RFP No. 1205G118R0011
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_03.pdf | ||
| Amendment_02.pdf | ||
| Amendment_01_(Final).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
1205G118R0011
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
1/29/2018
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
848465
6. PROJECT NO.
7. ISSUED BY CODE 05M6 8. ADDRESS OFFER TO
USDA Forest Service Mt. Baker-Snoqualmie National Forest Attn: Brian A. Johnson, CO 2930 Wetmore Ave., Ste 3A Everett, WA 9820-4065
Same as Block 7
9. FOR INFORMATION
CALL: Brian A. Johnson
A. E-MAIL ADDRESS
bajohnson03@fs.fed.us B. TELEPHONE NO. (Include area code)
(425) 783-6056
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
Building #2002 Colville SO, Entrance Security Supervisor’s Office (SO) Colville National Forest
(Stevens County, Washington State)
FAR 32.204 DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECT
Between $250,000 and $500,000 (This range includes both the construction and service line items in Section B., Schedule of Items)
11. The Contractor shall begin performance within 14 calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See Section F, Para. F.2)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and zero (0) copies to perform the work required are due at the place specified in Item 8 by 1400 (hour) local time February 28, 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than (See Section L, Paragraph L.16) _____ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
Note: Refer to Section L., Paragraph L.11 for the scheduled Pre-Proposal Conference.
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 1 of 277 bajohnson03 Highlight
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
E-mail: ________________________ DUNS: ________________
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
Invoice Processing Platform, www.ipp.gov
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 2 of 277
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
Building #2002 Colville SO, Entrance Security Supervisor’s Office (SO) Colville National Forest
(Stevens County, Washington State)
B.1 SCHEDULE OF ITEMS
The offeror must price all line items. Award will be on an all or none basis to the offeror whose proposal represents the best value to the Government, price and other factors considered (see Section M). If offeror does not intend to charge for an item, a “0” or “No Cost” shall be shown.
ITEM
NO.
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
TOTAL
PRICE
Base Item
Provide and install a building access system including system hardware/ software for all doors. Provide and install building access control system hardware and software, and door hardware required for connecting doors 1, 2, 4, 5, and 6 to the access system in accordance with the specs.
EA LSQ 1 $_______________
Option
Provide and install a badge printer to be used with the access system. EA LSQ 1 $_______________
Option
Provide and install a CCTV system including all hardware and software in accordance with the specs.
EA LSQ 1 $_______________
Option
Replace all exterior store front doors, hardware, and windows with heavy duty security glass in accordance with the specs.
EA LSQ 1 $_______________
Option
Provide and install building access control system hardware and software, and door hardware required for connecting doors 3, 7, 8, 9, and 10 to the system installed in the base bid in accordance with the specs.
EA LSQ 1 $_______________
Total Price (All Items): $_______________
B.2 LUMP SUM QUANTITIES (LSQ)
Lump Sum Quantities (LSQ) denote one complete unit of work as required by or described in the contract including necessary materials, equipment, labor, overhead, and profit to complete the job. They will not be measured.
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 3 of 277
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C.2 DESCRIPTION OF WORK
This project consist of performance based specifications that will require providing all materials, labor and equipment to install a building access control system, modify doors, frames and hardware, replace store front windows and doors, and a new closed circuit television (CCTV) system. The building access control system shall require an architectural door hardware specialist to assess the existing hardware and determine what hardware will be required and will work with access control system so building access is in accordance with the specifications.
Building access control software will require a USDA Lenel (refer to “Brand Name or Equal” provision in Section L) certified installer to do the installation per federal regulations. A badge printer for the access control system may be awarded.
The CCTV system consists of performance-based specification that will require providing all materials, labor and equipment to install a stand-alone CCTV system conforming to the specifications. This includes but is not limited to installation of cameras, monitors, computer, other hardware, and all associated electrical and network cabling in accordance to the specifications.
C.3 PROJECT LOCATION
This project is located in Colville, Washington at the Forest Supervisor’s Office, 765 South Main, Colville, WA 99114. Project is accessible by paved highways.
C.4 APPLICABLE SPECIFICATIONS
The specifications shown in the specification listing contained in the attachments are applicable to this contract. All specifications not included in the specification listing but referenced by listed specifications, are applicable. The specifications shown on the specification list are physically attached.
C.5 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS
(FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 4 of 277
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 5 of 277
SECTION E--INSPECTION AND ACCEPTANCE
E.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
FAR: https://www.acquisition.gov/?q=/browse/far/52 AGAR: www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
Clause Number Title Date 52.246-4 Inspection of Services – Fixed Price AUG 1996 52.246-12 Inspection of Construction AUG 1996
E.2 INSPECTION AND ACCEPTANCE (AGAR 452.246-70) (FEB 1988)
(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.
(b) Inspection and acceptance will be performed at the project site.
E.3 INSPECTION AND TESTING PERFORMED BY GOVERNMENT
The Government will perform sampling, testing and inspection of work in progress where these responsibilities are not expressly assigned to the Contractor by the Forest Service specifications or by the Special Project Specifications.
E.4 CONFORMITY WITH DRAWINGS AND SPECIFICATIONS
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 6 of 277
SECTION F--DELIVERIES OR PERFORMANCE
F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Clause Number Title Date 52.242-14 Suspension of Work APR 1984
F.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984) ALTERNATE I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within fourteen (14) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than August 30, 2018. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by June 1, 2018. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
F.3 AGAR 452.236-75 MAXIMUM WORKWEEK – CONSTRUCTION SCHEDULE (NOV 1996)
Within five (5) calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following in writing for approval:
(a) A schedule as required by FAR clause 52.236-15 “Schedules for Construction Contracts” and
(b) The hours (including the daily starting and stopping times) and days of the week the
Contractor proposes to carry out the work.
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 7 of 277
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 ADMINISTRATIVE CONTRACTING OFFICER (ACO)
The ACO for this project is Mrs. Cathy Van Alyne, E-mail: cvanalyne@fs.fed.us, Telephone:
(509) 684-7114, Address: USDA Forest Service, Colville National Forest, 765 S. Main Street, Colville, WA 99114-2507. Mrs. Van Alyne will handle all contractual matters following contract award.
G.2 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within fifteen (15) calendar days after the date of contract award. The conference will be held at the Colville National Forest Supervisor’s Office or a mutually agreed upon location.
G.3 CONTRACT RELEASE
When submitting final payment, Contractor shall provide a signed and dated contract release that includes the following information: "In consideration of receipt of final payment in the amount of $__________ Contractor hereby releases the United States of America from any and all obligations arising under this contract and any modifications thereof except as reserved herein.
Reservations:______________"
G.4 GOVERNMENT-FURNISHED PROPERTY (GFP)
The Government will provide the following item(s) of GFP to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
Item No. Description Qty Location Date Available
01 Laptop computer for access system 1 On site Upon implementation work commencing
Note: The Contractor shall confirm with the FS that the GFP is compatible with associated hardware/software planned for installation.
G.5 AGAR 452.232-70 REIMBURSEMENT FOR BOND PREMIUMS--FIXED-PRICE
CONSTRUCTION CONTRACTS (NOV 1996)
The Contract Price includes the total amount for premiums that the Contractor attributes to the furnishing of performance and payment bonds required by the contract. Reimbursement for bond premiums under the clause at FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not cover any amount therefor not included in the contract price.
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 8 of 277
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 FAR 52.236-4 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by visual surveys and inspections.
(b) Weather conditions are typical northeast Washington weather.
(c) Transportation facilities are paved State Highway 395.
H.2 PRODUCT SUBSTITUTION
a. When submitted within 30 days after contract award, the Contracting Officer will consider formal requests for substitution of products, equipment and methods, in place of those specified.
Requests submitted after 30 days will be considered only in case of product unavailability or other conditions beyond the control of Contractor. Requests shall provide the information and be in the format as specified in paragraph B below.
b. Submit separate request for each substitution. Support each request with:
1. Complete data substantiating compliance of proposed substitution with requirements stated in contract documents:
a) Product identification, including manufacturer's name and address.
b) Manufacturer's literature; identify:
1) Product description
2) Reference standards
3) Performance and test data
c) Samples, as applicable
d) Name and address of similar projects on which product has been used, and date of each installation.
e) Comparative data of item to be deleted by proposed substitution. Include drawings to same (or larger) scale as pertinent portion of contract documents and marked to show how differences will be accommodated.
f) Show complete system/assembly as revised to accommodate proposed alternate for difference in performance, size, configuration, connections, service, accessibility, or any other significant characteristics.
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 9 of 277
g) Show complete layout of system except that which is identical to contract documents unless unchanged portion must be shown to indicate clearances, etc.
h) Include complete detail drawings of supports for all substitute equipment and complete load calculations for adequacy of support prepared and signed by a registered structural engineer.
1) Itemized comparison of the proposed substitution with product specified; list significant variations.
2) Data relating to changes in construction schedule.
3) Any effect of substitution on separate contracts.
4) List of changes required in other work or products.
5) Accurate cost data comparing proposed substitution with product specified.
6) Proposed amount of change to the contract.
7) Designation of required license fees or royalties.
8) Designation of availability of maintenance services, sources of replacement materials.
c. Substitutions will NOT be considered for acceptance when:
1. They are merely indicated or implied on shop drawings or product data submittals without a formal request from Contractor.
2. They are requested directly by a subcontractor or supplier.
3. Acceptance will require substantial revision of contract documents.
4. Substitution has not been requested in accordance with this and related clauses.
d. Substitute products shall not be ordered or installed without written acceptance of the Contracting Officer.
e. Contracting Officer will determine acceptability of proposed substitutions.
f. Number of Substitution Submittals: Only one proposed alternative will be considered for each item. Provide specified item if substitution proposal is rejected.
H.3 CONTRACTOR’S REPRESENTATION AND RESPONSIBILITY
a. In making formal request for substitution the Contractor represents it:
1. Has investigated proposed product and determined that it is equal to or superior in all respects to that originally specified.
2. Will provide same warranties and bond for substitute as for originally specified product.
3. Will coordinate installation of accepted substitution into the work, and will make such changes as may be required for the work to be complete in all respects.
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 10 of 277
4. Will waive claims for additional costs caused by substitution, which may subsequently become apparent.
5. Cost data is complete and includes related costs under the contract, but not:
a. Costs under separate contracts.
b. Contracting Officer costs for redesign or revision of contract documents.
b. The Contractor assumes full responsibility that the substitution and/or alternate items or procedures proposed will meet the job requirements.
c. The Contractor is solely responsible for the cost of redesign and modifications to this and other parts of the work caused by the substitutions or alternates furnished.
H.4 SUBMITTALS, SHOP DRAWINGS, MATERIAL CERTIFICATIONS, AND
TESTING REPORTS
Product Substitution (See H.2) - Any modification of other items, designs, materials, products or equipment (including GFP), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer’s approval of any substitute will not affect the Contractor’s responsibility for such modification.
All substitutions shall be requested by the Contractor after award of the contract has been made.
No approvals will be made prior to award.
Submittals: The following project administration, specifications, material certifications, and shop drawings shall be submitted on this project:
Submittal Title Section /
Specification No.
Time of Contractor
Submittal
Time of Government Approval After
Submittal
Schedule of Work Section H & I With Proposal & Update when Necessary
14 Calendar Days (CDs)
Job Specific Safety Plan Section H Prior to Work Starting Prior to Work Starting Copy of Required Insurance Coverage Section H Prior to Work Starting N/A
Notification of Subcontracting Section G Prior to Subcontractor Starting Work
Prior to Subcontractor Starting Work
Biobased or BioPreferred Products Section C & I With proposal and in accordance with FAR 52.223-2
N/A
Release of Claims Form Section I Prior to Final Payment Prior to Final Payment Operation and Maintenance Manuals
Per Specifications Prior to Final Payment Prior to Final Payment
Division 1 Submittals Division 1 14 days after Notice to Proceed. 14 CDs Shop Drawings Spec. 08 71 00 Prior to Final Payment Prior to Final Payment Steel Studs Spec. 05 40 10 Prior to Ordering 14 CDs Hardwood plywood and edge trim Spec. 06 20 00 Prior to Ordering 14 CDs Fire Stopping Spec. 07 84 13 Prior to Ordering 14 CDs Joint Sealants Spec. 07 92 00 Prior to Ordering 14 CDs Steel Doors & Frames Spec. 08 11 00 Prior to Ordering 14 CDs
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 11 of 277
Wood Doors & Frames Spec. 08 14 16 Prior to Ordering 14 CDs Aluminum Storefront and Glazing Spec. 08 41 13 Prior to Ordering 21 CDs Door Hardware Spec. 08 71 00 Prior to Ordering 14 CDs Paint Spec. 09 91 23 Prior to Ordering 14 CDs Electrical General Spec. 26 00 10 Prior to Ordering 14 CDs Electrical Spec. 26 00 50 Prior to Ordering 21 CDs UPS Spec. 26 00 61 Prior to Ordering 14 CDs Telecommunications Spec. 27 00 00 Prior to Ordering 21 CDs Access Control Systems Spec. 28 13 00 Prior to Ordering 21 CDs Video Surveillance Spec. 28 23 00 Prior to Ordering 21 CDs
H.5 LANDSCAPE PRESERVATION
The Contractor shall give attention to the effect of contract operation upon the landscape, shall take care to maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following requirements.
a. Prevention of the Landscape Defacement. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or other natural features or any other improvements in the work area unless specifically authorized by the Contracting Officer.
Unless otherwise provided herein, the Contractor shall confine contract operations to within the areas designated in contract documents.
b. Protection of Streams, Lakes, and Reservoirs. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes, small ponds, and reservoirs with fuels, oils, bitumens, calcium chloride, silt, or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the Contracting Officer.
c. Structure Defacement. The Contractor shall not remove, deface, injure, or destroy structure elements of the site including but not limited to building structure, finish, or systems, adjacent roadways and sidewalks, fencing, onsite vehicles, or any other improvements in the work area unless specifically authorized by the Contracting Officer.
Unless otherwise provided herein, the Contractor shall confine contract operations to within the areas designated in contract documents or identified on site.
H.6 CONFORMITY WITH DRAWINGS AND SPECIFICATIONS
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.
a. Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
b. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 12 of 277 make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
c. Government inspections and tests are for the sole benefit of the Government and do not—
1. Relieve the Contractor of responsibility for providing adequate quality control measures;
2. Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
3. Constitute or imply acceptance; or
4. Affect the continuing rights of the Government after acceptance of the completed work under paragraph (I) below.
d. The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
e. The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes re-inspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
f. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
g. If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.
h. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 13 of 277
i. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately.
Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
H.7 TRAFFIC CONTROL
The Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public on site access routes from Washington State Highway 395. Roads shall not be closed to traffic. Suitable warning signs shall be provided to properly control and direct traffic.
All road barricades, warning signs, lights, temporary signals, flagman and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.
H.8 SAFETY
a. Job-Specific Safety Plan: Prior to allowing any work to commence on the project, the Contractor shall provide a written job-specific safety plan that recognizes the inherently hazardous conditions that will exist on this contract. Some of these hazardous conditions are, but not limited to: loading and unloading of materials, site security, noises and dust contract and the use of personal protective equipment (PPE) in the work area. The plan shall be in accordance with OSHA regulations. The plan shall include all tasks and related activities anticipated to successfully complete the work.
b. Safety Items:
1. Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the work site.
2. The following checked activities have been identified by the Government as potential safety hazards.
[X] Confined Entry Space.
[X] Fall hazard from work heights exceeding six feet.
[X] Fire hazards.
[X] Electrical hazard.
[X] Power tool operation including eye protection.
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 14 of 277
c. Personal Protective Equipment (FSAR 4G52.222-704 (FEB 2007)):
1. The Contractor will train in the safe operation and use of equipment to all workers using such equipment.
2. Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered in a manner capable of causing injury or impairment in the function of any part of the body.
3. Defective or damaged personal protective equipment shall not be used.
4. The Contractor shall assure that each employee wears foot protection that provides adequate traction and ankle support.
5. The Contractor shall provide, at no cost to the employee, and assure that each employee who works in an area where there is potential for head injury from falling objects or flying objects wears a hard hat that meets the minimum requirements of American National Standards Institute (ANSI) standard Z89.1-1997.
6. The Contractor shall provide, at no cost to the employee, eye protection where there is potential for eye injury due to flying objects. This eye protection must meet the minimum requirements of ANSI standard Z87.1-2003.
7. The Contractor shall provide, at no cost to the employee, hearing protection where there is a potential for hearing loss due to high intensity noise e.g., chain saw operation.
d. Hazardous Materials: Contractor shall notify the Government of any hazardous materials and or waste (as defined in 29 CFR 1910.1200) to be used on the job and will have Material Safety Data Sheets (MSDSs) for those materials available on the job. All such materials shall be labeled in accordance with Federal and State regulations.
H.9 SUSPENSIONS FOR OTHER THAN GOVERNMENT’S CONVENIENCE
The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of: (1) Weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to become muddy or unsuitable; or (2) Failure of the Contractor to comply with Specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements. Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by his/her operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered as suspensions for the Convenience of the Government under FAR 52.242-14, Suspension of Work, and shall not qualify for equitable adjustment.
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 15 of 277
H.10 AGAR 452.237-74 KEY PERSONNEL (FEB 1988)
a. The Contractor shall assign to this contract the following key personnel:
Door Hardware specialist;
USDA certified software installer; and Employee licensed to work on elevator controls.
b. During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
c. The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutions, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
H.11 ADDITIONAL REQUIREMENTS OR RESTRICTIONS
a. Storage of Materials: Materials shall be stored to assure the preservation of quality and fitness for the work. Stored material shall be located to facilitate their prompt inspection. Sites on Forest Service administered land, approved by the Forest Service, may be used for storage purposes and for the placing of Contractor’s plant equipment. All storage sites provided by the Forest Service shall be restored at Contractor’s expense. The Contractor shall be responsible for making arrangements for storage on other than Forest Service-administered lands.
This contract allows for the payment of materials stored at off-site locations.
All material and work covered by progress payments made shall thereon become the sole property of the Government, but this provision shall not be construed as relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work, or as waiving the right of the Government to require the fulfillment of all of the terms of the contract.
b. Legal Relations and Responsibilities:
1. Government's Responsibility for Utilities: The Government will notify all utility companies or other parties affected and make arrangements for all necessary adjustments of the public or private utility fixtures, pipelines, and other appurtenances affected by work under the contract.
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 16 of 277
2. Contractor's Responsibility for Utilities: In the event of interruption to utility services because of accidental breakage the Contractor shall promptly notify the utility authority and shall cooperate with that authority in the restoration of service.
c. Use of Premises: The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform this contract in such a manner as not to interrupt or interfere with the conduct of Government business.
d. Prosecution of Work:
1. The following special controls will affect the Contractor’s prosecution of work: Employees and other contractors will be working in the building and may need access thru hallway while installing doors. Contractor shall stage cutting of materials outside of building to reduce noise level. Weekend and evening work would be preferred to minimize impact during business house and on the contractor due to daily traffic.
2. The Contractor may encounter other contractors performing work on projects in the area.
3. Utilities made available by the Government for use by the Contractor are: Potable water, Sanitation, and 110v.
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 17 of 277
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES (FAC No. 2005-97 / 01-24-2018)
I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Clauses that Pertain to Construction & Service Contract Line Items:
52.202-1 Definitions (NOV 2013) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant Against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006) 52.203-7 Anti-Kickback Procedures (MAY 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
(MAY 2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of
Whistleblower Rights (APR 2014) 52.204-4 Printed or Copied Double-Sided on Recycled Paper (MAY 2011) 52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2016) 52.204-13 System for Award Management Maintenance (OCT 2016) 52.204-18 Commercial and Government Entity Code Maintenance (JUL 2016) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (JUL 2013) 52.215-2 Audit and Records -- Negotiation (OCT 2010) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-8 Utilization of Small Business Concerns (NOV 2016) 52.219-14 Limitations on Subcontracting (JAN 2017) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards – Overtime Compensation (MAY 2014) 52.222-7 Withholding of Funds (MAY 2014) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014)
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 18 of 277
52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEP 2016) 52.222-35 Equal Opportunity for Veterans (OCT 2015) 52.222-36 Affirmative Action for Workers with Disabilities (JUL 2014) 52.222-37 Employment Reports on Veterans (FEB 2016) 52.222-40 Notification of Employee Rights under the National Labor Relations Act (DEC 2010) 52.222-50 Combating Trafficking in Persons (MAR 2015) 52.222-54 Employment Eligibility Verification (OCT 2015) 52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2015) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts
(SEP 2013)
52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-1 Authorization and Consent (DEC 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-11 Pledges of Assets (JAN 2012) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (JUL 2013) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) 52.233-1 Disputes (MAY 2014) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.242-13 Bankruptcy (JUL 1995) 52.244-6 Subcontracts for Commercial Items (NOV 2017) 52.245-1 Government Property (NOV 2017) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012)--Alternate I
(APR 2012)
52.253-1 Computer Generated Forms (JAN 1991) 452.236-72 Use of Premises (NOV 1996), Agriculture Acquisition Regulations (AGAR) 452.236-75 Restrictions Against Disclosure (FEB 1988), AGAR 452.236-76 Samples and Certificates (FEB 1988), AGAR 452.236-77 Emergency Response (NOV 1996), AGAR
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 19 of 277
Clauses that Pertain to Construction Line Items Only:
52.222-6 Construction Wage Rate Requirements (MAY 2014) 52.222-8 Payrolls and Basic Records (MAY 2014) 52.222-13 Compliance with Construction Wage Requirements and Related Regulations (MAY 2014) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.227-4 Patent Indemnity – Construction Contracts (DEC 2007) 52.228-15 Performance and Payment Bonds – Construction (OCT 2010) 52.232-5 Payments Under Fixed-Price Construction Contracts (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
(APR 1984)
52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991), Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997), Alternate I (APR 1984) 52.236-26 Preconstruction Conference (FEB 1995) 52.243-4 Changes (JUN 2007) 52.246-21 Warranty of Construction (MAR 1994), Alternate I (APR 1984) 52.248-3 Value Engineering – Construction (OCT 2015) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996), (AGAR)
Clauses that Pertain to Service Line Items Only:
52.222-41 Service Contract Labor Standards (MAY 2014) 52.222-44 Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (MAY 2014) 52.232-1 Payments (APR 1984) 52.232-11 Extras (APR 1984) 52.232-25 Prompt Payment (JAN 2017) 52.237-2 Protection of Government Buildings, Equipment, and Vegetation (APR 1984) 52.243-1 Changes – Fixed Price (AUG 1987) ALT I (APR 1984) 52.246-25 Limitation of Liability - Services (FEB 1997) 52.248-1 Value Engineering (OCT 2010) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012) 52.249-8 Default (Fixed-Price Supply and Service) (APR 1984)
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 20 of 277
I.2 FAR 52.215-8 ORDER OF PRECEDENCE—UNIFORM CONTRACT FORMAT (OCT 1997)
Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
(a) The Schedule (excluding the specifications).
(b) Representations and other instructions.
(c) Contract clauses.
(d) Other documents, exhibits, and attachments.
(e) The specifications.
I.3 52.217-7 OPTION FOR INCREASED QUANTITY—SEPARATELY PRICED
LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within thirty (30) calendar days.
Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
I.4 AGAR 452.209-71 ASSURANCE REGARDING FELONY CONVICTIONS OR
TAX DELINQUENT STATUS FOR CORPORATE APPLICANTS (FEB 2012)
ALTERNATE I (FEB 2012)
(a) This award is subject to the provisions contained in section As prescribed in 25.1102(d)(2), substitute the following paragraph (b) for paragraph (b) of the basic provision:
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute shall submit the request with its offer, including the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11. Sections 433 and 434 of the Consolidated Appropriations Act, 2012 (P.L. No. 112-74), Division E, as amended and/or subsequently enacted, regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it – does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.
RFP No. 1205G118R0011 Building #2002 Colville SO, Entrance Security Page 21 of 277
(c) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434.
I.5 FAR 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(JUL 2013)
(a) Definitions. As used in this clause—
Long-term contract means a contract of more than five years in duration, including options.
However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.