This is an Amendment of Solicitation issued by USDA ARS Acquisition and Property Division for solicitation number 1232SA26Q1074, effective September 17, 2026. The amendment modifies the original solicitation specifications and clarifies technical requirements for offerors.

The amendment makes four key changes to the solicitation: (1) Attachment 1 Specifications.pdf is superseded by AMD 0001 Attachment 1 Specifications.pdf; (2) there is no requirement for an environmental sensor package in the specifications; (3) the Technical Capability Narrative section should only include confirmation of technical capability to meet each specification requirement as stated in the amended specifications document, disregarding references to Section 2.0 and numbered section references that do not apply to the new specifications; and (4) there is no indication in the Technical Acceptability Section that the quoted delivery in days (if more than 30 days) as entered in Block 20 of the SF1449 form is a condition of Technical Acceptability if delivery exceeds 30 days. Offerors must acknowledge receipt of this amendment prior to the offer submission deadline through completion of items 8 and 15, acknowledgment on each copy of the offer submitted, or by separate letter or electronic communication referencing the solicitation and amendment numbers. All other terms and conditions of the original solicitation remain unchanged and in full force and effect.

View the file

Other files for this federal contract opportunity

Other files attached to Flux Towers - Mandan ND, newest first.
File Type Posted
AMD 0001 Attachment 1 Specifications.pdf PDF
SF1449_RFQ_1232SA26Q1074.pdf PDF
Attachment 3 Provision 52.225-18 Place of Manufacture.pdf PDF
Attachment 1 Specifications.pdf PDF
Attachment 2 Provision 52.225-2 Buy American Certificate.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1232SA26Q1074

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ARS-1232SA

BELTSVILLE MD 20705

RM 3-2102

5601 SUNNYSIDE AVENUE

USDA ARS ACQUISITION AND PROPERTY D

09/17/20260001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

09/17/2026

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

LIST OF CHANGES:

1. Attachment 1 Specifications.pdf is superseded by AMD 0001 Attachment 1

Specifications.pdf

2. There is NO requirement stated in the specifications for an environmental sensor package.

3. The Section 2.0 and specification section numbers indicated in the Technical

Acceptability section Technical Capability Narrative subsection do not apply as there are no numbered sections in AMD 0001 Attachment 1 Specifications.pdf. The Technical Capability

Narrative shall only include confirmation of technical capability to meet each specification requirement as stated in AMD 0001 Attachment 1 Specifications.pdf.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

CHRISTOPHER C. TURNER

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1232SA26Q1074/0001

4. There is NO indication in the Technical

Acceptability Section that the _Quoted delivery in days if more than 30 days_ fillable entry in

Block 20 of the SF1449 is a condition of

Technical Acceptability if over 30 days.