7/02/2018
Equipment Detail Report Run:
1:52PM
1Page: Equipment: From Lowest To Highest.
Query: None.
DESCRIPTION
101-BANDSAW-010 BANDSAW Yes
MODEL: 1564911
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
0 / / 0.00 0.000
DESCRIPTION
101-DRILLPRESS-008 DRILL PRESS Yes
MODEL: 15-665 1443218
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
0 / / 0.00 0.000
DESCRIPTION
101-ENGRAVE-013 ENGRAVOGRAPH Yes
MODEL: ITF-II 81422
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
0 / / 0.00 0.000
DESCRIPTION
101-GRINDER-001 BENCH GRINDER AND WIRE WHEEL Yes
MODEL: E-33 WT-87
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
365 8/03/2017 0.00 0.00MECH1 ENSURE THE SIDE GUARDS COVER THE SPINDLE, NUT, Floating
AND FLANGE, AND 75% OF THE WHEEL DIAMETER.
365 8/03/2017 0.00 0.00MECH2 ENSURE THE WORK REST IS USED AND IS ADJUSTED TO Floating
WITHIN 1/8 INCH OF THE WHEEL.
365 8/03/2017 0.00 0.00MECH3 ENSURE THE ADJUSTABLE TONGUE GUARD ON THE TOP Floating
SIDE OF THE GRINDER IS USED AND KEPT WITHIN 1/4
INCH OF THE WHEEL.
365 8/03/2017 0.00 0.00MECH4 CHECK TO ENSURE THE MAX RPM RATING OF EACH Floating
ABRASIVE WHEEL IS COMPATIBLE WITH THE RPM
RATING OF THE GRINDER MOTOR.
365 8/03/2017 0.00 0.00MECH5 WIPE DOWN THE GRINDER AND THE AREA Floating
SURROUNDING.
365 8/03/2017 0.00 0.00MECH6 CHECK TO ENSURE THE GRINDER IS PERMANENTLY Floating
MOUNTED.
365 8/03/2017 0.00 0.00MECH7 CHECK THE PLUG AND MAKE SURE THERE IS NO Floating
DAMAGE TO THE PLUG AND THE CORD.
365 8/03/2017 0.00 0.00MECH8 ENSURE THAT ALL SAFETY SIGNS REGARDING PPE AND Floating
THE GRINDER ITSELF ARE STILL LEGIBLE. REPORT
OTHERWISE.
365 8/03/2017 0.00 0.00MECH9 REPORT DEFICIENCIES, SIGN PM TAG, AND FILL IN Floating
PAPERWORK
DESCRIPTION
101-GRINDER-002 BENCH GRINDER AND WIRE WHEEL Yes
MODEL: DW-758 21C03XL30423
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
365 8/03/2017 0.00 0.00MECH1 ENSURE THE SIDE GUARDS COVER THE SPINDLE, NUT, Floating
AND FLANGE, AND 75% OF THE WHEEL DIAMETER.
365 8/03/2017 0.00 0.00MECH2 ENSURE THE WORK REST IS USED AND IS ADJUSTED TO Floating
WITHIN 1/8 INCH OF THE WHEEL.
365 8/03/2017 0.00 0.00MECH3 ENSURE THE ADJUSTABLE TONGUE GUARD ON THE TOP Floating
SIDE OF THE GRINDER IS USED AND KEPT WITHIN 1/4
INCH OF THE WHEEL.
365 8/03/2017 0.00 0.00MECH4 CHECK TO ENSURE THE MAX RPM RATING OF EACH Floating
ABRASIVE WHEEL IS COMPATIBLE WITH THE RPM
RATING OF THE GRINDER MOTOR.
ALUTIIQ/SSI
Run:
1:52PM
2Page: Equipment: From Lowest To Highest.
Query: None.
365 8/03/2017 0.00 0.00MECH5 WIPE DOWN THE GRINDER AND THE AREA Floating
SURROUNDING.
365 8/03/2017 0.00 0.00MECH6 CHECK TO ENSURE THE GRINDER IS PERMANENTLY Floating
MOUNTED.
365 8/03/2017 0.00 0.00MECH7 CHECK THE PLUG AND MAKE SURE THERE IS NO Floating
DAMAGE TO THE PLUG AND THE CORD.
365 8/03/2017 0.00 0.00MECH8 ENSURE THAT ALL SAFETY SIGNS REGARDING PPE AND Floating
THE GRINDER ITSELF ARE STILL LEGIBLE. REPORT
OTHERWISE.
365 8/03/2017 0.00 0.00MECH9 REPORT DEFICIENCIES, SIGN PM TAG, AND FILL IN Floating
PAPERWORK
DESCRIPTION
101-GRINDER-003 BENCH GRINDER AND WIRE WHEEL Yes
MODEL: WG656 4112334
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
365 8/03/2017 0.00 0.00MECH1 ENSURE THE SIDE GUARDS COVER THE SPINDLE, NUT, Floating
AND FLANGE, AND 75% OF THE WHEEL DIAMETER.
365 8/03/2017 0.00 0.00MECH2 ENSURE THE WORK REST IS USED AND IS ADJUSTED TO Floating
WITHIN 1/8 INCH OF THE WHEEL.
365 8/03/2017 0.00 0.00MECH3 ENSURE THE ADJUSTABLE TONGUE GUARD ON THE TOP Floating
SIDE OF THE GRINDER IS USED AND KEPT WITHIN 1/4
INCH OF THE WHEEL.
365 8/03/2017 0.00 0.00MECH4 CHECK TO ENSURE THE MAX RPM RATING OF EACH Floating
ABRASIVE WHEEL IS COMPATIBLE WITH THE RPM
RATING OF THE GRINDER MOTOR.
365 8/03/2017 0.00 0.00MECH5 WIPE DOWN THE GRINDER AND THE AREA Floating
SURROUNDING.
365 8/03/2017 0.00 0.00MECH6 CHECK TO ENSURE THE GRINDER IS PERMANENTLY Floating
MOUNTED.
365 8/03/2017 0.00 0.00MECH7 CHECK THE PLUG AND MAKE SURE THERE IS NO Floating
DAMAGE TO THE PLUG AND THE CORD.
365 8/03/2017 0.00 0.00MECH8 ENSURE THAT ALL SAFETY SIGNS REGARDING PPE AND Floating
THE GRINDER ITSELF ARE STILL LEGIBLE. REPORT
OTHERWISE.
365 8/03/2017 0.00 0.00MECH9 REPORT DEFICIENCIES, SIGN PM TAG, AND FILL IN Floating
PAPERWORK
DESCRIPTION
101-GRINDER-004 BENCH GRINDER AND WIRE WHEEL Yes
MODEL: L65 W9-70
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
365 8/03/2017 0.00 0.00MECH1 ENSURE THE SIDE GUARDS COVER THE SPINDLE, NUT, Floating
AND FLANGE, AND 75% OF THE WHEEL DIAMETER.
365 8/03/2017 0.00 0.00MECH2 ENSURE THE WORK REST IS USED AND IS ADJUSTED TO Floating
WITHIN 1/8 INCH OF THE WHEEL.
365 8/03/2017 0.00 0.00MECH3 ENSURE THE ADJUSTABLE TONGUE GUARD ON THE TOP Floating
SIDE OF THE GRINDER IS USED AND KEPT WITHIN 1/4
INCH OF THE WHEEL.
365 8/03/2017 0.00 0.00MECH4 CHECK TO ENSURE THE MAX RPM RATING OF EACH Floating
ABRASIVE WHEEL IS COMPATIBLE WITH THE RPM
RATING OF THE GRINDER MOTOR.
365 8/03/2017 0.00 0.00MECH5 WIPE DOWN THE GRINDER AND THE AREA Floating
SURROUNDING.
365 8/03/2017 0.00 0.00MECH6 CHECK TO ENSURE THE GRINDER IS PERMANENTLY Floating
MOUNTED.
365 8/03/2017 0.00 0.00MECH7 CHECK THE PLUG AND MAKE SURE THERE IS NO Floating
DAMAGE TO THE PLUG AND THE CORD.
Run:
1:52PM
3Page: Equipment: From Lowest To Highest.
Query: None.
365 8/03/2017 0.00 0.00MECH8 ENSURE THAT ALL SAFETY SIGNS REGARDING PPE AND Floating
THE GRINDER ITSELF ARE STILL LEGIBLE. REPORT
OTHERWISE.
365 8/03/2017 0.00 0.00MECH9 REPORT DEFICIENCIES, SIGN PM TAG, AND FILL IN Floating
PAPERWORK
DESCRIPTION
101-JOINTER-003 JOINTER Yes
MODEL: 9643
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 1/08/2018 0.00 0.00ATM1 ENSURE THE MACHINE IS TURNED OFF AND IN NO WAY Floating
ABLE TO BE USED DURING INSPECTION UNLESS THE
MACHINE IS BEING OPERATED BY YOU.
180 1/08/2018 0.00 0.00ATM2 INSPECT MACHINERY TO MAKE SURE IT IS WORKING Floating
PROPERLY
180 1/08/2018 0.00 0.00ATM3 LUBRICATE THE SELF-ALIGNING PRECISION BEARINGS Floating
WITH SAE 10 OIL.
180 1/08/2018 0.00 0.00ATM4 LUBRICATE THE DUST PROOF OIL CUPS (ON EITHER Floating
SIDE OF THE BEARING HOUSING) WITH APPROX. 5-10
DROPS OF OIL.
180 1/08/2018 0.00 0.00ATM6 INSPECT THE CORD AND PLUG. IF FRAYED/DAMAGED Floating
REPORT TO YOUR SUPERVISOR.
180 1/08/2018 0.00 0.00ATM7 FILL OUT MAINTENANCE CHECKLSIT, REPORT Floating
DEFICIENCES, AND SIGN PM TAG
180 1/08/2018 0.00 0.00ATM12 LUBRICATE THE OIL FRONT TABLE RAISING CROSS Floating
SHAFT. THERE ARE HOLES IN THE BASE WHERE THE
SHAFT ENTERS.
DESCRIPTION
101-KEYCUT-012 SPEEDEX KEY CUTTER Yes
MODEL: 916OMC 28310
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
0 / / 0.00 0.000 Floating
DESCRIPTION
101-LATHE-006 WOOD LATHE Yes
MODEL: 839949
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
365 6/11/2018 0.00 0.00PW1 INSPECT FOR DAMAGE TO SWITCHGEAR, WIRING, Floating
AND/OR CONDUIT.
365 6/11/2018 0.00 0.00PW2 CHECK ISOLATOR IS LOCKABLE IN OFF POSITION Floating
365 6/11/2018 0.33 0.00PW3 CHECK OPERATION OF START/STOP SWITCH Floating
365 6/11/2018 0.00 0.00PW4 CHECK EMERGENCY STOP IS WORKING. Floating
365 5/07/2018 0.00 0.00ATM5 CHECK ALL GUARDS ARE SECURE AND FUNCTION Floating
CORRECTLY (INCLUDES LATCHES, LOCKS, FASTENERS
AND/OR INTERLOCKS IF FITTED).
365 5/07/2018 0.00 0.00ATM6 CHECK FIXED AND LIVE CENTRES FOR DAMAGE. Floating
REPORT CONDITION.
365 5/07/2018 0.00 0.00ATM7 CHECK TAILSTOCK CLAMPS AND LOCKING LEVERS FOR Floating
EFFECTIVE OPERTION. ADJUST OR RECOMMEND
REPLACEMENT IF NECESSARY.
365 5/07/2018 0.00 0.00ATM8 CHECK TOOL-REST HOLDER CLAMPS AND LOCKING Floating
LEVERS FOR EFFECTIVE OPERATION. ADJUST OR
RECOMMEND REPLACEMENT IF NECESSARY.
365 5/07/2018 0.00 0.00ATM9 CHECK CONDITION OF TOOL RESTS Floating
365 5/07/2018 0.00 0.00ATM10 EXAMINE DRIVE BELTS FOR DAMAGE AND CORRECT Floating
TENSION, ADJUST, OR REPLACE.
365 5/07/2018 0.00 0.00ATM11 GREASE AS APPROPRIATE Floating
Run:
1:52PM
4Page: Equipment: From Lowest To Highest.
Query: None.
120 5/07/2018 0.00 0.00ATM12 CLEAN THE CHIPS OUT OF THE CHIP PAN. GREASE Floating
FITTINGS ON UNIT.
120 5/07/2018 0.00 0.00ATM13 CLEAN OFF THE MACHINE AND SURROUNDING AREA. Floating
120 5/07/2018 0.00 0.00ATM14 WIPE DOWN ANY UNIT AND LUBRICATE WITH HYDRAULIC Floating
OIL.
120 5/07/2018 0.00 0.00ATM15 CHECK AND GREASE THE CHAIN ON THE CHIP Floating
CONVEYOR
120 5/07/2018 0.00 0.00ATM16 CHECK AND CLEAN FILTERS ON THE COOLANT TANK Floating
365 6/11/2018 0.00 0.00PW17 FILL OUT MAINTENANCE CHECKLIST, REPORT Floating
DEFIENCIES, AND SIGN PM TAG
365 5/07/2018 0.00 0.00ATM18 FILL OUT MAINTENANCE CHECKLIST, REPORT Floating
DEFIENCIES, AND SIGN PM TAG
120 5/07/2018 0.00 0.00ATM27 FILL OUT MAINTENANCE CHECKLIST, REPORT Floating
DEFIENCIES, AND SIGN PM TAG
DESCRIPTION
101-PLANER-004 S63 PLANER Yes
MODEL:
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
365 5/10/2018 0.00 0.00ATM1 MAKE SURE THE MACHINE CANNOT BE STARTED/ LOTO Floating
365 5/10/2018 0.00 0.00ATM2 CLEAN ALL DEBRIS FROM UNIT Floating
365 5/10/2018 0.00 0.00ATM3 LUBRICATE ROLLER BRUSHES WITH MEDIUM VISCOSITY Floating
OIL THROUGH THE APPROPRIATE NIPPLES.
365 5/10/2018 0.00 0.00ATM4 LUBRICATE TABLE VEE WAYS WITH MEDIUM VISCOSITY Floating
OIL
365 5/10/2018 0.00 0.00ATM5 CHECK OIL LEVEL IN GEAR BOX. LEVEL MUST BE KEPT Floating
BETWEEN THE 2 NOTCHES ON THE DIP STICK. IF
NEEDED USE ESSO GEAR OIL LC 90 OR EQUIVALENT.
365 5/10/2018 0.00 0.00ATM6 CLEAN AND GREASE CHAINS WITH A DRY LUBRICANT. Floating
365 5/10/2018 0.00 0.00ATM7 FILL OUT MAINTENANCE CHECKLIST AND REPORT Floating
DEFIENCIES.
DESCRIPTION
101-RADIALSAW-002 16" RADIAL ARM SAW Yes
MODEL: 66063450
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 3/05/2018 0.00 0.00ATM1 ENSURE THE MACHINE IS TURNED OFF AND IN NO WAY Floating
CAN BE USED DURING INSPECTION.
180 3/05/2018 0.00 0.00ATM2 USING A CLEAN, DRY RAG, WIPE DOWN THE COLUMN. Floating
180 3/05/2018 0.00 0.00ATM3 USING A CLEAN RAG AND WITHER DENATURED ALCOHOL Floating
OR PAINT THINNER, WIPE DOWN THE TRACKS OF THE
ARM.
180 3/05/2018 0.00 0.00ATM4 MOVE THE CARRIAGE BACK AND FORTH AND CLEAN. Floating
180 3/05/2018 0.00 0.00ATM5 CHECK FOR LOOSE OR BROKEN PARTS AND REPLACE IF Floating
NECESSARY.
180 3/05/2018 0.00 0.00ATM6 INSPECT THE BLADE TO ENSURE SHARPNESS AND FREE Floating
OF WOBBLE.
180 3/05/2018 0.00 0.00ATM7 IF CUTTING RESULTS PRODUCE UNACCEPTABLE Floating
ACCURACY, ADJUST AND RE-ALIGN THE SAW.
180 3/05/2018 0.00 0.00ATM8 CHECK ALL BEARINGS TO ENSURE THEY HAVE A FREE Floating
AND SMOOTH ROTATION. DO NOT LUBRICATE.
180 3/05/2018 0.00 0.00ATM9 CHECK THE ELEVATING MECHANISM. CHECK FOR WEAR Floating
BETWEEN NUT AND JACK SCREW. REPLACE ASSEMBLY
IF LOOSE. CLEAN AND LUBRICATE WITH TYPE EP
GREASE.
180 3/05/2018 0.00 0.08ATM11 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
Run:
1:52PM
5Page: Equipment: From Lowest To Highest.
Query: None.
180 3/05/2018 0.00 0.00ATM12 INSPECT CORD AND PLUG. IF FRAYED OR DAMAGED Floating
REPORT TO YOUR SUPERVISOR AND LOTO.
DESCRIPTION
101-SANDER-009 CABLE DISC SANDER Yes
MODEL: JB8060
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
0 / / 0.00 0.000 Floating
DESCRIPTION
101-TBLRTER-005 TABLE ROUTER Yes
MODEL: W200 2552
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
365 2/12/2018 0.00 0.00ATM1 LOTO MACHINE AND ENSURE IT IS OFF. Floating
365 2/12/2018 0.00 0.00ATM2 MAKE A THOROUGH INSPECTION OF THE FENCE Floating
INCLUDING CLEANLINESS OF THE AREA AND THE
CONDITION OF THE COLLET AND COLLET. NUT. REPLACE
COLLET IF NEEDED.
365 2/12/2018 0.00 0.00ATM3 GRAB THE SPINDLE BY HAND AND CHECK FOR PLAY OR Floating
LOOSENESS
365 2/12/2018 0.00 0.00ATM4 CLEAN THE UNIT AND THE SURROUNDING AREA. Floating
365 2/12/2018 0.00 0.00ATM5 FILL OUT MAINTENANCE CHECKLIST, REPORT Floating
DEFIENCIES, AND SIGN PM TAG
DESCRIPTION
101-TBLSAW-007 10" TABLE SAW Yes
MODEL: 50-2210
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
0 / / 0.00 0.000 Floating
DESCRIPTION
101-TBLSAW-011 TABLE SAW Yes
MODEL: 87-853-F676
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
0 / / 0.00 0.000 Floating
DESCRIPTION
102-ACSPU-006 A/C SPLIT CEILING UNIT Yes
MODEL:
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 2/05/2018 0.08 0.00HVAC1 NOTIFY AND SCHEDULE SHUT-DOWN WITH OPERATING FloatingMT1
PERSONNEL.
180 2/05/2018 0.17 0.17HVAC2 CLEAN INTAKE SIDE OF CONDENSER COILS, FANS AND Floating
INTAKE SCREENS
180 2/05/2018 0.08 0.08HVAC3 LUBRICATE SHAFT AND MOTOR BEARINGS Floating
180 2/05/2018 0.34 0.17HVAC4 PRESSURE WASH CONDENSER COILS WITH COIL CLEAN Floating
SOLUTION AS REQUIRED
180 2/05/2018 0.08 0.08HVAC5 REPLACE AIR FILTERS Floating
180 2/05/2018 0.13 0.08HVAC6 CLEAN ELECTRICAL WIRING AND CONNECTIONS: Floating
TIGHTEN LOOSE CONNECTIONS
180 2/05/2018 0.34 0.17HVAC7 CLEAN EVAPORATOR COILS, DRAINPAN, BLOWERS, Floating
FANS, MOTORS AND DRAIN PIPING AS REQUIRED
180 2/05/2018 0.08 0.08HVAC8 PERFORM OPERATIONAL CHECK OF UNIT;CHECK Floating
REFRIGERANT PRESSURE; ADD AS NEEDED
180 2/05/2018 0.08 0.08HVAC9 CLEAN AREA AROUND EQUIPMENT FloatingMC280
180 2/05/2018 0.08 0.08HVAC10 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
Run:
1:52PM
6Page: Equipment: From Lowest To Highest.
Query: None.
DESCRIPTION
102-ACSPU-009 A/C SPLIT UNIT Yes
MODEL: PL36AK
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 4/30/2018 0.08 0.08HVAC1 NOTIFY AND SCHEDULE SHUT-DOWN WITH OPERATING FloatingMT1
PERSONNEL.
180 4/30/2018 0.21 0.25HVAC2 CLEAN INTAKE SIDE OF CONDENSER COILS, FANS AND Floating
INTAKE SCREENS
180 4/30/2018 0.08 0.08HVAC3 LUBRICATE SHAFT AND MOTOR BEARINGS Floating
180 4/30/2018 0.34 0.17HVAC4 PRESSURE WASH CONDENSER COILS WITH COIL CLEAN Floating
SOLUTION AS REQUIRED
180 4/30/2018 0.08 0.08HVAC5 REPLACE AIR FILTERS Floating
180 4/30/2018 0.13 0.08HVAC6 CLEAN ELECTRICAL WIRING AND CONNECTIONS: Floating
TIGHTEN LOOSE CONNECTIONS
180 4/30/2018 0.34 0.17HVAC7 CLEAN EVAPORATOR COILS, DRAINPAN, BLOWERS, Floating
FANS, MOTORS AND DRAIN PIPING AS REQUIRED
180 4/30/2018 0.13 0.17HVAC8 PERFORM OPERATIONAL CHECK OF UNIT;CHECK Floating
REFRIGERANT PRESSURE; ADD AS NEEDED
180 4/30/2018 0.08 0.08HVAC9 CLEAN AREA AROUND EQUIPMENT FloatingMC280
180 4/30/2018 0.08 0.08HVAC10 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
DESCRIPTION
102-ACSPU-010 A/C SPLIT UNIT Yes
MODEL: PL36AK
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 4/30/2018 0.08 0.08HVAC1 NOTIFY AND SCHEDULE SHUT-DOWN WITH OPERATING FloatingMT1
PERSONNEL.
180 4/30/2018 0.21 0.25HVAC2 CLEAN INTAKE SIDE OF CONDENSER COILS, FANS AND Floating
INTAKE SCREENS
180 4/30/2018 0.08 0.08HVAC3 LUBRICATE SHAFT AND MOTOR BEARINGS Floating
180 4/30/2018 0.34 0.17HVAC4 PRESSURE WASH CONDENSER COILS WITH COIL CLEAN Floating
SOLUTION AS REQUIRED
180 4/30/2018 0.08 0.08HVAC5 REPLACE AIR FILTERS Floating
180 4/30/2018 0.13 0.08HVAC6 CLEAN ELECTRICAL WIRING AND CONNECTIONS: Floating
TIGHTEN LOOSE CONNECTIONS
180 4/30/2018 0.34 0.17HVAC7 CLEAN EVAPORATOR COILS, DRAINPAN, BLOWERS, Floating
FANS, MOTORS AND DRAIN PIPING AS REQUIRED
180 4/30/2018 0.13 0.17HVAC8 PERFORM OPERATIONAL CHECK OF UNIT;CHECK Floating
REFRIGERANT PRESSURE; ADD AS NEEDED
180 4/30/2018 0.08 0.08HVAC9 CLEAN AREA AROUND EQUIPMENT FloatingMC280
180 4/30/2018 0.08 0.08HVAC10 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
DESCRIPTION
102-ACSPU-011 A/C SPLIT UNIT Yes
MODEL: KHS3082 0005402
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 4/30/2018 0.08 0.07HVAC1 NOTIFY AND SCHEDULE SHUT-DOWN WITH OPERATING FloatingMT1
PERSONNEL.
180 4/30/2018 0.34 0.17HVAC2 CLEAN INTAKE SIDE OF CONDENSER COILS, FANS AND Floating
INTAKE SCREENS
Run:
1:52PM
7Page: Equipment: From Lowest To Highest.
Query: None.
180 4/30/2018 0.08 0.08HVAC3 LUBRICATE SHAFT AND MOTOR BEARINGS Floating
180 4/30/2018 0.34 0.42HVAC4 PRESSURE WASH CONDENSER COILS WITH COIL CLEAN Floating
SOLUTION AS REQUIRED
180 4/30/2018 0.13 0.13HVAC5 REPLACE AIR FILTERS Floating
180 4/30/2018 0.08 0.20HVAC6 CLEAN ELECTRICAL WIRING AND CONNECTIONS: Floating
TIGHTEN LOOSE CONNECTIONS
180 4/30/2018 0.13 0.17HVAC7 CLEAN EVAPORATOR COILS, DRAINPAN, BLOWERS, Floating
FANS, MOTORS AND DRAIN PIPING AS REQUIRED
180 4/30/2018 0.08 0.08HVAC8 PERFORM OPERATIONAL CHECK OF UNIT;CHECK Floating
REFRIGERANT PRESSURE; ADD AS NEEDED
180 4/30/2018 0.17 0.08HVAC9 CLEAN AREA AROUND EQUIPMENT FloatingMC280
180 4/30/2018 0.08 0.08HVAC10 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
DESCRIPTION
103-ACWIN-001 A/C WINDOW Yes
MODEL:
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 2/05/2018 0.08 0.08HVAC1 NOTIFY AND SCHEDULE SHUT-DOWN WITH OPERATING FloatingMT1
PERSONNEL.
180 2/05/2018 0.13 0.08HVAC2 CLEAN INTAKE SIDE OF CONDENSER COILS, FANS AND Floating
INTAKE SCREENS
180 2/05/2018 0.08 0.08HVAC3 LUBRICATE SHAFT AND MOTOR BEARINGS Floating
180 2/05/2018 0.13 0.08HVAC4 PRESSURE WASH CONDENSER COILS WITH COIL CLEAN Floating
SOLUTION AS REQUIRED
180 2/05/2018 0.08 0.08HVAC5 REPLACE AIR FILTERS Floating
180 2/05/2018 0.08 0.08HVAC6 CLEAN ELECTRICAL WIRING AND CONNECTIONS: Floating
TIGHTEN LOOSE CONNECTIONS
180 2/05/2018 0.13 0.08HVAC7 CLEAN EVAPORATOR COILS, DRAINPAN, BLOWERS, Floating
FANS, MOTORS AND DRAIN PIPING AS REQUIRED
180 2/05/2018 0.08 0.08HVAC8 PERFORM OPERATIONAL CHECK OF UNIT;CHECK Floating
REFRIGERANT PRESSURE; ADD AS NEEDED
180 2/05/2018 0.13 0.08HVAC9 CLEAN AREA AROUND EQUIPMENT FloatingMC280
180 2/05/2018 0.08 0.08HVAC10 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
DESCRIPTION
103-ACWIN-002 A/C WINDOW Yes
MODEL:
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 1/10/2018 0.08 0.07HVAC1 NOTIFY AND SCHEDULE SHUT-DOWN WITH OPERATING FloatingMT1
PERSONNEL.
180 1/10/2018 0.13 0.17HVAC2 CLEAN INTAKE SIDE OF CONDENSER COILS, FANS AND Floating
INTAKE SCREENS
180 1/10/2018 0.08 0.08HVAC3 LUBRICATE SHAFT AND MOTOR BEARINGS Floating
180 1/10/2018 0.13 0.42HVAC4 PRESSURE WASH CONDENSER COILS WITH COIL CLEAN Floating
SOLUTION AS REQUIRED
180 1/10/2018 0.13 0.13HVAC5 REPLACE AIR FILTERS Floating
180 1/10/2018 0.08 0.20HVAC6 CLEAN ELECTRICAL WIRING AND CONNECTIONS: Floating
TIGHTEN LOOSE CONNECTIONS
180 1/10/2018 0.13 0.17HVAC7 CLEAN EVAPORATOR COILS, DRAINPAN, BLOWERS, Floating
FANS, MOTORS AND DRAIN PIPING AS REQUIRED
180 1/10/2018 0.08 0.08HVAC8 PERFORM OPERATIONAL CHECK OF UNIT;CHECK Floating
Run:
1:52PM
8Page: Equipment: From Lowest To Highest.
Query: None.
REFRIGERANT PRESSURE; ADD AS NEEDED
180 1/10/2018 0.13 0.08HVAC9 CLEAN AREA AROUND EQUIPMENT FloatingMC280
180 1/10/2018 0.08 0.08HVAC10 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
DESCRIPTION
103-ACWIN-006 A/C WINDOW Yes
MODEL: ACO55N4B1
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 4/16/2018 0.08 0.08HVAC1 NOTIFY AND SCHEDULE SHUT-DOWN WITH OPERATING FloatingMT1
PERSONNEL.
180 4/16/2018 0.13 0.17HVAC2 CLEAN INTAKE SIDE OF CONDENSER COILS, FANS AND Floating
INTAKE SCREENS
180 4/16/2018 0.08 0.08HVAC3 LUBRICATE SHAFT AND MOTOR BEARINGS Floating
180 4/16/2018 0.08 0.08HVAC4 PRESSURE WASH CONDENSER COILS WITH COIL CLEAN Floating
SOLUTION AS REQUIRED
180 4/16/2018 0.08 0.08HVAC5 REPLACE AIR FILTERS Floating
180 4/16/2018 0.08 0.08HVAC6 CLEAN ELECTRICAL WIRING AND CONNECTIONS: Floating
TIGHTEN LOOSE CONNECTIONS
180 4/16/2018 0.08 0.08HVAC7 CLEAN EVAPORATOR COILS, DRAINPAN, BLOWERS, Floating
FANS, MOTORS AND DRAIN PIPING AS REQUIRED
180 4/16/2018 0.08 0.08HVAC8 PERFORM OPERATIONAL CHECK OF UNIT;CHECK Floating
REFRIGERANT PRESSURE; ADD AS NEEDED
180 4/16/2018 0.13 0.08HVAC9 CLEAN AREA AROUND EQUIPMENT FloatingMC280
180 4/16/2018 0.08 0.08HVAC10 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
DESCRIPTION
103-ACWIN-007 A/C WINDOW Yes
MODEL:
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 4/30/2018 0.08 0.08HVAC1 NOTIFY AND SCHEDULE SHUT-DOWN WITH OPERATING FloatingMT1
PERSONNEL.
180 4/30/2018 0.13 0.17HVAC2 CLEAN INTAKE SIDE OF CONDENSER COILS, FANS AND Floating
INTAKE SCREENS
180 4/30/2018 0.08 0.08HVAC3 LUBRICATE SHAFT AND MOTOR BEARINGS Floating
180 4/30/2018 0.08 0.08HVAC4 PRESSURE WASH CONDENSER COILS WITH COIL CLEAN Floating
SOLUTION AS REQUIRED
180 4/30/2018 0.08 0.08HVAC5 REPLACE AIR FILTERS Floating
180 4/30/2018 0.08 0.08HVAC6 CLEAN ELECTRICAL WIRING AND CONNECTIONS: Floating
TIGHTEN LOOSE CONNECTIONS
180 4/30/2018 0.08 0.08HVAC7 CLEAN EVAPORATOR COILS, DRAINPAN, BLOWERS, Floating
FANS, MOTORS AND DRAIN PIPING AS REQUIRED
180 4/30/2018 0.08 0.08HVAC8 PERFORM OPERATIONAL CHECK OF UNIT;CHECK Floating
REFRIGERANT PRESSURE; ADD AS NEEDED
180 4/30/2018 0.13 0.08HVAC9 CLEAN AREA AROUND EQUIPMENT FloatingMC280
180 4/30/2018 0.08 0.08HVAC10 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
Run:
1:52PM
9Page: Equipment: From Lowest To Highest.
Query: None.
DESCRIPTION
103-ACWIN-008 A/C WINDOW Yes
MODEL:
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 2/05/2018 0.08 0.07HVAC1 NOTIFY AND SCHEDULE SHUT-DOWN WITH OPERATING FloatingMT1
PERSONNEL.
180 2/05/2018 0.17 0.17HVAC2 CLEAN INTAKE SIDE OF CONDENSER COILS, FANS AND Floating
INTAKE SCREENS
180 2/05/2018 0.08 0.08HVAC3 LUBRICATE SHAFT AND MOTOR BEARINGS Floating
180 2/05/2018 0.08 0.42HVAC4 PRESSURE WASH CONDENSER COILS WITH COIL CLEAN Floating
SOLUTION AS REQUIRED
180 2/05/2018 0.17 0.13HVAC5 REPLACE AIR FILTERS Floating
180 2/05/2018 0.08 0.20HVAC6 CLEAN ELECTRICAL WIRING AND CONNECTIONS: Floating
TIGHTEN LOOSE CONNECTIONS
180 2/05/2018 0.08 0.17HVAC7 CLEAN EVAPORATOR COILS, DRAINPAN, BLOWERS, Floating
FANS, MOTORS AND DRAIN PIPING AS REQUIRED
180 2/05/2018 0.00 0.08HVAC8 PERFORM OPERATIONAL CHECK OF UNIT;CHECK Floating
REFRIGERANT PRESSURE; ADD AS NEEDED
180 2/05/2018 0.08 0.08HVAC9 CLEAN AREA AROUND EQUIPMENT FloatingMC280
180 2/05/2018 0.08 0.08HVAC10 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
180 2/05/2018 0.00 0.00HVAC11 ADD JHA Floating
DESCRIPTION
103-ACWIN-009 A/C WINDOW Yes
MODEL:
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 1/10/2018 0.08 0.07HVAC1 NOTIFY AND SCHEDULE SHUT-DOWN WITH OPERATING FloatingMT1
PERSONNEL.
180 1/10/2018 0.17 0.17HVAC2 CLEAN INTAKE SIDE OF CONDENSER COILS, FANS AND Floating
INTAKE SCREENS
180 1/10/2018 0.08 0.08HVAC3 LUBRICATE SHAFT AND MOTOR BEARINGS Floating
180 1/10/2018 0.08 0.42HVAC4 PRESSURE WASH CONDENSER COILS WITH COIL CLEAN Floating
SOLUTION AS REQUIRED
180 1/10/2018 0.17 0.13HVAC5 REPLACE AIR FILTERS Floating
180 1/10/2018 0.08 0.20HVAC6 CLEAN ELECTRICAL WIRING AND CONNECTIONS: Floating
TIGHTEN LOOSE CONNECTIONS
180 1/10/2018 0.08 0.17HVAC7 CLEAN EVAPORATOR COILS, DRAINPAN, BLOWERS, Floating
FANS, MOTORS AND DRAIN PIPING AS REQUIRED
180 1/10/2018 0.00 0.08HVAC8 PERFORM OPERATIONAL CHECK OF UNIT;CHECK Floating
REFRIGERANT PRESSURE; ADD AS NEEDED
180 1/10/2018 0.08 0.08HVAC9 CLEAN AREA AROUND EQUIPMENT FloatingMC280
180 1/10/2018 0.08 0.08HVAC10 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
DESCRIPTION
104-DEHUM-004 DEHUMIDIFICATION FOR ROOM Yes
MODEL:
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 3/05/2018 0.08 0.07HVAC1 NOTIFY AND SCHEDULE SHUT-DOWN WITH OPERATING FloatingMT1
PERSONNEL.
180 3/05/2018 0.13 0.17HVAC2 CLEAN INTAKE SIDE OF CONDENSER COILS, FANS AND Floating
INTAKE SCREENS
Run:
1:52PM
10Page: Equipment: From Lowest To Highest.
Query: None.
180 3/05/2018 0.13 0.08HVAC3 LUBRICATE SHAFT AND MOTOR BEARINGS Floating
180 3/05/2018 0.00 0.42HVAC4 PRESSURE WASH CONDENSER COILS WITH COIL CLEAN Floating
SOLUTION AS REQUIRED
180 3/05/2018 0.07 0.13HVAC5 REPLACE AIR FILTERS Floating
180 3/05/2018 0.13 0.20HVAC6 CLEAN ELECTRICAL WIRING AND CONNECTIONS: Floating
TIGHTEN LOOSE CONNECTIONS
180 3/05/2018 0.13 0.17HVAC7 CLEAN EVAPORATOR COILS, DRAINPAN, BLOWERS, Floating
FANS, MOTORS AND DRAIN PIPING AS REQUIRED
180 3/05/2018 0.13 0.08HVAC8 PERFORM OPERATIONAL CHECK OF UNIT;CHECK Floating
REFRIGERANT PRESSURE; ADD AS NEEDED
180 3/05/2018 0.08 0.08HVAC9 CLEAN AREA AROUND EQUIPMENT FloatingMC280
180 3/05/2018 0.08 0.08HVAC10 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
DESCRIPTION
104-HUMID-001 HUMIDIFIER FOR AIR HANDLER Yes
MODEL: STS200S
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
0 / / 0.00 0.000 Floating
DESCRIPTION
104-HUMID-002 HUMIDIFIER FOR AIR HANDLER Yes
MODEL: STS200S
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
0 / / 0.00 0.000 Floating
DESCRIPTION
104-HUMID-003 HUMIDIFIER FOR AIR HANDLER (STEAM) Yes
MODEL:
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
0 / / 0.00 0.000 Floating
DESCRIPTION
105-COMPR-001 AIR COMPRESSOR Yes
MODEL:
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 5/16/2018 0.08 0.08MO1 CHECK WITH OPERATING OR AREA PERSONNEL FOR FloatingMC260
DEFICIENCIES
180 5/16/2018 0.08 0.00MO2 REVIEW MANUFACTURERS' INSTRUCTIONS AND Floating
EQUIPMENT HISTORY RECORD
180 5/16/2018 0.08 0.00MO3 DE-ENERGIZE TAG AND LOCK OUT CIRCUITS Floating
180 5/16/2018 0.00 0.00MO4 PERFORM NORMAL TOUR CHECKS AND OPERATIONS Floating
PERFORM A VISUAL INSPECTION
180 5/16/2018 0.08 0.00MO5 CHANGE COMPRESSOR CRANKCASE OIL Floating
180 5/16/2018 0.08 0.08MO6 CLEAN OR REPLACE INTAKE FILTER Floating
180 5/16/2018 0.08 0.00MO7 INSPECT ALIGNMENT AND CONDITION. ADJUST OR Floating
REPLACE BELTS AS REQUIRED
180 5/16/2018 0.12 0.16MO8 CLEAN HEAT EXCHANGE SURFACES Floating
180 5/16/2018 0.19 0.25MO9 CHECK ACCURACY OF GAUGES Floating
180 5/16/2018 0.08 0.00MO10 TEST RELIEF VALVES, REPLACE IF LEAKING OR THE Floating
RELIEF RANGE IS INCORRECT. DO NOT READJUST
SAFETY
180 5/16/2018 0.25 0.00MO11 CHECK OPERATION OF COMPRESSOR UNLOADER, Floating
REPAIR OR REPLACE IF NEEDED
180 5/16/2018 0.08 0.00MO12 CHECK COMPRESSOR SUCTION AND DISCHARGE Floating
VALVES FOR PROPER OPERATION
Run:
1:52PM
11Page: Equipment: From Lowest To Highest.
Query: None.
180 5/16/2018 0.08 0.00MO13 CHECK CUT-IN AND CUT-OUT OF COMPRESSOR Floating
PRESSURE CONTROLLER, READJUST IF NEEDED
180 5/16/2018 0.08 0.00MO14 CHECK IF AIR COMPRESSOR IS RUNNING EXCESSIVELY Floating
OR FREQUENTLY CYCLING ON OR OFF
180 5/16/2018 0.08 0.00MO15 PERFORM AN AIR LEAK CHECK ON THE COMPRESSOR Floating
AND AIR DISTRIBUTION NETWORK IN THE MACHINE
ROOM. CHECK HOSES, CONNECTIONS, COUPLERS, AND
REGULATORS
180 5/16/2018 0.08 0.00MO16 CORRECT OR SCHEDULE RE-PAIRS AS WORK ITEMS Floating
180 5/16/2018 0.08 0.08MO17 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
DESCRIPTION
105-COMPR-002 AIR COMPRESSOR Yes
MODEL:
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 1/11/2018 0.08 0.08MO1 CHECK WITH OPERATING OR AREA PERSONNEL FOR FloatingMC260
DEFICIENCIES
180 1/11/2018 0.08 0.05MO2 REVIEW MANUFACTURERS' INSTRUCTIONS AND Floating
EQUIPMENT HISTORY RECORD
180 1/11/2018 0.00 0.05MO3 DE-ENERGIZE TAG AND LOCK OUT CIRCUITS Floating
180 1/11/2018 0.00 0.05MO4 PERFORM NORMAL TOUR CHECKS AND OPERATIONS Floating
PERFORM A VISUAL INSPECTION
180 1/11/2018 0.33 0.20MO5 CHANGE COMPRESSOR CRANKCASE OIL Floating
180 1/11/2018 0.08 0.05MO6 CLEAN OR REPLACE INTAKE FILTER Floating
180 1/11/2018 0.17 0.20MO7 INSPECT AQLIGNMENT AND CONDITION. ADJUST OR Floating
REPLACE BELTS AS REQUIRED
180 1/11/2018 0.21 0.05MO8 CLEAN HEAT EXCHANGE SURFACES Floating
180 1/11/2018 0.08 0.05MO9 CHECK ACCURACY OF GAUGES Floating
180 1/11/2018 0.08 5.00MO10 TEST RELIEF VALVES, REPLACE IF LEAKING OR THE Floating
RELIEF RANGE IS INCORRECT. SO NOT READJUST
SAFETY
180 1/11/2018 0.00 0.05MO11 CHECK OPERATION OF COMPRESSOR UNLOADER, Floating
REPAIR OR REPLACE IF NEEDE
180 1/11/2018 0.00 0.05MO12 CHECK COMPRESSOR SUCTION AND DISCHARGE Floating
VALVES FOR PROPER OPERATION
180 1/11/2018 0.00 0.05MO13 CHECK CUT-IN AND CUT-OUT OF COMPRESSOR Floating
PRESSURE CONTROLLER, READJUST IF NEEDED
180 1/11/2018 0.08 0.05MO14 CHECK IF AIR COMPRESSOR IS RUNNING EXCESSIVELY Floating
OR FREQUENTLY CYCLING ON OR OFF
180 1/11/2018 0.08 0.05MO15 PERFORM AN AIR LEAK CHECK ON THE COMPRESSOR Floating
AND AIR DISTRIBUTION NETWORK IN THE MACHINE
ROOM. CHECK HOSES, CONNECTIONS, COUPLERS, AND
REGULATORS
180 1/11/2018 0.08 0.05MO16 CORRECT OR SCHEDULE RE-PAIRS AS WORK ITEMS Floating
180 1/11/2018 0.00 0.08MO17 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
180 1/11/2018 0.00 0.00MO18 2-BX58 BELTS Floating
DESCRIPTION
105-COMPR-003 AIR COMPRESSOR Yes
MODEL:
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
Run:
1:52PM
12Page: Equipment: From Lowest To Highest.
Query: None.
180 1/17/2018 0.08 0.08MO1 CHECK WITH OPERATING OR AREA PERSONNEL FOR FloatingMC260
DEFICIENCIES
180 1/17/2018 0.00 0.05MO2 REVIEW MANUFACTURERS' INSTRUCTIONS AND Floating
EQUIPMENT HISTORY RECORD
180 1/17/2018 0.00 0.05MO3 DE-ENERGIZE TAG AND LOCK OUT CIRCUITS Floating
180 1/17/2018 0.00 0.05MO4 PERFORM NORMAL TOUR CHECKS AND OPERATIONS Floating
PERFORM A VISUAL INSPECTION
180 1/17/2018 0.00 0.20MO5 CHANGE COMPRESSOR CRANKCASE OIL Floating
180 1/17/2018 0.00 0.05MO6 CLEAN OR REPLACE INTAKE FILTER Floating
180 1/17/2018 0.00 0.20MO7 INSPECT AQLIGNMENT AND CONDITION. ADJUST OR Floating
REPLACE BELTS AS REQUIRED
180 1/17/2018 0.25 0.05MO8 CLEAN HEAT EXCHANGE SURFACES Floating
180 1/17/2018 0.00 0.05MO9 CHECK ACCURACY OF GAUGES Floating
180 1/17/2018 0.08 5.00MO10 TEST RELIEF VALVES, REPLACE IF LEAKING OR THE Floating
RELIEF RANGE IS INCORRECT. SO NOT READJUST
SAFETY
180 1/17/2018 0.00 0.05MO11 CHECK OPERATION OF COMPRESSOR UNLOADER, Floating
REPAIR OR REPLACE IF NEEDE
180 1/17/2018 0.00 0.05MO12 CHECK COMPRESSOR SUCTION AND DISCHARGE Floating
VALVES FOR PROPER OPERATION
180 1/17/2018 0.00 0.05MO13 CHECK CUT-IN AND CUT-OUT OF COMPRESSOR Floating
PRESSURE CONTROLLER, READJUST IF NEEDED
180 1/17/2018 0.00 0.05MO14 CHECK IF AIR COMPRESSOR IS RUNNING EXCESSIVELY Floating
OR FREQUENTLY CYCLING ON OR OFF
180 1/17/2018 0.00 0.05MO15 PERFORM AN AIR LEAK CHECK ON THE COMPRESSOR Floating
AND AIR DISTRIBUTION NETWORK IN THE MACHINE
ROOM. CHECK HOSES, CONNECTIONS, COUPLERS, AND
REGULATORS
180 1/17/2018 0.00 0.05MO16 CORRECT OR SCHEDULE RE-PAIRS AS WORK ITEMS Floating
180 1/17/2018 0.08 0.08MO17 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
180 1/17/2018 0.00 0.00MO18 2-BP85 BELTS Floating
DESCRIPTION
105-COMPR-005 AIR COMPRESSOR No
MODEL: FRU17B2JW WA64000776
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 12/08/2014 0.08 0.08MO1 CHECK WITH OPERATING OR AREA PERSONNEL FOR FloatingMC260
DEFICIENCIES
180 12/08/2014 0.08 0.08MO2 REVIEW MANUFACTURERS' INSTRUCTIONS AND Floating
EQUIPMENT HISTORY RECORD
180 12/08/2014 0.17 0.17MO3 DE-ENERGIZE TAG AND LOCK OUT CIRCUITS Floating
180 12/08/2014 0.17 0.08MO4 PERFORM NORMAL TOUR CHECKS AND OPERATIONS Floating
PERFORM A VISUAL INSPECTION
180 12/08/2014 0.33 0.33MO5 CHANGE COMPRESSOR CRANKCASE OIL Floating
180 12/08/2014 0.08 0.08MO6 CLEAN OR REPLACE INTAKE FILTER Floating
180 12/08/2014 0.33 0.33MO7 INSPECT ALIGNMENT AND CONDITION. ADJUST OR Floating
REPLACE BELTS AS REQUIRED
180 12/08/2014 0.12 0.08MO8 CLEAN HEAT EXCHANGE SURFACES Floating
180 12/08/2014 0.08 0.08MO9 CHECK ACCURACY OF GAUGES Floating
180 12/08/2014 0.08 0.08MO10 TEST RELIEF VALVES, REPLACE IF LEAKING OR THE Floating
RELIEF RANGE IS INCORRECT. DO NOT READJUST
SAFETY
Run:
1:52PM
13Page: Equipment: From Lowest To Highest.
Query: None.
180 12/08/2014 0.08 0.08MO11 CHECK OPERATION OF COMPRESSOR UNLOADER, Floating
REPAIR OR REPLACE IF NEEDED
180 12/08/2014 0.08 0.08MO12 CHECK COMPRESSOR SUCTION AND DISCHARGE Floating
VALVES FOR PROPER OPERATION
180 12/08/2014 0.08 0.08MO13 CHECK CUT-IN AND CUT-OUT OF COMPRESSOR Floating
PRESSURE CONTROLLER, READJUST IF NEEDED
180 12/08/2014 0.08 0.08MO14 CHECK IF AIR COMPRESSOR IS RUNNING EXCESSIVELY Floating
OR FREQUENTLY CYCLING ON OR OFF
180 12/08/2014 0.08 0.08MO15 PERFORM AN AIR LEAK CHECK ON THE COMPRESSOR Floating
AND AIR DISTRIBUTION NETWORK IN THE MACHINE
ROOM. CHECK HOSES, CONNECTIONS, COUPLERS, AND
REGULATORS
180 12/08/2014 0.08 0.08MO16 CORRECT OR SCHEDULE RE-PAIRS AS WORK ITEMS Floating
180 12/08/2014 0.08 0.08MO17 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
DESCRIPTION
105-COMPR-007 AIR COMPRESSOR Yes
MODEL: AML-2201034
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 1/17/2018 0.08 0.08MO1 CHECK WITH OPERATING OR AREA PERSONNEL FOR FloatingMC260
DEFICIENCIES
180 1/17/2018 0.00 0.05MO2 REVIEW MANUFACTURERS' INSTRUCTIONS AND Floating
EQUIPMENT HISTORY RECORD
180 1/17/2018 0.00 0.05MO3 DE-ENERGIZE TAG AND LOCK OUT CIRCUITS Floating
180 1/17/2018 0.21 0.05MO4 PERFORM NORMAL TOUR CHECKS AND OPERATIONS Floating
PERFORM A VISUAL INSPECTION
180 1/17/2018 0.08 0.20MO5 CHANGE COMPRESSOR CRANKCASE OIL Floating
180 1/17/2018 0.00 0.05MO6 CLEAN OR REPLACE INTAKE FILTER Floating
180 1/17/2018 0.00 0.20MO7 INSPECT AQLIGNMENT AND CONDITION. ADJUST OR Floating
REPLACE BELTS AS REQUIRED
180 1/17/2018 0.25 0.05MO8 CLEAN HEAT EXCHANGE SURFACES Floating
180 1/17/2018 0.00 0.05MO9 CHECK ACCURACY OF GAUGES Floating
180 1/17/2018 0.00 5.00MO10 TEST RELIEF VALVES, REPLACE IF LEAKING OR THE Floating
RELIEF RANGE IS INCORRECT. SO NOT READJUST
SAFETY
180 1/17/2018 0.00 0.05MO11 CHECK OPERATION OF COMPRESSOR UNLOADER, Floating
REPAIR OR REPLACE IF NEEDE
180 1/17/2018 0.00 0.05MO12 CHECK COMPRESSOR SUCTION AND DISCHARGE Floating
VALVES FOR PROPER OPERATION
180 1/17/2018 0.00 0.05MO13 CHECK CUT-IN AND CUT-OUT OF COMPRESSOR Floating
PRESSURE CONTROLLER, READJUST IF NEEDED
180 1/17/2018 0.00 0.05MO14 CHECK IF AIR COMPRESSOR IS RUNNING EXCESSIVELY Floating
OR FREQUENTLY CYCLING ON OR OFF
180 1/17/2018 0.00 0.05MO15 PERFORM AN AIR LEAK CHECK ON THE COMPRESSOR Floating
AND AIR DISTRIBUTION NETWORK IN THE MACHINE
ROOM. CHECK HOSES, CONNECTIONS, COUPLERS, AND
REGULATORS
180 1/17/2018 0.08 0.05MO16 CORRECT OR SCHEDULE RE-PAIRS AS WORK ITEMS Floating
180 1/17/2018 0.08 0.08MO17 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
Run:
1:52PM
14Page: Equipment: From Lowest To Highest.
Query: None.
DESCRIPTION
105-COMPR-008 AIR COMPRESSOR Yes
MODEL:
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 5/07/2018 0.08 0.08MO1 CHECK WITH OPERATING OR AREA PERSONNEL FOR FloatingMC260
DEFICIENCIES
180 5/07/2018 0.08 0.08MO2 REVIEW MANUFACTURERS' INSTRUCTIONS AND Floating
EQUIPMENT HISTORY RECORD
180 5/07/2018 0.11 0.17MO3 DE-ENERGIZE TAG AND LOCK OUT CIRCUITS Floating
180 5/07/2018 0.13 0.08MO4 PERFORM NORMAL TOUR CHECKS AND OPERATIONS Floating
PERFORM A VISUAL INSPECTION
180 5/07/2018 0.33 0.33MO5 CHANGE COMPRESSOR CRANKCASE OIL Floating
180 5/07/2018 0.08 0.08MO6 CLEAN OR REPLACE INTAKE FILTER Floating
180 5/07/2018 0.25 0.33MO7 INSPECT ALIGNMENT AND CONDITION. ADJUST OR Floating
REPLACE BELTS AS REQUIRED
180 5/07/2018 0.17 0.08MO8 CLEAN HEAT EXCHANGE SURFACES Floating
180 5/07/2018 0.13 0.08MO9 CHECK ACCURACY OF GAUGES Floating
180 5/07/2018 0.13 0.08MO10 TEST RELIEF VALVES, REPLACE IF LEAKING OR THE Floating
RELIEF RANGE IS INCORRECT. DO NOT READJUST
SAFETY
180 5/07/2018 0.08 0.08MO11 CHECK OPERATION OF COMPRESSOR UNLOADER, Floating
REPAIR OR REPLACE IF NEEDED
180 5/07/2018 0.08 0.08MO12 CHECK COMPRESSOR SUCTION AND DISCHARGE Floating
VALVES FOR PROPER OPERATION
180 5/07/2018 0.08 0.08MO13 CHECK CUT-IN AND CUT-OUT OF COMPRESSOR Floating
PRESSURE CONTROLLER, READJUST IF NEEDED
180 5/07/2018 0.10 0.08MO14 CHECK IF AIR COMPRESSOR IS RUNNING EXCESSIVELY Floating
OR FREQUENTLY CYCLING ON OR OFF
180 5/07/2018 0.13 0.08MO15 PERFORM AN AIR LEAK CHECK ON THE COMPRESSOR Floating
AND AIR DISTRIBUTION NETWORK IN THE MACHINE
ROOM. CHECK HOSES, CONNECTIONS, COUPLERS, AND
REGULATORS
180 5/07/2018 0.08 0.08MO16 CORRECT OR SCHEDULE RE-PAIRS AS WORK ITEMS Floating
180 5/07/2018 0.08 0.08MO17 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
180 5/07/2018 0.00 0.00MO18 3-BP81 BELTS Floating
DESCRIPTION
105-COMPR-009 AIR COMPRESSOR Yes
MODEL: OCD1008DX3 5019263
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 5/07/2018 0.08 0.08MO1 CHECK WITH OPERATING OR AREA PERSONNEL FOR FloatingMC260
DEFICIENCIES
180 5/07/2018 0.00 0.08MO2 REVIEW MANUFACTURERS' INSTRUCTIONS AND Floating
EQUIPMENT HISTORY RECORD
180 5/07/2018 0.08 0.17MO3 DE-ENERGIZE TAG AND LOCK OUT CIRCUITS Floating
180 5/07/2018 0.08 0.08MO4 PERFORM NORMAL TOUR CHECKS AND OPERATIONS Floating
PERFORM A VISUAL INSPECTION
180 5/07/2018 0.08 0.33MO5 CHANGE COMPRESSOR CRANKCASE OIL Floating
180 5/07/2018 0.08 0.08MO6 CLEAN OR REPLACE INTAKE FILTER Floating
180 5/07/2018 0.27 0.33MO7 INSPECT ALIGNMENT AND CONDITION. ADJUST OR Floating
REPLACE BELTS AS REQUIRED
180 5/07/2018 0.44 0.08MO8 CLEAN HEAT EXCHANGE SURFACES Floating
Run:
1:52PM
15Page: Equipment: From Lowest To Highest.
Query: None.
180 5/07/2018 0.08 0.08MO9 CHECK ACCURACY OF GAUGES Floating
180 5/07/2018 0.08 0.08MO10 TEST RELIEF VALVES, REPLACE IF LEAKING OR THE Floating
RELIEF RANGE IS INCORRECT. DO NOT READJUST
SAFETY
180 5/07/2018 0.08 0.08MO11 CHECK OPERATION OF COMPRESSOR UNLOADER, Floating
REPAIR OR REPLACE IF NEEDED
180 5/07/2018 0.08 0.08MO12 CHECK COMPRESSOR SUCTION AND DISCHARGE Floating
VALVES FOR PROPER OPERATION
180 5/07/2018 0.08 0.08MO13 CHECK CUT-IN AND CUT-OUT OF COMPRESSOR Floating
PRESSURE CONTROLLER, READJUST IF NEEDED
180 5/07/2018 0.08 0.08MO14 CHECK IF AIR COMPRESSOR IS RUNNING EXCESSIVELY Floating
OR FREQUENTLY CYCLING ON OR OFF
180 5/07/2018 0.10 0.08MO15 PERFORM AN AIR LEAK CHECK ON THE COMPRESSOR Floating
AND AIR DISTRIBUTION NETWORK IN THE MACHINE
ROOM. CHECK HOSES, CONNECTIONS, COUPLERS, AND
REGULATORS
180 5/07/2018 0.08 0.08MO16 CORRECT OR SCHEDULE RE-PAIRS AS WORK ITEMS Floating
180 5/07/2018 0.08 0.08MO17 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
180 5/07/2018 0.00 0.00MO18 2-BX51 BELTS Floating
DESCRIPTION
105-COMPR-010 MAIN AIR COMPRESSOR # 1 Yes
MODEL: MBVEFA A40317
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 4/05/2018 0.08 0.08MO1 CHECK WITH OPERATING OR AREA PERSONNEL FOR FloatingMC260
DEFICIENCIES
180 4/05/2018 0.08 0.08MO2 REVIEW MANUFACTURERS' INSTRUCTIONS AND Floating
EQUIPMENT HISTORY RECORD
180 4/05/2018 0.08 0.17MO3 DE-ENERGIZE TAG AND LOCK OUT CIRCUITS Floating
180 4/05/2018 0.17 0.25MO4 PERFORM NORMAL TOUR CHECKS AND OPERATIONS Floating
PERFORM A VISUAL INSPECTION
180 4/05/2018 0.08 0.75MO5 CHANGE COMPRESSOR CRANKCASE OIL Floating
180 4/05/2018 0.21 0.25MO6 CLEAN OR REPLACE INTAKE FILTER Floating
180 4/05/2018 0.21 0.33MO7 INSPECT ALIGNMENT AND CONDITION. ADJUST OR Floating
REPLACE BELTS AS REQUIRED
180 4/05/2018 0.50 0.25MO8 CLEAN HEAT EXCHANGE SURFACES Floating
180 4/05/2018 0.08 0.08MO9 CHECK ACCURACY OF GAUGES Floating
180 4/05/2018 0.08 0.08MO10 TEST RELIEF VALVES, REPLACE IF LEAKING OR THE Floating
RELIEF RANGE IS INCORRECT. DO NOT READJUST
SAFETY
180 4/05/2018 0.08 0.08MO11 CHECK FOR CORROSION OR SCALE ON WATER COOLED Floating
UNITS
180 4/05/2018 0.00 0.08MO13 LOG METER READINGS Floating
180 4/05/2018 1.54 0.08MO14 CHECK IF AIR COMPRESSOR IS RUNNING EXCESSIVELY Floating
OR FREQUENTLY CYCLING ON OR OFF
180 4/05/2018 0.08 0.17MO15 PERFORM AN AIR LEAK CHECK ON THE COMPRESSOR Floating
180 4/05/2018 0.00 0.08MO16 CORRECT OR SCHEDULE RE-PAIRS AS WORK ITEMS Floating
180 4/05/2018 0.08 0.08MO17 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
180 4/05/2018 0.00 0.00MO18 6-5VX1400 BELTS Floating
Run:
1:52PM
16Page: Equipment: From Lowest To Highest.
Query: None.
DESCRIPTION
105-COMPR-011 MAIN AIR COMPRESSOR # 2 Yes
MODEL: MBVEFA A40316
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 3/06/2018 0.08 0.08MO1 CHECK WITH OPERATING OR AREA PERSONNEL FOR FloatingMC260
DEFICIENCIES
180 3/06/2018 0.00 0.08MO2 REVIEW MANUFACTURERS' INSTRUCTIONS AND Floating
EQUIPMENT HISTORY RECORD
180 3/06/2018 0.08 0.17MO3 DE-ENERGIZE TAG AND LOCK OUT CIRCUITS Floating
180 3/06/2018 0.17 0.25MO4 PERFORM NORMAL TOUR CHECKS AND OPERATIONS Floating
PERFORM A VISUAL INSPECTION
180 3/06/2018 0.50 0.75MO5 CHANGE COMPRESSOR CRANKCASE OIL Floating
180 3/06/2018 0.33 0.25MO6 CLEAN OR REPLACE INTAKE FILTER Floating
180 3/06/2018 0.58 0.33MO7 INSPECT ALIGNMENT AND CONDITION. ADJUST OR Floating
REPLACE BELTS AS REQUIRED
180 3/06/2018 0.50 0.25MO8 CLEAN HEAT EXCHANGE SURFACES Floating
180 3/06/2018 0.08 0.08MO9 CHECK ACCURACY OF GAUGES Floating
180 3/06/2018 0.08 0.08MO10 TEST RELIEF VALVES, REPLACE IF LEAKING OR THE Floating
RELIEF RANGE IS INCORRECT. DO NOT READJUST
SAFETY
180 3/06/2018 0.08 0.08MO11 CHECK FOR CORROSION OR SCALE ON WATER COOLED Floating
UNITS
180 3/06/2018 0.00 0.08MO12 LOG METER READINGS Floating
180 3/06/2018 0.63 0.08MO13 CHECK IF AIR COMPRESSOR IS RUNNING EXCESSIVELY Floating
OR FREQUENTLY CYCLING ON OR OFF
180 3/06/2018 0.25 0.17MO14 PERFORM AN AIR LEAK CHECK ON THE COMPRESSOR Floating
180 3/06/2018 0.00 0.08MO15 CORRECT OR SCHEDULE RE-PAIRS AS WORK ITEMS Floating
180 3/06/2018 0.08 0.08MO16 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
180 3/06/2018 0.00 0.00MO17 6-5VX1400 BELTS Floating
DESCRIPTION
105-COMPR-012 AIR COMPRESSER Yes
MODEL:
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 1/09/2018 0.08 0.08MO1 CHECK WITH OPERATING OR AREA PERSONNEL FOR FloatingMC260
DEFICIENCIES
180 1/09/2018 0.08 0.05MO2 REVIEW MANUFACTURERS' INSTRUCTIONS AND Floating
EQUIPMENT HISTORY RECORD
180 1/09/2018 0.00 0.05MO3 DE-ENERGIZE TAG AND LOCK OUT CIRCUITS Floating
180 1/09/2018 0.00 0.05MO4 PERFORM NORMAL TOUR CHECKS AND OPERATIONS Floating
PERFORM A VISUAL INSPECTION
180 1/09/2018 0.00 0.20MO5 CHANGE COMPRESSOR CRANKCASE OIL Floating
180 1/09/2018 0.08 0.05MO6 CLEAN OR REPLACE INTAKE FILTER Floating
180 1/09/2018 0.00 0.20MO7 INSPECT AQLIGNMENT AND CONDITION. ADJUST OR Floating
REPLACE BELTS AS REQUIRED
180 1/09/2018 0.17 0.05MO8 CLEAN HEAT EXCHANGE SURFACES Floating
180 1/09/2018 0.08 0.05MO9 CHECK ACCURACY OF GAUGES Floating
180 1/09/2018 0.00 5.00MO10 TEST RELIEF VALVES, REPLACE IF LEAKING OR THE Floating
RELIEF RANGE IS INCORRECT. SO NOT READJUST
SAFETY
180 1/09/2018 0.08 0.05MO11 CHECK OPERATION OF COMPRESSOR UNLOADER, Floating
REPAIR OR REPLACE IF NEEDE
Run:
1:52PM
17Page: Equipment: From Lowest To Highest.
Query: None.
180 1/09/2018 0.00 0.05MO12 CHECK COMPRESSOR SUCTION AND DISCHARGE Floating
VALVES FOR PROPER OPERATION
180 1/09/2018 0.08 0.05MO13 CHECK CUT-IN AND CUT-OUT OF COMPRESSOR Floating
PRESSURE CONTROLLER, READJUST IF NEEDED
180 1/09/2018 0.08 0.05MO14 CHECK IF AIR COMPRESSOR IS RUNNING EXCESSIVELY Floating
OR FREQUENTLY CYCLING ON OR OFF
180 1/09/2018 0.08 0.05MO15 PERFORM AN AIR LEAK CHECK ON THE COMPRESSOR Floating
AND AIR DISTRIBUTION NETWORK IN THE MACHINE
ROOM. CHECK HOSES, CONNECTIONS, COUPLERS, AND
REGULATORS
180 1/09/2018 0.08 0.05MO16 CORRECT OR SCHEDULE RE-PAIRS AS WORK ITEMS Floating
180 1/09/2018 0.00 0.08MO17 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
DESCRIPTION
105-COMPR-013 AIR COMPRESSOR Yes
MODEL:
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 1/17/2018 0.08 0.08MPM1 CHECK WITH OPERATING OR AREA PERSONNEL FOR FloatingMC260
DEFICIENCIES
180 1/17/2018 0.00 0.05MO2 REVIEW MANUFACTURERS' INSTRUCTIONS AND Floating
EQUIPMENT HISTORY RECORD
180 1/17/2018 0.00 0.05MO3 DE-ENERGIZE TAG AND LOCK OUT CIRCUITS Floating
180 1/17/2018 0.00 0.05MO4 PERFORM NORMAL TOUR CHECKS AND OPERATIONS Floating
PERFORM A VISUAL INSPECTION
180 1/17/2018 0.08 0.20MO5 CHANGE COMPRESSOR CRANKCASE OIL Floating
180 1/17/2018 0.08 0.05MO6 CLEAN OR REPLACE INTAKE FILTER Floating
180 1/17/2018 0.08 0.20MO7 INSPECT AQLIGNMENT AND CONDITION. ADJUST OR Floating
REPLACE BELTS AS REQUIRED
180 1/17/2018 0.75 0.05MO8 CLEAN HEAT EXCHANGE SURFACES Floating
180 1/17/2018 0.08 0.05MO9 CHECK ACCURACY OF GAUGES Floating
180 1/17/2018 0.08 5.00MO10 TEST RELIEF VALVES, REPLACE IF LEAKING OR THE Floating
RELIEF RANGE IS INCORRECT. SO NOT READJUST
SAFETY
180 1/17/2018 0.00 0.05MO11 CHECK OPERATION OF COMPRESSOR UNLOADER, Floating
REPAIR OR REPLACE IF NEEDE
180 1/17/2018 0.00 0.05MO12 CHECK COMPRESSOR SUCTION AND DISCHARGE Floating
VALVES FOR PROPER OPERATION
180 1/17/2018 0.00 0.05MO13 CHECK CUT-IN AND CUT-OUT OF COMPRESSOR Floating
PRESSURE CONTROLLER, READJUST IF NEEDED
180 1/17/2018 0.00 0.05MO14 CHECK IF AIR COMPRESSOR IS RUNNING EXCESSIVELY Floating
OR FREQUENTLY CYCLING ON OR OFF
180 1/17/2018 0.00 0.05MO15 PERFORM AN AIR LEAK CHECK ON THE COMPRESSOR Floating
AND AIR DISTRIBUTION NETWORK IN THE MACHINE
ROOM. CHECK HOSES, CONNECTIONS, COUPLERS, AND
REGULATORS
180 1/17/2018 1.50 0.05MO16 CORRECT OR SCHEDULE RE-PAIRS AS WORK ITEMS Floating
180 1/17/2018 0.08 0.08MO17 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
180 1/17/2018 0.00 0.00MO18 6-B78 BELTS Floating
Run:
1:52PM
18Page: Equipment: From Lowest To Highest.
Query: None.
DESCRIPTION
106-SUPFAN-001 SUPPLY FAN 7 Yes
MODEL:
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 5/03/2018 0.00 0.00HVAC1 SCHEDULE OUTAGE WITH OPERATING PERSONNEL. Floating
180 5/03/2018 0.00 0.00HVAC2 REVIEW MANUFACTURERS INSTRUCTIONS. Floating
180 5/03/2018 0.00 0.00HVAC3 CHECK CONTROLS AND UNIT FOR PROPER OPERATION. Floating
180 5/03/2018 0.00 0.00HVAC4 CHECK FOR UNUSUAL NOISE OR VIBRATION. Floating
180 5/03/2018 0.00 0.00HVAC5 VACUUM HEATING COILS. CLEAN INLET DUCT WORK TO Floating
REMOVE DIRT AND DEBRIS.
180 5/03/2018 0.00 0.00HVAC6 CHECK OPERATION AND CLEAN DAMPERS, LOUVERS, Floating
AND SHUTTERS. LUBRICATE ALL PIVOT POINTS AND
LINKAGES.
180 5/03/2018 0.00 0.00HVAC7 GREASE MOTOR AND FAN BEARINGS. Floating
180 5/03/2018 0.00 0.00HVAC8 CHECK TENSION, CONDITION, AND ALIGNMENT OF BELT. Floating
ADJUIST OR REPLACE AS NECESSARY.
180 5/03/2018 0.00 0.00HVAC9 REPLACE AIR FILTERS. Floating
180 5/03/2018 0.00 0.00HVAC10 INSPECT EXTERIOR PIPING AND VALVES FOR LEAKS. Floating
TIGHTEN CONNECTIONS AS REQUIRED.
180 5/03/2018 0.00 0.00HVAC11 FILL OUT MAINTENANCE CHECKLIST, REPORT Floating
DEFICIENCIES, AND SIGN PM TAG.
180 5/03/2018 0.00 0.00HVAC12 CLEAN UNIT AND SURROUNDING AREA. Floating
180 5/03/2018 0.00 0.00HVAC13 BELTS (1) B78 Floating
180 5/03/2018 0.00 0.00HVAC14 FILTERS (8) 24X24X2 PREFILTERS, (8) 24X24X12 METAL Floating
BOX FILTERS
DESCRIPTION
107-DRYER-001 AIR DRYER No
MODEL:
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 3/03/2017 0.13 0.05HVAC1 REVIEW MANUFACTURERS INSTRUCTIONS. Floating
180 3/03/2017 0.13 0.17HVAC2 CHECK DRYER OPERATING CYCLE. FloatingAD15
180 3/03/2017 0.13 0.08HVAC3 CHECK AUTOMATIC BLOW DOWN DEVICES. FloatingAD19
180 3/03/2017 0.08 0.08HVAC4 CHECK TRAPS. FloatingAD22
180 3/03/2017 0.13 0.05HVAC5 CLEAN AND LUBRICATE CONDENSER FAN MOTOR. FloatingAD24
180 3/03/2017 0.13 0.08HVAC6 CHECK THE INLET FLOW PRESSURE, TEMPERATURE, FloatingAD27
AND PURGE RATE.
180 3/03/2017 0.08 0.08HVAC7 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
DESCRIPTION
107-DRYER-002 AIR DRYER Yes
MODEL: 8010-115
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 1/09/2018 0.08 0.05HVAC1 REVIEW MANUFACTURERS INSTRUCTIONS. Floating
180 1/09/2018 0.08 0.05HVAC2 LOCK/OUT TAG OUT Floating
180 1/09/2018 0.13 0.17HVAC3 CHECK DRYER OPERATING CYCLE. FloatingAD15
180 1/09/2018 0.08 0.25HVAC4 INSPECT AND CLEAN HEAT EXCHANGER. FloatingAD16
180 1/09/2018 0.08 0.17HVAC5 CLEAN AND LUBRICATE BLOWER. FloatingAD18
180 1/09/2018 0.08 0.08HVAC6 CHECK AUTOMATIC BLOW DOWN DEVICES. FloatingAD19
180 1/09/2018 0.13 0.17HVAC7 CHECK REFRIGERANT LEVEL AND MOISTURE CONTENT. FloatingAD23
IF LOW LEVEL OR MOISTURE IS INDICATED, CHECK FOR
REFRIGERANT LEAKS USING A HALOGEN LEAK
Run:
1:52PM
19Page: Equipment: From Lowest To Highest.
Query: None.
DETECTOR OR SIMILAR DEVICE. IF LEAKS ARE NOT ABLE
TO BE STOPPED CORRECTED, REPORT LEAK STATUS TO
SUPERVISOR.
180 1/09/2018 0.13 0.05HVAC8 CLEAN AND LUBRICATE CONDENSER FAN MOTOR. FloatingAD24
180 1/09/2018 0.08 0.08HVAC9 CHECK THE INLET FLOW PRESSURE, TEMPERATURE, FloatingAD27
AND PURGE RATE.
180 1/09/2018 0.08 0.08HVAC10 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
DESCRIPTION
107-DRYER-004 AIR DRYER No
MODEL:
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN SERVICE:EQUIPMENT:
SERIAL:
180 1/10/2018 0.07 0.05HVAC1 REVIEW MANUFACTURERS INSTRUCTIONS. Floating
180 1/10/2018 0.05 0.05HVAC2 APPLY LOCK/OUT TAG OUT IF NECESSARY Floating
180 1/10/2018 0.00 0.00HVAC3 FOR REFRIGERANT TYPE UNITS, CLOSELY FOLLOW ALL FloatingAD12
SAFETY PROCEDURES DESCRIBED IN THE MATERIAL
SAFETY DATA SHEET (MSDS) FOR THE REFRIGERANT
AND ALL LABELS ON REFRIGERANT CONTAINERS.
180 1/10/2018 0.16 0.16HVAC4 CHECK DRYER OPERATING CYCLE. CHECK INLET AND Floating
OUTLET PRESSURE GAGES FOR PROPER READINGS.
180 1/10/2018 0.13 0.08HVAC5 INSPECT AND CLEAN CONDENSER COIL. Floating
180 1/10/2018 0.07 0.05HVAC6 CHECK AND CLEAN FAN MOTOR. LUBRICATE IF NEEDED. Floating
180 1/10/2018 0.07 0.05HVAC7 CHECK AUTOMATIC BLOW DOWN DEVICES. VERIFY Floating
DRAIN IS CLEAR.
180 1/10/2018 0.17 0.17HVAC8 CHECK REFRIGERANT LEVEL AND MOISTURE CONTENT. FloatingAD23
IF LOW LEVEL OR MOISTURE IS INDICATED, CHECK FOR
REFRIGERANT LEAKS USING A HALOGEN LEAK
DETECTOR OR SIMILAR DEVICE. IF LEAKS ARE NOT ABLE
TO BE STOPPED CORRECTED, REPORT LEAK STATUS TO
SUPERVISOR.
180 1/10/2018 0.08 0.03HVAC9 CHECK FOR LOOSE OR MISSING BOLTS, HANGERS, Floating
SUPPORTS AND OTHER HARDWARE. REPLACE IF
NECESSARY
180 1/10/2018 0.07 0.05HVAC10 CHECK LINES, FITTINGS AND VALVES FOR LEAKS Floating
180 1/10/2018 0.06 0.03HVAC11 CHECK PREFILTER AND CLEAN IF NECESSARY. Floating
180 1/10/2018 0.00 0.00HVAC12 NO INTENTIONAL VENTING OF REFRIGERANTS IS FloatingAD6
PERMITTED. DURING THE SERVICING, MAINTENANCE,
AND REPAIR OF REFRIGERATION EQUIPMENT, THE
REFRIGERANT MUST BE RECLAIMED.
180 1/10/2018 0.00 0.00HVAC13 WHENEVER REFRIGERANT IS ADDED OR REMOVED FloatingAD7
FROM EQUIPMENT, RECORD THE QUANTITIES ON THE
APPROPRIATE FORMS.
180 1/10/2018 0.25 0.03HVAC14 CLEAN UP SURROUNDING AREA. Floating
180 1/10/2018 0.06 0.03HVAC15 FILL OUT MAINTENANCE CHECKLIST, REPORT FloatingMC270
DEFICIENCIES AND SIGN PM TAG
DESCRIPTION
107-DRYER-006 AIR DRYER Yes
MODEL: H570A1157008053
SEQ ASSIGNED TO TASK AVG ESTDONE SCHEDULEFREQUENCY
IN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.