12034320Q0037Drawings.pdf
PDF 2 MB Posted
- Solicitation number
- 12034320Q0037
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12034320Q0037Amend001.pdf | ||
| 12034320Q0037FoodStorageOrder.pdf | ||
| 12034320Q0037WD.pdf | ||
| 12034320Q0037ExperienceQuestionaire.docx | DOCX document | |
| 12034320Q0037.pdf | ||
| 12034320Q0037SampleTO.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
e
Example of roadway before obliteration with five foot or higher cut slopes
Example of roadway before obliteration with less than five foot cut slopes.
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
Helena-Lewis & Clark NATIONAL
FOREST GREAT FALLS, MONTANA
FOREST ROAD
OBLITERATION
BEFORE AND AFTER PHOTOS
PAST OBLITERAnON WORK
DESIGNED:
DRAWN:
CHECKED:
"After" picture of same road as shown at left. Cut and fill slope material has been placed on the scarified roadbed and live vegetation material has been machine placed across the roadway to promote re-vegation. If ordered by the Contacting Officer, all disturbed surfaces will be seeded with appropriate grass seed. Some roads may require that a 3-5 foot passage way be provided that is not blocked by debris or large woody material. This passage way is to allow animal and human foot traffic. A tread is not required in this passage way.
"After" picture of same road as shown at left. Roadbed has been scarified to a minimum depth 12 inches and a maximum depth of 24 inches. Vegetation material has been machine placed to promote re-vegetation. If ordered by the Contracting Officer, all disturbed surfaces will be seeded with the appropriate seed mix. Note that if this was a designated snowmobile trail the scarification depth would also be 12 to 24 inches deep but no large woody debris, or other large obstacles would be placed on the road surface that would create hazards for snowmobiles.
S. Van Sickle
R. Gardiner
D. Woods
DATE:
DATE:
DATE:
3/2010
I
DATE REVISION
3/2010 3/2019
§( DRAWING NAME )
( SHEET __2._ )
Existing Cut
Slope
Road Surface
CULVERT REMOVAL
LIVE STREAM
A
Deposit Fill Mat'I on
Scarified Road Surface.
Existing Fill
Slope
Material
Existing Fill
Slope
NOTES:
1. Dewatering and stream restoration will be done under Excavator Rental Item of Schedule B. A Government Inspector is required to be on site during the course of this work and Contractor is required to give four working days notice prior to starting.
2. Government will obtain all necessary permits to work in live streams and Contractor is required to comply with the specifications in the permits.
3. Remove all fill material from floodplain down to the original channel. Place this removed material on the scarified roadbed. Fully re-contour the adjacent roadway.
4. Transplant live vegetation, sod and scatter available woody debris, including root wads on finished slopes to help establish new vegetation.
5. Sedimat material will be purchased and placed by the Government below the culvert site to capture dirt and silt generated by the culvert removal.
e
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
Helena-Lewis & Clark NATIONAL
FOREST GREAT FALLS, MONTANA
FOREST ROAD
OBLITERATION
TYPICAL ROUTE OBLITERATION
AND CULVERT REMOVAL
DESIGNED:
DRAWN:
CHECKED:
S. Van Sickle R. Gardiner D. Woods
Scarify road surface to a depth of 12-24".
When ordered by the Contracting Officer, leave a 3-5 foot passage way free of debris to promote animal and human foot traffic
Excavate material and place on remaining rm bed/
Place woody debris on re-contoured surface help prevent soil erosion. All slash must be compacted so that it is in contact with the soils.
Exception; do not place large woody material on designated snowmobile routes. If ordered all disturbed surfaces must be seeded in accordance with Specification C-3-3.
SECTION A-A
NOTE: This typical cross section will apply to all obliteration work.
Place woody material and debris on slope surface to prevent
Remove culvert and dispose off Government property erosion.
n,m ,;2n10
IDATE: 3/2010
DATE: 3/2019
SECTION B-B
REVISION
Place fill material on surface balancing amount on both sides. Avoid creating a berm.
Re-establish stream bank full width and flood plain.
§( DRAWING NAME )
ACAD.DWG
( SHEET __J_ )
| 2019Drawing_pkge |
| OblitIDIQcover2019 |
| pkge |
| Culvert_Removal |
| photos_Before _ Afters |
oblitcover
File details come from the government source that posted it. Updated .