A005 9. Acres by unit and treatment.pdf

PDF 99 KB Posted

Attached to
GSER NELDER GROVE STEWARDSHIP IRSC
Solicitation number
12363N23Q4117
Issued by

About this file

This document provides details for a federal stewardship contract solicitation to perform fuels management services on the Sierra National Forest in California. The solicitation seeks a contractor to conduct emergency fuels treatments within the Giant Sequoia groves of the Nelder Grove unit to reduce wildfire risk, including cutting and piling dead and dying conifers up to 20 inches in diameter, mastication of brush, piling of fuels, and road reconstruction and maintenance activities. The period of performance is through December 2024 with an estimated price range of $250,000 to $500,000. An estimated 2,200 tons of timber and biomass may be generated. A pre-bid site visit will be held on May 26, 2023. The contract will be awarded on a best value basis as a firm fixed price commercial services contract by the USDA Forest Service.

View the file

Other files

File Type Posted
A005 6d. NG-GSER IRSC CAM5 Helicopter Maintanance Landings.pdf PDF
A005 6c. NG-GSER IRSC CAM4 All Resource Protections.pdf PDF
A005 6a. NG-GSER IRSC CAM1 Treatments.pdf PDF
A005 0. SF30 NG-GSER.pdf PDF
A005 6b. NG-GSER IRSC CAM2 Wildlife and Bio Protections.pdf PDF
A005 2. Appendix A_NG-GSER.pdf PDF
A005 3. Appendix B_NG-GSER.pdf PDF
A005 1. 12363N23Q4117 NG-GSER.pdf PDF
A004 SF30 NG-GSER.pdf PDF
A003 9. NG-GSER Unit Acre Summary.pdf PDF
A003 SF30 NG-GSER.pdf PDF
A002 Addl Questions Received NG-GSER.pdf PDF
A002 9. NG-GSER Unit Acre Summary.pdf PDF
A002 6b. NG-GSER IRSC CAM2 Wildlife & Bio Protections.pdf PDF
A002 SF30 NG-GSER.pdf PDF
A001 NG-GSER IRSC CAM1 Treatments.pdf PDF
A001 NG-GSER IRSC CAM4 All Resource Protections.pdf PDF
A001 12363N23Q4117 NG-GSER.pdf PDF
A001 Appendix A_NG-GSER.pdf PDF
A001 SF30 NG-GSER.pdf PDF
A001 NG-GSER IRSC CAM2 Wildlife and Bio Protections.pdf PDF
A001 Site Visit Agenda.pdf PDF
A001. 05262023 Site Visit Q&A.pdf PDF
A001 Appendix B_NG-GSER.pdf PDF
7. Fire Plan_NG-GSER.pdf PDF
8c. WD-DBA#CA20230018 04212023.pdf PDF
6c. CAM3-All Protections.pdf PDF
3. Appendix B_NG-GSER.pdf PDF
2. Appendix A_NG-GSER.pdf PDF
6a. CAM1-Treatments.pdf PDF
5a. Appendix D Supplemental Specifications NG GSER IRSC.pdf PDF
6b. CAM2-Biological Protections.pdf PDF
8a. Forestry Services WD-SCA#1977-0727v69.pdf PDF
4. Appendix C_NG-GSER.pdf PDF
8b. Aerial Services WD-SCA-1955-0222v62.pdf PDF
1. Solicitation 12363N23Q4117 NG-GSER.pdf PDF
5b. Appendix D Drawings NG GSER.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NELDER GROVE UNIT SUMMARY TABLE

Item Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6 Unit 7 Unit 8 Unit 9 Unit 10 Unit 110 Unit 11 Unit 66 Treatment totals

1a GS Fuels 7.00 7.00 2a SMZ Fuels 14.80 16.40 12.70 17.00 4.00 8.20 28.90 8.70 110.70 3a Hand Fuels 24.00 14.00 5.00 43.00 4a Hand Piling 24.00 14.00 5.00 43.00 5 Mech DFPZ 32.00 66.00 32.00 36.00 14.00 32.00 104.00 316.00 6 Mech Fuels (non DFPZ) 69.00 100.00 169.00 7 Mech Pile 32.00 66.00 32.00 36.00 14.00 32.00 173.00 100.00 485.00 8 Mastication 32.00 21.00 53.00 1b GS Fuels 0.50 18.45 5.20 24.15 2b SMZ Fuels 19.30 46.80 35.90 102.00 3b Hand Fuels 25.00 0.00 90.00 115.00 4b Hand Piling 25.00 71.00 100.00 196.00 9 Hand Felling Dead Trees 95.00 176.00 265.00 536.00 10 Aerial Removal and Piling 95.00 176.00 265.00 536.00 2c Hand SMZ 12.40 12.40 13 Fell and Remove H Fuels 31.00 31.00 Unit Total Footprint( Includes SMZ) 46.80 82.40 36.70 63.00 45.00 14.00 40.20 201.90 114.30 222.80 108.70 300.90 43.40 1320.10 Unit Treatment Totals 110.80 148.40 60.70 109.00 86.00 28.00 72.20 395.90 259.80 488.25 215.70 761.10 43.40 2779.25 Meadows 0.70 1.00 0.40 1.70 0.60 0.20 Untreat island 5.00 No treat SMZ 8.00 Nichols Mdw 3.80

File details come from the government source that posted it. Updated .