Atch 5 Wage Determination - Construction.pdf
PDF 2 MB Posted
- Solicitation number
- 12305B24R0028
About this file
This document is a Wage Determination attachment related to a pre-solicitation notice for the Eastern Regional Research Center Boiler Replacement project in Wyndmoor, PA. The pre-solicitation provides general information about the upcoming solicitation, which is expected to be issued around May 15, 2024. The project involves the replacement of a 400HP dual-fuel boiler with a 250HP boiler, including demolition, installation, and integration with the facility's building automation system. The resulting contract will be a Firm Fixed-Price contract awarded to a Small Business under a Total Small Business Set-Aside. The anticipated construction magnitude is between $250,000 and $500,000. To be eligible, firms must be registered in the System for Award Management (SAM) database.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch 2- DIV 1 USDA GEN REQUIREMENTS 29FEB2024.pdf | ||
| Atch 4 Project Specific Submittal Log.xlsx | XLSX spreadsheet | |
| Sol_12305B24R0028.pdf | ||
| Atch 1- site drawings.pdf | ||
| Atch 3 - DIVISION 1 USDA GENERAL REQUIREMENTS SUBMITTAL LOG.xlsx | XLSX spreadsheet | |
| Boiler 3 replacement SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .