A005 0. SF30 NG-GSER.pdf

PDF 197 KB Posted

Attached to
GSER NELDER GROVE STEWARDSHIP IRSC
Solicitation number
12363N23Q4117
Issued by

About this file

This document includes a solicitation and amendment for a stewardship contract opportunity with the USDA Forest Service. The objective of the project is to provide long-term survival of Giant Sequoias in the Nelder Grove by reducing wildfire risk through emergency fuels treatments such as cutting and piling dead and dying conifers under 20 inches DBH, mastication of brush, and road reconstruction. The estimated value is between $250,000 and $500,000. The amendment extends the response deadline to August 18, 2023, replaces maps and appendices, provides clarification on questions, and permits fuel staging at the work center. Work must be completed by December 31, 2024.

View the file

Other files

File Type Posted
A005 6d. NG-GSER IRSC CAM5 Helicopter Maintanance Landings.pdf PDF
A005 6c. NG-GSER IRSC CAM4 All Resource Protections.pdf PDF
A005 9. Acres by unit and treatment.pdf PDF
A005 6a. NG-GSER IRSC CAM1 Treatments.pdf PDF
A005 6b. NG-GSER IRSC CAM2 Wildlife and Bio Protections.pdf PDF
A005 2. Appendix A_NG-GSER.pdf PDF
A005 3. Appendix B_NG-GSER.pdf PDF
A005 1. 12363N23Q4117 NG-GSER.pdf PDF
A004 SF30 NG-GSER.pdf PDF
A003 9. NG-GSER Unit Acre Summary.pdf PDF
A003 SF30 NG-GSER.pdf PDF
A002 Addl Questions Received NG-GSER.pdf PDF
A002 9. NG-GSER Unit Acre Summary.pdf PDF
A002 6b. NG-GSER IRSC CAM2 Wildlife & Bio Protections.pdf PDF
A002 SF30 NG-GSER.pdf PDF
A001 NG-GSER IRSC CAM1 Treatments.pdf PDF
A001 NG-GSER IRSC CAM4 All Resource Protections.pdf PDF
A001 12363N23Q4117 NG-GSER.pdf PDF
A001 Appendix A_NG-GSER.pdf PDF
A001 SF30 NG-GSER.pdf PDF
A001 NG-GSER IRSC CAM2 Wildlife and Bio Protections.pdf PDF
A001 Site Visit Agenda.pdf PDF
A001. 05262023 Site Visit Q&A.pdf PDF
A001 Appendix B_NG-GSER.pdf PDF
7. Fire Plan_NG-GSER.pdf PDF
8c. WD-DBA#CA20230018 04212023.pdf PDF
6c. CAM3-All Protections.pdf PDF
3. Appendix B_NG-GSER.pdf PDF
2. Appendix A_NG-GSER.pdf PDF
6a. CAM1-Treatments.pdf PDF
5a. Appendix D Supplemental Specifications NG GSER IRSC.pdf PDF
6b. CAM2-Biological Protections.pdf PDF
8a. Forestry Services WD-SCA#1977-0727v69.pdf PDF
4. Appendix C_NG-GSER.pdf PDF
8b. Aerial Services WD-SCA-1955-0222v62.pdf PDF
1. Solicitation 12363N23Q4117 NG-GSER.pdf PDF
5b. Appendix D Drawings NG GSER.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

363N 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

005 07/21/2023 MULTIPLE

6. ISSUED BY CODE 363N 7. ADMINISTERED BY (If other than Item 6) CODE 363N

USDA Forest Service Procurement & Property Services National Stewardship Contracting Branch 1400 Independence Ave. SW, MS-1138 Washington DC 20250-1138

Same as issuing office

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

X 12363N23Q4117

9B. DATED (SEE ITEM 11)

05/19/2023

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: 52.211.18 THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 1 and 2.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

GIANT SEQUOIA EMERGENCY RESPONSE (GSER) NELDER GROVE IRSC

SIERRA NATIONAL FOREST

BASS LAKE RANGER DISTRICT

AMENDMENT 005

**See page 2-4 for amendment details**

Except as provided herein, all terms and conditions of the documents referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

MARK T. PHILLIPP

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE 2 of 4

Amendment 005

GIANT SEQUOIA EMERGENCY RESPONSE (GSER) NELDER GROVE

PACIFIC SOUTHWEST (PSW) STEWARDSHIP BPA

SIERRA NATIONAL FOREST

BASS LAKE RANGER DISTRICT

12363N23Q4117

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

This amendment:

1. Amends the reply date for proposals to August 18, 2023, at 12:00 PM Pacific time.

2. Replaces the Solicitation, Appendices A and B, all Contract Area Maps and the Unit Acre Summary.

a. All changes in Blue text.

3. Adds clarification to questions posted in amendment 002 and adds question 45.

16. Would surface rock material be permitted on a temp road for localized improvements as needed? Likely not, this is based on Heritage protection needs. Due to resource protection requirements, these requests would need to be addressed on a case-by-case basis.

24. Will any of the speculative Helicopter Service Landings identified and asked about in the pre-bid tour be approved for use (pre-bid tour Stop 2 or either of the two locations off-site viewed at the end of the pre-bid tour?)

Yes, as agreed too. There are two located just outside of the northeast corner of the project area. See updated maps.

Reference updated Amendment 005 maps.

25. Will only the trees marked in teal colored paint be removed in Unit 66 or is the intent to remove others in addition following the Rx. See Appendix A Optional Item 13: Fell and Remove Hazards Fuels (Unit 66) Bullet point

1. Green trees to be cut are marked, snag to be cut are not marked. Green trees that are larger than 10-inch DBH are marked with paint. Green trees to be removed less than 10-inch DBH are by designation by description and snags to be removed are also designation by description.

33. Why are monarch giants designated in three different ways on the map? Please see CAM, Green the inter 50-foot treatment has been completed, what remains to be treated is the perimeter from 50-100 feet. Red circles No work has been completed, the entire 100-foot perimeter needs treatment and small brown dots piling needs to occur in all Giant Sequoia treatment has been completed, this just need to be protected when working adjacent to them on the east side. Please clarify what the colors mean in relation to mechanical piling when located in a helicopter unit 10? Do we treat non-colored monarchs (small brown dots in Units 66 and 11) according to the nested circle RX? Can mechanized piling occur within the outer 50 ft ring in the red and/or green circles of monarchs in Unit 110? Yes.

37. What is the difference between the 15% “wildlife Cover” that can be excluded (where we assume stand structure is important) and other areas that could be considered “deferrals” (where ops are difficult rocks, slope etc?)? The contract requirement is to leave 15% untreated, this will be left up the contractor to identify. The 15% retention requirement has been removed.

45. Can fuel be staged at the Batterson Work Center? Yes, fuel storage can be permitted at the Batterson Work Center with appropriate spill containment.

File details come from the government source that posted it. Updated .