IRSC_vs_IRTC.pdf

PDF 510 KB Posted

Attached to
Chewelah A-Z Stewardship BPA
Solicitation number
1204H120S4001
Issued by

About this file

This document contains details regarding a federal solicitation for stewardship contracting services on the Colville National Forest in Washington. The solicitation will result in multiple blanket purchase agreements to be awarded for treating thousands of acres of forest land over approximately fifteen years. Work may include activities such as timber removal, road and trail maintenance, habitat improvement, and controlling invasive species. The purpose is to reduce wildfire risk and restore forest health through commercial and non-commercial logging methods. The agreements will be structured as either Integrated Resource Timber Contracts or Integrated Resource Service Contracts depending on the value of goods compared to services for each project area. The Forest Service will retain decision-making authority and select treatments, while contractors will perform activities as ordered and be responsible for NEPA analysis costs.

Appendix B - IRSC vs IRTC

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Integrated Resource Service Contract (IRSC) -VS- Integrated Resource Timber Contract (IRTC)

The Chewelah A to Z Stewardship BPA has the option of utilizing either an IRSC or IRTC. The contract mechanism selected for any given contract area will be based on the value of goods compared to the value of service work. An IRSC (SF-33 and S-1449) will be used when the cost of services or construction exceeds the value of the goods. Conversely, an IRTC (FS-2400-13 and 13T) will be used when the value of goods exceeds the cost of services. Each contract type shall include mandatory restoration work items and may include optional restoration work items as determined by the Forest Service. IRSC’s will require the purchaser to sign the solicitation (SF-33 or SF-1449) and IRTC’s will still require the purchaser to sign the Bid (Form FS-2400-14)

The two-contract mechanism also have additional contrast which are shown below in Table 1:

Table:1

Types of Use

Integrated Resource Timber Contract (IRTC)

FS-2400-13

Scaled and

FS-2400-13T

Tree Measurement

Integrated Resource Service Contract (IRSC) for Commercial Services SF-1449 and for Construction SF-33 Scaled and Tree Measurement

Full NEPA compliance required Yes Yes Contracting Officer Timber Procurement

Produce Retained

Receipts Yes No

Spend Retained Receipts No Yes Payment at Escalated Rates Yes No Associated Charges (e.g. Road Maintenance/ surface replacement, Scaling, etc.)

Yes No

Performance Bond Required Optional No KV/SSF/BD Fund Plans Allowed Yes No Service Contract Act (SCA) wages required No Yes

Davis-Bacon Act wages required Turn back roads only No for Commercial Services

Yes for Construction Local woods wage rates applicable Yes No

Incompletely Marked Timber Yes No Specified Roads Yes No SBA Road Option Yes No

Scheduled Rate

Redetermination Yes No

Contract Term Extension Yes Depends

Reimbursement of Bond

Premium (for construction or performance under FAR) No Yes

Market-Related Contract Term

Addition Yes No

Contract Term Adjustment Yes Depends

3rd Party Agreements Allowed Yes No

Timber Subject to Agreement Yes Yes

Default Damage Provisions Yes No

Catastrophic Damage

Provisions Yes No

File details come from the government source that posted it. Updated .