This is a specification document for plumbing work related to ABSL3AG and ABSL4AG Penning and Gating Modifications (Contract Number 12805B24F0141), issued in May 2024 with a change order dated November 2024. The specification covers Section 22 00 00 (Plumbing, General Purpose) and establishes comprehensive requirements for materials, installation, testing, and quality control of plumbing systems in what appears to be an agricultural or livestock facility environment.

The work requires installation of stainless steel water piping systems with seamless Schedule 10 Type 316L pipe per ASTM A312/A312M, welded fittings per ANSI B16.9, and full-port two-piece stainless steel ball valves rated to 2000 psig CWP (¼"-1"), 1500 psig (1¼"-2"), and 1000 psig (2½"-3"). Additional products specified include heavy-duty stainless steel hose reels designed for corrosive environments with NITRILE seals and non-toxic food-grade components, and stainless steel troughs with removable plugs and hose clamps suitable for washdown environments. All piping must be fully supported without penetrating existing walls using stainless steel supports and clamps. Installation requirements mandate welded connections conforming to ASME B31.1 and B31.9, with qualified welders per ASME BPVC SEC IX, 100% weld penetration, and identification tags on all valves. The contractor must submit shop drawings, product data, welding procedures and welder qualifications, test reports, and material certifications for government approval, and provide instruction to government personnel on system operation and maintenance.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSL3AG AND ABSL4AG PENNING AND GATING MODIFICATIONS 12805B24F0141

SECTION 22 00 00

PLUMBING, GENERAL PURPOSE

05/24, CHG 1: 11/24

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

ASME B1.20.1 (2013; R 2018) Pipe Threads, General Purpose (Inch)

ASME B16.34 (2021) Valves - Flanged, Threaded and Welding End

ASME B31.1 (2024) Power Piping

ASME B31.9 (2020) Building Services Piping

ASME BPVC SEC IX (2017; Errata 2018) BPVC Section IX-Welding, Brazing and Fusing Qualifications

ASTM INTERNATIONAL (ASTM)

ASTM A312/A312M (2022a) Standard Specification for Seamless, Welded, and Heavily Cold Worked Austenitic Stainless Steel Pipes

ASTM A351/A351M (2024; E 2025) Standard Specification for Castings, Austenitic, for Pressure-Containing Parts

ASTM B584 (2022) Standard Specification for Copper Alloy Sand Castings for General Applications

INTERNATIONAL CODE COUNCIL (ICC)

ICC IPC (2024) International Plumbing Code

MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS

INDUSTRY (MSS)

MSS SP-110 (2010) Ball Valves Threaded, Socket-Welding, Solder Joint, Grooved and Flared Ends

NSF INTERNATIONAL (NSF)

NSF/ANSI 372 (2016) Drinking Water System Components - Lead Content

SECTION 22 00 00 Page 1

1.2 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Welding

SD-06 Test Reports

Tests, Flushing and Disinfection

SD-07 Certificates

Materials and Equipment

1.3 SHOP DRAWINGS

Submit Plumbing System Detail drawings consisting of schedules, performance charts, instructions, diagrams, and other information to illustrate the requirements and operations of systems that are not covered by the Plumbing Code. Submit Plumbing System Detail drawings for the complete plumbing system including piping layouts and locations of connections ; dimensions for roughing-in, foundation, and support points;

schematic diagrams and wiring diagrams or connection and interconnection diagrams. Detail drawings must indicate clearances required for maintenance and operation. Where piping and equipment are to be supported other than as indicated, details must include loadings and proposed support methods. Mechanical drawing plans, elevations, views, and details, must be drawn to scale.

1.4 STANDARD PRODUCTS

Specified materials and equipment must be standard products of a manufacturer regularly engaged in the manufacture of such products.

Specified equipment must essentially duplicate equipment that has performed satisfactorily at least 2 years prior to bid opening. Standard products must have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year use must include applications of equipment and materials under similar circumstances and of similar size.

The product must have been for sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2 year period.

Where equipment is specified to conform to requirements of the ASME Boiler and Pressure Vessel Code, the design, fabrication, and installation must conform to the code and a certificate must be submitted for the equipment.

1.4.1 Alternative Qualifications

Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturer's factory or laboratory tests, can be shown.

SECTION 22 00 00 Page 2

1.4.2 Service Support

The equipment items must be supported by service organizations. Submit a certified list of qualified permanent service organizations for support of the equipment which includes their addresses and qualifications. These service organizations must be reasonably convenient to the equipment installation and able to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.

1.4.3 Manufacturer's Nameplate

Each item of equipment must have a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.

1.4.4 Modification of References

In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "must" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction", or words of similar meaning, to mean the Contracting Officer.

1.4.4.1 Definitions

For the International Code Council (ICC) Codes referenced in the contract documents, advisory provisions must be considered mandatory, the word "should" must be interpreted as "must." Reference to the "code official" must be interpreted to mean the "Contracting Officer." For USDA owned property, references to the "owner" must be interpreted to mean the "Contracting Officer." For leased facilities, references to the "owner" must be interpreted to mean the "lessor." References to the "permit holder" must be interpreted to mean the "Contractor."

1.4.4.2 Administrative Interpretations

For ICC Codes referenced in the contract documents, the provisions of Chapter 1, "Administrator," do not apply. These administrative requirements are covered by the applicable Federal Acquisition Regulations (FAR) included in this contract and by the authority granted to the Officer in Charge of Construction to administer the construction of this project. References in the ICC Codes to sections of Chapter 1, must be applied appropriately by the Contracting Officer as authorized by his administrative cognizance and the FAR.

1.5 DELIVERY, STORAGE, AND HANDLING

Handle, store, and protect equipment and materials to prevent damage before and during installation in accordance with the manufacturer's recommendations, and as approved by the Contracting Officer. Replace damaged or defective items.

1.6 PERFORMANCE REQUIREMENTS

1.6.1 Welding

Piping must be welded in accordance with qualified procedures using performance-qualified welders and welding operators. Submit a copy of

SECTION 22 00 00 Page 3 qualified procedures and a list of names and identification symbols of qualified welders and welding operators. Procedures and welders must be qualified in accordance with ASME BPVC SEC IX . Welding procedures qualified by others, and welders and welding operators qualified by another employer, may be accepted as permitted by ASME B31.9 , unless temperature and pressure limits specified then may be accepted as permitted by ASME B31.1 . The Contracting Officer must be notified 24 hours in advance of tests, and the tests must be performed at the work site if practicable. Welders or welding operators must apply their assigned symbols near each weld they make as a permanent record.

1.7 REGULATORY REQUIREMENTS

Unless otherwise required herein, plumbing work must be in accordance with

ICC IPC .

1.8 PROJECT/SITE CONDITIONS

The Contractor must become familiar with details of the work, verify dimensions in the field, and advise the Contracting Officer of any discrepancy before performing any work.

1.9 INSTRUCTION TO GOVERNMENT PERSONNEL

Furnish the services of competent instructors to give full instruction to the designated Government personnel in the adjustment, operation, and maintenance, including pertinent safety requirements, of the specified equipment or system. Instructors must be thoroughly familiar with all parts of the installation and must be trained in operating theory as well as practical operation and maintenance work. Submit Plumbing System Operation and Maintenance Data in accordance with Section 01 78 23

OPERATION AND MAINTENANCE DATA.

Instruction must be given during the first regular work week after the equipment or system has been accepted and turned over to the Government for regular operation. The number of man-days (8 hours per day) of instruction furnished must be as specified in the individual section.

When more than 4 man-days of instruction are specified, use approximately half of the time for classroom instruction. Use other time for instruction with the equipment or system. When significant changes or modifications in the equipment or system are made under the terms of the contract, provide additional instruction to acquaint the operating personnel with the changes or modifications.

PART 2 PRODUCTS

2.1 MATERIALS

Water piping must be constructed of stainless steel as follows:

a. Pipe: Stainless steel, seamless, schedule 10, type 316L, ASTM A312/A312M .

b. Fittings: Stainless steel, schedule 10, weld type, ANSI B16.9.

c. Joints: Welded

d. Shutoff Valves: Full Port, 2 Piece: Bronze body, ASTM B584, stainless steel ball and stem, Teflon seats, stem extension, 600 psi

SECTION 22 00 00 Page 4

WOG pressure rating.

2.2 PIPE HANGERS, INSERTS, AND SUPPORTS

All new piping shall be fully supported without penetrating existing walls. Where piping is modified or extended, provide stainless steel pipe supports and clamps to secure new piping to existing piping and/or existing support structures. Verify integrity and load capacity of existing supports prior to attachment. All supports and fasteners shall be stainless steel and suitable for the environment in which they are installed. Coordinate locations of new supports to avoid interference with existing systems and finishes.

2.3 VALVES

Provide full-port, two-piece, stainless steel ball valves in accordance with MSS SP-110 and ASME B16.34 , suitable for potable and process water use in high-containment plumbing systems. Valves shall be Sharpe 50C7 or approved equal, with socket-weld ends per ASME B16.11, rated to 2000 psig CWP (¼"-1"), 1500 psig (1¼"-2"), and 1000 psig (2½"-3"). Valve bodies shall be cast CF8M stainless steel per ASTM A351/A351M with 316 stainless steel ball and blowout-proof stem, PTFE seats and stem packing, and a 304 stainless steel handle. All valves shall be full-port, silicone-free, vented-ball type, NSF/ANSI 61 and NSF/ANSI 372 certified for lead-free compliance, and meet NACE MR0175 for corrosion resistance.

Valves shall include mounting pads and be suitable for use in corrosive and bio-secure environments.

2.4 HOSE REELS

Provide heavy-duty, professional-grade hose reels designed for long-term durability in corrosive environments. Hose reels shall meet the following requirements:

Construction: Entire reel assembly, including frame, drum, and support structure, shall be constructed of stainless steel.

Finish: Stainless steel finish with corrosion-resistant components suitable for washdown or agricultural environments.

Swivel Inlet: Non-corrosive external fluid path with machined 90° full-flow NPT swivel inlet constructed from high-quality stainless steel.

Swivel Seals: NITRILE seals, non-toxic and rated for food-grade applications, lubricated with non-toxic food-grade grease.

Spring and Ratchet Mechanism: Stainless steel spring, stainless steel pawl, and zinc-plated ratchet.

Design Features: Rolled edges and ribbed discs to enhance structural strength and operator safety.

Mounting: Hose reels shall be mounted to existing penning and gating structures. Contractor shall verify structural adequacy prior to installation. No new wall or floor penetrations are permitted.

Mounting hardware shall be stainless steel.

SECTION 22 00 00 Page 5

2.5 TROUGH

Provide stainless steel troughs suitable for use in corrosive and washdown environments. Troughs shall meet the following requirements:

Construction: Fabricated entirely from stainless steel with smooth, sanitary surfaces suitable for easy cleaning and long-term durability.

Accessories: Each trough shall be provided with a removable trough plug and stainless steel hose clamps for secure connection of drainage or cleaning accessories.

Installation: Install in accordance with manufacturer’s recommendations. Verify compatibility with existing site conditions and coordinate with adjacent systems. All hardware shall be stainless steel.

PART 3 EXECUTION

3.1 GENERAL INSTALLATION REQUIREMENTS

The plumbing system must be installed complete with necessary fittings, valves, and accessories. Submit diagrams, instructions, and other sheets proposed for posting for Plumbing System.

3.1.1 Water Pipe, Fittings, and Connections

3.1.1.1 Utilities

The supply line to each trough must be equipped with a shutoff valve to enable isolation of the item for repair and maintenance without interfering with operation of other equipment or fixtures. Supply piping to hose reels and flexible piping must be anchored to prevent movement.

3.1.1.2 Cutting and Repairing

The work must be carefully laid out in advance, and unnecessary cutting of construction must be avoided. Damage to building, piping, wiring, or equipment as a result of cutting must be repaired by mechanics skilled in the trade involved.

3.1.1.3 Protection of Fixtures, Materials, and Equipment

Fixtures and equipment must be tightly covered and protected against dirt, water, chemicals, and mechanical injury. Upon completion of the work, the materials, and equipment must be thoroughly cleaned, adjusted, and operated.

3.1.1.4 Mains, Branches, and Runouts

Piping must be installed as indicated. Pipe must be accurately cut and worked into place without springing or forcing. Structural portions of the building must not be weakened. Branch pipes from service lines may be taken from top, bottom, or side of main, using crossover fittings required by structural or installation conditions. Supply pipes, valves, and fittings must be kept a sufficient distance from other work and other services to permit not less than 1/2 inch between finished covering on the different services. Bare and insulated water lines must not bear directly against building structural elements so as to transmit sound to the

SECTION 22 00 00 Page 6 structure or to prevent flexible movement of the lines.

3.1.2 Supports

3.1.2.1 General

Hangers used to support piping 2 inches and larger must be fabricated to permit adequate adjustment after erection while still supporting the load. Pipe guides and anchors must be installed to keep pipes in accurate alignment, to direct the expansion movement, and to prevent buckling, swaying, and undue strain.

3.1.3 Welded Installation

Plumbing pipe weldments must be as indicated. Changes in direction of piping must be made with welding fittings only; mitering or notching pipe to form elbows and tees or other similar type construction will not be permitted. Branch connection may be made with either welding tees or forged branch outlet fittings. Branch outlet fittings must be forged, flared for improvement of flow where attached to the run, and reinforced against external strains. Beveling, alignment, heat treatment, and inspection of weld must conform to ASME B31.1 . Weld defects must be removed and repairs made to the weld, or the weld joints must be entirely removed and rewelded. After filler metal has been removed from its original package, it must be protected or stored so that its characteristics or welding properties are not affected. Electrodes that have been wetted or that have lost any of their coating must not be used.

Welds must have 100% penetration and smooth lines of fusion on exterior and interior.

3.2 IDENTIFICATION SYSTEMS

3.2.1 Identification Tags

Identification tags made of brass, engraved laminated plastic, or engraved anodized aluminum, indicating service and valve number must be installed on valves, except those valves installed on supplies at plumbing fixtures.

Tags must be 1-3/8 inch minimum diameter, and marking must be stamped or engraved. Indentations must be black, for reading clarity. Tags must be attached to valves with No. 12 AWG, copper wire, chrome-plated beaded chain, or plastic straps designed for that purpose.

3.3 TESTS, FLUSHING AND DISINFECTION

Submit test reports in booklet form showing all field tests performed to adjust each component and all field tests performed to prove compliance with the specified performance criteria, completion and testing of the installed system. Each test report must indicate the final position of controls.

3.3.1 Defective Work

If inspection or test shows defects, such defective work or material must be replaced or repaired as necessary and inspection and tests must be repeated. Repairs to piping must be made with new materials. Caulking of screwed joints or holes will not be acceptable.