Attachment 3 RAD Quality Assurance Surveillance Plan (QASP)

View the file

Other files

File Type Posted
AMENDMENT_002.pdf PDF
FBO_AMEND_001_REVISED_Standard_Form_1449.pdf PDF
FBO_3_Attachment_2_Proposal_Preparation_and_Instructions.pdf PDF
FBO_12_Technical_Exhibit_7_RAD_and_RID_Sample_Analysis_Projects.pdf PDF
FBO_17_Technical_Exhibit_12_RCA_Legislative_Requirement_and_Background.pdf PDF
FBO_16_Technical_Exhibit_11_USDA_Quality_of_Information_Activities_2018.pdf PDF
FBO_6_Technical_Exhibit_1_NRI_Overview.pdf PDF
FBO_18__Technical_Exhibit_13_CEAP_Background.pdf PDF
FINAL_SOLICITATION_TERMS_AND_CONDITIONS_02_12_2018.pdf PDF
FBO_8_Technical_Exhibit_3_Ethical_Requrements.pdf PDF
FBO_14_Technical_Exhibit_9_Geospatial_Data_File_Naming_Standard_2015.pdf PDF
Standard_Form_1499.pdf PDF
FBO_10__Technical_Exhibit_5_Hardware_Sofware_Equip_2018.pdf PDF
FBO_15_Technical_Exhibit_10_Example_Monthly_Invoice.pdf PDF
FBO_13_Technical_Exhibit_8_Personnel_Security_Bulletin06_01_Advance_FBI_Fingerprint_Checks2_from_Web.pdf PDF
FBO_7_Technical_Exhibit_2_NRI_Confidentiality_Agreement-blank.pdf PDF
FBO_9_Technical_Exhibit_4_RAD_Organizational_Chart.pdf PDF
FBO_5_Attachment_4_SCLS_Wage_Determination_Prince_George_Cty_State_of_MD.pdf PDF
FBO_11_Technical_Exhibit_6_Computer_System_Access_Control_Process.pdf PDF
FBO_2_Attachment_1_Statement_of_Work.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan (QASP)

Support for the RAD GIS Lab and RID program

Issued [DATE], 2018

1 INTRODUCTION

This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the Statement of Work (SOW) entitled “STATEMENT OF WORK FOR NATURAL RESOURCE ANALYSIS, ASSESSMENT AND POLICY SUPPORT FOR THE RESOURCES ASSESSMENT DIVISION AND

THE RESOURCES INVENTORY DIVISION”. This plan sets forth the procedures and guidelines that will be used in ensuring the required performance standards or services levels are achieved by the contractor.

1.1 Performance Management Approach

1.1.1 This QASP will define the performance management approach taken by the RAD GIS Lab Coordinator, at times with assistance from RID staff, to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the Statement of Work are achieved.

1.2 Performance Management Strategy

1.2.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control program (QCP). The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the SOW---see section “6.2 Tasks and Performance Standards”.

2 IDENTIFICATION OF REQURED PERFORMANCE STANDARDS/QUALITY

LEVELS

The required performance standards and/or quality levels are included in the SOW---see section “6.2 Tasks and Performance Standards”.

3 METHODOLOGIES TO MONITOR PERFORMANCE

3.1 Surveillance Techniques

In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:

Random monitoring, which shall be performed by the COR’s designated inspector 100% Inspection-COR shall review the generated documentation.

ATTACHMENT 3

121A2348Q0006 Solicitation - NRCS (SSRA-RAD)

RAD GIS LAB, Beltsville, Maryland

Periodic Inspection by COR on an as needed basis.

4 QUALITY ASSURANCE DOCUMENTATION

4.1 The Performance Management Feedback Loop

The performance management feedback loop begins with the communication of expected outcomes.

Performance standards are expressed in the SOW---see section “6.2 Tasks and Performance Standards”.

NRCS uses an Earned Value Management System (EVM) in accordance with ANSI Standard 748 to report and track performance of investments that use work under this task order. Contractors doing work under this task order shall provide Project Managers with periodic EVM data documenting the cost, schedule, and performance of work. The data shall be provided within five (5) business days of the end of the reporting period. The reporting period shall be at least monthly but may be more frequent---see section “4.8.3 Earned Value Management” in the SOW.

4.2 Monitoring Forms

Besides reviewing EVM data, the government’s QA surveillance, accomplished by the COR, will include reports using the monitoring form in Attachment 1. The form, when completed will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results are being achieved.

4.2.1 The COR will retain a copy of all completed QA surveillance forms.

5 ANALYSIS OF QUALITY ASSURANCE ASSESMENT

5.1 Determining Performance

5.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels

5.2 Reporting

5.2.1 At the end of each quarter in the contract year, the COR will prepare a written report summarizing the overall results of the quality assurance surveillance of the contractors performance. It will enable the government to demonstrate whether the contractor is meeting the stated objective s and/or performance standards, including cost/technical/scheduling objectives.

5.3 Reviews and Resolution

5.3.1 The COR, with assistance from the CO, must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.

ATTACHMENT 3

121A2348Q0006 Solicitation - NRCS (SSRA-RAD)

ATTACHMENT 1: SAMPLE QUALITY ASSURANCE MONITORING FORM

SERVICE OR

STNADARD:________________________________________________________________________

SURVEY PERIOD: ___________________________________________________________

SURVEILLANCE METHOD (CHECK):

Random Sampling 100% Inspection Periodic Inspection

LEVEL OF SURVEILLANCE (Check):

Monthly Quarterly As needed

PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: _______%

ANALYSIS OF RESULTS:

Observed Service Provide Performance Measurement Rate: _____%

Service Provider’s Performance (Check):

Meets Standards Does Not Meet Standards

Narrative of Performance During Survey Period:________________________________________________________________________

PREPARED BY:________________________ DATE:_____________