1232SD18R0018_Amd_0001.pdf

PDF 90 KB Posted

Attached to
Remove and Replace Roof CRL Federal contract opportunity
Solicitation number
1232SD18R0018
Issued by
Department of Agriculture Agricultural Research Service Central Program Planning Coordination and Support

About this file

1232SD18R0018 Amd 0001

View the file

Other files for this federal contract opportunity

Other files attached to Remove and Replace Roof CRL, newest first.
File Type Posted
1232SD18R0022_Amd_0002.pdf PDF
1232SD18R0022_Amd_0003.pdf PDF
Aerial_view_of_parking_lot20180703.pdf PDF
CRL_Pre-Proposal_Sign_In.pdf PDF
CRL_roof_plans-_Sheet_A202.2.pdf PDF
Existing_Photos.pdf PDF
1232SD18R0018.pdf PDF
HH_Roof_Plan_w_Dimensions_20180423v3.pdf PDF
RFI_FORM.pdf PDF
Contractor_Certification_Regarding_EMR.pdf PDF
ars372.pdf PDF
ars371.pdf PDF
Wage_Determination_CO180034_03-02-2018_CO34.pdf PDF
FCco_CRL_HH_Roofing_SOW_20180423.pdf PDF
Historical_Wall_Sections_Boiler_Room_2001_A405_1.pdf PDF
Historical_Headhouse_and_Laboratory_Section_A403_2.pdf PDF
Roof_Plan_Lab_Office_HH_2004_USDA014_(2).pdf PDF
Calculation_of_Self_Performed_Work.xlsx XLSX spreadsheet
Roof_Replacement_HH_Areas_Plan_(1)20180405.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1232SD18R0018

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

FORT COLLINS CO 80526

ARS-NPA-5402-04

1701 CENTRE AVE

SUGAR BEET RESEARCH UNIT

USDA ARS CROPS RESEARCH LABORATORY

CRL, SUGAR BEET RESEARCH UNIT

ARS-WBSC-0330-05-T

Peoria IL 61604 1815 N University St ARS WBSC Contracting, Acquisition, ARS WBSC Contracting, Acquisition, 05/10/20180001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/10/2018

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide answers to questions and provide a legible copy of drawing (CRL roof plans- Sheet A202.2). Also provided is the sign in sheet for the pre-solicitation meeting.

Q.1: The spec calls for ½" per foot slope to taper. Is that in the crickets only with ¼" per foot slope on the remaining areas of the deck?

A.1: Statement of Work Item 5.C, stated "The CONTRACTOR shall install new fully adhered tapered insulation to attain a minimum slope of ½" per foot." That will be changed to "a minimum slope of ¼" per foot so that the parapets and most roof curbs will not need to be raised, but the roof drains will need to be raised to attain the average R-30 insulation

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JEFFERY A. RIDENOUR

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1232SD18R0018/0001

thickness

Q.2: Existing RTU RA Duct on south side of RTU less than 2" above surface of the existing roof deck (See SOW IMG_0712 for photo). This area is too tight to allow removal and proper replacement of new roofing system. Contractor recommends sealing off this area with new roofing system and leaving existing portion of roof in place. Please advise.

A.2: Rooftop Air Handling Unit #3's duct on the

South side of the unit shall have its bottom sealed off with a new curb system, leaving the existing portion of the roof under the duct left in place.

Q.3: Areas of existing parapet wall cap intersect/underlay greenhouse end wall flashing and counter flashing (see attached Pics 1-4). The metal in these areas appears to be in good condition. R&R of the flashing and closure strips may require authorized greenhouse representative to remove and replace their components proprietary to their greenhouse system to maintain warranties. Contractor recommends replacing parapet cap around these areas in question, resealing these existing areas with approved sealant and or counter flashing and sealing, and providing appropriate sealant/fasteners where new wall cap overlays existing, to create water-tight seal(s). Please advise.

A.3: Existing Greenhouse end wall framing shall remain as is. But the existing parapet wall flashing and coping intersecting the GH end wall framing shall be removed and replaced. New details shall be required to be sketched by the fabricator after investigative removal of the existing intersecting flashings for approval by the Location Coordinator.

Q.4: Several existing (Abandoned?) roof penetration curbs are under 4" in height and maybe too close to the roof deck to provide warrantable roof for this project. This may require removal of sheet metal caps, reworking the curbs and replacing the caps. Is this acceptable solution or shall these location(s), Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1232SD18R0018/0001

if unused, be filled in and curbs/caps removed?

Curbs(s) in question are directly north of

Greenhouses A & B on flat roof.

A.4: Curbs questioned are directly North of GH A

& B on the flat roof. Abandoned roof penetration curbs and sheet metal caps are anticipated to have existing concrete curbs, therefore will need to be built up for adequate height for curb flashing details for warranty, and is applicable to the total HH Roof.

Q.5: H.H. Drawing 1 of 1 General Notes: Roof

Replacement Outlined in Green and Option1

Outlined in Red. Is this correct?

A.5: NO, That note was from the initial roofing project done in 2017. This is to be corrected to

"Roof Replacement Base Bid Boundaries are shown in Red." There are no option areas.

Q.6.: Please provide a higher quality drawing

A202.2. This is the main roof plane. The dimensions are not legible.

A.6: An additional drawing of A202.2 is attached, with the dimensions in metric.

Q.7: In the project statement of work, Item

5-Project Requirements Paragraph C states to install taper insulation with ½" per foot slope minimum. There are a lot of curbs and other units that might need to be raised if this slope is used. The typical slope on the roof is ¼" per foot. Please advise.

A.7: See the Answer to Question 1.

LIST OF CHANGES:

All terms and conditions remain unchanged.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it.