestation Acre TBD

Items 6-8- Road Maintenance ‘Menu’

6-8.1 T-101 Surface Blading Mile TBD

6-8.2 T-103 Dust Abatement-H2O Mile TBD

6-8.3 T-103 Dust Abatement-Chemcal Mile TBD

6-8.4 T-108 Slide Removal and Repair Mile TBD

6-8.5 T-113 Asphalt Surface Repair Mile TBD

6-8.6 T-113 Aggregate Surface Repair Mile TBD

6-8.7 T-201 Shoulder Maintenance Mile TBD

6-8.8 T-301 Ditch Cleaning Mile TBD

6-8.9 T-310 Minor Drain Structures Mile TBD

6-8.10 T-506 Clearing Roadway Vegetation Mile TBD

6-8.11 T-507 Cutting Roadside Vegetation Mile TBD

6-8.12 T-508 Revegetation Mile TBD

Item 9- Road Reconstruction ‘Menu’

9.1 15101 - Mobilization Lump Sum

TBD

9.2 20209 – Selective Clearing, Type Roadside, Disposal Method (F) Mile TBD

9.3 20210 - Special Clearing And Grubbing, Type Roadway, Disposal Method (K), Compaction Method 5 Mile

TBD

9.4 20302 - Removal Of Culvert, Disposal Method A, Compaction Method 5 Each

TBD

9.5 20401 - Roadway Excavation, Compaction Method 2, Tolerance Class A

Cubic Yard

TBD

9.6 20415 - Embankment Construction, Compaction Placement Method 2, Tolerance Class A

Cubic Yard

TBD

9.7 20420A - Drainage Excavation, Type Roadside Ditch, Tolerance Class A, Compaction Method 5 Foot

TBD

9.8 20420B - Drainage Excavation, Type Outlet Ditch, Tolerance Class A, Compaction Method 5 Foot

TBD

9-9 20421A - Drainage Excavation, Type ii Drain Dip, Tolerance Class A, Compaction Method 3 Each

TBD

Description of Proposed Optional Work Activities Unit Estimated

Quantity

9.10 20421B - Drainage Excavation, Type Catch Basin, Tolerance Class A, Compaction Method 2 Each

TBD

9.11 21201 -Linear Grading, Compaction Method 3, Disposal Method

(F) Mile

TBD

9.12 25101 - Placed Riprap, Class Iii, Gov'T Source Cubic Yard

TBD

9.13 25104 - Keyed Riprap, Class 0, Commercial Source Cubic Yard

TBD

9.14 30103 - Aggregate Base Course Gradation W, (B) Compaction Method B (Gov'T Source)

Cubic Yard

TBD

9.15 30115 - Aggregate Surface Course Gradation F, (B) Compaction Method B (Gov'T Source)

Cubic Yard

TBD

9.16 30315 - Roadway Reconditioning, Compaction Method 4 Mile TBD

9.17 60201A - 18 Inch Pipe Culvert, Corrugated Steel, 16 Gage, Compaction Method 6 Foot

TBD

9.18 60201B - 24 Inch Pipe Culvert, Corrugated Steel, 16 Gage, Compaction Method 6 Foot

TBD

9.19 60201C - 36 Inch Pipe Culvert, Corrugated Steel, 16 Gage, Compaction Method 6 Foot

TBD

9.20 60201D - 48 Inch Pipe Culvert, Corrugated Steel, 16 Gage, Compaction Method 6 Foot

TBD

9.21 61902 - Gate, Single Lane Perforated Square Steel Each TBD

9.22 62550 - Turf Establishment, Dry Method Seeding, Dry Method Mulching, Gov'T Furnished Seed

Lump Sum

TBD

9.23 63304A - Barricade Marker Sign (Fbm-L), Metal Panel, Type Iii Sheeting Each

TBD

9.24 63304B - Barricade Marker Sign (Fbm-R), Metal Panel, Type Iii Sheeting Each

TBD

9.25 63304C - Object Marker Sign (Om2-2V), Metal Panel, Type Iii Sheeting Each

TBD

9.26 63304D - Road Closure Sign, Metal Panel, Type Iii Sheeting Each TBD

9.27 63304E - Sign On 4" X 4" Post Each TBD

9.28 63304G - Furnish And Install Sign System Each TBD

Item 10 Fuels Work “Menu”

10.1 Machine Pile Acre TBD

Description of Proposed Optional Work Activities Unit Estimated

Quantity

10.2 Tether Pile >35% slope Acre TBD

10.3 Hand Pile and Covering Acre TBD

10.4 Landing Cleanup Each TBD

10.5 Manual Fireline Foot TBD

10.6 Machine Fireline Mile TBD

10.7 Slashing Acre TBD

10.8 Mastication Acre TBD

10.9 Leave Tree Protection Each TBD

10.10 Chipping Acre TBD

10.11 Biomass Removal Ton TBD

10.12 Photoplot Monitoring Each TBD

PROPOSED OPTIONAL SALVAGE ACTIVITES

Item No. Description of Optional Salvage Work Activities Unit Estimated Quantity

Salvage Prep Work- To be priced as needed

1 Identify and GPS harvest units TBD

2 Road Survey TBD

3 Cruise Design Plan and Cruise TBD

4 Cut and Remove Included Timber: Tractor Units TBD

5 Cut and Remove Included Timber: Skyline/Shovel/Tether Units TBD

6 Road Maintenance: Pre-Haul TBD

7 Road maintenance: During TBD

8 Road Maintenance: Post-Haul TBD

9 Road Reconstruction TBD

10 Fuels Work TBD

TIMBER/PRODUCT REMOVAL PRICE SCHEDULE:

TIMBER SUBJECT TO AGREEMENT PRICE SCHEDULE:

SCHEDULE NOTES

A second site visit is scheduled for 10/30/25 to meet with project management staff, view the project area and discuss the objectives of this contract. The meeting will take place at 9:00 am PT at the Nez Perce-Clearwater National Forest Supervisors Office, 104 Airport Road, Grangeville ID 83530.

3. LAND MANAGEMENT ACTIVITIES.

The Forest Service is executing this procurement under the stewardship contracting authority provided under Section 8205 of Public Law 113-79, the Agricultural Act of 2014 as amended under Section 204 & 207 of the Consolidated Appropriations Act (Omnibus Bill 2018). Stewardship authority grants the Forest Service Chief or designee the authority to aggregate contractual requirements into stewardship projects and solicit those requirements utilizing full and open competition

Performance of land management activities shall be in accordance with Project Description and Work Specifications. Payment for Land Management Work Activities in Schedule of Items will be made in Stewardship Credits and Appropriated Funds.

All Base Work Activities (Mandatory) shall be performed. Optional activities are listed in order of planned priority.

Award may be made for optional items in any order that the Contracting Officer determines is in the best interest of the Government.

4. FAR 52.212-4 CONTRACT TERMS AND CONDITIONS - COMMERCIAL PRODUCTS AND COMMERCIAL

SERVICES (DEVIATION AUG 2025)

a) Definitions. The clause at Federal Acquisition Regulation (FAR) 52.202-1, Definitions, is incorporated by reference.

(b) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price

SPECIES PRODUCT ESTIMATED QUANTITY UNIT OF

MEASURE

Grand-Fir and Others Sawtimber TBD Ton

Combined Softwood Non-saw TBD Ton

SPECIES PRODUCT ESTIMATED QUANTITY UNIT OF

MEASURE

Grand-Fir and Others Sawtimber Unestimated Ton

Combined Softwood Non-saw Unestimated Ton reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(c) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(d) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(e) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal, or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause FAR 52.233-1, Disputes, which is incorporated in this contract by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence. Examples of occurrences include acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. When an excusable delay occurs, the Contractor shall—

(1) Notify the Contracting Officer in writing as soon as possible;

(2) Remedy the delay as quickly as possible; and

(3) Notify the Contracting Officer when the occurrence is over.

(g) Invoice. The Government will handle invoices according to the Prompt Payment Act (31 U.S.C. 3903) and 5 CFR part 1315. The Contractor shall submit invoices to the address designated in the contract to receive invoices. An invoice must include the information required by 5 CFR part 1315.9(b).

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees, and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark, or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment—

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR Part 1315.

http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim

(3) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(4) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(5) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by if–

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures for interest credits prescribed in FAR part 32 in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon—

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance.

The Government will send a cure notice to the Contractor, unless the reason for the termination is late delivery.

In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 49 U.S.C. 40118, Government-financed air transportation; and 41 U.S.C. chapter 21 relating to procurement integrity.

(r) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services;

(2) The Disputes, Payments, Invoice, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;

(3) Other contract clauses incorporated in the solicitation or contract;

(4) Addenda to this solicitation or contract;

(5) Solicitation provisions incorporated in the solicitation;

(6) Other paragraphs of this clause;

(7) Other documents, exhibits, and attachments; and

(8) The specification.

(s) Unauthorized obligations.

(1) Except as stated in paragraph (s)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti- Deficiency Act violation (31 U.S.C. 1341), the following shall govern:

(i) Any such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government-authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.

(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (s)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.

(t) Comptroller General examination of record. This paragraph applies if this contract was awarded using other than sealed bid procedures and is in excess of the simplified acquisition threshold on the date of award of this contract.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices, at all reasonable times, the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR part 4, longer period required by statute, or periods specified in other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement.

Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This clause does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(u) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

(End of clause)

ADDENDUM TO FAR 52.212-4

5. SCOPE OF CONTRACT

(a) Description of Work- The intent of the project is to dramatically increase the pace and scale of forest restoration treatment to mitigate risk of catastrophic wildfire. Work taking place in this project includes:

Identify and GPS harvest units.

• Layout of timber units and GPS Boundaries. Boundary designations will be determined by the contractor. Flagging and/or paint will be required on hard boundaries such as private property, heritage, and archaeological features. Layout cards will be required and available to the Forest Service for review

• Slope distance water buffers will be as follows: No timber harvest is to occur within 300 feet of fish-bearing streams, 150 feet of perennial non-fish bearing water, 150 food slope distance from the edge of ponds, lakes, reservoirs, and wetlands greater than 1 acre, and 100 foot slope dance from seasonally flowing or intermittent streams, wetlands less than 1 acre, landslides, and landslide-prone areas.

Cruise Design Plan and Cruise

• In contract areas that are selected, contractors shall conduct a cruise. Collected data such as plot locations, plot data, and processing data shall be provided to Forest Service. Forest Service may elect to do a check cruise. Forest Service will appraise stumpage and stump to mill costs for each contract area separately.

Road Survey, Maintenance, Reconstruction, and Temporary Road Construction/Obliteration

• Road surveys will include identifying road work necessary to facilitate log haul, completing road maintenance plans, and road worklists with lengths and quantities for Forest Service review.

Work identified as Design will be reviewed and approved by the Forest Service.

• Maintenance will include pre, during, and post haul work typical of Forest Service T-specification work. Road Maintenance requirements may be incidental to the cut and removal of included products.

• Reconstruction work will include work that exceeds T-specs and utilize FP-14 or FP-24 requirements. Expected reconstruction work may include: deep fill culverts, curve widening, gate installations, rock crushing, and obliteration.

• Temporary roads will be limited in quantity by contract area, existing non-system roads may be used and will be obliterated after use. Temporary road water crossings are not permitted.

Cut and Remove Included Timber

• Tractor units are limited to slopes <35%. Skyline units are the remaining areas >35% slope. Whole tree yarding will be required for all units and non-saw material will be mandatory removal. Skyline and tether may be used interchangeably on slopes up to 65%.

Fuels work and Erosion Control

• Reduce natural and activity generated fuel loading to maintain 7-15 tons of course woody debris.

• Cut and remove and/or pile all trees <7” DBH in harvest units or as Silvicultural Rx describes.

• Reduce erosion of skid trails, landings, and skyline/tether corridors though methods such as scarification, grass seeding, water bars, and coarse woody debris

• Slashing will be required to meet the desired stems per acre per the Silvicultural Rx.

Reforestation

• Undetermined at this time.

(b) Resulting Contract – Any resultant contract will be a firm-fixed price with economic adjustment Integrated Resource Service Contract with requirements for timber removal.

(c) Project Location- Approximately 8 air miles south of Grangeville, ID.

a. Approximate location of the Jungle Bird contract area:

https://maps.app.goo.gl/EJBBqT5VLda7scGj6

(d) Under this contract, “Contractor’s Operations” shall include activities of or use of equipment of Contractor, Contractor’s employees, agents, Subcontractors, or their employees or agents, acting in the course of their employment in operations hereunder on National Forest lands or within Forest Service protection boundary (unless acting under the immediate supervision of Forest Service).

https://maps.app.goo.gl/EJBBqT5VLda7scGj6

(e) Contractor’s Operations shall be conducted in a workmanlike and orderly manner. The timing of required Forest Service designation of work on the ground and the performance of other Forest Service work shall not be such as to cause unnecessary delay to Contractor.

6. CONTRACTOR QUALITY CONTROL INSPECTION SYSTEM

The Contractor shall identify the quality control inspection system it will use to ensure that contract specifications will be achieved. At no time shall the contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contractor shall produce written inspection records in a format and at times and places satisfactory to the Contracting Officer. Inspection records shall be made available upon request of the Contracting Officer and be maintained until the date of contract closure. The Contracting Officer may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.

7. ACCEPTANCE

The Forest Service shall perform an inspection upon Contractor’s written request and assurance that work has been completed. Requests shall be for a reasonable portion of work. Acceptance may be made for all or portions of work.

8. GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN

Quality assurance plans specific to individual items will be found in Appendix A.

9. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

The Contractor shall be required to (a) commence work under this contract within 30 calendar days after receipt of Notice to Proceed for specified work items, (b) prosecute the work diligently, and (c) complete all work no later than 10/15/2036. The time stated for completion shall include final cleanup of the premises.

10. PERIOD OF PERFORMANCE

The period of performance of this contract is from date of award through 10/15/2036.

11. POST AWARD CONFERENCE

A post award conference with the successful offeror is required. It will be scheduled within 30 days after the date of contract award. The conference will be held at TBD.

12. PREWORK CONFERENCE

Annually, prior to commencement of work, a prework conference will be held to discuss contract terms and work performance requirements. At this meeting such things as responsibility under OSHA, and procedures for how undesignated timber that may have to be added (including danger trees) shall be discussed and documented.

13. CONTRACT OPERATIONS SCHEDULE

Contractor shall, before commencing operations, provide in writing an annual Operating Schedule of anticipated major activities and needs for logging Included Timber and completing stewardship projects, such as logging, road maintenance, and construction. Upon reasonable notice to Forest Service, such a schedule shall be subject to modifications necessitated by weather, markets, or other unpredictable circumstances.

The Contractor agrees to conduct its operations under this contract and other related business activities in compliance with Federal, State, and local statutes, standards, orders, permits and other regulations.

The Contractor shall meet all State and local environmental quality laws applicable to National Forest system lands.

Contractor’s Operations may be conducted outside Normal Operating Season. “Normal Operating Season” is the period(s) beginning and ending on the dates stated below.

Work may be done any time during the term of the contract, except under the following conditions:

Description Timeframe

Normal Operating Season

14. SCHEDULES AND REPORTS

Contractor shall provide the following submittals as stated below unless otherwise mutually agreed upon. The Contractor shall update all submittals as needed, or as required by the CO, but in no case less than once per calendar year on a date specified by the Contracting Officer:

ITEM DESCRIPTION Submittal Due Proposed Operation Plan (Overall Schedule): The Contractor shall prepare and submit one electronic copy of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the estimated starting and completion dates of various phases of the work. The schedule shall comply with the contract time requirements in the contract.

With proposal for Mandatory Work and 30 days after optional work items are exercised

Schedule for Construction Items: The Contractor shall comply with the requirements of FAR 52.236-15 – Schedules for Construction Contracts.

At prework meetings

Subcontractors: List of proposed subcontractors and their intended work. Sub-contractors must have Contracting Officer’s written approval prior to starting work on the project. Submit on Standard Form 1413 at prework meeting.

With proposal

Traffic Control Plan. The Contractor shall prepare and submit a Traffic Control Plan detailing conformance with OSHA requirements, MUTCD requirements, and all other contract requirements, including, but not limited to the requirements included in the Appendices, if any.

At prework meetings

Safety Plan. The Contractor shall comply with the requirements of the solicitation’s safety clause for all activities under this contract.

With proposal

Quality Control Plan. Submit original with proposal. Any updates need to be provided for approval to the CO.

With proposal

Small Business Subcontracting Plan. Applies to large businesses only- A Draft Small Business Subcontracting Plan is required with any proposal from a large business. Refer to 52.216-9 Small Business Subcontracting Plan for requirements.

With proposal

Soil Erosion and Water Pollution Control Plan. The Contractor shall prepare and submit an Erosion Control Plan detailing permanent and temporary control measures to minimize erosion and sedimentation during and after contract performance. Plan shall conform to all contract requirements and the requirements in the Appendices.

At prework meetings

Designation of Contractor personnel describing responsibilities and authorities At prework meeting

Annual Operating Plan. Contractor shall submit an annual plan listing units, roads and other information required in Appendix B.

Beginning of every operating season annually Fire Control Plan. Contractor shall submit plan in accordance with Fire Precautions and Control requirements.

At prework meetings

Aggregate Gradation and Quality. Test results certifying material meet specifications.

Shall be turned in to COR a minimum of 7 days before placement for review and approval. Before Placement https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_236_15 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_219_9

Culvert Certifications. Certification of gauge. Shall be turned into COR a minimum of 7 days before placement for review and approval. Before Installation

Weed Free Material Source. As applicable for reconstruction materials. Shall be turned in to COR a minimum of 7 days before placement for review and approval. Before placement

All schedules and reports shall be submitted to the Contracting Officer, unless the Contracting Officer directs the Contractor to submit any schedules or reports directly to the Contracting Officer’s Representative.

15. PAYMENT

It is anticipated that funds will be exchanged in the performance of this contract because the value of the timber will not completely offset the value of the work to be performed. When payment is made to the contractor for work performed, it will be made in accordance with the specifications set forth under the payment methods provisions in Appendix A. When harvesting operations are underway, the value of work completed and timber removed will be documented monthly in the Forest Products Financial System which will produce a Statement of Accounts.

Payment for funded work items will be net 14 days.

16. STEWARDSHIP CREDITS

Stewardship Credits are credits that are earned and established when work listed in the Schedule of Supplies/ Services has been performed and accepted. Stewardship credits may be cash or non-monetary (product value) and shall be earned at the rate as shown in award documents. Earned non-monetary credits may be used to pay for timber value included in the Schedule of Items. Unless otherwise indicated in the Schedules, credits will be earned based upon Actual Quantities accomplished and accepted.

17. ESTABLISHMENT OF STEWARDSHIP CREDITS

Notwithstanding references to payments in “Payment” clauses or provisions of this contract, payment for Stewardship Activities will be made with Stewardship Credits as indicated in the award document.

Stewardship Credits will be established on a monthly basis as work is accepted. Stewardship credits will be established for the number of units of each activity that have been completed and accepted. Acceptance may be for all, or a reasonable portion of, any specific activity.

Invoices to establish cash credits (cash payment) are to be submitted electronically via the Invoice Processing Platform (IPP).

Invoices to establish non-monetary credit are to be submitted to the Contracting Officer Representative (COR) identified on award documents. These credits will be used to offset the amount required to be paid for the forest products value when earned prior to the cutting of Included Timber.

18. TIMBER PAYMENT GUARANTEE

(1) General—(a) To guarantee payment for timber scheduled for removal under the IRSC, Contractor may earn Stewardship Credits in advance of removal or provide a Timber Payment Guarantee in the form of an acceptable surety payment bond, cash payment, or a deposit in a Federal Depository negotiable securities of the United States.

(b) Any earned Stewardship Credits and alternate Timber Payment Guarantee together will maintain a minimum unobligated balance equal to the applicable charges for timber the Forest Service estimates will be cut in 60 calendar days plus the value of any outstanding charges, or equal to the total value of the timber that has not been paid for.

(c) Securities shall be deposited through the Contracting Officer accompanied by a power of attorney and agreement authorizing the bond-approving officer to sell or collect such securities if payment is not made within 15 days of billing by Forest Service. The penal sum of such surety bond or the market value at time of deposit of such negotiable securities shall be the maximum amount of the payment guaranteed.

(2) A Timber Payment Guarantee for a single contract shall be provided utilizing FS Form 6500-12.

(3) Blanket Surety Bond—(a) Contractor may furnish an acceptable bond, or deposits securities, to guarantee payment for timber from multiple contracts. Contractor shall not start cutting hereunder until this contract receives an allocation that will meet the obligation for payment guarantee.

(b) The amount of such bond or deposited securities shall be allocated to such contracts by the Forest Service. The Contractor will provide the contact information for the Forest Service representative administering the Blanket Surety Bond.

(c) When there is to be no timber cutting hereunder for 30 days or more and payment of current charges has been made, the allocation to this contract shall be reallocated to other contracts at Contractor’s request.

(d) A Timber Payment Guarantee for multiple contracts (Blanket Guarantee) shall be provided utilizing FS Form 6500-12a.

(4) Letters of Credit for Payment Bond—Contractor may use letters of credit in lieu of a surety bond for payment bond purposes when approved by Contracting Officer.

19. EXCESS STEWARDSHIP CREDITS

In the event there are excess (unused) established Stewardship Credits when all of the included timber has been cut and removed the Forest Service, at its option, shall either add more timber or make cash payment for the unused credits.

20. EXCESS TIMBER VALUE

In the event the value of the included timber exceeds the total value of all of the mandatory activities plus the ordered Optional activities, the Contractor shall make cash payment for the excess timber value.

21. REFUND OF EXCESS CASH

If at any time the credit balance of the Integrated Resource Statement of Account exceeds the charges for timber removed to date and for timber that the Forest Service estimates will be cut within the next 60 calendar days, any portion of such excess from cash in the account shall be refunded if requested by Contractor. If no cutting is planned within the next 60 calendar days, refund of the entire unencumbered cash balance may be made. After a refund, deposits shall be made to meet the requirements of the clause entitled, “TIMBER PAYMENT GUARANTEE” before additional timber may be cut.

22. FOREST PRODUCT APPRAISAL METHODOLGY

Minimum acceptable offer rates for Timber and Product removal were determined using standard Forest Service appraisal methodologies for each individual logging system.

23. TIMBER PRODUCT VOLUME ESTIMATION

Quantities listed in Timber/Product removal schedules are estimates only. Volume quantities are made available with the understanding that values shown are Forest Service estimates and are not guaranteed. Contractors are urged to examine the contract areas and make their own estimates.

24. FINAL PAYMENT - RELEASE OF CLAIMS

The Government shall pay the full amount due the Contractor under this contract after—

(1) Completion and acceptance of all work;

(2) Presentation of a properly executed voucher; and

(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release.

25. AGAR 452.204-70 MODIFICATION FOR CONTRACT CLOSEOUT (JAN 2025)

Upon contract closeout for contracts utilizing anything other than cost reimbursement:

(a) If unliquidated funds in the amount of $1000 or less remain on the contract, the Contracting Officer (CO) shall issue a unilateral modification for deobligation. The contractor will receive a copy of the modification but will not be required to provide a signature. The CO shall immediately proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.

(b) Upon contract closeout for contracts utilizing SAP: if unliquidated funds of more than $1000 remain on the contract, the CO shall issue a bilateral modification for deobligation. The contractor will receive a copy of the modification and will be required to provide a signature. (The CO may also request a “Contractor Release of Claims” be completed by the contractor, although not required for contracts and orders using SAP.) If the bilateral modification and Release of Claims are not returned to the CO within 60 days, the CO shall release the modification as unilateral and proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.

(c) Upon contract closeout for contracts utilizing anything other than cost reimbursement, if unliquidated funds of more than $1000 remain on the contract, the CO shall issue a bilateral modification for deobligation. The contractor will receive a copy of the modification and a “Contractor Release of Claims” and will be required to provide a signature on both forms. If the bilateral modification and Release of Claims are not returned to the CO within 120 days, the CO shall release the modification as unilateral and proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.

26. PHYSICAL DATA

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of, or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by visual observation.

(b) Additional informational material made available to contractors including but not limited to: environmental documentation, timber cruise data, maps, access permits, etc.

27. USE OF PREMISES

(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor. (b) Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (i) dispose of solid waste in accordance with applicable Federal, State and local regulations. Such permission, if granted, will be without charge to the Contractor.

The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform his contract in such a manner as not to interrupt or interfere with the conduct of Government business.

The Contractor shall request permission (in writing) from the appropriate Ranger District to use campsites. If permission is granted, the District Ranger's letter shall specify all conditions and requirements.

It is further stipulated that in addition to clean-up of any camp sites, the Contractor is required to remove all their equipment from National Forest land before final acceptance and payment of the project.

Portable chemical toilets, self-contained holding tanks, approved pit or vault toilets which meet State Code are required.

28. KEY PERSONNEL

(a) The Contractor shall assign to this contract the following key personnel:

Overall Project Manager Logging Supervisor Roads Treatment Supervisor (for road construction/reconstruction activities) Sale Preparation Supervisor (for sale layout and cruising activities)

Individual Sub-Managers – Individuals supervising individual sub-contracts for work items not covered by personnel noted previously herein.

(b) During the first 90 days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

Key Personnel- Representatives:

Unless otherwise agreed, Contractor shall designate, in writing, a representative who is authorized to receive notices in regard to performance under this contract and take related action. In no case shall Contractor designate any representative to this contract who is currently debarred, proposed for debarment, or suspended by the Federal Government. Contractor’s representative shall provide a copy of the contract to Contractor’s field supervisor and persons authorized to assume responsibilities in the field supervisor’s absence. Prior to initial operations and after shutdowns of 10 days or more, the Contractor’s representative shall notify Forest Service 2 days before, excluding weekends and Federal holidays, any operations resuming in the Contract Area.

The Contractor’s representative shall designate, in writing, a field supervisor, one of whose responsibilities shall be on-the-ground direction and supervision of Contractor’s Operations.