About this file
This document is Amendment 2 to a federal solicitation for the Crazy Creek Suppression Repair-Fencing project, issued by the USDA Forest Service. The amendment modifies the original solicitation (12363N25Q4114) for fence repair and reconstruction in the Ochoco National Forest, updating key details such as the submission deadline to August 4, 2025, at 10:00 AM Mountain Time. Vendors are instructed to email quotes using a specific naming convention: 25Q4114-R6Fence-VendorName-Quote and 25Q4114-R6Fence-VendorName-Technical.
The amendment introduces changes to the period of performance, now spanning from August 15, 2025, to October 31, 2026, and updates the invoice submission process to use the Department of Treasury's Invoice Processing Platform (IPP). The solicitation requires contractors to construct various fence types, including 3-wire and 4-wire fences, with specific materials and installation requirements. The project involves clearing fence line corridors, removing existing fencing, and installing new fencing components such as steel pipe H-braces, metal T-posts, and wire, with detailed specifications for wire spacing, tension, and installation techniques.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amd-3 12363N25Q4114_1.pdf | ||
| Amend-1 12363N25Q4114-1.pdf | ||
| Amend-1 12363N25Q4114.pdf | ||
| (OCH) NR Crazy Creek Suppression Repair-Fencing_R6_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12363N25Q4114 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
363N
WASHINGTON DC 20250-1138
MS-1138
1400 INDEPENDENCE AVE SW
USDA-FS STEWARDSHIP CONTRACTING BR
07/22/20250002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/30/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ALL QUOTES SHALL BE EMAILED TO:
CHAD.BULLOCK@USDA.GOV; JAMES.KAMINSKI@USDA.GOV: B1_OFFE.pvwvpndi0hpchkrs@u.box.com on or
BEFORE August 4, 2025, 10:00 AM MOUNTIAN TIME.
Since all documents will be submitted to me electronically. Follow this naming convention for your attachments and keep the subject line the same or just reply all to this email.
25Q4114-R6Fence-VendorName-Quote AND 25Q4114-R6Fence-VendorName-Technical.
Be sure to fill out all required documentation.
Required to be filled in below:
Company Name:___________________________________
POC Name:_______________________________________
Continued ...
15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
CHAD A.T. BULLOCK
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 1 of 22
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
(A) (B) (C) (D) (E) (F)
12363N25Q4114/0002
Phone number:___________________________________
Email:__________________________________________
BPA/IDIQ/MATOC Contract #_______________________
UEI SAM #______________________________________
Contractual POC: Chad A.T. Bullock Contracting
Officer, chad.bullock@usda.gov 385-368-5300
Contractual Technical: James Kaminski APSO, james.kaminski@usda.gov 573-453-8424
Purpose of this amendment is to add addition spec to fencing project, see updated SOW and mapping.
LIST OF CHANGES:
Date distributed : 17-JUL-25 changed to 22-JUL-25
Period of Performance: 08/15/2025 to 10/31/2026
The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice
Processing Platform (IPP), https://www.ipp.gov.
If the contractor lacks an IPP account, USDA will automatically initiate the enrollment process with Treasury using the contractor's SAM.gov
Accounts Receivable POC as the IPP account holder. Once the enrollment process is complete, the IPP account holder will receive notification and can being invoicing. More information about
IPP can be found at: https://www.ipp.gov
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 2 of 22
B- 1 - SCHEDULE OF ITEMS for Crazy Creek Fire Fence Construction
Priority One
ITEM
NO.
DESCRIPTION PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
001 Mobilization Lump Sum ALL
002A Fence Construction, 3 Wire LF 453
002C Fence Construction, 4 Wire LF 33,870
002D Fence Construction, 4 Wire (Lay-Down Fence) LF 41,324
004A Braces (line or corner), Pipe EA 113
004B Braces (line or corner), Rock Jack or Crib EA 49
005 Wire Gate Installation EA 76
TOTAL
Priority Two
ITEM
NO.
DESCRIPTION PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
001 Mobilization Lump Sum ALL
002A Fence Construction, 3 Wire LF 29,112
002C Fence Construction, 4 Wire LF 54,499
004A Braces (line or corner), Pipe EA 126
004B Braces (line or corner), Rock Jack or Crib EA 54
005 Wire Gate Installation EA 64
TOTAL
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 3 of 22
Priority Three
ITEM
NO.
DESCRIPTION PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
001 Mobilization Lump Sum ALL
002A Fence Construction, 3 Wire LF 31,321
002B Fence Construction, 3 Wire (Lay-Down Fence) LF 7,206
002C Fence Construction, 4 Wire LF 18,484
002D Fence Construction, 4 Wire (Lay-Down Fence) LF 12,276
004A Pipe - Line Braces/ Corners Braces EA 81
004B Rock Jack or Crib Corner Braces EA 34
005 Wire Gate Installation EA 52
TOTAL
Tree Felling Option
ITEM
NO.
DESCRIPTION PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
006 Tree Felling (Greater than 20" DBH) EA 432
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 4 of 22
BAR Option
ITEM
NO.
DESCRIPTION PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
001 Mobilization Lump Sum ALL
002A Fence Construction, 3 Wire LF 109,871
002B Fence Construction, 3 Wire (Lay-Down Fence) LF 15,351
002C Fence Construction, 4 Wire LF 48,573
002D Fence Construction, 4 Wire (Lay-Down Fence) LF 54,253
004A Pipe - Line Braces/ Corners Braces EA 315
004B Rock Jack or Crib Corner Braces EA 135
005 Wire Gate Installation EA 98
TOTAL
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 5 of 22
Fence Material and Construction Specifications
PART 1: GENERAL
SUMMARY
A. Section Includes: Installing wire fences with Contractor furnished materials.
PART 2: PRODUCTS
2.1 CONTRACTOR FURNISHED MATERIALS
A. Steel Pipe H-braces o Post pipe will be 2-3/8” O.D. schedule 40 steel pipe or drill stem pipe with metal cap covers.
o Brace pipe will be 1-1/4” O.D. schedule 40 steel pipe.
o Steel pipe for braces and posts will be schedule 40, 7’ to 8’ length depending on the terrain and slope.
o Steel post pipe needs to be in the ground 3’ with a minimum of 46” above ground.
o Spacing between brace posts for the H-brace will be 7’ to 8’ depending on the soil.
o Whenever possible H-braces will be welded together but brace clamps can be used when welding is not possible.
B. Alternate Fence Brace Structures (Metal Construction -Refer to fence drawings) o Rock Crib o Rock Jack
C. Metal T-posts o Heavy-duty t-posts (1.33 LB) will be installed every 16’-6” on fence line.
o A minimum 5 1/2’ post will be used.
D. Inline Metal Pipe o Inline metal pipe will be used every 10th t-post or 160’.
o Inline metal pipe can be either 2 3/8” or 2 7/8” diameter pipe.
o Metal or wood stays are not needed if using metal inline pipes.
E. Wire o Smooth wire will be 12.5 gauge, two stranded, galvanized steel o Barbed wire will be two pt. barbed, 12.5 gauge, two stranded, galvanized steel
F. Wood Fence Stays o Commercially available wood stay, 48-inch length. Maximum width at the widest part of the stay will be 4-inches, minimum width at the widest part of the stay shall be 2 inches.
o Install a stay between each metal line post.
G. Fence Anchors and Drainage Crossings o Where determined to be necessary, fence anchors will be installed on the fence line when crossing drainages, dips, or swells to anchor line posts to eliminate lifting of line posts and fence line. See drawings for drainage crossing requirements.
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 6 of 22
PART 3: EXECUTION
3.1 PREPARATION
A. Clearing fence line corridor o Minimum clearing (fence right of way-ROW) width is 4 feet on each side of the fence line. All live woody vegetation greater than 24 inches in height is to be removed, except any live tree 8 inches or greater at DBH will stay. Small diameter brush does not need to be cleared. Large diameter bushes containing stems greater than 1-inch basal diameter shall be cleared. All dead standing trees that are within 4 feet of the fence centerline (fence line corridor) shall be removed. Stumps shall be cut no higher than 12 inches above the ground. Slash created by clearing fence line will be scattered outside of the fence line corridor, and not in any ditch or roadway. Limited additional clearing may also be necessary as the fence is constructed to meet clearing specifications, as approved by the CO. This work is incidental to fence construction.
o Minimum clearing width for dead standing trees less than 6” DBH (4.5 feet above ground) is 20 feet on each side of the fence line right of way. This work is incidental to fence construction.
o As requested by the Forest Service, the contractor will fall and remove (4 feet on each side of the fence line) all dead standing trees larger then 20” DBH as marked by the Forest Service. Tree felling is paid per each.
o Provide minimal disturbance to existing grass and sod. Dispose of all debris by scattering it to either side of the 8 feet clearance zone.
o All dead down and cut/felled trees that are within the fence line corridor shall be dragged away from the fence line ROW.
B. Existing Fence Removal: Existing fence and associated materials shall be removed except usable steel t-posts or other materials requested by the CO. Usable t-posts will be removed and stockpiled at a government facility designated by the CO within 20 miles of worksite. Metal wire and staples will be removed and hauled off-site by the contractor and disposed of in accordance with all local, state and federal requirements. Any untreated wood posts or trees used as part of existing fence can be left on site to degrade naturally. Questions related to removal or leaving should be directed to the CO.
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 7 of 22
3.2 CONSTRUCTION
A. General: Drive steel posts to the minimum depth to secure. Fenceline shall be straight between corners or end-points. Any change in direction shall only occur at a corner as depicted on the supplied drawings. Obstacles that interfere with construction of a straight fence shall be removed if possible. If not possible to remove an obstacle, additional corners shall be added at each directional change in order to navigate the fence around the obstacle.
B. Steel T-posts: Install new T-posts as described: Wire Fences and Gates. Drive Steel T-posts into ground. If Steel T-post is located in a place where rock prevents driving into the ground due to rock, remove anchor plate and drill holes into rock slightly smaller than the diameter of the Steel T-post at a minimum depth of 18 inches. Drive Steel T-post into the newly drilled hole in rock. Steel T-post shall remain straight and plumb after being driven into ground or into holes drilled into rock. If the Steel T-post is bent or not plumb after installation, the hole shall be re-drilled and a new, straight Steel T-post shall be installed. The Contractor shall incur all costs for new replacement Steel T-posts rendered unusable (bent, re-straightened, misshapen, or recycled) during installation. All Steel T-posts used in all fence segments shall be newly purchased Steel T-posts.
C. Post End Panel (Stress Panel), Brace, Post Corner Panel, Metal Caps, and Assemblies:
Unless otherwise specified by the Government, post end panels, braces, and post corner panels shall be constructed utilizing the specifications described on “Stress Panels (Steel Pipe)”, “Corner Panels (Steel Pipe)”, and “Stress Panel Fence & Gate” drawings.
Construct post end panels on crests of hills, and at a maximum of 1,320 feet center to center for barbed wire fence segments. Metal Steel Caps shall be installed on the top of every Steel Pipe Post. Wood fence Stays shall be installed in accordance with the drawings. Should a corner be placed in an area with rock, holes of such a size to securely anchor the pipe will be drilled into the rock, and the pipe will be inserted into the drilled hole. Braces will be placed at the top and bottom of all abrupt breaks in slopes. Braces will also be used to anchor both sides of gates, stream crossings, fence corners and fence end points
D. Wire: Shall be tightly and uniformly stretched on one side of the fence and securely attached to steel T-posts with standard wire clips. Wire is 12.5 gauge, class 1 wire. Wire shall be tensioned in accordance with manufacturer’s specifications. Terminate wire at each post end panel, gate post, post corner panel, or stress panel. Wrap wire around the post at least two times and tie off by wrapping around the incoming wire a minimum of four times. All wire used on the fence shall be new wire.
E. Wire Splicing: Wire will be tightened adequately to set the wire twists and remove factory kinks. It is, however, important to refrain from stretching the wire excessively.
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 8 of 22
Excessive tension will weaken the barbed wire by removing the capacity for it to stretch.
Location of stretch points will be determined by topography and the availability of tie-trees. Splices in the wire shall be made by wrapping the ends of the wire back around the wire three times, thereby forming an eye at the end of the wire. The other wire end is then placed through the eye and wrapped back around itself at least three times. All wraps shall lie directly adjacent to each other, thus forming neat, tight wraps.
F. Standard wire spacing is measured from the ground up. Three wire fences will be 18”- 28”-42”, four wire fences will be 18”-24”-30”-42”. The top wires will be barbed and bottom wire will be smooth.
G. Rock Cribs: Circular cribs can be constructed with t-posts with woven wire, and must be at least 42” in diameter. Square cribs can be constructed of angle iron or stronger metal materials with woven wire and must be at least 40” x 40.”
H. Rock Jacks: Shall be constructed with metal pipe, with a minimum diameter of 2 inches and brace pieces at least 7 feet long. Rock Jacks used for corners and end panels will be paid under pay item 004b. Rock jacks used for fence line post are at the discretion of the contractor and will be incidental to the fence line construction.
I. Steel Pipe H-braces: Use 7-8 ft post pipe depending on the terrain and slope. Posts need to be in the ground 3 ft with a minimum of 46” above the ground. Spacing between posts in the H-brace shall be 8 ft with a 1 ft variance on either side depending on the soil.
Uprights for braces shall be 2 3/8” diameter metal pipe. Cross bracing can be 1 1/4 - 2 3/8” depending on contractor preference. Steel Pipe H-braces shall be welded but can be drilled and clamped if welding cannot be achieved.
J. Gates: Installed according to the drawings, and as recommended by the manufacturer when applicable. End Panels associated with gates will be paid for under pay items 004a or 004b.
K. Trees: As these fences are within fire permitters there will not be many trees to use in fence lines. Live trees may only be used, and only if the fence runs through a live patch.
Solid live trees over 8 inches DBH may be used in place of posts, provided they are located not over 2 feet out of line. Tree branches shall be removed completely around the fence, to a height of 8 feet. A scab shall be securely nailed, with 6" helix nails to the tree at three points: top, center, and bottom.
L. Figure-4s: If figure-4s are use they must be constructed with 4-foot t-post or longer.
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 9 of 22
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this section will be measured and paid for by the linear feet as measured along the ground surface next to the completed fence, including the distance across gate openings, post end panels, post corner panels, stress panels, and stress panel drainage crossings. The quantities of post end panels, post corner panels, stress panels, gates, and stress panel drainage crossings will be paid for by the actual number of those items installed each.
4.2 BASIS OF PAYMENT
A. Payment: The basis of payment for this section will be per the schedule of pay items.
Pay Item Pay Unit 001 Mobilization LS 002A Fence Construction, 3 Wire LF 002B Fence Construction, 3 Wire (Lay-Down) LF 002C Fence Construction, 4 Wire LF 002D Fence Construction, 4 Wire (Lay-Down) LF 004A Brace (Line or Corner), Pipe EA 004B Brace (Line or Corner), Rock Jack or Crib EA 005 Wire Gate Installation EA 006 Tree Felling (greater then 20” DBH) EA
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 10 of 22
Fr y Cr ee k
M acCreekKe eto n Cr ee k
Buck Pt 5,830
Ea st Po rt er C re ek
D ee p C re ek
D er r C re ek
Haypress Creek
St up id Cr ee k
00 7
BIG
SPRING
Dr y P au li n a C re ek
D ry Pa ul in a C re ek
Little Summit Cree k
H ew ed Log
Creek
Juniper Butte 4,528
Roba Butte 5,207
Ruby Butte 4,167
Faulkner Butte 4,104
Big Rattlesnake Butte 4,124
Paulina Butte 5,571
Pine Mtn 4,501
750 750
6 5
M in if i e
R id g e
S abre
R idge
P A
U L I N
A
V A L L E Y
Isadore Butte 4,360
Mills Butte 3,947
Antone (H)
Deep Creek
Sh ing le C re ek
Co ck leb ur r C ree k
M u le
G u l c h
S p a n is h
G u l c h
COTTONWOOD
PIT
COTTONWOOD
Owl CreekMeadow
Rock Creek
East Birch Creek
High Creek
Ba ld y Cr ee k
W est Branch Rock Creek W es t B irc h Cr ee k
Fr ed
Cre ek
Bear Mtn 6,112
Spanish Pk 6,877
Windy Pt 6,775
1 2
WOLF
CREEK
SUGAR
CREEK
W ol f C re ek
SugarC reek
BeaverCreek
Su ga rC re ek
Wo lf C re ek
Powell Valley Butte 4,308
Rattlesnake Butte 4,291
Birdsong Butte 3,934
UV58
9:;58
9:;30 9:;12
9:;38
9:;42
Map
Map
Map
Map
Map
R25 E
R22 E
T
S T
S
T
S T
S
Crazy Creek Fire-Post Fire Fence Priority Construction Locations
0 1 2 3 4 Miles
Legend
Fence Repair/Reconstruction Needed Contract Priority Level 1
Contract Priority Level 2
Contract Priority Level 3
Let Down Fence
Administrative Forest Boundary
Map Series Page
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 11 of 22
FRY
Haypress Creek
Big Happy Spring
Younger Spring
Happy Spring
0 0
HappyCam p Creek
Aspen Grove Spring
Snowshoe Rd
Blevins Spring
60 0
T13S R23E
T.13S., R.23E., 33
T.14S., R.23E., 33
9:;12
9:;30
4 Wire
4 Wire
4 Wire
4 Wire
R 23 E
T
S
T
S
1Map: Crazy Creek Fire Post Fire Fence Priority Construction
0 0.25 0.5 0.75 1 Miles
Contract Priority Level 2
Let Down Fence
Administrative Forest Boundary
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 12 of 22
0 0
Jackson Creek
25 PB 42
24 19
PB 43
Dublin Spring
W est Branch Rock Creek
PB 40PB 41
COTTONWOOD
Ba lm Cr ee k
PB 44
PB 45
Sam Davis Spring
COTTONWOOD
PIT
Thorn ton Creek
17 16
2014274
T.13S., R.23E., 33
T.13S., R.24E., 33
T.14S., R.23E., 33
T.14S., R.24E., 33
9:;12
3 Wire
4 Wire
4 Wire
4 Wire
4 Wire
4 Wire
R 24 E R 23 E
T
S
T
S
2Map: Crazy Creek Fire Post Fire Fence Priority Construction
0 0.25 0.5 0.75 1 Miles
Contract Priority Level 2
Let Down Fence
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 13 of 22
17 16
Dean Spring
Clear Spring
Survey Spring
Connally Spring
05 04
08 09
Bull Spring
Frog Spring
ROCK
CREEK
Po do C r e ek
T14S R24E
W olf R id g e
Wolf Spring
Bear Mtn 6,112
510 0
004800
27 26
Board Tree Spring
429030
T.15S., R.24E., 33
T.14S., R.24E., 33
9:;42
9:;389:;12
4 Wire 4 Wire
3 Wire
3 Wire
4 wire
4 Wire
4 Wire
4 Wire
4 Wire
4 Wire
4 Wire
4 Wire
4 Wire
4 Wire
4 Wire
R 24 E
T
S
T
S
3Map: Crazy Creek Fire Post Fire Fence Priority Construction
0 0.25 0.5 0.75 1 Miles
Contract Priority Level 1
Contract Priority Level 2
Contract Priority Level 3
Let Down Fence
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 14 of 22
Po do C r e ek
W olf R id g e
Wolf Spring
004800
Board Tree Spring
24 1990
P ow ell C reek
W o lf
R id g e
Nichol Spring
Po we ll C re ek
Aqua Spring
5800Rock Creek20
T.15S., R.24E., 33
T.14S., R.25E., 33T.14S., R.24E., 33
T.15S., R.25E., 33
9:;38
9:;38
3 Wire
4 Wire
4 Wire
4 Wire
4 Wire
Wire
4 Wire
4 Wire
4 Wire
4 Wire
4 Wire
4 Wire
4 Wire
4 Wire
4 Wire
R 25 E R 24 E
T
S
T
S
4Map: Crazy Creek Fire Post Fire Fence Priority Construction
0 0.25 0.5 0.75 1 Miles
Contract Priority Level 1
Contract Priority Level 2
Contract Priority Level 3
Let Down Fence
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 15 of 22
08 09
Bull Spring
Frog Spring
17 16
Widow Spring
W ido w
Cr ee k
W olf
Cr ee k
29 28
32 33
Logan Ridge
Board Tree Spring
429030
WOLF
CREEK
W ol fC re ek
T15S R24E
Sugar Creek Spring
Scab Spring80
SUGAR
CREEK
Su ga r C re ek
W ol fC re ek
M iles Creek
5 8
SE
Be av er
Cre ek
Rd
T.15S., R.24E., 33
9:;58
9:;42
4 Wire
Wire
3 Wire
3 Wire
4 Wire
4 Wire
4 Wire
4 Wire
3 Wire
3 Wire
T
S
5Map: Crazy Creek Fire Post Fire Fence Priority Construction
0 0.25 0.5 0.75 1 Miles
Contract Priority Level 1
Contract Priority Level 2
Contract Priority Level 3
Let Down Fence
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 16 of 22
I n di an C re ek
D ry Po rte r C re ek
Peterson Pt 6,207
DEEP
CREEK
NORTH
FORK
CROOKED
RIVER
SEGMENT
C
WSR
W atson
Creek
Fr y Cr ee k
M acCreekKe eto n Cr ee k
Buck Pt 5,830
Ea st Po rt er Cr ee k
D ee p C re ek
Happy CampCreek
Haypress Creek
00 7
42 56
Dr y P au li n a Cr ee k
D ry Pa ul in a Cr ee k
Little Summit Creek
Buck Hollow C re ek
H ew ed Log
Cree k
Ro ba Cr ee k
Juniper Butte 4,528
Roba Butte 5,207
Ruby Butte 4,167
Faulkner Butte 4,104
Big Rattlesnake Butte 4,124
Paulina Butte 5,571
Pine Mtn 4,501
750 750
Paulina
M in ifi e
R id g e
S abre
R idge
P A
U L I N
A
V A L L E Y
Isadore Butte 4,360
Mills Butte 3,947
SE Paulina -Sup lee Hw y
Antone (H)
Sh ing le C re ek
Co ck leb ur r C ree k
M u le
G u l c h
S p a n is h
G u l c h
COTTONWOOD
PIT
COTTONWOOD
Owl CreekMeadow
Rock Creek
East Birch
Creek
High Creek
W est Branch RockCreek W es t B irc h Cr ee k
Fr ed
Cre ek
Bear Mtn 6,112
Bear Skull 6,047
Spanish Pk 6,877
Windy Pt 6,775
1 2
WOLF
CREEK
SUGAR
CREEK
Ta m a r ac k Cr ee k
SugarC reek
Bear Butte 4,764
Wolf Mtn 6,489
Tamarack Butte 5,587
G rinds toneCree k
Beave rCreek
Su ga rC re ek
Wo lf C re ek
Cam p Creek
So ut h Fo rk Be av er Cr ee k
Powell Valley Butte 4,308
Rattlesnake Butte 4,291
Elkins Butte 3,937
Birdsong Butte 3,934
Mud Spring Butte 4,236
SE Paulina-Suplee Hwy
UV58
9:;58
9:;12
9:;38
9:;30
9:;42
Map
Map
Map
Map
Map
Wire
4 wire4 Wire 3 Wire
4 Wire4 Wire
4 wire
3 Wire
3 Wire
4 Wire
4 Wire
3 Wire
4 Wire
4 Wire3 Wire
4 wire
3 Wire
3 Wire
3 Wire
3 Wire
R22 E
T
S T
S
T
S T
S
Crazy Creek Fire - Post Fire BAR Fence Construction Contract Option
0 1 2 3 4 Miles
Fence In Need of Reconstruction
- Contract Option
Let Down Fence
Administrative Forest Boundary
Map Series Page
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 17 of 22
0 0
Hegel Spring
Lonesome Spring
900 4900
47004800
C ra zy C re ek
St up id C re ek
Dee p Cr ee k 25
07 08
31 32
Fir Tree Spring
Snowshoe Rd
PAULINA
RANGER
DISTRICT
530009
T.13S., R.23E., 33
T.13S., R.22E., 33
T.14S., R.23E., 33
T.14S., R.22E., 33
9:;30
4 Wire
4 Wire
4 Wire
4 Wire
4 Wire
3 Wire
3 Wire
R 22 E R 23 E
T
S
T
S
1Map: Crazy Creek Fire - Post Fire BAR Fence Construction Contract Option
0 0.25 0.5 0.75 1 Miles
Arterial Road
Fence In Need of Reconstruction - Contract Option
Let Down Fence
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 18 of 22
Haypress Creek
H aypress Creek
60 0
T13S R23E
Wilson Spring
Jackson Creek
T.13S., R.23E., 33
T.14S., R.23E., 33
9:;12
9:;30
4 Wire
3 Wire
3 Wire
4 Wire
3 Wire
R 24 E R 23 E
T
S
T
S
2Map: Crazy Creek Fire - Post Fire BAR Fence Construction Contract Option
0 0.25 0.5 0.75 1 Miles
Arterial Road
Fence In Need of Reconstruction - Contract Option
Let Down Fence
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 19 of 22
COTTONWOOD
Ba lm Cr ee k
COTTONWOOD
PIT
Thor nton Creek
17 16
Dean Spring
Clear Spring
Survey Spring
Connally Spring
5400 5400
Bea r C ree k
Rock Creek
10 11
Vehrs Spring
4 823
ROCK
CREEK
54005600
Po do C r e ek
T14S R24E
W olf R id g e
Wolf Spring
Bear Mtn 6,112
510 0
27 26
T.14S., R.24E., 33
9:;42
9:;38
9:;12
4 wire
3 Wire
4 Wire
3 Wire
4 wire
R 24 E
T
S
3Map: Crazy Creek Fire - Post Fire BAR Fence Construction Contract Option
0 0.25 0.5 0.75 1 Miles
Arterial Road
Fence In Need of Reconstruction - Contract Option
Let Down Fence
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 20 of 22
PAULINA
RANGER
DISTRICT
5 1
Paulina Butte 5,571
Roba Creek
Paulina SpringStump
Spring
Dozer Spring
Roba Butte 5,207
Sand Spring
Little Sum m it Creek
Dipping Vat Creek
28 26
33 35
Post Spring
Hewed Log Spring
H ew ed Lo gC ree k
09 1110
020304
Roba Spring
Bog Spring
D ipping
Vat Creek
T15S R23E
16 15 14
T.14S., R.23E., 33
T.15S., R.23E., 33
9:;42
4 Wire 4 Wire
4 wire
3 Wire
R 23 E
T
S
T
S
4Map: Crazy Creek Fire - Post Fire BAR Fence Construction Contract Option
0 0.25 0.5 0.75 1 Miles
Arterial Road
Fence In Need of Reconstruction - Contract Option
Let Down Fence
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 21 of 22
S Little Summit Rd
N or th W ol f C re ek
D ry Pa ul in a Cr ee k
N or th W ol fC re ek
D ry Paulina Creek
13 18
Quicksand Spring
Dean Spring
Connally Spring
Bull Spring
Frog Spring
T.15S., R.24E., 33
T.14S., R.23E., 33
T.14S., R.24E., 33
T.15S., R.23E., 33
9:;12
9:;12
9:;42
4 Wire
4 Wire
3 Wire
R 23 E R 24 E
T
S
T
S
5Map: Crazy Creek Fire - Post Fire BAR Fence Construction Contract Option
0 0.25 0.5 0.75 1 Miles
Arterial Road
Fence In Need of Reconstruction - Contract Option
Let Down Fence
Amd-2 12363N25Q4114 (OCH) Crazy Creek Suppression Repair-Fencing Page 22 of 22