Section B and C replacement pagesAmend1.docx
DOCX document 27 KB Posted
- Solicitation number
- 12034320R0016
- Issued by
-
Department of Agriculture Forest Service
About this file
This solicitation package outlines requirements for a construction contract to complete campground improvements on the Idaho Panhandle National Forest. Work includes removing and replacing water and wastewater holding tanks, placing aggregate, paving asphalt, installing shade structures, toilets, picnic areas and signage. The Forest Service seeks a contractor to mobilize by a specified date and complete repairs, upgrades and new construction across multiple campground sites. Pricing is requested for base scope items along with two additive alternates that could expand the work. The contractor must follow all applicable state and federal construction standards and obtain necessary permits. Biobased products are preferred where feasible. The response due date is not provided in this package.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Kit Price FSSS Final Amend1.pdf | ||
| Kit Price Plans_Amend 1.pdf | ||
| SF30Amend 1KitPrice.doc | DOC document | |
| PastPerformanceSurvey optional use.docx | DOCX document | |
| Kit Price CG FSSS.pdf | ||
| DB Wage Decision.pdf | ||
| KitPriceRFP.docx | DOCX document | |
| Kit Price CG Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION RFP Kit Price Campground Improvement
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES
Kit Price Campground Improvement Coeur d’Alene River Ranger District Idaho Panhandle National Forests Shoshone County, Idaho
B- 1 - SCHEDULE OF ITEMS.
BASE PAY ITEM NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
| 15101 |
| Mobilization |
| LS |
| 1 |
| 15201 |
| Construction Surveying and Staking |
| LS |
| 1 |
| 15401 |
| Contract Testing |
| LS |
| 1 |
| 20101 |
| Clearing & Grubbing, Disposal Method (a) |
| LS |
| 1 |
| 20208 |
| Stump Removal, Disposal Method (a) |
| EA |
| 100 |
| 20302A |
| Removal of Existing Signs and Monuments, |
Disposal Method (a)
| EA |
| 2 |
| 20302B |
| Removal of Existing Shed, Disposal Method (a) |
| EA |
| 2 |
| 20302C |
| Removal of Existing Garbage Pads |
Disposal Method (a)
| EA |
| 2 |
| 20302D |
| Removal of Pit Toilet, Disposal Method (a) |
| EA |
| 6 |
| 20302E |
| Removal of Gate, Disposal Method (a) |
| EA |
| 4 |
| 20302F |
| Remove and Salvage Concrete Bollards |
| EA |
| 92 |
| 20302G |
| Removal of Picnic Tables, Fire rings, camp site marker posts, curb stops |
| LS |
| 1 |
| 20304 |
| Roadway Oblliteration, Method (a) |
| SY |
| 1176 |
| 20407 |
| Roadway Excavation (10 in depth) |
| CY |
| 1,358 |
| 30201 |
| Aggregate Base, Grading D, Compaction Method 2 (8 in depth) |
| CY |
| 1,086 |
| 30210 |
| Aggregate Surface Course, Grading Crusher Fines, Method 2 ( 4 in depth) |
| CY* |
| 329 |
| 40305 |
| Asphalt Concrete, Idaho DOT, Type II |
| SY |
| 4,889 |
| 40702 |
| Chip Seal Type 1C Single Application (all asphalt pavement existing and new) |
| SY |
| 22,054 |
| 41802 |
| Asphalt Concrete Pavement Patching, Type 1 (Idaho DOT, Type II) |
| SY |
| 1,716 |
BASE PAY ITEM NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
| 60909 |
| Pin Down Curb Stop |
| EA |
| 55 |
| 61101 |
| Water System (Removal and Replacement of Water Storage Tanks) |
| LS |
| 1 |
| 61201 |
| Sewer System (Host Site Sewer Dump with Holding Tank) |
| LS |
| 2 |
| 61902 |
| Gate |
| EA |
| 4 |
| 63301A |
| Sign System (Directional Signs) |
| EA |
| 3 |
| 63301B |
| Sign System (Campground Site Unit Marker) |
| EA |
| 58 |
| 63801A |
| Picnic Table |
| EA |
| 65 |
| 63801B |
| Shade Structure (Single) |
Spaces 27, 28, 32, 35, 42, 49, 55
| EA |
| 7 |
| 63801C |
| Shade Structure (Double) |
Spaces 25, 35, 40
| EA |
| 3 |
| 63801D |
| Kiosk (Covered Information Sign Check In System) |
| LS |
| 1 |
| 63901A |
| Vault Toilet, Gunnison Style |
| EA |
| 2 |
| 63901B |
| Vault Toilet, Tioga Style |
| EA |
| 4 |
| 63901C |
| Utility Building, Schweitzer I Style |
| EA |
| 2 |
| 64001A |
| Fire Ring |
| EA |
| 58 |
Total All Base Items
Additive ITEM NO. 1
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
| 30210 |
| Aggregate Surface Course, Grading Crusher fines, Method 2 (4 in depth) |
| CY* |
| 8 |
| 63801B |
| Shade Structure (Single) Spaces 34, 38, 45, 50 |
| EA |
| 4 |
| 63801C |
| Shade Structure (Double) Space 36 |
| EA |
| 1 |
Total Additive 1
Additive PAY ITEM NO. 2
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
| 30210 |
| Aggregate Surface Course, Grading Crusher fines, Method 2 (4 in depth) |
| CY* |
| 11 |
| 63801B |
| Shade Structure (Single) Spaces 2, 11, 13, 16, 44, 46 |
| EA |
| 6 |
| 63801C |
| Shade Structure (Double) Space 41 |
| EA |
| 1 |
Total Additive 2
TOTAL ALL BASE, ADDITIVE 1 and ADDITIVE 2 $__________________ Note: All quantities are Actual Quantity unless marked with an (*).
(*) Denotes Contract Quantity items.
B- 2 Payment for Bond Premiums Note: Payment for bond premiums in accordance with FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
B-3 Additive Item The Government may require the delivery of the numbered line item, identified in the Schedule as an additive item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the additive items by written notice to the Contractor within 90 days after contract award. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree. It is the unilateral right of the Government to exercise Additive 1 and/or Additive 2 at the price agreed upon. Award of additive items is contingent on availability of funds and in the best interest of the Government.
Except when it is determined not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all additive items to the total price for the basic requirement. Evaluation of additive items will not obligate the Government to exercise the additive items.
B-4 Permits and Responsibilities. Idaho Use Tax, FAR Clause 52.236-7 Contractors shall be responsible for complying with any Federal, State, and municipal laws, codes and regulations applicable to the performance of the work. Questions regarding assessment of Idaho Use Tax on Government Furnished Property should be directed to the Idaho State Tax Commission at (208) 799-3491.
PART I - THE SCHEDULE
SECTION C - DESCRIPTION/SPECIFICATIONS
C- 1 Scope of Contract Campground Improvements, this project includes the removal and replacement of two water holding tanks and necessary piping, removal and replacement of two wastewater holding tanks and associated piping, aggregate haul and placement, new asphalt paving, patching of existing pavement, asphalt pavement chip seal, installation of new precast concrete toilets and storage buildings, construction of wood shade structures and information kiosks, and installation of picnic tables and fire rings. Project also includes removal of existing toilet buildings and storage sheds, stumps, and concrete bollards and pads.
C-2 Project Location. Location From Coeur d'Alene, drive 28 miles east on Interstate 90, to exit 43 (Kingston), then 26 miles north on paved Forest Road No 9, then 11 miles north from Prichard on paved Forest Road 208. Section 30, T51N, R4E Boise Principal Meridian.
C-3 STANDARD SPECIFICATIONS
“Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects” (FP-14) are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract.
Copies are available electronically on the U.S. DEPARMENT OF TRANSPORTATION Federal Highways Administration website at: http://flh.fhwa.dot.gov/resources/specs/fp-14/fp14.pdf.
Section 101 Terms, Format and Definitions Section 102 Bid, Award, and Execution of Contract Section 103 Scope of Work Section 104 Control of Work Section 105 Control of Material Section 106 Acceptance of Work Section 107 Legal Relations and Responsibility to the Public Section 108 Prosecution and Progress Section 109 Measurement and Payment Section 151 Mobilization Section 152 Construction Survey and Staking Section 153 Contractor Quality Control Section 154 Contractor Sampling and Testing Section 155 Schedules for Construction Contracts Section 156 Public Traffic Section 157 Soil Erosion and Sediment Control Section 201 Clearing and Grubbing Section 202 Additional Clearing and Grubbing Section 203 Removal of Structures and Obstructions Section 204 Excavation and Embankment Section 211 Roadway Obliteration Section 302 Minor Crushed Aggregate Section 403 Asphalt Concrete Section 407 Chip Seal
Section 418 Asphalt Concrete Pavement Patching Section 609 Curb and Gutter Section 611 Water Systems Section 612 Sanitary Sewer Systems Section 619 Fences, Gates, Cattle Guards, and Bollard Posts Section 633 Permanent Traffic Control Section 638 Rough Carpentry Section 639 Vault Toilet/Utility Building Section 640 Site Furnishings Section 708 Plastic Pipe Section 716 Material for Timber Structures Section 725 Miscellaneous Material
C-4 AGAR 452.211-3 Statement of Work/Specifications. (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C-5 AGAR 452.211-4 Attachments to Statements of Work/Specifications. (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract. See list Supplemental Specifications and Drawings in Section J.
C- 6 Biobased Product Utilization The Contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February 2012, to provide biobased products.
The Contractor shall utilize products and material made from biobased materials to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer’s Representative (COR).
The following is an example list of products that may be used in this contract for which biobased products are available. The list is not all inclusive. It is desirable that Contractors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
| Grease Removers | Insulating Foam | Concrete and Asphalt Release Fluids |
| Fluid-filled Transformers | Wood and Concrete Sealers | Composite Panels |
| Adhesive and Mastic Removers | Carpets | Roof Coatings |
| Hydraulic Fluid | Water Tank Coatings |
Biobased products that are designated for preferred procurement under USDA’s Biopreferred Program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material.
In addition to the biobased products designated by the U.S. Department of Agriculture in the Biopreferred Program, the Contractor is encouraged to use other commercially available biobased products.
Additionally, the winning Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes (see Section I, FAR Clause 52.223-2).
Amendment No 1, dated 9/3/2020