12034320Q0037SampleTO.pdf
PDF 87 KB Posted
- Solicitation number
- 12034320Q0037
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12034320Q0037Amend001.pdf | ||
| 12034320Q0037FoodStorageOrder.pdf | ||
| 12034320Q0037WD.pdf | ||
| 12034320Q0037Drawings.pdf | ||
| 12034320Q0037ExperienceQuestionaire.docx | DOCX document | |
| 12034320Q0037.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 3
SAMPLE TASK ORDER FOR THE BASE YEAR
Item Unit Order No. Description Unit Price Quantity Total
0001 Roadway Obliteration Cut slopes greater than 5 feet high. Mile _____ 8 _____
0002 Roadway Obliteration
Cut Slopes 5 feet or less in height Mile _____ 12 _____
0003 Roadway Obliteration Cut slopes greater than 5 feet with 3-5 ft. wide Passage-way through debris Mile _____ 3 _____
0004 Roadway Obliteration Cut slopes 5 feet or less in height with 3-5 ft. wide passage-way through debris Mile _____ 4 _____
0005 Roadway Obliteration—Designated Mile _____ 2 _____ Snowmobile Trails
0006 Mobilization for Items 0001, 0002, and 0003, 0004, 0005. Mileage rate for one excavator Mile _____ 120** _____
0007 Culvert Removal, less than 5 feet of fill over top of culvert outlet Each _____ 4 _____
0008 Culvert Removal, between 5 feet and 15 feet of fill over top of culvert outlet Each _____ 2 _____
0009 Culvert Removal, greater than 15 feet of fill over top of culvert outlet Each _____ 1 _____
0010 Excavator Rental; 90 HP or Larger with hydraulic thumb. Hour _____ 20 _____
0011 Structure Disposal Each _____ 10 _____
0012 Rock/Gravel/Boulder Transport Mile _____ 20 _____
0013 Mobilization for Item 0012.
Mileage rate for one haul unit Mile _____ 120** _____
0014 Seeding, Dry Method for 0001, 0003 & 0005 Items (2.5 Ac/Mi) Acre _____ 32.5* _____
Total Task Order _____
ATTACHMENT 3
SAMPLE CONTINUED
Note: The above quantities are not indicative of the actual quantities that will be ordered in the first Task Order; however, these quantities will be used to compare Base Period Task Order price of all proposals.
*Item 0016 (miles in Item 0001, 0003 and 0005 = 13 miles) x 2.5 acres/mile = 32.5 acres
** Assumes for this example that only one excavator and one haul unit are ordered. If two excavators were ordered instead of one then the mileage for Item 0006 would be 240 miles (120 x 2). If this sample task order was for the Rocky Mountain Division the mobilizations (Items 0006 and 0010) would be based on 155 miles, and Helena Lincoln, Townsend Districts would be based on 90 miles as explained in Section G.
Sample Statement of Work
Provide one excavator and one haul unit to perform road obliteration on the Jefferson Division of the Lewis and Clark National Forest with Headquarters Office in Great Falls, Montana. The work is ordered as Task Order 001 for the Base Year Schedule and will be done in the upper Sheep Creek drainage located on the south side of Kings Hill.
The work consists of 29 miles of road obliteration as defined in the Schedule and performed to the standards and specifications described in the Contract. In addition approximately 10 structures will be removed. Approximately 32.5 acres of seeding as detailed in the Schedule will be required, and 20 hours of excavator rental will be required. Work for this Task Order will begin on or before July 15, 2020 with completion by October 15, 2020.
Note: Contractor must supply a Contractor Quality Control Plan based on this sample Task Order to satisfy the Technical Evaluation Criteria in the Evaluation Section.