This document is an amendment to a solicitation for National Mobile Shower Facilities. The Forest Service is seeking mobile shower units to support incident response efforts. The amendment provides answers to vendor questions, revises language around dispatch procedures, and extends the response deadline. Specifically, bladder bags are prohibited for potable water storage. Dispatch will prioritize the vendor with the closest depot as determined by Google Maps. The response deadline is extended to February 27, 2018. Vendors should submit copies of their technical and business proposals directly in the exhibits as instructed. The amendment also details requirements around mandatory availability periods and unit locations for dispatch consideration.
Amendment 03 to Solicitation 12024B18R9000
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Summary_of_Awards_12024B18R9000_-_Revised.pdf | ||
| Summary_of_Awards_12024B18R9000.pdf | ||
| Amendment_05.pdf | ||
| Amendment_04.pdf | ||
| Section_B.1_&_B.2.docx | DOCX document | |
| Amendment_02.pdf | ||
| Amendment_01.pdf | ||
| Exhibit_L.1.docx | DOCX document | |
| Exhibit_L.2.docx | DOCX document | |
| Solicitation_12024B18R9000.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
Amendment 03 February 21, 2018
6. ISSUED BY CODE 024B 7. ADMINISTERED BY (If other than Item 6) CODE
U.S. FOREST SERVICE - CONTRACTING
NATIONAL INTERAGENCY FIRE CENTER
OWYHEE BLDG, MS-1100
3833 S DEVELOPMENT AVE
BOISE ID 83705-5354
Same as Item 6
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
9A. AMENDMENT OF SOLICITATION NO.
12024B18R9000
9B. DATED (SEE ITEM 11)
January 26, 2018
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS PURSUANT TO: (specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
National Mobile Shower Facilities
Purpose of the Amendment: The purpose of this Amendment is to provide answers and clarifications to submitted questions and to revise language in the Solicitation.
Description of Changes: See Continuation for final Questions and Answers provided and description of language revision. The deadline for receipt of questions was no later than 2:00 PM (1400) MT, February 19, 2018. No further questions will be accepted.
The hour and date specified for receipt of proposals is extended by this Amendment. The Closing Date and deadline for receipt of proposals in response to Solicitation RFP 12024B18R9000 is extended to no later than 2:00 PM MT, February 27, 2018.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
BRYCE N. PITCHFORD, Contracting Officer Phone: (208) 387-5231
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable STANDARD FORM 30 (REV. 10-83)
Prescribed By GSA FAR (48 CFR) 53.243
Continuation, Questions and Answers, Language Revisions RFP 12024B18R9000, Amendment No. 03
Questions and Answers
Question #1 – In Section C Description/Specifications/Statement of Work, C.3 Minimum Equipment Requirements, subparagraph 18 indicates "The use of bladder bag is prohibited". Question:
Bladder bags have been a part of how this industry has done business for years. If bladder bags are needed as part of the 1500 gallon requirement, will there be an exception made to this statement of bladder bags being prohibited?
Answer #1 – No, there will not be an exception, bladder bags are not allowed for potable water storage.
Question #2 – It states, Provide two (2) copies of your Business proposal and four (4) copies of your Technical proposal in response to Section L and Exhibits L.1 and L.2 of the solicitation.
Question: Are the answers we provide directly in Exhibits L.1 and L.2 sufficient for the Technical and are the answers provided in B.1 sufficient for Business Proposal or does there need to be a separate written response for Technical and Business proposal?
Answer #2 – All instructions given for preparation of the Technical and Business proposals are contained in section L.7 Instructions For The Preparation Of Technical And Business Proposals (AGAR
452.215-71) (SEP 1999).
Question #3 – Are split DDPs still going to be considered like in the past contract using one unit (example Tucson April 1 to June 30 then Wenatchee July 1 to 9-30)?
Answer #3 – No, split locations will not be considered.
Question #4 – We were curious if you could post an editable version of Section B, like Section L.1 and L.2 so we can use it to prepare our business proposal electronically?
Answer #4 – An editable version of Section B will be posted.
Question #5 – We have an 18 stall unisex. Under B.2 there is a block that says Male and a Block that says Female. Where or how do we put in the 18 Unisex stalls?
Answer #5 – List the number of stalls available for male and notate Unisex underneath the number. The same for Female, list the number of stalls available and notate Unisex underneath the number.
No further questions will be accepted.
Language Revisions
Section C.2, Ordering, Relocating, Reducing, Releasing, Reassigning and Canceling Procedures, page 13, paragraph (b) Dispatch Procedures, subparagraph (1), this paragraph is changed to read as follows;
“The Government has contracts with multiple vendors for Mobile Shower Facilities. During periods of availability, the Government will utilize the Contractor whose DDP is the shortest route (mileage) closest to the incident as determined by using Google Maps® or Government determined mapping application when Google Maps® is inoperable, provided that the unit can meet the incident’s needs and required time frames.”
(See attached replacement page 13.)
(End Amendment 03)
Solicitation No. 12024B18R9000 U.S. Forest Service National Mobile Shower Facilities National Office
SECTION C
DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
13 Amendment 03
(b) Dispatch Procedures
(1) The Government has contracts with multiple vendors for Mobile Shower Facilities.
During periods of availability, the Government will utilize the Contractor whose DDP is the shortest route (mileage) to the incident as determined by using Google Maps® or Government determined mapping application when Google Maps® is inoperable, provided that the unit can meet the incident’s needs and required time frames.
(2) Contractor personnel and equipment are required to be physically located and available to perform services from each of their DDPs during the defined mandatory availability period (MAP). The DDP is the location where the unit must be physically located during the mandatory availability period, unless the Contractor has provided written notification to the CO and the NICC of its unavailability status. NICC is the only designated dispatch center authorized to place orders for all the National Mobile Shower Facility Units. NICC shall place orders against an overriding Delivery Order; issued by the CO at time of award.
(3) Outside the (MAP), priority consideration will be given to units physically located and available to perform services closest to the incident; provided that the unit can meet the incident’s needs and required time frames. The only two locations to be considered for dispatch outside of the availability dates are the DDP or the Company’s Headquarters.
Outside the availability dates, Contractors have the option of remaining at their DDP or returning to their Company’s Headquarters. Company’s Headquarters is defined as the company’s regular operating physical address (Block 15A on Standard Form 33).
Contractors are responsible for notifying the CO and the NICC, in writing, of availability status and locations outside of their mandatory availability period.
(4) The Government intends to dispatch resources in accordance with this procedure.
However, the number of fire orders in process and actual fire conditions at the time of dispatch may require a deviation from procedures stated in C.2 in order to respond effectively to such conditions. Any such deviation will be within the discretion of the Government, and will not be deemed a violation of any term or condition of this contract.
(5) When a Contractor agrees to a delivery schedule at the time the order is placed, the Contractor is required to perform in accordance with the agreed upon schedule documented on the Mobile Food and Shower Service Request Form. In addition, the Contractor is required to follow DOT regulations at all times.
(6) When a small capacity unit is ordered and there are no small units that can meet the incidents required time frames; NICC may use a large capacity unit to fill the order using the procedures in C.2, provided the large capacity unit can meet the incidents needs and required time frames.
(c) Release and/or Reassignment
(1) When the MSFU has been released from an incident, the unit may remain in the nearest town up to 24 hours in available status. After this time, it must return to the unit's DDP. Priority consideration for assignment will be given to the unit closest to the incident that is physically located at its DDP over other available units remaining in the nearest town or en-route; provided that the unit at its DDP can reasonably meet the date and time needed by the incident.
File details come from the government source that posted it. Updated .