U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE, REGION 10
TONGASS NATIONAL FOREST
THORNE BAY RANGER DISTRICT
CONSTRUCTION PLANS FOR:
AOP CULVERT REPLACEMENT
NFSR 2050400 MP 3.79
LOCATION MAP
FOREST ENGINEER
APPROVED BY:
DATE
TONGASS NATIONAL FOREST
DISTRICT RANGER
DATE
THORNE BAY DISTRICT
RECOMMENDED BY:
PREPARED BY:
INDEX TO SHEETS
NO. DESCRIPTION
1 TITLE SHEET
GENERAL NOTES & SCHEDULE OF
QUANTITIES
TYPICAL ROADWAY SECTION & POINT
TABLES
4 ROAD PLAN & PROFILE
5 CULVERT GENERAL LAYOUT
6 STRUCTURE EXCAVATION & BACKFILL
7 FOOTING DETAILS
8 PRECAST DETAILS
9 ROCK WEIR DETAILS
10 STREAM SIMULATION DETAILS
11 DEWATERING REQUIREMENTS
XS1-XS2 ROAD CROSS SECTIONS
PROJECT
LOCATION
JUNEAU
Craig
KEY MAP
140°142°
58°
138° 136°
Sitka
132°134°136°138°140°142°
60°
Yakutat
C A N
A D
A
A
LA
S K A
62°
Skagway
56°
54°
132°134°
Ketchikan
Wrangell
Petersburg
128°130°
60°
58°
HOONAH
VICINITY MAP
PROJECT
LOCATION MATERIAL
SOURCE
THORNE BAY
K
LA
W O
C K
MATERIAL SOURCES
GOVERNMENT FURNISHED
CHANNEL ROCK
RIPRAP
UNCLASSIFIED BORROW
WASTE SITE
CONTRACTOR FURNISHED
STREAMBED SIMULATION ROCK
ALL OTHER MATERIALS ARE
CONTRACTOR FURNISHED
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/2 6/1
9 1 3:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P3
.79 -D
ES
IG
N
OP
EN
B
OT
TO
M.
DW
G;
REGION 10
ALASKAN REGION
GENERAL NOTES &
ESTIMATED
QUANTITIES
Mar-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050400-MP 3.79
GENERAL NOTES
DESIGN: This structure is designed for HL-93 live loading in accordance with AASHTO LRFD Bridge Design Specifications, 7th Edition.
HYDROLOGY AND HYDRAULICS: This structure has been designed to pass a Q100 flood event with a headwater depth to culvert rise ratio less than
0.8. Flow data is provided on Sheet 5.
SPECIFICATIONS: Construct the project in compliance with Federal Highway Administration Standard Specifications for Construction of Road and Bridges on Federal Highway Projects (FP-14) and applicable Forest Service Supplemental Specifications.
ROAD WORK: Depths of all materials are given as final compacted depths. Remove all berms, existing or created, unless designated to remain, to allow drainage of water from the traveled way.
DEWATERING & EROSION CONTROL PLAN: Submit a dewatering and soil erosion and sediment control plan to the contracting officer for approval at least fifteen (15) days prior to beginning work. See Section 157 of the Supplemental Specifications, the notes on Sheet 6, and the general requirements shown on Sheet 11. Construct temporary means to divert the flow of the live stream as necessary to perform work. Do not pump water from excavations directly into the live stream.
DISPOSAL: All materials designated for removal become the property of the contractor and are to be disposed of by removing from the forest in an environmentally safe manner in accordance with all local, state and federal requirements. Dispose of excess or unsuitable material at the location designated in FSSS Section 105. Hauling of excess or unsuitable material is incidental to associated work.
TEMPORARY TRAFFIC CONTROL: Submit a temporary traffic control plan to the Contracting Officer for approval at least 30 days prior to intended use.
IN-STREAM WORK: All in-stream work will be done between June 15th and September 1st. Allowance shall be given to the Forest Service to capture and remove fish and other aquatic organisms from within the construction work area prior to and during work activities.
EQUIPMENT STORAGE: Storage of all equipment on government lands will be at a location approved by the CO.
SEEDING: Seed and mulch all disturbed soil that is not within travel way or stream channel. Use Tongass Seed Mix. See FSSS Section 625
CONCRETE: Use Class A(AE) Concrete for Precast members. The required 28-day compressive strength (F'c) is 3,000 psi with an entrained air content of 5% ± 1%. Finish all precast elements with an ordinary surface finish.
Make all concrete in accordance with an approved mix design. Chamfer all exposed edges of concrete 3/4" and fillet all acute angles 3" unless otherwise noted.
REINFORCING STEEL: Use reinforcing steel of the deformed type conforming to AASHTO M31 (ASTM A615) Grade 60. Concrete cover is as shown; where not shown it must conform to AASHTO. Cut and bend reinforcing steel in conformance with ACI 315. Lap splice bars 2' min.
HARDWARE AND STRUCTURAL STEEL: Use shapes, plates and bars meeting the requirements of ASTM A36, unless otherwise specified in these plans.
Use hardware meeting the requirements of ASTM A325, except as noted in the drawings.
WELDING: Weld in accordance with the Structural Welding Code, AWS D1.1.
ITEM
NO. ITEM DESCRIPTION UNIT QUANTITY REMARKS
15101 MOBILIZATION LUMP SUM ALL
TRAFFIC CONTROL, FIRE PROTECTION, EQUIPMENT
CLEANING, AND ANY MAINTENANCE OF EXISTING NFS
ROADS FOR CONTRACTOR ACCESS IS INDIRECT TO THIS
PAY ITEM
15221 CONSTRUCTION SURVEY AND STAKING LUMP SUM ALL
15713 SOIL EROSION & POLLUTION CONTROL LUMP SUM ALL INCLUDES DEWATERING. SEE GENERAL NOTES
20301
REMOVAL OF EXISTING CORRUGATED STEEL PIPE,
METHOD A
EACH 1
20411
UNCLASSIFIED BORROW EXCAVATION, PLACEMENT
METHOD 2
CUBIC YARD 110 CQ
GOVERNMENT SOURCE. ASSUMES 20% OF EXCAVATED
MATERIAL IS UNSUITABLE. QUANTITY IS IN-PLACE
AND NOT ADJUSTED FOR SHRINK/SWELL.
25101 PLACED RIPRAP, CLASS 2 CUBIC YARD 26 CQ GOVERNMENT SOURCE.
55217 PRECAST CONCRETE MEMBER, CULVERT FOOTING LINEAR
FOOT
60303 12'-0" SPAN x 4'-1" RISE CORRUGATED
ALUMINIZED-STEEL STRUCTURAL PLATE ARCH, 0.111"
THICKNESS
LINEAR
FOOT
CORRUGATED ARCH MATERIAL SHALL BE ALUMINIZED
STEEL. GALVANIZED STEEL WILL NOT BE ALLOWED.
MANUFACTURER TO CERTIFY CULVERT MEETS HL-93
LOADING WITH THE MINIMUM COVER SHOWN ON THESE
PLANS.
62504 SEEDING, DRY METHOD LUMP SUM ALL
USE TONGASS SEED MIX. SEE FSSS SECTION 625.
APPROXIMATELY ~1900 SQ FT
64802
PLACED STREAMBED SIMULATION MATERIAL
BED CLASS 3.79, METHOD A CUBIC YARD 23 CQ
COMMERCIAL SOURCE. SEE SHEET 10 FOR GRADATION
REQUIREMENTS. MATERIAL FROM THE EXCAVATION
MEETING THE GRADATION FOR BED CLASS 3.79 MAY BE
SALVAGED AND INCORPORATED INTO THE SIMULATED
STREAMBED.
64804
PLACED STREAMBED CHANNEL ROCK FOR CULVERT
BANKS, CLASS CR-2, METHOD A CUBIC YARD 38 CQ
GOVERNMENT SOURCE. SOME SORTING WILL BE
REQUIRED. ROCK SALVAGED FROM THE EXCAVATION
MEETING THE GRADATION FOR CLASS CR-2 MAY BE
SALVAGED AND INCORPORATED INTO THE SIMULATED
STREAMBED.
64806
PLACED STREAMBED CHANNEL ROCK FOR ROCK
WEIRS, RIBS, & ISOLATED BOULDERS, CLASS CR-2,
METHOD A
CUBIC YARD 20 CQ
GOVERNMENT SOURCE. SOME SORTING WILL BE
REQUIRED. ROCK SALVAGED FROM THE EXCAVATION
MEETING THE GRADATION FOR CLASS CR-2 MAY BE
SALVAGED AND INCORPORATED INTO THE SIMULATED
STREAMBED.
SCHEDULE OF QUANTITIES
CQ= CONTRACT QUANTITY (SEE SECTION 109.02(B) OF THE STANDARD SPECIFICATIONS);
OPTIONAL ITEMS
20501 ROCK EXCAVATION CUBIC YARD 10
SUBSURFACE CONDITIONS HAVE NOT BEEN ASSESSED.
BEDROCK MAY BE ENCOUNTERED AND ROCK
EXCAVATION MAY BE REQUIRED
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
CONTROL POINT TABLE
POINT #
CP-1
CP-2
CP-3
NORTHING
1437135.57
1436796.79
1436477.71
EASTING
2799326.23
2799310.20
2799203.82
ELEVATION
213.75
202.77
188.50
DESCRIPTION
SET-RPC
SET-RPC
SET-RPC
CP-1
CP-2
CP-3
S °4
'3
"W
.1
S
°2 6'
"W
6.
CENTERLINE POINTS
POINT #
NORTHING
1436848.3160
1436832.6689
1436808.3810
1436788.4959
1436768.7074
1436748.3004
1436729.5369
1436712.0304
1436690.9696
1436671.7271
1436652.4847
EASTING
2799302.1193
2799301.4831
2799299.9258
2799297.7967
2799294.9045
2799291.0999
2799286.8492
2799282.2166
2799276.2489
2799270.7965
2799265.3441
ELEVATION
202.68
203.13
203.81
203.95
203.50
202.42
200.88
199.41
197.82
196.55
195.47
DESCRIPTION
STA 12+40 CL ROAD/BEGIN CONSTRUCTION
STA 12+55.66 CL ROAD/PC CURVE
STA 12+80 CL ROAD
STA 13+00 CL ROAD
STA 13+20 CL ROAD
STA 13+40.76 CL ROAD/CL CULVERT
STA 13+60 CL ROAD
STA 13+78.11 CL ROAD/PT CURVE
STA 14+00 CL ROAD
STA 14+20 CL ROAD
STA 14+40 CL ROAD/END CONSTRUCTION
LAYOUT POINTS
POINT #
NORTHING
1436766.2998
1436755.3024
1436739.7935
1436728.7961
EASTING
2799275.2407
2799268.1534
2799316.3705
2799309.2832
ELEVATION
193.32
193.32
190.85
190.85
DESCRIPTION
BOTTOM OF FOOTING
BOTTOM OF FOOTING
BOTTOM OF FOOTING
BOTTOM OF FOOTING
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/2 6/1
9 1 3:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P3
.79 -D
ES
IG
N
OP
EN
B
OT
TO
M.
DW
G;
REGION 10
ALASKAN REGION
TYPICAL ROADWAY
SECTION & POINT
TABLES
Mar-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050400-MP 3.79
TYPICAL ROAD SECTION
NOT TO SCALE
Centerline Road
8'-0" 8'-0"
16'-0"
1.5 1
1.5
Clearing Limits
Clear to: Toe of Fill, Cut Daylight, or 5' min. shown.
5'-0" min.
Native surface
5'-0" min.
2%
Profile grade
ROAD CENTERLINE POINTS
SURVEY CONTROL POINTS
SET-RPC = Red Plastic Cap Control Point set by DJ&A.
See PROJECT CONTROL MAP for location of CONTROL POINTS.
CULVERT LAYOUT POINTS
See Sheet 5 for location of CULVERT INVERT POINTS
FLOW
PROJECT CONTROL MAP
Scale: 1" = 100'
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
11+20 12+00 13+00 14+00 15+00 15+20
2.87%
-5.19%
S T A
.0
E L
.6
STA = 14+40.00
EL = 195.47
80.00' VC
B V C S
.0
B V C E
.3
E V C S
.0
E V C E
.7
PVI STA:13+95.00
PVI ELEV:197.80
K: 22.18
80.00' VC
B V C S
.0
B V C E
.6
E V C S
.0
E V C E
.3
PVI STA:13+15.00
PVI ELEV:204.84
K: 6.86
CP-2
2+00
3+
4+00
4+47
0 20
12+00
13+00 14+00
15+00
PC
: 1
.6
PT
.1
CURVE DATA:
R=520.00 L=122.45' Δ=13°29'31"
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/2 6/1
9 1 3:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P3
.79 -D
ES
IG
N
OP
EN
B
OT
TO
M.
DW
G;
REGION 10
ALASKAN REGION
ROAD PLAN &
PROFILE
Mar-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050400-MP 3.79
LEGEND
Existing Edge of Shoulder
Existing Culvert
Existing Edge of Water Major Contour (5') Minor Contour (1')
EXISTING FEATURES
Existing Edge of Road
> > Existing Ditch
PLAN
PROFILE
Existing Ground at Centerline Road
Centerline Road Finished Grade
Remove & dispose existing culvert
New culvert
20'
FL
O
W
New Edge of Road
Centerline Road
New Culvert
Remove & Dispose Existing Corrugated Steel Pipe
STA 14+40
END ROAD WORK
MATCH EXISTING
STA 12+40
BEGIN ROAD WORK
MATCH EXISTING
New Toe of Fill, typ.
Stream Thalweg
Construct Rock Weir, typ. See sheet 9
ROAD CONSTRUCTION NOTES:
1. All road work, including hauling and disposing of excess and unsuitable material, is incidental to Item 20411.
2. Embankment quantities shown are in-place quantities and not adjusted for shrink/swell. Quantity shown assumes 20% of excavated material will not be suitable for reuse.
3. Haul & dispose unsuitable material to the waste site designated in FSSS Section 105.
110 CY Unclassified Borrow
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
Culvert
2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+30
EL 193.32
Bottom of Footing EL 190.85
Bottom of Footing
EL 193.5
Channel Bottom
FG EL 202.42
at Centerline Road
EL 196.3
Channel Bottom
-5.0%
13+
2+01 3+00
3+
Layout Pt.
Layout Pt.
Layout Pt.
Layout Pt.
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/2 6/1
9 1 3:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P3
.79 -D
ES
IG
N
OP
EN
B
OT
TO
M.
DW
G;
REGION 10
ALASKAN REGION
CULVERT GENERAL
LAYOUT
Mar-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050400-MP 3.79
SECTION THRU CENTERLINE CULVERT
Scale: 1" = 20'
10'
2'
Existing ground min.
cover
Centerline Road
Remove existing culvert
New Edge of Road
Stream Thalweg
FLOW
PLAN
7'-6" Bankfull Width
Channel Bottom EL
12'-0" Span
R is e
12'-0" Span x 4'-1" Rise Aluminized-Steel Structural Plate Arch
Precast Concrete Footing. See Sheet 8
TYPICAL SECTION
Not to Scale
Layout PT Layout PT
12'-0" Span x 4'-1" Rise Aluminized-Steel Structural Plate Arch
49'-0" Precast Footing
48'-0" Culvert
Construct Rock Weir, typ. See sheet 9
Centerline Culvert (STA 2+69.93) @ Centerline Road (STA 13+40.76)
See sheet 3 for Footing Layout Points Table.
HYDRAULIC DATA:
Drainage Area= 0.28 Sq. Mi.
Q2= 54.5 CFS
Bankfull Width= 7.5'
Depth= 1.4'
Q100= 125.4 CFS
Depth= 3.7'
HW/D= 0.78
12'-0" Span x 4'-1" Rise Aluminized-Steel Structural Plate Arch
Class 2 Riprap
2'-0"
Fill slope
New culvert
Top of bank
RIPRAP DETAIL
NOT TO SCALE
2'-0"
Top of bank in culvert/top of concrete footing
Concrete Footing
Furnish and place 13 CY Class 2 Riprap.
Typical of both ends. See DETAIL on this sheet
Bevel pipe on upstream end of culvert. See DETAIL on this sheet.
See Sheet 9 & 10 for channel and bank dimensions and construction details ty p
°5
4'
STEP BEVEL END DETAIL
BEVEL INLET END ONLY
Concrete Culvert Footing
1. The ends of culverts shall not be cut on a skew unless shown on the drawings, or called for in the schedule of items.
1'-2"
R is e
1'
1.5
Fill Slope
Q100= 3.7'
*Q2= 1.4'
Elevations at inlet of culvert
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONTOUR INTERVAL = 1'
200205
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/2 6/1
9 1 3:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P3
.79 -D
ES
IG
N
OP
EN
B
OT
TO
M.
DW
G;
REGION 10
ALASKAN REGION
STRUCTURE
EXCAVATION &
BACKFILL
Mar-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050400-MP 3.79
PLAN
STRUCTURE EXCAVATION NOTES:
1. Complete structure excavation in accordance with FP-14 Section 209.
2. The contractor is solely responsible for excavation support and compliance with all applicable OSHA regulations.
3. Notify the CO immediately if bedrock or soft, unsuitable soils are encountered.
FLOW
Existing corrugated steel pipe
Approximate culvert excavation limits
6 New Concrete Footings
Edge of Existing Road
2' min.
Existing culvert
STRUCTURAL EXCAVATION & BACKFILL SECTION
NOT TO SCALE
Existing ground
Finished ground
Backfill (704.03a) See "STRUCTURE BACKFILL NOTES" on this sheet.
Culvert Backfill limit
DEWATERING AND SOIL EROSION CONTROL NOTES:
1. Protect against soil erosion and sedimentation during construction in accordance with
FP-14 Section 157, the project permits, Forest Service Handbook (FSH) 2509.22, Region 10 BMPs for Erosion Control, and the Guidance for the Invasive Plant Managment Program (Krosse 2017). Prepare and submit a soil erosion and sediment control plan to the CO for approval.
2. Dewater the excavation in accordance with FP-14 Sections 208 and 157 and the requirements on sheet 11.
3. Contractor should anticipate water infiltrating the excavations.
4. Culvert excavation, riprap and rock weir placement, and backfill are to be completed in accordance with the Contract Specifications. Standing or running water in the work area does not relieve the contractor from meeting the specifications.
5. Dewatering is the sole responsibility of the contractor. Develop and submit to the CO a project-specific dewatering and sediment control plan with the excavation plan for approval. Sheet 11 illustrates the general dewatering requirements and possible methods and equipment and is not considered adequate or complete for this project.
Develop and submit a project-specific dewatering plan including drawings and a written outline illustrating and describing proposed layout, methods, and equipment. See sheet 11 for dewatering flows during construction. Approval of the contractor's dewatering plan does not relieve the contractor from completing the work as required. If the contractor's methods are not producing adequate results, the contractor must re-evaluate and submit another dewatering plan. Re-submittal of the dewatering plan, if required, is incidental to the work.
Limits of excavation per OSHA. See "STRUCTURE EXCAVATION NOTES" on this sheet
Material meeting FP-14 Specification
704.06 outside of the Culvert Backfill limits shown.
STRUCTURE BACKFILL NOTES:
1. Backfill limits shown here are the minimum requirements. Place backfill in accordance with FP-14 Section 209, and as shown on these Plans, with material meeting the requirements of Subsection 704.03a. Compact backfill material in accordance with FP-14 Subsection 209.10, Compaction Method 2.
Any material outside the Backfill limits shown is considered Road Embankment and the material must meet the requirements of FP-14 Subsection 704.06.
2. It is assumed that material conserved from the structure excavation at this site will meet the requirement for Backfill (704.03a) or Road Embankment (704.06). Some mixing and sorting may be required to meet the material specification. Haul and dispose unsuitable and excess material to the designated waste site. Haul and disposal of unsuitable and excess material is paid with Item 20411.
6" Foundation Fill leveling course
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text 7.5
AutoCAD SHX Text
CONTOUR INTERVAL = 1'
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/2 6/1
9 1 3:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P3
.79 -D
ES
IG
N
OP
EN
B
OT
TO
M.
DW
G;
REGION 10
ALASKAN REGION
FOOTING DETAILS
Mar-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050400-MP 3.79
DETAIL A
Note to Scale
Fill key with non-shrink grout
4" 5" 3"
2"
12'-0" Culvert Span
11'-1"
Foundation stem wall
INSTALLATION DETAIL
Not to Scale
DETAIL A
1'-3" 1'-0" 1'-3"
(3 x c on t.
E ac h F ac e m ax on c en te r
STREAM SIDEFILL SIDE
10"
9"
#4 U-bar @ 24" o.c.
#4 vert. @ 12" o.c.
NOTES:
1. Provide 2" clear cover for all reinforcement unless otherwise shown.
2. o.c. = on center.
3. Use 24" min. lap splice for all reinf. bars.
FOOTING DETAIL
Scale: 3/4" = 1'-0"
ITEM DESCRIPTION
STRUCTURAL CONCRETE, CLASS A(AE)
REINFORCING STEEL
Cubic Yard
Pounds
25.4
UNIT QUANTITY
Informational Quantities shown above are for the precast culvert footing and considered incidental to Item 55217.
INFORMATIONAL QUANTITIES
1. A limited foundation investigation was conducted at this site and no soft soils or bedrock were encountered. Notify the CO immediately if bedrock or very soft clay soils are encountered within the limits of the foundations shown in these PLANS. In no case should the footing be placed directly on large boulders, random outcroppings of bedrock, or soft soils without prior approval.
2. Prepare foundation in accordance with Section 208 of the Specifications.
Foundation must be approved in writing by the CO prior to placing the leveling course.
FOUNDATION NOTES
Elevation shown on Sheet 5
Bottom of Ftg.
6" typ.
cl r.
Undisturbed native ground
3'-6"
(4) #4 x cont. Top & Bottom
@ 12" on center
#4 x 3'-2" @ 12" o.c. Place footings on 6" min.
compacted leveling course material meeting the requirements of Foundation Fill (704.01) (Incidental to other Items)
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/2 6/1
9 1 3:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P3
.79 -D
ES
IG
N
OP
EN
B
OT
TO
M.
DW
G;
REGION 10
ALASKAN REGION
PRECAST DETAILS
Mar-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050400-MP 3.79
6" 6"
48'-0" Culvert
49'-0" Footing
End of Culvert, typ.
Mechanical Splice, typical both sides of wall and footing. See DETAIL on this sheet.
(4) Interior Sections @ 8'-2" = 32'-8"8'-2" Exterior Section, typ.
1 Contractor may adjust precast segment lengths shown depending upon setting equipments capabilities. Footing weight is approximately 975 lb/ft.
Mechanical Splice, typ. both sides of footing and wall.
See Detail on this sheet.
Typical Foundation Segments
Splice location at 1/2 height of stem wall
Alternate locations (on each side of stem wall) for Post-Installed Anchors/Plate Alternative. See Details this sheet
Prior to fabricating precast footings submit for approval shop drawings detailing segment lengths, splice connections, proposed concrete mix design, pick locations, and selected connection for culvert.
Other precast/prefabricated footing options that meet size, strength and functionality of concrete footings shown may be submitted for review and approval.
PRECAST FOUNDATION ELEVATION
Not to Scale
TYPICAL PRECAST SEGMENT
Not to Scale
Undisturbed Soil
1 2
PLAN SECTION
ELEVATION
BOLTED ALTERNATE
Footing Segment
Undisturbed Soil
Footing Segment
3/4"Ø A325 Bolts.
7/8"x 1-1/2" vert. slotted holes in flanges, typ.
Footing splice shown wall splice similar.
(2) 1/2"Ø x 8" Headed Concrete Anchors @ 6" o.c.
WT8x20x 0'-10" typical
Face of Footing
ELEVATION
POST-INSTALLED ANCHORS ALTERNATE
1'-3"
6"11 2" 6" 11
2"
11 2
11 2
P/L 5/16" x 8" x 1'-3" w/ 13/16"Ø holes
3/4"Ø x 6" Hilti HAS-E Rod or approved equal.
Embed 3-1/2" and secure w/ approved epoxy system
MECHANICAL SPLICE DETAIL
Not to Scale
Leveling Course
Place precast segments on leveling course
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Rock Weir
EL 193.3
STA 3+07
Rock Weir
EL 194.4
STA 2+83
Rock Weir
EL 195.7
STA 2+59
Rock Weir
EL 197.4
STA 2+35
Rock Rib
STA 2+75
3+00
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/2 6/1
9 1 3:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P3
.79 -D
ES
IG
N
OP
EN
B
OT
TO
M.
DW
G;
REGION 10
ALASKAN REGION
ROCK WEIR DETAILS
Mar-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050400-MP 3.79
ROCK WEIR PLAN - OUTSIDE CULVERT
Not to Scale
FL
O
W
W
W/3 W/3 W/3
Apex
60° m ax.60° max.
Backfill with native streambed material flush with top of surface rocks.
Layout PT.
location
Bank
FLOW
New streambed
Footer Rock.
Excavate and place below streambed as shown
Rock Weir Layout PT. Location (top of rock)
SECTION A-A
Not to Scale
Provide gaps in Surface Rocks in the middle 13 of the channel
Surface and Rocks to be 18"-24" dia.
(Channel Rock Class CR-2 )
4'-0"±
Key rocks into bank
Place Surface Rocks and Footer Rocks as close together as possible so that gaps between any of the rocks are minimized, except as noted.
A
A
Footer Rock, typ.
Surface Rock, typ.
Key in rock weir to stream bank for rock weirs outside of culvert, see DETAIL this sheet.
Place and embed Isolated Boulder, Class CR-2. See sheet 8 for layout locations
(4) Rock Weirs @ ±24' C-C Typical Spacing30° typ.
Construct Rock Weirs from Class CR-2 Channel Rock, typ.
See DETAIL on this sheet for rock weir details outside of culvert
ROCK WEIR PLAN
NOT TO SCALE
Streambed Simulation Rock, Bed Class 3.79 between rock weirs. See sheet 8
FLO
W
Slight contraction to bankfull width just upstream of rock weir.
Construct continuous hardened banks the entire length of the culvert with Class CR-2 Channel Rock
2+80
1 9
Stream Thalweg
Construct Rock Rib from Class CR-2 Channel Rock, typ. See notes on this sheet.
Edge of Bank, typ. Vary bankfull width along length of riffle. See TYPICAL RIFFLE SECTION on Sheet 8
Footing Stem Wall
30°
1 9
2+40 2+60
Existing ground along new stream thalweg
New culvert
Streambed Simulation Rock, Bed Class 3.79 between rock weirs.
See sheet 8
STREAM PROFILE
NOT TO SCALE
FLOW
Surface rock.
Surface and Footer Rocks to be 18"-24" dia.
(Channel Rock Class CR-2 )
FLOW
Riffle
Length Varies
Pool Length
Varies 4' to 6'
3.4%
Streambed grade between weirs
ROCK WEIR PROFILE
NOT TO SCALE
Step Height Varies: 5" to 7"
(4) Rock Weirs
Pool Depth Varies: 4" to 8"
Channel Rock Bank outside of structure. Cover with slash from clearing and grubbing and unsuitable material conserved from excavation.
Place seeding on channel banks.
Typical of both sides.
STA 3+14
Transition Channel Rock banks and Streambed Simulation Rock into existing steam.
STA 3+14
End Channel Rock banks and Streambed Simulation Rock.
Transition into existing steam.
STA 2+35
Begin Channel Rock banks and Streambed Simulation Rock. Tie into existing steambed and banks.
±24' Rock Weir spacing ±24' Rock Weir spacing ±24' Rock Weir spacing
Rib rock will be in contact with the adjacent piece and protrude ±3" from stream bed.
ROCK WEIR & RIB NOTES
Vary direction, shape, and orientation of the ribs. Ribs to be angled 30°± perpendicular to centerline of pipe. Ribs oriented straight across the channel are not desirable
3 Rock Weir & Rib placement is 1'± from designated station shown in profile. The spacing and configuration of rock weirs maybe adjusted in the field by the CO to fit actual streambed conditions.
3 3
Footer rock to control scour.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/2 6/1
9 1 3:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P3
.79 -D
ES
IG
N
OP
EN
B
OT
TO
M.
DW
G;
REGION 10
ALASKAN REGION
STREAM SIMULATION
DETAIL
Mar-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050400-MP 3.79
Construct continuous hardened banks the entire length of the culvert with Channel Rock, Class CR-2. Typical both sides (See FSSS 705.08)
Streambed Simulation Rock, Bed Class 3.79
TYPICAL POOL SECTION
NOT TO SCALE
TYPICAL RIFFLE SECTION
NOT TO SCALE
7'-6"± Bankfull Width
1'-9"± 1'-9"±
Bankfull Width at Riffle Varies: 6'-6"± to 7'-6"±
TYPICAL ROCK WEIR SECTION
NOT TO SCALE
6'-6"± Weir Length
Surface Rocks, typ.
Footer Rocks, typ.
Bank. Slight width contraction just upstream.
See PLAN on sheet 9
New pipe-arch culvert
Top of rock weir beyond
Pool- See PROFILE on sheet 9
New pipe-arch culvert
New pipe-arch culvert
Streambed Simulation Rock, Bed Class 3.79
PROPORTIONS CLASS 3.79
1 UNITS 16" - 6"
2 UNITS 6" - 2"
2 UNITS 2" - 1"
1 UNITS 1" - No. 10 (FINES)
1/2 UNITS <No. 10 (FINES)
BED CLASS 3.79 STREAMBED SIMULATION ROCK
FIELD MIX GUIDE
Construct continuous hardened banks the entire length of the culvert with Channel Rock, Class CR-2. Typical both sides (See FSSS 705.08)
New pipe-arch culvert
TYPICAL ROCK RIB SECTION
NOT TO SCALE
Construct Rock Rib with Channel Rock CR-2 to span Bed Width. Rock Rib to protrude 3" above Stream Bed
Riffle Stream Bed Elevation
Channel dimensions same as above TYPICAL RIFFLE SECTION
Bed Width at Riffle Varies: 5'-6"± to 6'-6"±
2'-3"± 2'-3"±
Varies:
1'-9" to 2'-3"
Varies:
1'-9" to 2'-3"
Varies: 21"-27"
±2'-0"
Inter-mix streambed material as directed by CO during placement of Channel Rock Bank to seal voids throughout the section.
FOOTNOTES:
FOOTNOTES:
The final channel bottom should be a dense, well interlocked streambed with low permeability. Compact each layer and fill surface voids by washing in fine material. Use water pressure, tamping rods, and similar hand operated equipment to force fine material into all surface voids.
THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT THE STREAM FLOW
DOES NOT GO SUBSURFACE THROUGH THE CULVERT FOR A 48 HOUR
PERIOD AFTER RE-WATERING.
Native material meeting the gradation for the specified Bed Class, and Channel Rock may be salvaged and incorporated into the simulated streambed.
1'-6" min.
1'-6" min.
ISOLATED BOULDER LOCATIONS
STATION
OFFSET
DISTANCE
FROM CL
PIPE (FT)
OFFSET
DIRECTION
BOULDER
DIAMETER SIZE
(IN)
PROTRUSION
ABOVE
SURFACE
(IN)
2+42 2.0' LEFT 18" - 24" (CLASS CR-2) 9" - 12"
2+45 1.9' RIGHT 18" - 24" (CLASS CR-2) 9" - 12"
2+50 1.2' LEFT 18" - 24" (CLASS CR-2) 9" - 12"
2+53 2.5' RIGHT 18" - 24" (CLASS CR-2) 9" - 12"
2+55 1.7' LEFT 18" - 24" (CLASS CR-2) 9" - 12"
2+67 1.2' RIGHT 18" - 24" (CLASS CR-2) 9" - 12"
2+69 1.3' LEFT 18" - 24" (CLASS CR-2) 9" - 12"
2+74 2.0' LEFT 18" - 24" (CLASS CR-2) 9" - 12"
2+79 2.6' LEFT 18" - 24" (CLASS CR-2) 9" - 12"
2+93 1.6' RIGHT 18" - 24" (CLASS CR-2) 9" - 12"
2+96 2.8' RIGHT 18" - 24" (CLASS CR-2) 9" - 12"
3+05 1.2' LEFT 18" - 24" (CLASS CR-2) 9" - 12"
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/2 6/1
9 1 3:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P3
.79 -D
ES
IG
N
OP
EN
B
OT
TO
M.
DW
G;
REGION 10
ALASKAN REGION
DEWATERING
REQUIREMENTS
Mar-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050400-MP 3.79
BYPASS DAM PROFILE VIEW
Impervious membrane key trench, fill with clean gravel as needed to control seepage under impervious membrane
Anchor impervious membrane (sandbags, stones, etc.)
Impervious membrane
Sandbags
Bypass pipe 18" diameter minimum
Streambed
Existing Culvert
PUMP
PUMP
Top of excavation (estimated)
Remove sediment from pumped water using filtration (e.g. "siltbags"), dispersion onto landscape (e.g. using perforated pipe), settling basin and/or addition of flocculates.
modify as needed to meet downstream turbidity requirements.
To downstream energy dissipater
Sandbag by-pass & "feeder" dams location to be staked by contractor and approved by the CO
By-pass pump use for installing and removing gravity by-pass dams and diversions
Construct backwater dam to prevent water from entering work area from downstream
D/S Flo w
(No turbidity)
Energy dissipater as needed to prevent turbidity (e.g.
plastic sheets, stones).
By-pass discharge location to be staked by contractor and approved by CO.
PUMP
Stream by-pass pipe. Diameter as specified, watertight joints, minimum grade 2% downstream.
PLAN
Upstream sump pump place in cutoff trench or sump at depth needed to dewater excavation
Sedimats- details & number of rows per manufacturer
Elbow joints as needed, typ.
Edge of exiting road, typ.
Edge of active channel, typ.
BYPASS DAM ELEVATION VIEW
4' Overflow
12" min. Varies
Sandbags
Streambed Pipe as needed
GEOTEXTILE-WRAPPED STRAW
BALE SEDIMENT CONTROL WEIR
SECTION VIEW PLAN VIEW
STREAM FLOW
Granular Backfill Section 703.03(a)
Straw bales
Granular Backfill Section 703.03(a)
Straw bales
Geotextile mirafi 140N or equal
Stream Flow
SANDBAG BYPASS DAM DETAILS
Anti-seep collar. place anti-seep collar over membrane & pipe, then cut membrane to allow water through pipe.
6 mil plastic sheeting minimum
Bypass pipe
Downstream sump pump place in cutoff trench or sump at depth needed to dewater excavation
NOTES:
1. Design dewatering flow for construction is 55 CFS.
2. The plan shown here is intended to represent the general dewatering requirements and not applicable to a specific site.
submit a plan specific to the site.
3. Contractor to determine the size of the bypass pipe based on the specified flow.
4. Ensure that the bypass pipe and dam are leak-proof. Do not proceed with construction until the implemented dewatering plan has been inspected and accepted by the CO in writing.
5. Ensure pumps are be clean and free of leaks and placed in a containment kit.
6. Excavate draw down pool for sumps a minimum of 2 feet below the bottom of the excavation and a minimum of 5 feet in diameter.
7. Maintain all elements of the operation in order to dewater the foundation, facilitate construction, prevent harm to aquatic organisms (not just fish) and prevent sediment and turbidity from entering the stream. Construct the dewatering system in a manner which enables USFS biologists to collect and transport organisms from the live channel, just before completion of the diversion dam.
8. Operate pumps (preferably electric) downstream of the bypass dam if the dam does not seal thoroughly. Maintain a pump running 24 hours a day in the downstream sediment retention dam to divert water containing sediment to the forest floor where it will be filtered before entering back into the stream.
Leave pumps in position on site even if water discharge drops considerably, to be prepared for storm flows.
Provide ditches and/or sumps along outside of foundation as necessary to dewater foundations
New Culvert Footings
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
12+40.00
12+55.66
12+80.00
13+00.00
13+20.00
13+40.76
-20 0 20
-20 0 20
-20 0 20
-20 0 20
-20 0 20
-20 0 20
Existing ground, typ.
8'8'
Typ.Typ.
Match existing cross slopes
-2.0% Typ. -2.0% Typ.
1.25
Typical fill slope, both sides
NFSR 2050400 MP 3.79
ROAD CROSS SECTIONS
AOP CULVERT REPLACEMENT
CONSULTING ENGINEERS & LAND SURVEYORS
3203 Russell Street, Missoula, Montana 59801-8591 Phone 406/721-4320 Fax 406/549-6371
A& , P.C.DJ
AutoCAD SHX Text
PREPARED BY :
SHEET XS1 OF XS2
13+60.00
13+78.11
14+00.00
14+20.00
14+40.00
-20 0 20
-20 0 20
-20 0 20
-20 0 20
-20 0 20
Match existing cross slopes
Existing ground, typ.
8'8'
Typ.Typ.
-2.0% Typ. -2.0% Typ.
1.25
Typical fill slope, both sides
NFSR 2050400 MP 3.79
ROAD CROSS SECTIONS
AOP CULVERT REPLACEMENT
CONSULTING ENGINEERS & LAND SURVEYORS
3203 Russell Street, Missoula, Montana 59801-8591 Phone 406/721-4320 Fax 406/549-6371
A& , P.C.DJ
AutoCAD SHX Text
PREPARED BY :
SHEET XS2 OF XS2
| Sheets and Views |
| 1 3.79 COVER |
| 2 QTY |
| 3 TYP SECT |
| 4 ROAD |
| 5 CULVERT |
| 6 EXCAVATION |
| 7 FOOTING |
| 8 PRECAST |
| 9 STREAM |
| 10 STREAM (2) |
| 11 DEWATER |
| XSEC1 |
| XSEC1 (2) |
| 2019-06-06T13:08:32-0800 | |
| TYLER GUNN |
| 2019-06-11T10:59:18-0800 | |
| LEONARD JOB, P.E. |
File details come from the government source that posted it. Updated .