13. DRAFT_EOTW GZ LTIRSC.pdf

PDF 874 KB Posted

Attached to
End of the World Long Term Stewardship
Solicitation number
12363N25R4014
Issued by

About this file

This is a draft Integrated Resource Service Contract (IRSC) solicitation issued by the Nez Perce-Clearwater National Forest's Salmon River Ranger District for the End of the World G-Z Long-Term project. The solicitation (12363N25R4014) is currently in draft form for informational purposes only and is not open for proposals.

The contract encompasses timber harvesting, road reconstruction, fuels reduction, and reforestation work across five contract areas (Jungle Bird, Wooly Bully, Ski Bird, Cold Fir, and Free Bird) and optional Contract Area B. Mandatory work activities in the base area include cutting and skidding timber using tractor and skyline/tether systems across specified harvest units (approximately 764 acres), loading and hauling approximately 95,660 tons of sawlog and non-saw timber to multiple facilities, reconstructing approximately 12 miles of forest roads with associated drainage and culvert work, machine piling approximately 585 acres, landing cleanup on 39.6 acres, and erosion control on 88.3 acres. Optional contract areas include additional timber harvest, road work, and fuels management activities totaling significantly more acreage. The contract extends through September 15, 2036, with a normal operating season from June 15 to October 15 annually. Compensation will be made in Stewardship Credits (non-monetary timber value offsets) and appropriated funds. The contractor must establish and maintain Performance and Payment Bonds equal to 100 percent of contract value, provide a timber payment guarantee, maintain worker certifications under MSPA and H-2B requirements, and submit a comprehensive Quality Control Plan. Technical proposals are evaluated based on Technical Approach (most important), Relevant Past Performance, and Benefit to Local Community, which are weighted approximately equal to price. Offerors are encouraged to conduct site visits and should submit proposals in two separate documents addressing technical and pricing components.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

End of the World G-Z Long-Term IRSC Nez Perce–Clearwater National Forest Solicitation 12363N25R4014 Salmon River Ranger District

DRAFT DOCUMENT – FOR INFORMATIONAL PURPOSES ONLY – NOT OPEN FOR PROPOSALS

The Salmon River Ranger District of the Nez Perce-Clearwater National Foret are pleased to share draft solicitation documents for the upcoming End of the World G-Z Long Term Stewardship Integrated Resource Service Contract.

These materials are being provided for information and review purposes only. This is supplemental information to the Request for Information published on June 11, 2025. This is NOT a Solicitation Announcement, nor is it a Request for Proposal. This request does not obligate the Government in any contract award.

Please note the following important points:

• These documents are drafts and are subject to revision.

• At this stage, no proposals or offers will be accepted.

• Feedback, comments, or questions regarding the draft documents are welcome and may be submitted to Matthew Daigle, Acquisition Program Support Officer at matthew.daigle@usda.gov.

Your input will help ensure that the final solicitation is clear, comprehensive, and aligned with industry best practices. We value your expertise and look forward to your constructive feedback. Thank you for your attention and cooperation.

mailto:matthew.daigle@usda.gov

DRAFT DOCUMENT – FOR INFORMATIONAL PURPOSES ONLY – NOT OPEN FOR PROPOSALS

1. GENERAL INFORMATION

The Government does not intend to award a contract on the basis of this RFI or otherwise pay for information requested; Responses will be treated as information only and not as a proposal.

All Federal Acquisition Regulation citations refer to the Revolutionary FAR overhaul. AGAR citations are included full text.

2. PROPOSED SCHEDULE OF ITEMS

MANDATORY WORK ACTIVITIES:

Item No.

Description of Proposed Mandatory Work Activities Unit Estimated

Quantity Unit Price Total Price

Contract Area A-Jungle Bird

4a.1*

Cut/Skid/Deck Included Timber (Saw and Nonsaw): Tractor Units: 54A, 145A, 54C, 146A, 146B, 54E, 54D, 54B, 48, 63A, 63B, 69B, 87E, 58D,147, 169, 58E, 58A, 58C, 58B, 62B, 62C, 87C, 50A, 50B and portions of Units: 49, 87A, 145B, 62A

High Volume:

Acre 616 $ $

5a.1*

Cut/Skid/Deck Included Timber (Saw and Nonsaw): Skyline/Tether Units 47C, 47D, 47A, 87D, 47B, 57, 47E, 87B, 69A and portions of Units: 49, 87A, 145B 62A

High Volume:

Acre 148 $ $

6a.1* Load/Haul/Road Maintenance Included Sawlog Timber Ton 86,376 $ $

6a.2* Load/Haul/Road Maintenance Included Nonsaw Timber: Local Facility Ton Unest. $

6a.3* Load/Haul/Road Maintenance Included Nonsaw Timber: Pulp Facility Ton 9,284 $ $

7a Road Reconstruction

7a.1* 15101-0000 MOBILIZATION Lump Sum 1.00 $ $

7a.3* 20203-0000 SELECTIVE CLEARING, TYPE ROADSIDE, DISPOSAL METHOD (b) Mile 8.78 $ $

7a.5*

20207-0000 SELECTIVE CLEARING AND

GRUBBING, TYPE ROADWAY, DISPOSAL

METHOD (e)

Mile 0.33 $ $

7a.6* 20301-1900 REMOVAL OF PIPE CULVERT, DISPOSAL METHOD A, COMPACTION (g) Each 27 $ $

7a.7* 20401-0000 ROADWAY EXCAVATION, COMPACTION (d), TOLERANCE CLASS A

Cubic Yard 1,915 $ $

7a.8* 20420-0000 EMBANKMENT CONSTRUCTION, COMPACTION (d) PLACEMENT METHOD 2, Cubic Yard 150 $ $

Item No.

Description of Proposed Mandatory Work Activities Unit Estimated

Quantity Unit Price Total Price

TOLERANCE CLASS A

7a.10*

20425-1000 DRAINAGE EXCAVATION, TYPE

ROADSIDE DITCH, TOLERANCE CLASS A,

COMPACTION (g)

Foot 505 $ $

7a.12*

20425-2001 DRAINAGE EXCAVATION, TYPE II

DRAIN DIP, TOLERANCE CLASS A,

COMPACTION (e)

Each 4 $ $

7a.13*

20425-2002 DRAINAGE EXCAVATION, TYPE

CATCH BASIN, TOLERANCE CLASS A,

COMPACTION (g)

Each 5 $ $

7a.14* 21201-0000 LINEAR GRADING, COMPACTION (e), DISPOSAL METHOD (f) Mile 6.36 $ $

7a.19 26801-0000 HORIZONTAL DRAIN PIPE FOOT 130 $ $

7a.20 26802-0000 COLLECTOR SYSTEM PIPE FOOT 40 $ $

7a.21

30103-1000B AGGREGATE BASE COURSE,

GRADING C, (b) COMPACTION B

(COMMERCIAL SOURCE)

Cubic Yard 30 $ $

7a.23

30112-0000A AGGREGATE SURFACE

COURSE, GRADING F, (b) COMPACTION B

(GOV'T SOURCE)

Cubic Yard 885 $ $

7a.25* 30301-5000 ROADWAY RECONDITIONING, AGGREGATE SURFACE, COMPACTION (d) Mile 8.45 $ $

7a.26* 30301-6000 ROADWAY RECONDITIONING, COMPACTION (d) Mile 3.7 $ $

7a.27

60201-0600 18 INCH PIPE CULVERT,

CORRUGATED STEEL, 16 GAGE,

COMPACTION METHOD (h)

Foot 1,164 $ $

7a.28

60201-0800 24 INCH PIPE CULVERT,

CORRUGATED STEEL, 16 GAGE,

COMPACTION METHOD (h)

Foot 366 $ $

7a.29

60201-1000 36 INCH PIPE CULVERT,

CORRUGATED STEEL, 16 GAGE,

COMPACTION METHOD (h)

Foot 46 $ $

7a.30

60201-1200 48 INCH PIPE CULVERT,

CORRUGATED STEEL, 16 GAGE,

COMPACTION METHOD (h)

Foot 90 $ $

7a.33 62501-0000 TURF ESTABLISHMENT, DRY METHOD SEEDING, DRY METHOD Acre 12 $ $

Description of Proposed Mandatory Work Activities Unit Estimated

Quantity Unit Price Total Price

MULCHING, GOV'T FURNISHED SEED

7a.34

63301-0000 BARRICADE MARKER SIGN (FBM-

L) OR (FBM-R), METAL PANEL, TYPE III

SHEETING

Each 2 $ $

7a.35 63303-0900 MILE MARKER SIGN, ALUMINUM PANEL, TYPE 3 SHEETING Each 2 $ $

7a.37 63303-0901 ROAD CLOSURE SIGN, METAL PANEL, TYPE 3 SHEETING Each 14 $ $

7a.36 63308-0000 OBJECT MARKER SIGN (OM2-2V), METAL PANEL, TYPE III SHEETING Each 1 $ $

7a.39 63306-0100 U - CHANNEL POST Each 9 $ $

8a Fuels Work/Reforestation

8.1a* Machine Pile Acre 585 $ $

8.4a* Landing Cleanup Acre 39.6 $ $

8.5a Manual Fireline Feet 42,890 $ $

8.15a Planting Acre 61 $ $

9a Temporary Road Construction and Obliteration

9a.1* New Temporary Road Mile 1.8 $ $

9a.2* Existing Prism Temporary Road Mile 2.5 $ $

10a* Erosion Control Acre 88.3 $ $ *Indicates line item may be eligible for price adjustment.

OPTIONAL WORK ACTIVITIES:

Item No.

Description of Proposed Optional Work Activities Unit Estimated

Quantity Unit Price Total Price

Contract Area B- Jungle Bird Optional

1b Unit Recon, Layout, Boundary Identification, and GPS Acre 1,913 $ $

2b Road Survey

Survey via motorized vehicle Mile 10 $ $

Survey via foot Mile 10 $ $

3b Marking Plan, Cruise Design/Plan, Cruise, and Processing Acre 1,913 $ $

4b.1* Cut/Skid/Deck Included Timber (Saw and High 649 $ $

Description of Proposed Optional Work Activities Unit Estimated

Quantity Unit Price Total Price

Nonsaw): Tractor Units Volume:

Acre

4b.2* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Tractor Units

Medium Volume:

Acre 670 $ $

4b.3* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Tractor Units

Low Volume:

Acre 406 $ $

5b.1* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Skyline/Tether Units

High Volume:

Acre 94 $ $

5b.2* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Skyline/Tether Units

Medium Volume:

Acre 58 $ $

5b.3* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Skyline/Tether Units

Low Volume:

Acre 36 $ $

6b.1* Load/Haul/Road Maintenance Included Sawlog Timber Ton 105,195 $ $

6b.2* Load/Haul/Road Maintenance Included Nonsaw Timber: Local Facility Ton Unest. $

6b.3* Load/Haul/Road Maintenance Included Nonsaw Timber: Pulp Facility Ton 11,688 $ $

7b Road Reconstruction Mile 10

8b Fuels Work/Reforestation

8.1b* Machine Pile Acre 1,725 $ $

8.4b* Landing Cleanup Acre 34.5 $ $

8.5b Manual Fireline Feet 10,000 $ $

9b Temporary Road Construction and Obliteration

9b.1* New Temporary Road Mile 1 $ $

9b.2* Existing Prism Temporary Road Mile 3 $

10b* Erosion Control Acre 191 $ $

Contract Area C- Wooly Bully Unit Price Total Price

1c Unit Recon, Layout, Boundary Identification, and GPS Acre 1,323 $ $

Description of Proposed Optional Work Activities Unit Estimated

Quantity Unit Price Total Price

2c Road Survey

Survey via motorized vehicle Mile 27 $ $

Survey via foot Mile 9 $ $

3c Marking Plan, Cruise Design/Plan, Cruise, and Processing Acre 1,323 $ $

4c.1* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Tractor Units

High Volume:

Acre 560 $ $

4c.2* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Tractor Units

Medium Volume: Acre 545 $ $

4c.3* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Tractor Units

Low Volume:

Acre 100 $ $

5c.1* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Skyline/Tether Units

High Volume:

Acre 100 $ $

5c.2* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Skyline/Tether Units

Medium Volume: Acre 5 $ $

5c.3* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Skyline/Tether Units

Low Volume:

Acre 13 $ $

6c.1* Load/Haul/Road Maintenance Included Sawlog Timber Ton 87,268 $ $

6c.2* Load/Haul/Road Maintenance Included Nonsaw Timber: Local Facility Ton Unest. $

6c.3* Load/Haul/Road Maintenance Included Nonsaw Timber: Pulp Facility Ton 9,697 $ $

7c Road Reconstruction Mile 36

8c Fuels Work/Reforestation

8.1c* Machine Pile Acre 1205 $ $

8.4c* Landing Cleanup Acre 26.5 $ $

8.5c Manual Fireline Foot 12,355 $ $

9c Temporary Road Construction and Obliteration

9c.1* New Temporary Road Mile 3 $ $

9c.2* Existing Prism Temporary Road Mile 8 $

10c* Erosion Control Acre 132 $ $

Contract Area D- Ski Bird

Description of Proposed Optional Work Activities Unit Estimated

Quantity Unit Price Total Price

1d Unit Recon, Layout, Boundary Identification, and GPS Acre 3,313 $ $

2d Road Survey

Survey via motorized vehicle Mile 46 $ $

Survey via foot Mile 15 $ $

3d Marking Plan, Cruise Design/Plan, Cruise, and Processing Acre 3,313 $ $

4d.1* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Tractor Units

High Volume:

Acre 1,105 $ $

4d.2* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Tractor Units

Medium Volume: Acre 979 $ $

4d.3* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Tractor Units

Low Volume:

Acre 781 $ $

5d.1* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Skyline/Tether Units

High Volume:

Acre 197 $ $

5d.2* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Skyline/Tether Units

Medium Volume: Acre 235 $ $

5d.3* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Skyline/Tether Units

Low Volume:

Acre 22 $ $

6d.1* Load/Haul/Road Maintenance Included Sawlog Timber Ton 193,032 $ $

6d.2* Load/Haul/Road Maintenance Included Nonsaw Timber: Local Facility Ton Unest. $

6d.3* Load/Haul/Road Maintenance Included Nonsaw Timber: Pulp Facility Ton 21,448 $ $

7d Road Reconstruction Mile 61

8d Fuels Work/Reforestation

8.1d* Machine Pile Acre 2,865 $ $

8.4d* Landing Cleanup Acre 66 $ $

8.5d* Manual Fireline Mile 56,232 $ $

8.15d Planting Acre 31 $ $

9d Temporary Road Construction and Obliteration

9d.1* New Temporary Road Mile 3 $ $

Description of Proposed Optional Work Activities Unit Estimated

Quantity Unit Price Total Price

9d.2* Existing Prism Temporary Road Mile 8 $ $

10d* Erosion Control Acre 331 $ $

Contract Area E- Cold Fir

1e Unit Recon, Layout, Boundary Identification, and GPS Acre 2,714 $ $

2e Road Survey

Survey via motorized vehicle Mile 52 $ $

Survey via foot Mile 17 $ $

3e Marking Plan, Cruise Design/Plan, Cruise, and Processing Acre 2,714 $ $

4e.1* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Tractor Units

High Volume:

Acre 762 $ $

4e.2* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Tractor Units

Medium Volume:

Acre 1,268 $ $

4e.3* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Tractor Units

Low Volume:

Acre 152 $ $

5e.1* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Skyline/Tether Units

High Volume:

Acre 217 $ $

5e.2* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Skyline/Tether Units

Medium Volume:

Acre 163 $ $

5e.3* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Skyline/Tether Units

Low Volume:

Acre 152 $ $

6e.1* Load/Haul/Road Maintenance Included Sawlog Timber Ton 163,073 $ $

6e.2* Load/Haul/Road Maintenance Included Nonsaw Timber: Local Facility Ton Unest. $

6e.3* Load/Haul/Road Maintenance Included Nonsaw Timber: Pulp Facility Ton 18,119 $ $

7e Road Reconstruction Mile 69

8e Fuels Work/Reforestation

Description of Proposed Optional Work Activities Unit Estimated

Quantity Unit Price Total Price

8.1e* Machine Pile Acre 2,182 $ $

8.4e* Landing Cleanup Acre 54 $ $

8.5e Manual Fireline Mile 48,523 $ $

8.15e Planting Acre 429 $ $

9e Temporary Road Construction and Obliteration

9e.1* New Temporary Road Mile 3 $ $

9e.2* Existing Prism Temporary Road Mile 8 $ $

10e* Erosion Control Acre 271 $ $

Contract Area F- Free Bird

1f Unit Recon, Layout, Boundary Identification, and GPS Acre 2,916 $ $

2f Road Survey

Survey via motorized vehicle Mile 56 $ $

Survey via foot Mile 18 $ $

3f Marking Plan, Cruise Design/Plan, Cruise, and Processing Acre 1,916 $ $

4f.1* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Tractor Units

High Volume:

Acre 1,948 $ $

4f.2* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Tractor Units

Medium Volume:

Acre 435 $ $

4f.3* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Tractor Units

Low Volume:

Acre 297 $ $

5f.1* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Skyline/Tether Units

High Volume:

Acre 174 $ $

5f.2* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Skyline/Tether Units

Medium Volume:

Acre 17 $ $

5f.3* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Skyline/Tether Units

Low Volume:

Acre 45 $ $

Description of Proposed Optional Work Activities Unit Estimated

Quantity Unit Price Total Price

6f.1* Load/Haul/Road Maintenance Included Sawlog Timber Ton 200,977 $ $

6f.2* Load/Haul/Road Maintenance Included Nonsaw Timber: Local Facility Ton Unest. $

6f.3* Load/Haul/Road Maintenance Included Nonsaw Timber: Pulp Facility Ton 22,330 $ $

7f Road Reconstruction Mile 74

8f Fuels Work/Reforestation

8.1f* Machine Pile Acre 2,680 $ $

8.4f* Landing Cleanup Acre 58.3 $ $

8.5f Manual Fireline Feet 27,350 $ $

8.15f Planting Acre 547 $ $

9f Temporary Road Construction and Obliteration

9f.1* New Temporary Road Mile 3 $ $

9f.2* Existing Prism Temporary Road Mile 5 $ $

10f* Erosion Control Acre 292 $ $

Item 7- Optional Road Reconstruction ‘Menu’

7a.1 15101-0000 MOBILIZATION Lump Sum 5 $ $

7a.2* 20101-0001 CLEARING AND GRUBBING, DISPOSAL METHOD (b), COMPACTION (g) Mile $

7a.3*

20203-0000 SELECTIVE CLEARING, TYPE

ROADSIDE, DISPOSAL METHOD (f), COMPACTION (g)

Mile $

7a.4*

20210-0000 SPECIAL CLEARING AND

GRUBBING, TYPE ROADWAY,

MERCHANTABLE TIMBER DISPOSAL

METHOD (e), SLASH DISPOSAL METHOD (g), COMPACTION METHOD (g).

Mile $

7a.5*

20207-0000 SELECTIVE CLEARING AND

GRUBBING, TYPE ROADWAY, DISPOSAL

METHOD (e), COMPACTION (g)

Mile $

7a.6* 20301-1900 REMOVAL OF PIPE CULVERT, DISPOSAL METHOD A, COMPACTION (g) Each $

Description of Proposed Optional Work Activities Unit Estimated

Quantity Unit Price Total Price

7a.7* 20401-0000 ROADWAY EXCAVATION, COMPACTION (d), TOLERANCE CLASS A

Cubic Yard $

7a.8*

20420-0000 EMBANKMENT CONSTRUCTION,

COMPACTION (b) PLACEMENT METHOD 2, TOLERANCE CLASS A

Cubic Yard $

7a.9* 20421-0000 ROCK EXCAVATION, COMPACTION (d), TOLERANCE CLASS A

Cubic Yard $

7a.10*

20425-1000 DRAINAGE EXCAVATION, TYPE

ROADSIDE DITCH, TOLERANCE CLASS A,

COMPACTION (g)

Foot $

7a.11*

20425-2000 DRAINAGE EXCAVATION, TYPE

OUTLET DITCH, TOLERANCE CLASS A,

COMPACTION (g)

Foot $

7a.12*

20425-2001 DRAINAGE EXCAVATION, TYPE II

DRAIN DIP, TOLERANCE CLASS A,

COMPACTION (e)

Each $

7a.13*

20425-2002 DRAINAGE EXCAVATION, TYPE

CATCH BASIN, TOLERANCE CLASS A,

COMPACTION (g)

Each $

7a.15* 20441-0001A WASTE END HAUL / AGGREGATE HAUL – END DUMP $/CY/Mile $

7a.16*

20441-0001B WASTE END HAUL /

AGGREGATE HAUL – BELLY DUMP/SIDE

DUMP

$/CY/Mile $

7a.17* 25101-0100 PLACED RIPRAP, CLASS 3, GOV'T SOURCE $/CY/Mile $

7a.18* 25105-0300 PLACED RIPRAP, CLASS 3, COMMERCIAL SOURCE

Cubic Yard $

7a.19 26801-0000 HORIZONTAL DRAIN PIPE Foot $

7a.20 26802-0000 COLLECTOR SYSTEM PIPE Foot $

7a.21

30103-1000A AGGREGATE BASE COURSE,

GRADING C, (b) COMPACTION B (GOV'T

SOURCE)

$/CY/Mile $

7a.22

30103-1000B AGGREGATE BASE COURSE,

GRADING C, (b) COMPACTION B

(COMMERCIAL SOURCE)

Cubic Yard $

7a.23 30112-0000A AGGREGATE SURFACE COURSE, GRADING F, (b) COMPACTION B $/CY/Mile $

Description of Proposed Optional Work Activities Unit Estimated

Quantity Unit Price Total Price

(GOV'T SOURCE)

7a.24

30112-0000B AGGREGATE SURFACE

COURSE, GRADING F, (b) COMPACTION B

(COMMERCIAL SOURCE)

Cubic Yard

7a.25* 30301-5000 ROADWAY RECONDITIONING, AGGREGATE SURFACE, COMPACTION (d) Mile $

7a.26* 30301-6000 ROADWAY RECONDITIONING, COMPACTION (d) Mile $

7a.27

60201-0600 18 INCH PIPE CULVERT,

CORRUGATED STEEL, 16 GAGE,

COMPACTION METHOD (h)

Foot $

7a.28

60201-0800 24 INCH PIPE CULVERT,

CORRUGATED STEEL, 16 GAGE,

COMPACTION METHOD (h)

Foot $

7a.29

60201-1000 36 INCH PIPE CULVERT,

CORRUGATED STEEL, 16 GAGE,

COMPACTION METHOD (h)

Foot $

7a.30

60201-1200 48 INCH PIPE CULVERT,

CORRUGATED STEEL, 16 GAGE,

COMPACTION METHOD (h)

Foot $

7a.31 60705-0000 REPAIR DRAINAGE STRUCTURE Each $

7a.32 61902-1400 STEEL 16' FS SWING GATE Each $

7a.33

62501-0000 TURF ESTABLISHMENT, DRY

METHOD SEEDING, DRY METHOD

MULCHING, GOV'T FURNISHED SEED

Acre $

7a.34

63301-0000 BARRICADE MARKER SIGN (FBM-

L) OR (FBM-R), METAL PANEL, TYPE III

SHEETING

Each $

7a.35 63303-0900 MILE MARKER SIGN, ALUMINUM PANEL, TYPE 3 SHEETING Each $

7a.36 63308-0000 OBJECT MARKER SIGN (OM2- 2V), METAL PANEL, TYPE III SHEETING Each $

7a.37 63303-0901 ROAD CLOSURE SIGN, METAL PANEL, TYPE 3 SHEETING Each $

7a.38 63306-1700 POST, WOOD, 4-INCH X 4-INCH Each $

7a.39 63306-0100 U - CHANNEL POST Each $

7a.40 30110-0000 AGGREGATE SURFACE COURSE Ton 50,000 $

Description of Proposed Optional Work Activities Unit Estimated

Quantity Unit Price Total Price

– CRUSHING – GRADATION F

7a.41 30101-1000 AGGREGATE BASE COURSE – CRUSHING – GRADATION C Ton 10,000 $

7a.42 61903-0001 CATTLE GUARD – STEEL Foot $

7a.43 57801-0000 PRECAST STRUCTURAL CONCRETE – CG ABUTMENT Foot $

7a.44 41401-2000 CRACKS, CLEANING AND

SEALING

Linear Foot 271,000

7a.45 41401-3000 CRACKS, CLEANING AND

FILLING

Linear Foot 14,000

Item 8- Optional Fuels Work/Reforestation ‘Menu’

8.1* Machine Pile Acre Unest. $

8.2* Tether Pile >35% Slope Acre Unest. $

8.3 Hand Pile and Covering Acre Unest. $

8.4* Landing Cleanup Acre Unest. $

8.5 Manual Fireline Foot Unest. $

8.6* Machine Fireline Mile Unest, $

8.7 Slashing Acre 3619 $

8.8* Mastication Type 1 Acre Unest. $

8.81* Mastication Type 2 Acre Unest. $

8.82* Mastication Type 3 Acre 1097 $

8.9 Leave Tree Protection Acre 1068 $

8.10* Chipping Acre TBD

8.11* Biomass Removal Ton TBD

8.12 Precommercial Thinning Type 1 Acre 550 $ $

8.13 Precommercial Thinning Type 2 Acre 225 $ $

8.14 Precommercial Thinning Type 3 Acre 225 $ $

8.15 Planting Acre TBD $

Timber Salvage-Contract Area X

1x Unit Recon, Layout, Boundary Identification, and GPS Acre TBD

2x Road Survey Mile TBD

*Indicates line item may be eligible for price adjustment.

TIMBER/PRODUCT REMOVAL PRICE SCHEDULE:

3. LAND MANAGEMENT ACTIVITIES.

The Forest Service is executing this procurement under the stewardship contracting authority provided under Section 8205 of Public Law 113-79, the Agricultural Act of 2014 as amended under Section 204 & 207 of the Consolidated Appropriations Act (Omnibus Bill 2018). Stewardship authority grants the Forest Service Chief or designee the authority to aggregate contractual requirements into stewardship projects.

Performance of land management activities shall be in accordance with Project Description and Work Specifications. Payment for Land Management Work Activities in Schedule of Items will be made in Stewardship Credits and Appropriated Funds.

All Base Work Activities (Mandatory) shall be performed. Optional activities are listed in order of planned priority.

Award may be made for optional items in any order that the Contracting Officer determines is in the best interest of the Government.

Item No.

Description of Proposed Optional Work Activities Unit Estimated

Quantity Unit Price Total Price

3x Cruise Design Plan, Cruise, and Processing Acre TBD

4x.1* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Tractor Units Acre TBD

5x.1* Cut/Skid/Deck Included Timber (Saw and Nonsaw): Skyline/Tether Units Acre TBD

6x.1* Load/Haul/Road Maintenance Included Sawlog Timber Ton TBD

6x.*2 Load/Haul/Road Maintenance Included Nonsaw Timber: Local Facility Ton TBD

7x* Road Reconstruction Mile TBD

8x* Fuels Work/Reforestation Acre TBD

9x* Temporary Road Construction and Obliteration Mile TBD

10x* Erosion Control Acre TBD

SPECIES PRODUCT ESTIMATED

QUANTITY

UNIT OF

MEASURE

MINIMUM

ACCEPTABLE

OFFER

OFFER

(FLAT)

TOTAL OFFER

Jungle Bird Contract Area Grand fir and

Others Sawtimber 76,017 Ton

Ponderosa Pine Sawtimber 10,359 Ton

Combined Softwood Non-saw 9,284 Ton

4. SCOPE OF CONTRACT

(a) The intent of the project is to mitigate wildfire risk and increase resilience to disturbances from insect and disease across the End of the World project area. The G-Z contracting tool will help increase the pace and scale of restoration beyond the forest’s current capacities. This contract is planned to implement the following work activities:

1. Timber Sale Preparation

a. Contractor will complete layout of harvest units. Units must be within project approved NEPA boundaries and avoid exclusion areas such as riparian areas, protected areas, private property, etc. Boundaries may be identified by paint, flagging, or be virtual unless they are adjacent to private property or pre-identified archaeological sites. Contractor will determine cutting specifications that may include marking, DxP, DxD, or a combination of methods to accomplish the Silvicultural prescriptions provided by the Forest Service.

b. During layout, the Contractor will identify and GPS pre commercial thinning (PCT) units. PCT survey templates provided by the Forest Service.

c. Contractor will layout, measure and record tracks for temporary roads utilizing Geographic Positioning System (GPS) tools. Temporary roads will be limited in miles for the project area and require recontouring post-harvest. Existing non-system road prisms may be used in addition to temporary road quantities and will be recontoured after use. Temporary water crossings are not permitted.

d. Harvest units will be GPS’d to Forest Service specifications individually with delineations for logging systems and volumes per acre (Tons) to be delivered to the Forest Service for activity tracking. Contract Area maps will be developed by the Contractor utilizing templates provided by the Forest Service for individual Contract Areas.

e. In Optional Contract Areas, volume determination will be completed on a contract area basis that meets or exceeds Forest Service R1 cruise standards. Cruise plans shall be accepted by the Forest Service prior to completing volume determinations. Collected data such as plot locations, plot data, and processed data shall be provided to the Forest Service in the format specified. Forest Service may elect to do a check cruise. Forest Service will appraise contract areas separately utilizing the R1 Residual Value Appraisal.

2. Road Survey

a. Contractor will survey haul routes to identify work necessary to facilitate log haul, complete road maintenance plans, and develop worklists for Forest Service review. Templates will be provided by the Forest Service.

3. Timber Removal and Haul

a. Timber removal will be limited to two contract areas operating at time to ensure clean-up type activities are kept current and for control of operations. Operating in more than two may be done by agreement.

b. Timber cutting, skidding, and decking for sawlog and nonsaw will be broken into three separate categories for tractor and skyline/tether harvest systems based on volume per acre as follows:

c. Helicopter logging will not be considered in this contract unless the Contractor provides a cost advantage to the Government.

d. Loading and hauling will be broken into sawlog and nonsaw for multiple delivery points.

e. Road maintenance will be performed by the Contractor and will be commensurate with use.

4. Haul Roads

a. Road work may consist of maintenance, reconstruction, decommissioning, and obliteration.

b. Roadwork for the contract will be limited to the minimum necessary to facilitate safe haul.

c. Forest Service Road (FSR) 221 has a limited operating period from 12/1-4/1 annually for winter recreation, Use of FSR 221 during this period is subject to agreement and will require snow plowing. Break-up limits will be implemented depending on seasonal conditions to protect pavement on FSR 221. Alternate haul routes may be utilized within the project, if agreed to between the Contractor and Forest Service.

5. Fuels Work, Reforestation and Erosion Control

a. Reduce natural and activity generated fuel loading within the project area.

b. Plant regeneration harvest units with early-seral species to increase insect and disease resiliency.

c. Implement a variety of control measures to prevent erosion within the project area.

d. Thin small diameter trees to specified stocking levels.

6. Catastrophic Event

a. Respond quickly to changed conditions that may affect the End of the World project area by the inclusion of salvage operations and suppression repair activities.

(b) Resulting Contract – Any resultant contract will be a firm fixed price commercial services contract with requirements for timber removal.

(c) Project Location- Approximately 8 air miles south of Grangeville, Idaho.

(d) Under this contract, “Contractor’s Operations” shall include activities of or use of equipment of Contractor, Contractor’s employees, agents, Subcontractors, or their employees or agents, acting in the course of their employment in operations hereunder on National Forest lands or within Forest Service protection boundary (unless acting under the immediate supervision of Forest Service).

(e) Contractor’s Operations shall be conducted in a workmanlike and orderly manner. The timing of required Forest Service designation of work on the ground and the performance of other Forest Service work shall not be such as to cause unnecessary delay to Contractor.

5. FAR 52.212-4 CONTRACT TERMS AND CONDITIONS - COMMERCIAL PRODUCTS AND COMMERCIAL

SERVICES (NOV 2025)

a) Definitions. The clause at Federal Acquisition Regulation (FAR) 52.202-1, Definitions, is incorporated by reference.

(b) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(c) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(d) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(e) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal, or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause FAR 52.233-1, Disputes, which is incorporated in this contract by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence. Examples of occurrences include acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. When an excusable delay occurs, the Contractor shall—

(1) Notify the Contracting Officer in writing as soon as possible;

(2) Remedy the delay as quickly as possible; and

(3) Notify the Contracting Officer when the occurrence is over.

(g) Invoice. The Government will handle invoices according to the Prompt Payment Act (31 U.S.C. 3903) and 5 CFR part 1315. The Contractor shall submit invoices to the address designated in the contract to receive invoices. An invoice must include the information required by 5 CFR part 1315.9(b).

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees, and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark, or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment—

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR Part 1315.

(3) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(4) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(5) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by if–

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures for interest credits prescribed in FAR part 32 in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon—

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance.

The Government will send a cure notice to the Contractor, unless the reason for the termination is late delivery.

In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 49 U.S.C. 40118, Government-financed air transportation; and 41 U.S.C. chapter 21 relating to procurement integrity.

(r) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services;

(2) The Disputes, Payments, Invoice, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;

(3) Other contract clauses incorporated in the solicitation or contract;

(4) Addenda to this solicitation or contract;

(5) Solicitation provisions incorporated in the solicitation;

(6) Other paragraphs of this clause;

(7) Other documents, exhibits, and attachments; and

(8) The specification.

(s) Unauthorized obligations.

(1) Except as stated in paragraph (s)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti- Deficiency Act violation (31 U.S.C. 1341), the following shall govern:

(i) Any such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government-authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.

(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (s)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.

(t) Comptroller General examination of record. This paragraph applies if this contract was awarded using other than sealed bid procedures and is in excess of the simplified acquisition threshold on the date of award of this contract.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices, at all reasonable times, the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR part 4, longer period required by statute, or periods specified in other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement.

Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This clause does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(u) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

ADDENDUM TO FAR 52.212-4

6. SPECIFICATIONS

General specifications for each Contract Activity individually described by an item number in the Schedule of Service Items can be found in Appendix A. Specifications for timber removal can be found in Appendix B and associated road plans and specifications in Appendix C for Stewardship related projects. Incidental construction or reconstruction specified road work plans, drawings, exhibits, and specifications can be found in Appendix D.

7. CONTRACTOR QUALITY CONTROL INSPECTION SYSTEM

The Contractor shall identify the quality control inspection system it will use to ensure that contract specifications will be achieved. At no time shall the contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contractor shall produce written inspection records in a format and at times and places satisfactory to the Contracting Officer. Inspection records shall be made available upon request of the Contracting Officer and be maintained until the date of contract closure. The Contracting Officer may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.

8. GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN

Quality assurance plans specific to individual items will be found in Appendix A.

9. PERIOD OF PERFORMANCE

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after receipt of Notice to Proceed for specified work items, (b) prosecute the work diligently, and (c) complete all work no later than September 15, 2036. The time stated for completion shall include final cleanup of the premises.

10. POST AWARD CONFERENCE

A post award conference with the successful offeror is required. It will be scheduled within 30 days after the date of contract award. The conference will be held at Bitterroot National Forest Supervisors Office.

11. PREWORK CONFERENCES

Annually, prior to commencement of work, a prework conference will be held to discuss contract terms and work performance requirements. Also at this meeting such things as responsibility under OSHA, and procedures for how undesignated timber that may have to be added to the contract (including danger trees) shall be discussed and documented.

12. CONTRACT OPERATIONS SCHEDULE

Contractor shall, before commencing operations, provide in writing an annual Operating Schedule of anticipated major activities and needs for logging Included Timber and completing stewardship projects, such as logging, road maintenance, and construction. Upon reasonable notice to Forest Service, such a schedule shall be subject to modifications necessitated by weather, markets, or other unpredictable circumstances.

Contractor’s Operations may be conducted outside Normal Operating Season. “Normal Operating Season” is the period(s) beginning and ending on the dates stated below.

Timeframe Restriction Description

6/15-10/15 Annually Normal Operating Season

12/1-4/1 Annually FSR221 Grangeville Salmon Road is closed to vehicular traffic 12/1-4/1.

Weekends and Federal Holidays Hauling Prohibited on Weekends (all day Saturday & Sunday) and Federal Holidays from Memorial Day through December 1st.

Award through October 30, 2027 Completion of road reconstruciotion requirements in the Jungle Bird contract Area

Completion date for road reconstruction is binding on the party that constructs road, whether Contractor or Forest Service. Contracting Officer shall modify the completion date in writing to conform to the approved plan of operations at the request of Contractor.

When Contractor elects Forest Service construction of Specified Roads shown in sale advertisement, Forest Service may adjust construction completion date when road construction is interrupted or delayed for causes that qualify for an adjustment of the completion date of the road construction contract. When qualifying interruptions or delays of road construction occur, Forest Service shall evaluate such occurrences and document any findings.

The current status of any adjustment shall be available to Contractor on request. Promptly after the end of Normal Operating Season in which qualifying days occur, Forest Service shall give Contractor written notice of (a) number of qualifying days claimed, and (b) new construction completion dates.

Forest Service shall in no way be responsible for any delay or damage caused by road contractor in performing the road construction except such delay as may be the fault or negligence of Forest Service.

As used in this solicitation, construction of a road is completed when:

(a) Contractor constructs Specified Roads and Forest Service furnishes Contractor with written notice of acceptance, or

(b) Forest Service constructs road and furnishes Contractor with written notice authorizing use of road.

Contractor shall not use a road that Contractor has elected for Forest Service to construct, until construction is complete, and Forest Service furnishes Contractor with written notice authorizing use of road.SCHEDULES AND

REPORTS

Contractor shall provide the following submittals as stated below unless otherwise mutually agreed upon. The Contractor shall update all submittals as needed, or as required by the CO, but in no case less than once per calendar year on a date specified by the Contracting Officer:

ITEM DESCRIPTION SUBMITTAL DUE

Proposed Operation Plan (Overall Schedule): The Contractor shall prepare and submit one electronic copy of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the estimated starting and completion dates of various phases of the work. The schedule shall comply with the contract time requirements in the contract.

With proposal

Schedule for Construction Items: The Contractor shall comply with the requirements of FAR 52.236-15 – Schedules for Construction Contracts. At prework meeting

Subcontractors: List of proposed sub-contractors and their intended work. Sub-contractors must have Contracting Officer’s written approval prior to starting work on the project. Submit on Standard Form 1413.

With proposal

Traffic Control Plan. The Contractor shall prepare and submit a Traffic Control Plan detailing conformance with OSHA requirements, MUTCD requirements, and all other contract requirements, including, but not limited to the requirements included in the Appendices, if any.

At prework meeting

Safety Plan. The Contractor shall comply with the requirements of the solicitation’s safety clause for all activities under this contract.

With proposal

Quality Control Plan. Submit original with proposal. Any updates need to be provided for approval to the CO.

With proposal

Small Business Subcontracting Plan. Applies to large businesses only- A Draft Small Business Subcontracting Plan is required with any proposal from a large business. Refer to 52.216-9 Small Business Subcontracting Plan for requirements.

With proposal

Annual Operating Plan. Contractor shall submit an annual plan listing units, roads and other information required in the Appendices.

Beginning of every operating season annually Fire Control Plan. Contractor shall submit plan in accordance with requirements in the Appendices.

At prework meetings

Designation of Contractor personnel describing responsibilities and authorities At prework meeting Aggregate Gradation and Quality. Test results certifying material meet specifications.

Shall be turned in to COR a minimum of 7 days before placement for review and approval. Before Placement

Culvert Certifications. Certification of gauge. Shall be turned in to COR a minimum of 7 days before placement for review and approval. Before Installation

Weed Free Material Source. As applicable for reconstruction materials. Shall be turned in to COR a minimum of 7 days before placement for review and approval. Before placement

BioBased Report. Submit annually via SAM.gov and provide a copy to the CO. October 31 Annually

All schedules and reports shall be submitted to the Contracting Officer, unless the Contracting Officer directs the Contractor to submit any schedules or reports directly to the Contracting Officer’s Representative.

14. PAYMENT

It is anticipated that funds will be exchanged in the performance of this contract because the value of the timber will not completely offset the value of the work to be performed. When payment is made to the contractor for work performed, it will be made in accordance with the specifications set forth under the payment methods provisions in Appendix A. When harvesting operations are underway, the value of work completed and timber removed will be documented monthly in the Forest Products Financial System which will produce a Statement of Accounts.

15. STEWARDSHIP CREDITS

Stewardship Credits are credits that are earned and established when work listed in the Schedule of Supplies/ Services has been performed and accepted. Stewardship credits may be cash or non-monetary (product value) and shall be earned at the rate as shown in award documents. Earned non-monetary credits may be used to pay for timber value included in the Schedule of Items. Unless otherwise indicated in the Schedules, credits will be earned based upon Actual Quantities accomplished and accepted.

16. ESTABLISHMENT OF STEWARDSHIP CREDITS

Notwithstanding references to payments in “Payment” clauses or provisions of this contract, payment for Stewardship Activities will be made with Stewardship Credits as indicated in the award document.

Stewardship Credits will be established on a monthly basis as work is accepted. Stewardship credits will be established for the number of units of each activity that have been completed and accepted. Acceptance may be for all, or a reasonable portion of, any specific activity.

Invoices to establish cash credits (cash payment) are to be submitted electronically via the Invoice Processing Platform (IPP).

Invoices to establish non-monetary credit are to be submitted to the Contracting Officer Representative (COR) identified on award documents. These credits will be used to off-set the amount required to be paid for the forest products value when earned prior to the cutting of Included Timber.

17. TIMBER PAYMENT GUARANTEE

(1) General—(a) To guarantee payment for timber scheduled for…

This is the start of the file's text. The full file is on GovTribe.