1232SD18R0018.pdf
PDF 717 KB Posted
- Attached to
- Remove and Replace Roof CRL Federal contract opportunity
- Solicitation number
- 1232SD18R0018
About this file
1232SD18R0018
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1232SD18R0022_Amd_0002.pdf | ||
| 1232SD18R0022_Amd_0003.pdf | ||
| Aerial_view_of_parking_lot20180703.pdf | ||
| 1232SD18R0018_Amd_0001.pdf | ||
| CRL_Pre-Proposal_Sign_In.pdf | ||
| CRL_roof_plans-_Sheet_A202.2.pdf | ||
| Existing_Photos.pdf | ||
| Calculation_of_Self_Performed_Work.xlsx | XLSX spreadsheet | |
| Roof_Replacement_HH_Areas_Plan_(1)20180405.pdf | ||
| HH_Roof_Plan_w_Dimensions_20180423v3.pdf | ||
| RFI_FORM.pdf | ||
| Contractor_Certification_Regarding_EMR.pdf | ||
| ars372.pdf | ||
| ars371.pdf | ||
| Wage_Determination_CO180034_03-02-2018_CO34.pdf | ||
| FCco_CRL_HH_Roofing_SOW_20180423.pdf | ||
| Historical_Wall_Sections_Boiler_Room_2001_A405_1.pdf | ||
| Historical_Headhouse_and_Laboratory_Section_A403_2.pdf | ||
| Roof_Plan_Lab_Office_HH_2004_USDA014_(2).pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
911538
ARS WBSC Contracting, Acquisition, ARS WBSC Contracting, Acquisition, 1815 N University St Peoria IL 61604
ARS-WBSC-0330-05-T
email: jeffery.ridenour@ars.usda.gov
JEFFERY RIDENOUR 309-363-5914
1x 05/10/2018
1232SD18R0018
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
The Contractor shall furnish all labor, materials, tools, equipment, permits, supervision, all other resources necessary to complete Remove and Replace Roof CRL
Project, in accordance with all contract documents and Statement of Work at
USDA-Agricultural Research Service (USDA-ARS), Sugar Beet Research Unit, 1701 Centre
Ave, Fort Collins, Co. 80526.
Project magnitude: Between $100,000 and $250,000,000.
The NAICS code is 238160 - Small Business size standard is $15M.
An organized site visit is scheduled, refer to FAR 52.236-27 and AGAR 452.237-71 in this solicitation for the meeting place, date and time (page 37 and page 38).
Attendee(s) must have Govt. issued photo ID (e.g. Driver's License)
This solicitation is a total small business solicitation.
Contractor must provide information requested in SECTION M - Evaluation Factors for
Award
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 120 calendar days and complete it within ________________ ________________ calendar days after receiving
FAR 52.211-10
06/11/2018
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
CRL, SUGAR BEET RESEARCH UNIT
USDA ARS CROPS RESEARCH LABORATORY
SUGAR BEET RESEARCH UNIT
1701 CENTRE AVE
ARS-NPA-5402-04
FORT COLLINS CO 80526
JEFFERY A. RIDENOUR
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 44
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
1232SD18R0018
Remove and replace existing roof on CRL headhouse
Delivery: 120 Days After Notice to Proceed
Delivery Location Code: ARS-NPA-5402-04
CRL, SUGAR BEET RESEARCH UNIT
USDA ARS CROPS RESEARCH LABORATORY
SUGAR BEET RESEARCH UNIT
1701 CENTRE AVE
FORT COLLINS CO 80526 US
FOB: Destination
001 Remove and replace existing roof on CRL headhouse 1 JC
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SOLICITATION 1232SD18R0018
Fort Collins, CO
Remove and Replace Roof CRL
B - SECTION B - Supplies or Services and Prices/Costs Schedule of Items Clauses C - SECTION C - Description/Specifications/Statement of Work Clauses D - SECTION D - Packaging and Marking Clauses E - SECTION E - Inspection and Acceptance Clauses F - SECTION F - Deliveries or Performance Clauses G - SECTION G - Contract Administration Data Clauses H - SECTION H - Special Contract Requirements Clauses I - SECTION I - Contract Clauses/Provisions Clauses/Provisions J - SECTION J - List of Documents, Exhibits, and Other Attachments Provisions L - SECTION L - Instructions, Conditions, and Notices to Offerors or Respondents Provisions M - SECTION M - Evaluation Factors for Award
Remove and Replace Roof CRL
B - SECTION B - Supplies or Services and Prices/Costs Schedule of Items Clauses
B.1 SCOPE OF CONTRACT
The Contractor shall furnish all labor, materials, equipment, supplies, transportation, utilities, and supervision for complete construction of the following in accordance with the clauses, specifications, drawings, attachments, and other terms and conditions set forth herein:
B.2 SCHEDULE OF ITEMS
Item # Description Price/Cost
1 Remove and Replace Roof CRL $
B.3 PERFORMANCE TIME
Base Item: 120 calendar days after Notice to Proceed is issued.
End of this section
Remove and Replace Roof CRL
C - SECTION C - Description/Specifications/Statement of Work
C.1 General Intention:
C.1.1 It is the intention of this contract to Remove and Replace Roof CRL.
C.1.2 Work Location - Crops Research Laboratory, Fort Collins, CO.
C.2 Description of work:
The CONTRACTOR shall remove all roofing, roof insulation, roof base flashing, metal wall cap flashing, and metal coping on the roof, apply vapor/ moisture barrier to the concrete deck prior to the installation of new insulation, install new fully adhered tapered insulation, install fully adhered White Thermoplastic Polyolefin, TPO, Membrane, 80 mils thick, and replace all removed wall cap flashings with new, base and metal.
C.2.1 Permits and Licenses.
Pursuant to FAR 52.236-7 Permits and Responsibilities, the Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state, and local laws and regulations.
C.2.2 Directives, Instructions and References Only the Contracting Officer shall issue directives/instructions defining the roles and responsibilities and appointment of a Contracting Officer Representative (COR); Location Monitor (LM); Project Manager (PM); Occupational Health & Safety Manager and/or any other functional appointment as deemed necessary for the scope of work.
C.2.3 The Contractor shall manage the total work effort associated with the services required in each task order to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality control. The Contractor shall provide a staff with the necessary management expertise to assure performance objectives and standards are met.
C.2.4 Service Interruptions/Utility Outages If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the Contracting Officer Representative ten calendar days in advance to allow notification of affected tenants and customers. If the discontinued service is due to an emergency breakdown the Contractor shall notify the Contracting Officer Representative as soon as practicable.
At a minimum, include the location of the outage, utilities being affected, duration of outage and any necessary sketches. Once approved, and prior to beginning work on the utility system requiring shut down, attend a pre-outage coordination meeting with the Contracting Officer to review the scope of work and the lock-out/tag-out procedures for worker protection. No work will be performed on energized electrical circuits unless proof is provided that no other means exist.
C.2.7.1 Key Personnel The Contractor shall confirm to the Contracting Officer the List of Key Personnel and their qualifications provided as part of the proposal. The contractor will provide any additional information requested by the Contracting Officer to certify their qualifications.
C.2.7.2 Employee Requirements The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety and environmental requirements associated with the work they perform. Competent personnel shall be provided as required by each task order.
C.2.7.3 OSHA training requirements shall be strictly enforced prior to the commencement of work. The job superintendent must be an OSHA certified “competent person” with 30 hours of training and all other employees working on the project must have a minimum of 10 hours of OSHA training.
Remove and Replace Roof CRL
C.2.7.3 The job superintendent/OSHA certified competent person needs to be on site at all times when work is being done.
C.2.7.2.4 Employee Conduct Contractor employees and Subcontractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.
C.2.7.2.5 Removal of Employees The Contractor shall remove from the site any individual whose continued employment is deemed by the Contracting Officer to be contrary to the public interest or inconsistent with the best interests of Agricultural Research Service.
C.3 CONTRACT CLAUSES INCLUDED BY FULL TEXT:
AGAR 452.211-72 Statement of Work/Specifications As prescribed in 411.171, insert the following clause:
Statement of Work/Specifications (Feb 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
(End of Clause)
AGAR 452.211-73 Attachments to Statements of Work/Specifications As prescribed in 411.171, insert the following clause:
Attachments to Statements of Work/Specifications (Feb 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
(End of Clause) http://www.dm.usda.gov/procurement/policy/docs/AGAR_Updated_5May2016.pdf
Remove and Replace Roof CRL
D - SECTION D - Packaging and Marking
(For this Solicitation, there are NO Clauses in this Section)
Remove and Replace Roof CRL
E - SECTION E - Inspection and Acceptance
E.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT:
AGAR 452.246-70 -- Inspection and Acceptance As prescribed in 446.370, insert the following clause:
INSPECTION AND ACCEPTANCE (FEB 1988)
(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.
(b) Inspection and acceptance will be performed at: Crops Research Laboratory, Fort Collins, CO.
(End of clause)
E.2 CONTRACT CLAUSES INCLUDED BY REFERENCE:
FAR 52.246-12 -- Inspection of Construction (Aug 1996)
E.3 FINAL INSPECTION
(a) A final inspection shall be made only when all the materials have been furnished, all the work has been performed, and all the construction provided for by the contract in accordance with the terms has been completed. If, upon examination by the Contracting Officer and/or Government inspection personnel, the project is determined not sufficiently completed to have warranted a final inspection, the contractor may be charged with any additional cost of re-inspection when material and workmanship are not ready at the time specified by the Contractor for its inspection.
(b) The contractor shall give the Contracting Officer ten (10) calendar days advance notice, in writing, of the date the work will be fully completed and ready for final inspection.
(c) The Contractor's request for final inspection will not be approved unless all documentation required below, and all other contract requirements have been provided to the Contracting Officer:
-Guarantees and warranty schedule and contacts -Certified payroll records for all prime and subcontractor employees
(d) As soon as practicable, following final inspection, the Contracting Officer will inform the contractor, in writing, of any discrepancies and/or omissions noted at the final inspection. The Contracting Officer shall also state the time allowable for replacement of material and performance or re-performance o f any unsatisfactory work necessary for final acceptance.
E.4 FINAL ACCEPTANCE
Upon written notification that all deficiencies identified during the final inspection have been corrected, the Contracting Officer will schedule a final acceptance inspection of the work. If all construction required by the contract is determined to be complete and all requisite contract deliverables (e.g., certified payroll records, as-built drawings, warranty documents, etc.) have been submitted and approved by the Government, the Contracting Officer shall notify the Contractor in writing of such acceptance. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee
Remove and Replace Roof CRL
F - SECTION F - Deliveries or Performance
F.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT:
52.211-10 -- Commencement, Prosecution, and Completion of Work.
As prescribed in 11.404(b), insert the following clause in solicitations and contracts when a fixed-price construction contract is contemplated. The clause may be changed to accommodate the issuance of orders under indefinite-delivery contracts for construction.
Commencement, Prosecution, and Completion of Work (Apr 1984) The Contractor shall be required to
(a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 120 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
F.2 CONTRACT CLAUSES INCLUDED BY REFERENCE:
FAR 52.242-14 -- Suspension of Work (Apr 1984) FAR 52.242-15 -- Stop-Work Order (Aug. 1989) http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/11.htm#P198_30162
Remove and Replace Roof CRL
G - SECTION G - Contract Administration Data
G.1 CONTRACTING OFFICER'S REPRESENTATIVE
A Contracting Officer's Representative (COR) will be designated after contract award. The contractor will be notified by letter of the name and duties of the COR.
G.2 Contractor Performance Information and Contractor Performance Assessment Reporting System
(CPARS) (PA 96 SEP 21, 2010) FAR 42.1502
(a) General. Past performance evaluations shall be prepared at least annually and at the time the work under a contract or order is completed. Past performance evaluations are required for contracts and orders as specified in paragraphs (b) through (f) of this section, including contracts and orders performed outside the United States. These evaluations are generally for the entity, division, or unit that performed the contract or order. Past performance information shall be entered into CPARS, the Government wide evaluation reporting tool for all past performance reports on contracts and orders. Instructions for submitting evaluations into CPARS are available at http://www.cpars.gov/
(b) Past performance evaluations shall be prepared for each construction contract of $700,000 or more, and for each construction contract terminated for default regardless of contract value. Past performance evaluations may also be prepared for construction contracts below $700,000.
G.3 INVOICE PREPARATION AND SUBMISSION
Based upon acceptance of required contract deliverables, the contractor shall submit an original invoice to the following address:
Email to Jeffery.ridenour@ars.usda.gov The contractor shall include the following information on each invoice in order to be considered a proper invoice:
1. Name and address of contractor.
2. Invoice number and Invoice date.
3. Contract number.
4. Description of work and period of performance.
5. Name, title, phone number, and complete mailing address of official to whom payment is to be sent.
6. Name, title, phone number, and complete mailing address of person to notify in the event of a defective invoice.
7. Taxpayer Identification Number (TIN) and DUNS Number.
8. Invoices must be submitted with ARS-371 and ARS-372, along with certified payroll records, Contractor Certification, and updated CPM Schedule.
Once the paper invoice has been approved by the Contracting Officer, the Contractor shall submit the invoice electronically through the Invoice Processing Platform (IPP) at www.ipp.gov.
http://www.cpars.gov/ mailto:Jeffery.ridenour@ars.usda.gov http://www.ipp.gov/
Remove and Replace Roof CRL
H - SECTION H - Special Contract Requirements Clauses
H.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT:
AGAR 452.236-71 -- PROHIBITION AGAINST THE USE OF LEAD-BASED PAINT
As prescribed in 436.571, insert the following clause:
PROHIBITION AGAINST THE USE OF LEAD-BASED PAINT (NOV 1996)
Neither the Contractor nor any subcontractor performing under this contract shall use paints containing more than 0.06 of 1 percent lead by weight (calculated as lead metal) in the total nonvolatile content of the paint, or the equivalent measure of lead in the dried film of paint already applied, or both.
AGAR 452.236-72 -- USE OF PREMISES
As prescribed in 436.571, insert the following clause
USE OF PREMISES (NOV 1996)
(1) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, written permission shall be obtained through the Contracting Officer. A camp is interpreted to include the camp site or trailer parking area of any employee working on the project for the Contractor.
(b) Unless excepted elsewhere in the contract, the Contractor shall(i)provide and maintain sanitation facilities for the workforce at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.
AGAR 452.237-74 -- KEY PERSONNEL (FEB 1988)
(a) The contractor shall assign to this contract the following key personnel:
Title(s): Name(s):
Site Superintendent
(b) During the first ninety (90) days of performance, the contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-period, the contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the person(s) being replaced. The Contracting Officer will notify the contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
H.2 CONTRACT CLAUSES INCLUDED BY REFERENCE:
FAR 52.236-1 -- Performance of Work by the Contractor (Apr 1984) FAR 52.236-2 -- Differing Site Conditions (Apr 1984) FAR 52.236-3 -- Site Investigation and Conditions Affecting the Work (Apr 1984) FAR 52.236-6 -- Superintendence by the Contractor (Apr 1984) FAR 52.236-8 -- Other Contracts -- (Apr 1984) FAR 52.236-9 -- Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr
1984) FAR 52.236-10 -- Operations and Storage Areas (Apr 1984) FAR 52.236-11 -- Use and Possession Prior to Completion (Apr 1984) FAR 52.236-12 -- Cleaning Up (Apr 1984) FAR 52.236-13 -- Accident Prevention (Nov 1991) FAR 52.236-14 -- Availability and Use of Utility Services (APR 1984) FAR 52.236-15 -- Schedules for Construction Contracts (Apr 1984) FAR 52.236-17 -- Layout of Work (APR 1984)
Remove and Replace Roof CRL
FAR 52.236-21 -- Specifications and Drawings for Construction (FEB 1997)
H.3 CONSTRUCTION PROGRESS AND PAYMENT SCHEDULE
(a) Within 14 days after the date of receipt of award, the contractor shall prepare and submit to the Contracting Officer for approval, the original copy of ARS Form 371, Construction Progress and Payment Schedule. This form will serve as a Schedule of Estimates, Progress Schedule, and when used with ARS Form 372, it will be the basis for Requests for Partial Payment. The values employed in making the schedule will be used only for determining partial payments and will not be considered as establishing a basis for additions to or deductions from the contract. A copy of the approved schedule will be returned to the contractor.
(b) Samples of both ARS Forms 371 and 372 are available upon request. A supply of these forms together with instruction for completion of ARS Form 371 will be mailed to the contractor with the Notice of Award.
(c) ARS Form 371 is required even though progress or partial payments are not requested.
(d) The need by an offeror for partial or progress payments, when authorized in the payment provisions of this request for proposals, will not be treated as a handicap in making the award.
H.4 UTILITIES OUTAGE
Any interruption of utilities or services that would interfere with the operation of the facility will be permitted only with prior written approval from the Contracting Officer. Any utilities or service connections made at other than normal working hours will be at no additional cost to the Government.
Permission to make such an interruption shall be requested in writing to the Contracting Officer, at least three (3) days prior to the day of interruption. Failure by the Contractor to comply with this requirement will cause the Contractor to be subject to liability for actual damages.
H.5 COOPERATION WITH OTHER CONTRACTORS
During the period of construction for the work covered by this contract, other contractors performing work for the Government may be operating concurrently at the site. To minimize interference and delay to the construction progress of all concerned, all contractors shall cooperate with each other and coordinate their construction operations to the fullest extent. As far as practicable, all contractors performing work for the Government at the site shall have equal rights to the use of all referenced facilities. In a dispute regarding the use of such facilities, the matter shall be referred to the Contracting Officer.
H.6 SUBMITTALS AND SHOP DRAWINGS
(a) The Contractor shall submit for approval, shop drawings of all manufactured products required in the construction for which such drawings are hereinafter required. When approved, one set will be retained;
one set forwarded to the Government representative on the job and two sets forwarded to the Contractor.
When changes or corrections are necessary, two sets will be returned to the Contractor with such corrections noted thereon, and he shall resubmit revised prints.
(b) Shop drawings shall be marked with the contract number and Work Order Number, project description, name of the Contractor, and accompanied by a letter of transmittal. If the shop drawings show variations from the contract requirements because of standard shop practice or other reason, the Contractor shall make specific mention of such variations in his letter of transmittal.
(c) Approval of shop drawings will be general and will not relieve the Contractor from the responsibility of furnishing material and work required by the contract.
(d) Shop drawings shall be submitted for approval in ample time to permit checking of the drawings, allow the Contractor to make any corrections and resubmit drawings prior to the time construction is started on work covered by any drawings.
(e) Non-approval of equipment due to failure to meet specifications, or non-approval of the Contractor’s drawings due to submission of incomplete or incorrect information cannot be considered as a basis for extension of time for completion of the contract.
(f) The quantity of shop drawings required are subject to change. This will occur only when the Government is under contract with an A-E firm to approve shop drawings. In this respect, A-E will coordinate final quantity required between all interested parties.
H.7 LIST OF MATERIALS
(a) The Contractor shall submit for approval a complete list, in duplicate, of brands, type, and make of
Remove and Replace Roof CRL various equipment and materials proposed to be used. If the Contractor fails to submit such a list, or names of equipment which does not comply with the specifications, or if the manufacturers named are unsatisfactory, the Government reserves the right to reject same and to select satisfactory substitute materials. This selection shall be final and binding upon the Contractor, and the work shall be installed on this basis without change in contract price.
(b) In order to properly identify and to prove compliance with the requirements of the specifications, the Contractor shall give the following data for each product included in the list of materials.
Section heading of the specifications under which material is specified.
Manufacturer’s name and address.
Grade, type, trade or catalog number.
Size, capacity, and other pertinent data.
(c) All materials, fixtures, and equipment furnished and installed under this contract shall be new and of the best quality; shall be standard cataloged products or reputable manufacturers products or of special manufacture, satisfying completely the contract requirements.
(d) Similar items, unless otherwise specified herein or approved by the Contracting Officer, shall be the product of the same manufacturer, and those fulfilling the same requirements as to size and construction shall be identical.
(e) Substitutions and/or Approved Equal: Where particular make, brand or type of material or equipment is mentioned in these specifications, it is to denote quality standard of article desired, but does not restrict contractor to brand specified; however, any substitution must be met with approval of the Contracting Officer. Other products comparable in type, quality, utility, and price are acceptable if approved by the Contracting Officer. Burden of proof of equality shall rest with the Contractor. The Contracting Officer shall be sole judge of paralleled quality.
H.8 PROPERTY DAMAGE LIABILITY INSURANCE
The Contractor shall ensure that the property damage liability insurance policy (or rider) required by FAR 52.228-5, Insurance-Work on a Government Installation, is in full compliance with all the terms and conditions of this contract. The policy shall not contain any exclusions or exceptions that would limit or adversely affect the Government’s rights and remedies under any other clause in this contract or other Federal regulation or law. Should there be any exclusions or exceptions contained in the policy that limits or adversely affects the Government’s rights, the Contractor shall be responsible for the full amount of any damages that occur to the immediate facilities, adjacent facilities/property, and other Government property under the control of the Contractor due to fraud, negligence, vandalism, willful misconduct, or violation of Federal, state, or local safety regulations, building codes and laws. The Contractor shall have full responsibility and is liable for these facilities and properties until the Government has accepted the contract as being completed in full and a release from claims has been received from the Contractor.
For those areas where the Government has taken "beneficial occupancy" prior to completion and acceptance of the whole contract, the contractor shall not be responsible for those specific areas under Government control, except in such instances where damage occurs to those areas as a result of negligence, fraud, vandalism, willful misconduct, or violation of Federal, state, or local safety regulations, building codes, or laws in those areas under the control of the Contractor.
This liability and responsibility includes the activities of all the Contractor’s personnel, their subcontractors and suppliers.
H.9 SUBCONTRACTORS, OUTSIDE ASSOCIATES AND CONSULTANTS
Any subcontractors, outside associates or consultants required by the Contractor in connection with the services covered by the contract will be limited to individuals or firms that were specifically identified at time of award or agreed upon during negotiations. The Contractor shall obtain the Contracting Officer’s written consent before making any substitution for these individuals or firms.
H.10 BIOBASED PRODUCTS
The United States Department of Agriculture (USDA) designates certain bio-based products for federal procurement and specifies minimum bio-based content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA Bio-Preferred’s minimum bio-based content level. Visit the BioPreferred web site https://biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml for the complete list of designated products and the associated minimum bio-based content level requirements.
http://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml https://biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml
Remove and Replace Roof CRL
H.11 ENERGY EFFICIENCY
As required in clause 52.223-15 Energy Efficiency in Energy-Consuming Products, the contractor shall only provide products that earn the ENERGY STAR label and meet ENERGY STAR specifications for energy efficiency. The contractor is encouraged to visit http://www.energystar.gov for complete product specifications and updated lists of qualifying products.”
https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html#wp1194323 http://www.energystar.gov/
Remove and Replace Roof CRL
I - SECTION I - Contract Clauses/Provisions Clauses/Provisions
I.1 CONTRACT CLAUSES INCLUDED BY FULL TEXT:
FAR 52.222-35 -- Equal Opportunity for Veterans.
As prescribed in 22.1310(a)(1), insert the following clause:
Equal Opportunity for Veterans (Oct 2015)
(a) Definitions. As used in this clause-- “Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,’ and “recently separated veteran” have the meanings given at FAR 22.1301.
(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.
(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of $150,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate of identify properly the parties and their undertakings.
(End of Clause) Alternate I (Jul 2014). As prescribed in 22.1310(a)(2), add the following as a preamble to the clause:
Notice: The following term(s) of this clause are waived for this contract: _____________________ [List term(s)].
FAR 52.222-36 – Equal Opportunity for Workers With Disabilities As prescribed in 22.1408(a), insert the following clause:
Equal Opportunity for Workers With Disabilities (Jul 2014)
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60.741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
FAR 52.223-20 – Aerosols.
As prescribed in 23.804(a)(3), insert the following clause:
Aerosols (Jun 2016)
(a) Definitions. As used in this clause-- “Global warming potential” means how much a given mass of a chemical contributes to global warming over a given time period compared to the same mass of carbon dioxide. Carbon dioxide’s global warming potential is defined as 1.0.
“High global warming potential hydrofluorocarbons” means any hydrofluorocarbons in a particular end use for which EPA’s Significant New Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40 CFR part 82, subpart G. with supplemental tables of alternatives available at http://www.epa.gov/snap/).
“Hydrofluorocarbons” means compounds that contain only hydrogen, fluorine, and carbon.
(b) Unless otherwise specified in the contract, the Contractor shall reduce its use, release, or emissions of high global warming potential hydrofluorocarbons, when feasible, from aerosol propellants or solvents under this contract. When determining feasibility of using a particular alternative, the Contractor shall consider environmental, technical, and economic factors such as--
(1) In-use emission rates, energy efficiency;
(2) Safety, such as flammability or toxicity;
https://www.acquisition.gov/?q=/browse/far/22 https://www.acquisition.gov/?q=/browse/far/22 https://www.acquisition.gov/?q=/browse/far/22 https://www.acquisition.gov/?q=/browse/far/22 http://farsite.hill.af.mil/reghtml/Regs/far2afmcfars/fardfars/Far/23.htm#P364_49080 http://www.epa.gov/snap/
Remove and Replace Roof CRL
(3) Ability to meet technical performance requirements; and
(4) Commercial availability at a reasonable cost.
(c) The Contractor shall refer to EPA’s SNAP program to identify alternatives. The SNAP list of alternatives is found at 40 CFR part 82, subpart G, with supplemental tables available at http://www.epa.gov/snap/.
FAR 52.223-21 Foams.
As prescribed in 23.804(a)(4), insert the following clause:
Foams (Jun 2016)
(a) Definitions. As used in this clause– “Global warming potential” means how much a given mass of a chemical contributes to global warming over a given time period compared to the same mass of carbon dioxide. Carbon dioxide's global warming potential is defined as 1.0.
“High global warming potential hydrofluorocarbons” means any hydrofluorocarbons in a particular end use for which EPA’s Significant New Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40 CFR part 82 subpart G with supplemental tables of alternatives available at http://www.epa.gov/snap/.
“Hydrofluorocarbons” means compounds that contain only hydrogen, fluorine, and carbon.
(b) Unless otherwise specified in the contract, the Contractor shall reduce its use, release, and emissions of high global warming potential hydrofluorocarbons and refrigerant blends containing hydrofluorocarbons, when feasible, from foam blowing agents, under this contract. When determining feasibility of using a particular alternative, the Contractor shall consider environmental, technical, and economic factors such as–
(1) In-use emission rates, energy efficiency, and safety;
(2) Ability to meet performance requirements; and
(3) Commercial availability at a reasonable cost.
(c) The Contractor shall refer to EPA’s SNAP program to identify alternatives. The SNAP list of alternatives is found at 40 CFR part 82 subpart G with supplemental tables available at http://www.epa.gov/snap/.
FAR 52.225-9 -- Buy American–Construction Materials.
As prescribed in 25.1102(a), insert the following clause:
Buy American–Construction Materials (May 2014)
(a) Definitions. As used in this clause-- “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
http://www.epa.gov/snap/ https://www.acquisition.gov/far/html/Subpart%2023_8.html#wp1073926 http://www.epa.gov/snap/ http://www.epa.gov/snap/ https://www.acquisition.gov/?q=/browse/far/25
Remove and Replace Roof CRL
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which non-availability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)).
The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: None
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material.
However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, Remove and Replace Roof CRL the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of measure Quantity Price (dollars) *
Item 1 Foreign construction material Domestic construction material Item 2 Foreign construction material Domestic construction material [List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
FAR 52.225-21 -- Required Use of American Iron, Steel, and Manufactured Goods--Buy American Statute--Construction Materials.
As prescribed in 25.1102(e), insert the following clause:
Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American Statute-- Construction Materials (May 2014)
(a) Definitions. As used in this clause— “Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
“Domestic construction material” means the following—
(1) An unmanufactured construction material mined or produced in the United States. (The Buy American statute applies.)
(2) A manufactured construction material that is manufactured in the United States and, if the construction material consists wholly or predominantly of iron or steel, the iron or steel was produced in the United States. (Section 1605 of the Recovery Act applies.).
“Foreign construction material” means a construction material other than a domestic construction material.
“Manufactured construction material” means any construction material that is not unmanufactured construction material.
“Steel” means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements.
“United States” means the 50 States, the District of Columbia, and outlying areas.
“Unmanufactured construction material” means raw material brought to the construction site for incorporation into the building or work that has not been—
(1) Processed into a specific form and shape; or
(2) Combined with other raw material to create a material that has different properties than the properties of the individual raw materials.
(b) Domestic preference.
(1) This clause implements—
(i) Section 1605 of the American Recovery and Reinvestment Act of 2009 (Recovery Act) (Pub. L. 111-5), by requiring, unless an exception applies, that all manufactured construction material in the project is manufactured in the United States and, if the construction material consists wholly or predominantly of iron or steel, the iron or steel was produced in the United States (produced in the United States means that all manufacturing https://www.acquisition.gov/?q=/browse/far/25
Remove and Replace Roof CRL processes of the iron or steel must take place in the United States, except metallurgical processes involving refinement of steel additives); and
(ii) 41 U.S.C chapter 83, Buy American, by providing a preference for unmanufactured construction material mined or produced in the United States over unmanufactured construction material mined or produced in a foreign country.
(2) The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraph (b)(3) and (b)(4) of this clause.
(3) This requirement does not apply to the construction material or components listed by…