A001 Site Visit Agenda.pdf

PDF 424 KB Posted

Attached to
GSER NELDER GROVE STEWARDSHIP IRSC
Solicitation number
12363N23Q4117
Issued by

About this file

This document outlines a federal stewardship contract opportunity for fuels management services. The solicitation is for the GSER Nelder Grove Stewardship IRSC located on the Sierra National Forest in Madera County, California. Work includes removing surface and ladder fuels from Giant Sequoia Groves to reduce wildfire risk, as well as road reconstruction and maintenance. Estimated timber volume is approximately 2,200 tons. The period of performance is through December 2024. The estimated price range is $250,000 to $500,000. A site visit for prospective contractors will be held on May 26, 2023 at 9:30am at the Batterson Work Center. The contract will be awarded using best value and will be a firm fixed price commercial services agreement issued by the USDA Forest Service.

View the file

Other files

File Type Posted
A005 6d. NG-GSER IRSC CAM5 Helicopter Maintanance Landings.pdf PDF
A005 6c. NG-GSER IRSC CAM4 All Resource Protections.pdf PDF
A005 9. Acres by unit and treatment.pdf PDF
A005 6a. NG-GSER IRSC CAM1 Treatments.pdf PDF
A005 0. SF30 NG-GSER.pdf PDF
A005 6b. NG-GSER IRSC CAM2 Wildlife and Bio Protections.pdf PDF
A005 2. Appendix A_NG-GSER.pdf PDF
A005 3. Appendix B_NG-GSER.pdf PDF
A005 1. 12363N23Q4117 NG-GSER.pdf PDF
A004 SF30 NG-GSER.pdf PDF
A003 9. NG-GSER Unit Acre Summary.pdf PDF
A003 SF30 NG-GSER.pdf PDF
A002 Addl Questions Received NG-GSER.pdf PDF
A002 9. NG-GSER Unit Acre Summary.pdf PDF
A002 6b. NG-GSER IRSC CAM2 Wildlife & Bio Protections.pdf PDF
A002 SF30 NG-GSER.pdf PDF
A001 NG-GSER IRSC CAM1 Treatments.pdf PDF
A001 NG-GSER IRSC CAM4 All Resource Protections.pdf PDF
A001 12363N23Q4117 NG-GSER.pdf PDF
A001 Appendix A_NG-GSER.pdf PDF
A001 SF30 NG-GSER.pdf PDF
A001 NG-GSER IRSC CAM2 Wildlife and Bio Protections.pdf PDF
A001. 05262023 Site Visit Q&A.pdf PDF
A001 Appendix B_NG-GSER.pdf PDF
7. Fire Plan_NG-GSER.pdf PDF
8c. WD-DBA#CA20230018 04212023.pdf PDF
6c. CAM3-All Protections.pdf PDF
3. Appendix B_NG-GSER.pdf PDF
2. Appendix A_NG-GSER.pdf PDF
6a. CAM1-Treatments.pdf PDF
5a. Appendix D Supplemental Specifications NG GSER IRSC.pdf PDF
6b. CAM2-Biological Protections.pdf PDF
8a. Forestry Services WD-SCA#1977-0727v69.pdf PDF
4. Appendix C_NG-GSER.pdf PDF
8b. Aerial Services WD-SCA-1955-0222v62.pdf PDF
1. Solicitation 12363N23Q4117 NG-GSER.pdf PDF
5b. Appendix D Drawings NG GSER.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Welcome contractors, describe what the mee�ng is for.

FS introduc�on

Rules of engagement: please respect all par�cipants, please stay on topic, keep side conversa�on to a minimum and at a low murmur.

Safety for the day and for the contract.

Pre-bid tour: Snakes, Bees, overhead hazards

Contract: Fallers safety, Hazard trees, Helicopter over mechanical & hand

Touch on the key proposal requirements

Discuss the different parts of the contract: Helicopter, mechanical & hand.

1. Time frame for work. PAL’s, LOP’s, Wet weather ops

2. Discuss resource protec�ons.

Monitors for the Arch work.

Wildlife: ops in LOP areas, LOPS, snags, down logs

Wildlife work within the PAC’s.

GS protec�ons, discuss removal of large logs that are under GS with Helicopter

Botany: Bull thistle

SMZ work. order 1 streams may or may not be visible, opera�ons will be agreed to.

3. Discuss road work.

Which road are arch sites.

Discuss arch roads and the work that can be done, revisit this topic as we walk the roads to get any concerns for contractors.

4. Discuss virtual boundaries, type being used and where they are being used at. Where flagging is being used and what the different colors are for.

5. TSA

6. Any ques�ons or comments pertaining to subject other then the work items in Appendix A

7. Discuss parking at the different stops.

Move to the Project area.

Stop 1 Talking point: DFPZ in green stands, SMZ, handwork.

Treatment prescrip�on, Piling Specs

Stop 2 Talking point: DFPZ

Treatment prescrip�on, in the first 150’ and outside of the 150’

Stop 3 Talking point: (walk to no parking) DFPZ high burn severity.

Same as above discuss mas�ca�on, and leaving small trees, mas�ca�on of GS pole tree

Stop 4 Talking point: Rec area.

Treatment prescrip�on, Piling Specs within area of high concentra�on of resource protec�on needs.

Discussion on what can be done, type of equipment that can be used, and type of protec�on that will be in place. Looking for input from contractors.

Stop 5&6 Talking point: Helicopter.

Treatment prescrip�on, Piling Specs- open for discussion.

ENFASIZE NO DAMAGE TO RESIDUE

Stop 7 Talking point: Hand work & Road work.

Treatment prescrip�on, Piling Specs.

Ques�on or concerns about the required road work.

®e

®e

®e

®e

®e

®e

®e

32 33

Text ¯

0.45 0 0.450.225 Miles

Legend No Treatment Area

®e Pre-Bid Stops

Nelder Grove Boundary

Roads

<all other values>

Unit_numbe

Helicopter Log Landings

Nelder Grove Pre-Bid Tour

Not for contract use

Prebid tour agenda.pdf
Pre_tour.pdf

File details come from the government source that posted it. Updated .