2. EOTW_RFI_PPT.pdf

PDF 2 MB Posted

Attached to
End of the World Long Term Stewardship
Solicitation number
12363N25R4014
Issued by

About this file

This document is a Request for Information (RFI) for the End of the World G-Z Integrated Resource Service Contract, issued by the USDA Forest Service's Salmon River Ranger District. The project involves timber harvest and forest management across approximately 17,500 acres, with 16,000 acres of intermediate thinning (including commercial and variable density thinning) and 1,500 acres of regeneration harvest through clearcut, shelterwood, and seed tree methods. The primary goals include increasing treatment pace and scale, reducing fuel loading, improving forest resilience, and leveraging timber value to offset service work costs.

The project timeline includes RFI questionnaire responses due by 9/17, follow-up responses by 10/1, a potential fall 2025 site visit, contract preparation in winter 2025/26, solicitation in spring 2026, and contract award in summer/fall 2026. The initial project areas include five priority treatment zones: Jungle Bird (764 acres, 14.8 MMBF sawlog), Wooly Bully, Ski Bird, Cold Fir, and Free Bird, with potential treatment acres ranging from 1,189 to 4,739 across these areas. The contract will use an Integrated Resource Service Contract approach, focusing on end-result contracting and building partnerships with industry.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

End of the World G-Z Integrated Resource Service Contract

Request for Information

Agenda

• Definition of an Integrated Resource Service Contract (IRSC)

• Purpose of Request for Information (RFI) Meeting

• Project Overview

• Goals

• Proposed Activities

• What’s been done so far

• Timelines

• Site Visit

Definition and Purpose

• IRSC = Integrated Resource Service Contract

• Reason for use = Costs of service work exceeds the value of timber to be traded

• To support removal of timber that road work, timber value, haul or logging systems would make uneconomical in traditional timber sale

• To support restoration or timber layout activities using timber value to offset funding need

• Method to build partnership with industry

• End Result Contracting

• Focus on outcomes

Purpose of RFI and Project Questionnaire

• Gauge interest in the project

• Receive feedback and ideas from industry on project development

• Identify potential challenges and solutions

• Questionnaire responses will be confidential

• Determine industry capacity

Project Overview

Project Overview

End of the World EIS

• 16,000 acres of intermediate

• Commercial thinning

• Variable density thinning

• 1,500 acres of regeneration harvest

• Clearcut

• Shelterwood

• Seed tree

• Net acres are expected to be less after layout

Goals

• Increase pace and scale of treatment across landscape

• Maximize treatment within NEPA units

• Thin intermediate units to 100-120 Sq. FT. Basal area

• Leverage stumpage value to offset costs of service work items

• Regeneration harvest to convert stands to desirable species

• Reduce fuel loading to mitigate catastrophic wildfire

• Improve insect and disease resiliency across the landscape

• Award by FY26 Q4

Proposed Activities

Proposed Activities Timber Sale Preparation

• Unit layout, Marking/Designation, GPSing, Cruising

Commercial Cut and Removal

• Tractor, Skyline, Tether

• Maximize harvest within NEPA boundaries

• Mandatory non-saw removal

Roads

• Reconstruction, road survey, work packages, maintenance plan, temporary road construction/obliteration

• Road design is not included

Fuels

• Machine piling, handline, machine line, landing piling, tethered piling, slashing, PCT

Jungle Bird

• 764 Acres

• 616 acres tractor

• 148 acres skyline

• 14.8 MMBF Sawlog

• 1.9 MMBF Nonsaw

• Combination of DxD and DxP

• 4,200 NEPA acres with potential for additional volume

How do we include undefined areas with defined end results?

Wooly Bully

Timelines

• RFI Questionnaire response 9/17

• Response to questions from RFI by 10/1

• Fall 2025 Site Visit?

• Winter 25/26 Contract preparation

• Spring 26 Solicitation

• Summer/Fall 26 Award

Site Visit

• Drive to Jungle Bird TS

End of the World G-Z Integrated Resource Service Contract��Request for Information
Agenda
Definition and Purpose
Purpose of RFI and Project Questionnaire
Project Overview
Project Overview
Goals
Proposed Activities
Proposed Activities
Jungle Bird
How do we include undefined areas with defined end results?
Wooly Bully
Timelines
Site Visit