Questions_and_Answers_1232SA26Q0209.pdf
PDF 353 KB Posted
- Attached to
- Pendleton Building Repairs Project E (Adams, OR)
- Solicitation number
- 1232SA26Q0209
About this file
This is a Questions and Answers document for Amendment 2 to RFQ# 1232SA26Q0209 for the Pendleton Building Repairs Project E in Adams, Oregon. The document provides clarifications on project scope, specifications, and responsibilities for contractors responding to this solicitation.
The project involves constructing an exhaust system for new fume hoods and modifying the existing HVAC system while maintaining current heating and cooling capacities, along with designing and constructing platforms to support fume hood exhaust fans and ductwork. The base bid budget range is $100,000 to $250,000, with combined base bid and alternate pricing between $250,000 and $500,000. Key clarifications include: the contractor is responsible for providing stamped shop drawings and calculations meeting Detail 3 on sheet M-501; no permits are required; fume hoods are installed against and attached to the wall; both sides require standard height acid storage base cabinets with vent kits; the existing control system is Alerton BMS controls; the contractor is responsible for ductwork wall penetrations with weathertight sealing; PVC ductwork is required per drawing notes on fume hoods (specification 233116), while stainless steel ductwork is required for connections to EF-003-03 (specification 233100); the contractor shall hire and pay for all special inspections; and one qualified individual may fulfill the roles of Site Safety and Health Officer, Quality Control Manager, and Superintendent. No liquidated damages are associated with the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 2
RFQ# 1232SA26Q0209
Pendleton Building Repairs Project E (Adams, OR)
Questions and Answers
1. What is the expected rough order of magnitude (ROM) for this project?
ANSWER: Base Bid is between $100,000 and $250,000. Base Bid combined with Alternate is Between $250,000 and $500,000.
2. Are there any liquidated damages associated with this project?
ANSWER: No
3. Part 1 – General in the specifications, paragraph 1.3.A.1 states, “This project will construct an exhaust system to connect to new fume hoods and modify the existing HVAC system to maintain current heating and cooling capacities. It will also design and construct platforms to support fume hood exhaust fans and ductwork.”
Attachment 04 from Coffman Engineers provides a preliminary design for this structure on page 12 of 12. Please confirm that the offeror’s structural engineer can use the design and calculations provided in Attachment 04 from which to create stamp ed engineering drawings for the tower structure and platforms.
ANSWER: Detail 3 on sheet M-501 indicates the requirements for this platform. The awarded contractor is responsible for providing stamped shop drawings and calculations to meet the criteria listed.
4. Are there any permits required for the work?
ANSWER: No
5. Exterior wall/roof penetrations for the exhaust ducting typically require architectural designs. Will the government provide these details, or is this included as part of the offeror’s scope of work?
ANSWER: Contractor shall be responsible for supporting ductwork through wall penetrations and properly sealing weathertight.
6. Sheet M-201 shows the fume hoods installed against the wall. Detail 3/M-501 show the fume hood away from the wall. Please confirm if the units will be installed against the wall or as freestanding. If freestanding, does the existing owner furnished fume hood include 3-sided rear cabinet panels and rear worksurface supports?
ANSWER: Installed against and attached to the wall.
7. Regarding Alt#1 - Please confirm required fume hood base cabinets/sizes. Options are standard storage, acid storage (with vent kit), flammable storage, or vacuum pump storage available in standard height or ADA height.
ANSWER: Both sides are standard height acid storage with vent kit.
8. I am looking at the project documents. Clima-Tech has an Automated Logic DDC System installed at one of the USDA AGS facilities in Corvallis, but I don’t think we have any systems in place in Pendleton. The mechanical drawings indicate the existing controls are to remain but doesn’t list what controls are currently in place.
Can you provide me with the mfg of your current system?
ANSWER: Alerton BMS controls.
9. Specification Section 01 35 26 paragraph 1.7 Site Qualifications, Duties and
Meetings, sub paragraph A personnel Qualifications, states the SSHO may serve as the Quality Control Manager. The SSHO may also serve as the Superintendent.
Please confirm one onsite individual can fulfill the rolls for SSHO, QC, and superintendent providing this person meets the qualifications for all three positions?
ANSWER: Yes, one qualified individual can fulfill the rolls.
10. Please confirm Delegated design is required for the HVAC support structure and foundation? It appears all of the structural calculations have already been provided in Attachment 4 Structural Calculations.
ANSWER: Detail 3 on sheet M-501 indicates the requirements for this platform. The awarded contractor is responsible for providing stamped shop drawings and calculations to meet the criteria listed.
11. Specification section 01 40 00 paragraph 1.8 Quality Control, Sub paragraph A discusses the Owners responsibility for special inspection. Subparagraph B discusses Contractors responsibility for special inspection. The individual specifications sections do not indicate who is responsible for testing and inspections. Please confirm if the Owner or the contractor is responsible for hiring and paying for the special inspections noted in the specifications.
ANSWER: Contractor shall be responsible for hiring and paying for special inspections.
12. Please confirm required fume hood duct material. Keynote 2 on sheet M-201 says type 1 unplasticized PVC and specification 233100, 2.4 says 316 stainless steel.
ANSWER: PVC Ductwork is required per drawing notes on fume hoods, applicable specification section is 233116 Nonmetal Ducts. Stainless steel ductwork is required for the ductwork connecting to EF-003-03 and shall meet the criteria of 233100 Metal Ducts and Casings.
See attached M-201 Clarification drawing below.
A
B
2.3 23 1.7
AGRONOMY
LAB
S102
SHOWER
S101
REST.
S100
MECH.
S104
HALL
S107
OFFICE 1
S106
OFFICE 2 / STORAGE
HYDROLOGY
LAB
(E) AHU-003-01
8x8 x1
12"ø
(E) HWC-003-01
16"ø
"ø
16"ø
20x20
16"ø 16"ø 12"ø x1
S
(E) HWC-003-02
(E) HWC-003-03
S x1
2 E A
AB
OV
E/ x1 2 S
A
BE
LO
W
"ø
"ø
"ø
"ø
"ø
"ø
"ø
"ø
10"ø
8"ø 8"ø
8x8 10x10
24x12
S
(E) EQ-003-01
(E) EQ-003-02
(E) EQ-003-03
AC-003-01
AC-003-02
CU-003-01
B-003-03
EF-003-02
FH-003-02
12"ø
AC-003-03
AC-003-04AC
-0
-0
AC
-0
-0
EF-003-01
"ø
E A
"ø
E A
EF-003-03
5'-0"
MIN.
5'- 0"
MI
N.
12"ø DN
1180 CFM
1180 CFM
DESIGN ALTERNATE 1
HWP-003-05
DESIGN ALT 1:
REBALANCE (E)
GRILLE TO 470 CFM
1-1/4" HHWS
1-1/4" HHWR
3"ø EA UP THRU ROOF 3"ø OA UP THRU ROOF
30x12 (E) GRILLE
135 CFM
T AC-003-06
T
AC-003-05
TAC-003-03
AC-003-04
24x24 (E)
DIFFUSER
375 CFM
TYP. 4
335 CFM
24x24 (E)
DIFFUSER
375 CFM
TYP. 4
TAC-003-01
AC-003-02
(E) HWC-003-01
24x24 (E)
DIFFUSER
250 CFM
(E) HWC-002
24x24 (E)
GRILLE
175 CFM
TYP. 2
24x24 (E)
DIFFUSER
175 CFM
TYP. 2
(E) HWC-03
(E) TRANSFER GRILLE
150 CFM TYP. 2
FH-003-01
24x24 (E)
GRILLE
150 CFM
36x12
1R (36x12)
1650 CFM
PROJ. NO.
DRAWN
CHECKED
DATE
COFFMAN ENGINEERS INC.C
48037 TUBBS RANCH ROAD
ADAMS, OR 97810
231290
02/28/2025
SHEET TITLE:
SHEET NO:
A
B
C
D
A
B
C
D
1 2 3 4 5
2 3 4 5
FINAL
TURNOVER
P:
\S
PO
\23
JO
BS
\23
A
RS
P
EN
DL
ET
ON
B
UI
LD
IN
G
RE
PA
IR
S\ 0.0
D W
GS
\M
\P
RO
JE
CT
E
BL
DG
3\2
0_ M-
1.D
W G.
_M
-2
: C
AM
PB
EL
L, RO
B : L
AS
T
SA
VE
D:
F eb ru ar y 2
8, : P
LO
T
DA
TE
: 2 /28
/25 www.coffman.com ph 509.328.2994
221 N. Wall Street
Spokane, WA 99201 Suite 500
PENDLETON
BUILDING
REPAIRS
PROJECT E
REV DATE DESCRIPTION
TAH
DJP
MECHANICAL PLAN
M-201
GENERAL NOTES
KEY NOTES
1. DESIGN OF PLATFORMS FOR EF-003-01 AND EF-003-02 SHALL BE
DEFERRED TO THE CONTRACTOR. REFER TO DETAILS FOR ROUGH
DIMENSIONS.
2. DUCT SHALL BE TYPE 1 UNPLASTICIZED PVC. SLOPE AT 1/2" PER 1'-0"
TOWARDS FUME HOOD FOR DRAINAGE.
3. LAB EQUIPMENT EXHAUST SHALL BE AT LEAST 30 FT FROM AHU-003-01 OA
OPENING. BOILER FLUE SHALL BE AT LEAST 10 FT FROM AHU-003-01
OPENING.
4. LAB EQUIPMENT EXHAUST CONNECTED BY MOVEX ME-75 LOCAL FUME
EXTRACTION ARMS. EXHAUST FLOW RATE SHALL BE CONSTANT EVEN
WHEN ARMS ARE NOT IN USE.
5. CONNECT NEW WALL-MOUNT BOILER TO EXISTING BOILER SYSTEM. SEE
DETAIL FOR PIPING CONFIGURATION. COORDINATE LOCATION WITH
EXISTING ELECTRICAL PANEL. ROUTE PIPES SUCH THAT THEY DO NOT
PASS OVER ELECTRICAL EQUIPMENT.
6. AIR BALANCE FOR ROOM 306 IS (- 150) CFM.
7. AIR BALANCE FOR ROOM 312 IS (- 150) CFM FOR BOTH THE BASE DESIGN
AND DESIGN ALT 1.
8. LOCATE CONDENSING UNIT SUCH THAT ROOF OVERHANG DOES NOT
DRIP INTO UNIT. PROVIDE 12" TALL STAND AND CONCRETE SLAB
UNDERNEATH UNIT, INSTALL ACCORDING TO DETAIL 4/M-502.
9. PROVIDE DUCT SUPPORTS AT NO LESS THAN 10' INTERVALS. PROVIDE
DUCT SUPPORTS FOR VERTICAL AND HORIZONTAL (WIND) LOADS. USE
SUPPORT METHODS AND MATERIALS FROM SMACNA DUCT
CONSTRUCTION STANDARDS, AND SUBMIT FOR GOVERNMENT REVIEW.
10. REPLACE EXISTING GRILLE AND BRANCH DUCT WITH A LARGER GRILLE,
DUCWORK, AND BALANCING DAMPER FOR BASE BID ONLY.
11. NEW HEATING WATER PIPING FOR NEW BOILER SHALL CONNECT TO
EXISTING BOILER HEADER PIPING ON THE PRIMARY LOOP.
CLOSELY-SPACED TEE CONNECTING PRIMARY AND SECONDARY LOOPS
SHALL REMAIN UNMODIFIED.
A. EXISTING WORK IS SHOWN WITH LIGHT LINES AND NEW WORK IS SHOWN
WITH BOLD CONTINUOUS LINES, TYP. VERIFY THERMOSTAT PLACEMENT
WITH OWNER PRIOR TO ROUGH-IN. COORDINATE PLACEMENT WITH
ELECTRICAL CONTRACTOR AND LIGHT SWITCH LOCATIONS.
THERMOSTAT SHALL BE AT THE SAME ELEVATION AS LIGHT SWITCHES
(BETWEEN 30"-48" AFF)
B. MAINTAIN ACCESS TO ALL EXISTING DAMPERS FOR MAINTENANCE
PURPOSES.
SCALE:1 MECHANICAL PLAN
1/4" = 1'-0"
2-28-25 matthews Callout
SS
matthews Rectangle
| Questions_and_Answers_1232SA26Q0209 |
| M-201 Clarification |
File details come from the government source that posted it. Updated .