U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE, REGION 10
TONGASS NATIONAL FOREST
THORNE BAY RANGER DISTRICT
CONSTRUCTION PLANS FOR:
AOP CULVERT REPLACEMENT
NFSR 2050000 MP 10.36
LOCATION MAP
VICINITY MAP
FOREST ENGINEER
APPROVED BY:
DATETONGASS NATIONAL FOREST
DISTRICT RANGER
DATETHORNE BAY DISTRICT
RECOMMENDED BY:
PREPARED BY:
PROJECT
LOCATION
JUNEAU
Craig
KEY MAP
140°142°
58°
138° 136°
Sitka
132°134°136°138°140°142°
60°
Yakutat
C A N
A D
A
A
LA
S K A
62°
Skagway
56°
54°
132°134°
Ketchikan
Wrangell
Petersburg
128°130°
60°
58°
HOONAH
PROJECT
LOCATION
MATERIAL
SOURCE
THORNE BAY
K
LA
W O
C K
MATERIAL SOURCES
GOVERNMENT FURNISHED
CHANNEL ROCK
RIPRAP
FOUNDATION FILL
WASTE SITE
CONTRACTOR FURNISHED
STREAMBED SIMULATION ROCK
ALL OTHER MATERIALS ARE
CONTRACTOR FURNISHED
INDEX TO SHEETS
NO. DESCRIPTION
1 TITLE SHEET
SCHEDULE OF QUANTITIES & GENERAL
NOTES
TYPICAL ROADWAY SECTION & POINT
TABLES
4 ROAD PLAN & PROFILE
5 ROAD SHOULDER & GUARDRAIL PLAN
6 BRIDGE GENERAL LAYOUT
7 STRUCTURE EXCAVATION & BACKFILL
8-9 RIPRAP PLAN & DETAILS
10 STREAM PLAN & PROFILE
11 STREAM DETAILS
12 FOUNDATION DETAILS
13 DEWATERING REQUIREMENTS
APPENDIX A
A1-A10 STANDARD ABUTMENT DETAILS
APPENDIX B
B1-B5 STANDARD BRIDGE DETAILS
APPENDIX C
XS1 ROAD CROSS SECTIONSNOT FOR CONSTRUCTION
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 3/1
9 1 0:
M
IK
EJ
F :\6
4 U
SF
S
- T
ON
GA
SS
N F
AO
P
SI
TE
S (1
4) \D
W G\
-R D2
-M
P1 0.3
6-
DE
SI
GN
_B
RI
DG
E
NO
S
KE
W
.D W
G;
REGION 10
ALASKAN REGION
SCHEDULE OF
QUANTITIES &
GENERAL NOTES
Jul-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
RD 2050000-MP 10.36
SCHEDULE OF QUANTITIES
CQ= CONTRACT QUANTITY (SEE SECTION 109.02(B) OF THE STANDARD SPECIFICATIONS);
OPTIONAL ITEMS
20501 ROCK EXCAVATION CUBIC YARD 10
SUBSURFACE CONDITIONS HAVE NOT BEEN ASSESSED.
BEDROCK MAY BE ENCOUNTERED AND ROCK EXCAVATION
MAY BE REQUIRED
GENERAL NOTES
DESIGN: This structure is designed for HL-93 live loading in accordance with AASHTO LRFD Bridge Design Specifications, 8th Edition.
HYDROLOGY AND HYDRAULICS: This structure has been designed to pass a Q100 flood event with more than 5' of freeboard from upstream side of bridge. Flow data is provided on Sheet 6.
SPECIFICATIONS: Construct the project in compliance with Federal Highway Administration Standard Specifications for Construction of Road and Bridges on Federal Highway Projects (FP-14) and applicable Forest Service Supplemental Specifications.
ROAD WORK: Depths of all materials are given as final compacted depths. Remove all berms, existing or created, unless designated to remain, to allow drainage of water from the traveled way.
DEWATERING & EROSION CONTROL PLAN: Submit a dewatering and soil erosion and sediment control plan to the contracting officer for approval at least fifteen (15) days prior to beginning work. See Section 157 of the Supplemental Specifications, the notes on Sheet 7, and the general requirements shown on Sheet 13. Construct temporary means to divert the flow of the live stream as necessary to perform work.
Do not pump water from excavations directly into the live stream.
DISPOSAL: All materials designated for removal become the property of the contractor and are to be disposed of by removing from the forest in an environmentally safe manner in accordance with all local, state and federal requirements. Dispose of excess or unsuitable material at the location designated in FSSS Section 105. Hauling of excess or unsuitable material is incidental to associated work.
TEMPORARY TRAFFIC CONTROL: Submit a temporary traffic control plan to the Contracting Officer for approval at least 30 days prior to intended use.
IN-STREAM WORK: All in-stream work will be done between June 15th and September 1st. Allowance shall be given to the Forest Service to capture and remove fish and other aquatic organisms from within the construction work area prior to and during work activities.
EQUIPMENT STORAGE: Storage of all equipment on government lands will be at a location approved by the CO.
SEEDING: Seed and mulch all disturbed soil that is not within travel way or stream channel. Use Tongass Seed Mix. See FSSS Section 625.
SEE SHEET A1 & B1 FOR
ADDITIONAL GENERAL NOTES
ITEM
NO. ITEM DESCRIPTION UNIT QUANTITY REMARKS
15101 MOBILIZATION LUMP SUM ALL
TRAFFIC CONTROL, FIRE PROTECTION, EQUIPMENT CLEANING,
AND ANY MAINTENANCE OF EXISTING NFS ROADS FOR
CONTRACTOR ACCESS IS INDIRECT TO THIS PAY ITEM
15221 CONSTRUCTION SURVEY AND STAKING LUMP SUM ALL
15713 SOIL EROSION & POLLUTION CONTROL LUMP SUM ALL INCLUDES DEWATERING. SEE GENERAL NOTES
20301
REMOVAL OF EXISTING CORRUGATED STEEL
PIPE, METHOD A EACH 1
20802 FOUNDATION FILL CUBIC YARD 10 CQ GOVERNMENT SOURCE.
20806 STRUCTURE EXCAVATION LUMP SUM ALL INCLUDES HAUL & DISPOSAL OF EXCESS & UNSUITABLE
MATERIAL
25101 PLACED RIPRAP, CLASS 3 CUBIC YARD 180 CQ GOVERNMENT SOURCE.
30207 CRUSHED AGGREGATE, SURFACING, METHOD 1 CUBIC YARD 88 CQ GOVERNMENT SOURCE. GRADATION MUST BE APPROVED BY
THE CO. COMPACTION PER FSSS 302.05
55601 THRIE BEAM BRIDGE RAIL, TYPE 2, CLASS B LINEAR
FOOT
55702
TREATED STRUCTURAL TIMBER & LUMBER,
RUNNING PLANKS
MBF 3.24
55703
TREATED STRUCTURAL TIMBER & LUMBER,
GLUED LAMINATED, DECK PANELS MBF 6.37
55704
TREATED STRUCTURAL TIMBER & LUMBER,
GLUED LAMINATED, SUBSTRUCTURE &
BACKWALL
MBF 3.86 ALTERNATE SUBSTRUCTURE MAY BE USED. SEE APPENDIX A
57101
STEEL PREFABRICATED BRIDGE
SUPERSTRUCTURE, DESIGN, FABRICATE,
TRANSPORT, AND INSTALL
EACH 1 SEE APPENDIX B
61702
TERMINAL SECTION, FLARED TERMINAL, TYPE 2,
CLASS B
EACH 4
61706
GUARDRAIL TRANSITION SECTION, TYPE 2,
CLASS B
EACH 4
62504 SEEDING, DRY METHOD LUMP SUM ALL
USE TONGASS SEED MIX. SEE FSSS SECTION 625.
APPROXIMATELY 3500 SQ FT
64802
PLACED STREAMBED SIMULATION MATERIAL BED
CLASS 10.36, METHOD A CUBIC YARD 80 CQ
COMMERCIAL SOURCE. SEE SHEET 11 FOR GRADATION
REQUIREMENTS. MATERIAL FROM THE EXCAVATION MEETING
THE GRADATION FOR BED CLASS 10.36 MAY BE SALVAGED
AND INCORPORATED INTO THE SIMULATED STREAMBED.
64804
PLACED STREAMBED CHANNEL ROCK FOR ROCK
WEIRS & ISOLATED BOULDERS, CLASS CR-3,
METHOD A
CUBIC YARD 10 CQ
GOVERNMENT SOURCE. SOME SORTING WILL BE REQUIRED.
ROCK SALVAGED FROM THE EXCAVATION MEETING THE
GRADATION FOR CLASS CR-3 MAY BE SALVAGED AND
INCORPORATED INTO THE SIMULATED STREAMBED.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
CONTROL POINT TABLE
POINT #
CP-1
CP-2
CP-3
NORTHING
1447901.58
1447894.84
1447841.42
EASTING
2796313.19
2796196.00
2795763.50
ELEVATION
178.43
178.49
173.50
DESCRIPTION
SET-RPC
SET-RPC
SET-RPC
CP-1
CP-2
CP-3
S °5
'3
"W
.7
S °4
'3
"W
.3
LAYOUT POINTS
POINT #
NORTHING
1447873.4728
1447869.7306
EASTING
2796096.4138
2796026.0132
ELEVATION
169.13
169.13
DESCRIPTION
ABUTMENT 1 - BOTTOM OF SILL
ABUTMENT 2 - BOTTOM OF SILL
CENTERLINE POINTS
POINT #
NORTHING
1447888.0207
1447885.1429
1447883.4465
1447880.8158
1447880.1883
1447878.1397
1447875.4300
1447873.4728
1447869.7305
1447868.6548
1447867.8303
1447866.3998
1447864.5159
EASTING
2796335.4354
2796227.1281
2796207.2004
2796182.3288
2796176.9790
2796158.2410
2796127.6087
2796096.4138
2796026.0102
2796005.7712
2795990.2620
2795963.3498
2795927.9087
ELEVATION
177.90
177.42
176.53
176.32
175.64
174.90
174.57
174.57
174.67
174.76
174.78
174.43
DESCRIPTION
STA 10+31.61 CL ROAD - PC CURVE
STA 11+40 CL ROAD - BEGIN CONSTRUCTION
STA 11+60 CL ROAD
STA 11+85.01 CL ROAD - PT CURVE
STA 11+90.40 CL ROAD - PC CURVE
STA 12+09 CL ROAD
STA 12+40 CL ROAD
STA 12+71.26 CL BRG. ABUT. 1
STA 13+41.76 CL BRG. ABUT. 2
STA 13+62 CL ROAD
STA 13+78 CL ROAD
STA 14+05 CL ROAD
STA 14+40 CL ROAD - END CONSTRUCTION
LAYOUT POINTS
POINT #
NORTHING
1447840.8009
EASTING
2796054.6906
ELEVATION
160.60
DESCRIPTION
TOP OF ROCK WEIR
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 3/1
9 1 0:
M
IK
EJ
F :\6
4 U
SF
S
- T
ON
GA
SS
N F
AO
P
SI
TE
S (1
4) \D
W G\
-R D2
-M
P1 0.3
6-
DE
SI
GN
_B
RI
DG
E
NO
S
KE
W
.D W
G;
REGION 10
ALASKAN REGION
TYPICAL ROADWAY
SECTION & POINT
TABLES
Jul-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
RD 2050000-MP 10.36
TYPICAL ROAD SECTION
NOT TO SCALE
2%
Centerline Road
Profile grade
8'-0" 8'-0"
16'-0"
2%
1.5
Clearing Limits
Clear to: Toe of Fill, Cut Daylight, or 5' min. shown.
5'-0" min.
Crushed Aggregate Surfacing 6" Compacted Thickness
5'-0" min.
1.5
FL
OW
BRIDGE LAYOUT POINTS
ROAD CENTERLINE POINTS
See Sheet 12 for location of BRIDGE LAYOUT POINTS
SURVEY CONTROL POINTS
SET-RPC = Red Plastic Cap Control Point set by DJ&A.
See PROJECT CONTROL MAP for location of CONTROL POINTS.
PROJECT CONTROL MAP
Scale: 1" = 100'
ROCK WEIR LAYOUT POINTS
See Sheet 10 for location of ROCK WEIR LAYOUT POINTS
Centerline Road Varies:
8'-0" min to 10'-7" max Varies:
8'-0" min to 10'-7" max
Varies:
16'-0" min to 21'-2"
3.58'
2'
3.58'
2'
2%
Profile grade
2%
Crushed Aggregate Surfacing 6" Compacted Thickness
1.5
1.5
STA 11+40 to STA 12+08 STA 14+05 to STA 14+40
STA 12+08 to BRIDGE BRIDGE to STA 14+05
Clearing Limits
Clear to: Toe of Fill, Cut Daylight, or 5' min. shown.
5'-0" min.5'-0" min.
TYPICAL ROAD SECTION
NOT TO SCALE
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
CP-2
11+00 12+00 13+00 14+00 15+00
PC
: 1
.4
PT
.7
PT
: 1
.0
CURVE DATA:
R=1200.00
L=76.38' Δ=3°38'48"
CURVE DATA:
R=1100.00 L=153.40' Δ=7°59'25"
11+00 12+00 13+00 14+00 15+00
70.00' VC
B V C S
.0
B V C E
.1
E V C S
.0
E V C E
.6
PVI STA:12+30.00
PVI ELEV:174.79
K: 21.15
40.00' VC
B V C S
.0
B V C E
.7
E V C S
.0
E V C E
.6
PVI STA:14+00.00
PVI ELEV:174.88
K: 24.27
35.00' VC
B V C S
.5
B V C E
.8
E V C S
.5
E V C E
.8
PVI STA:11+60.00
PVI ELEV:177.50
K: 18.74
S T A
.0
E L
.9
STA = 12+70.51
EL = 174.57
S T A
.5
E L
.5
S T A
.0
E L
.4
-0.00%
-0.56%
-2.00% -3.87%
0.54% -1.11%
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 3/1
9 1 0:
M
IK
EJ
F :\6
4 U
SF
S
- T
ON
GA
SS
N F
AO
P
SI
TE
S (1
4) \D
W G\
-R D2
-M
P1 0.3
6-
DE
SI
GN
_B
RI
DG
E
NO
S
KE
W
.D W
G;
REGION 10
ALASKAN REGION
ROAD PLAN &
PROFILE
Jul-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
RD 2050000-MP 10.36
PLAN
PROFILE
LEGEND
Existing Edge of Shoulder
Existing Culvert
Existing Edge of Water Major Contour (5') Minor Contour (1')
EXISTING FEATURES
Existing Edge of Road
> > Existing Ditch
FLO
W
Remove & Dispose Existing Corrugated Steel Pipe
Centerline Road Finished Grade
Existing Ground at Centerline Road
Centerline Road
New Edge of Road
STA 14+40
END ROAD WORK
MATCH EXISTING
STA 11+20
END ROAD WORK
MATCH EXISTING
Remove & dispose existing culvert
PC: 10+31.61
20'
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
12+00 13+00 14+00
STA:12+51
OFF:11.7'L
STA:12+41
OFF:14.5'L
STA:12+36
OFF:14.6'L
STA:12+08
OFF:8.0'L
STA:12+09
OFF:8.0'R
STA:12+35
OFF:13.8'R
STA:12+40
OFF:13.9'R
STA:12+51
OFF:11.5'R
STA:13+62
OFF:11.6'L
STA:13+73
OFF:14.2'L
STA:13+78
OFF:14.2'L
STA:14+05
OFF:8.0'L
STA:14+05
OFF:8.0'R
STA:13+78
OFF:14.2'R
STA:13+73
OFF:14.2'R
STA:13+62
OFF:11.6'R
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 3/1
9 1 0:
M
IK
EJ
F :\6
4 U
SF
S
- T
ON
GA
SS
N F
AO
P
SI
TE
S (1
4) \D
W G\
-R D2
-M
P1 0.3
6-
DE
SI
GN
_B
RI
DG
E
NO
S
KE
W
.D W
G;
REGION 10
ALASKAN REGION
ROAD SHOULDER &
GUARDRAIL PLAIN
Jul-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
RD 2050000-MP 10.36
SHOULDER & GUARDRAIL PLAN
77' Bridge Rail Pay Length17'-214"
Transition Section
12'-6"
Terminal
17'-214"
Transition Section
12'-6"
Terminal
Centerline Road
New Edge of Road
R
R 26'
R 26'
R
SEE SHEET B7-B12 FOR BRIDGE RAIL
& APPROACH GUARDRAIL DETAILS
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
13+00
CURVE DATA:
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 3/1
9 1 0:
M
IK
EJ
F :\6
4 U
SF
S
- T
ON
GA
SS
N F
AO
P
SI
TE
S (1
4) \D
W G\
-R D2
-M
P1 0.3
6-
DE
SI
GN
_B
RI
DG
E
NO
S
KE
W
.D W
G;
REGION 10
ALASKAN REGION
BRIDGE GENERAL
LAYOUT
Jul-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
RD 2050000-MP 10.36
PLANSCALE IN FEET
0 10 20
Centerline Road
New Edge of Road
S T A
.2
C en te rl in e B rg
A b u t.
S T A
.7
C en te rl in e B rg
A b u t.
Remove & Dispose Existing Culvert
70.50' Centerline Bearing to Centerline Bearing
Glu-Lam Bearing Block on Glu-Lam Sill
Centerline Road Finished Grade
Riprap, typ.
ELEVATION
Scale: 1"=20'
HYDRAULIC DATA:
Q2 = 129.6 cfs
Avg. depth = 2.1' Bankfull width = 17'
Q100 = 446.9 cfs Avg. depth = 3.5'
Q100= 164.01 at upstream edge of bridge
6.9' min.
Freeboard at upstream edge of bridge
Centerline Brg.
Abutment 1
FG EL = 174.57
Centerline Brg.
Abutment 2
FG EL = 174.57
0%
Existing ground at Centerline Road
TYPICAL BRIDGE SECTION
Not to scale
FLO
W
Streambed Simulation Rock
Riprap Bank, typ.
See Sheet 8
See Appendix B for Bridge Superstructure Details
Approach Guardrail
Rock Bank, typ.
17'-3" Out-to-Out Bridge
8'-0"
51 8
Centerline Road Centerline Structure
3x12 Treated Timber Running Plank, typ.
5-1/8" x 47-5/8" Treated Glu-lam Deck Panel
4'-0"
W36x182 Steel Girder, typ.
Profile Grade
Bent Plate Diaphragm, typ.
8'-0"
Thrie Beam Bridge Railing, typ.
5'-0" 4'-0"
70.5' Centerline Bearing to Centerline Bearing
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 3/1
9 1 0:
M
IK
EJ
F :\6
4 U
SF
S
- T
ON
GA
SS
N F
AO
P
SI
TE
S (1
4) \D
W G\
-R D2
-M
P1 0.3
6-
DE
SI
GN
_B
RI
DG
E
NO
S
KE
W
.D W
G;
REGION 10
ALASKAN REGION
STRUCTURE
EXCAVATION &
BACKFILL
Jul-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
RD 2050000-MP 10.36
STRUCTURE EXCAVATION NOTES:
1. Complete structure excavation in accordance with FP-14 Section 208.
2. Limits of excavation are shown for information purposes only. The contractor is solely responsible for excavation support and compliance with all applicable OSHA regulations.
3. Notify the CO immediately if bedrock or soft, unsuitable soils are encountered.
4. The estimated volume of structure excavation is based on the excavation limits shown in structure excavation section above. This quantity does not include any streambed simulation of earthwork necessary for stream channel re-grading.
DEWATERING AND SOIL EROSION CONTROL NOTES:
1. Protect against soil erosion and sedimentation during construction in accordance with
FP-14 Section 157, the project permits, Forest Service Handbook (FSH) 2509.22, Region 10 BMPs for Erosion Control, and the Guidance for the Invasive Plant Managment Program (Krosse 2017). Prepare and submit a soil erosion and sediment control plan to the CO for approval.
2. Dewater the excavation in accordance with FP-14 Sections 208 and 157 and the requirements on sheet 13.
3. Contractor should anticipate water infiltrating the excavations.
4. Structure excavation, riprap and rock rib placement, and backfill are to be completed in accordance with the Contract Specifications. Standing or running water in the work area does not relieve the contractor from meeting the specifications.
5. Dewatering is the sole responsibility of the contractor. Develop and submit to the CO a project-specific dewatering and sediment control plan with the excavation plan for approval. Sheet 13 illustrates the general dewatering requirements and possible methods and equipment and is not considered adequate or complete for this project.
Develop and submit a project-specific dewatering plan including drawings and a written outline illustrating and describing proposed layout, methods, and equipment. See sheet 13 for dewatering flows during construction. Approval of the contractor's dewatering plan does not relieve the contractor from completing the work as required. If the contractor's methods are not producing adequate results, the contractor must re-evaluate and submit another dewatering plan. Re-submittal of the dewatering plan, if required, is incidental to the work.
STRUCTURE BACKFILL NOTES:
1. Structural Backfill limits shown here are the minimum requirements. Place
Structural Backfill in accordance with FP-14 Section 208, and as shown on these Plans, with material meeting the requirements of Subsection 704.04.
Compact Structural Backfill material in accordance with FP-14 Subsection
208.10. Any material outside the Structural Backfill limits shown is considered Road Embankment and the material must meet the requirements of FP-14 Subsection 704.06.
2. It is assumed that material conserved from the structure excavation at this site will meet the requirement for Structural Backfill (704.04) or Road Embankment (704.06). Some mixing and sorting may be required to meet the material specification. Haul and dispose unsuitable and excess material to the designated waste site. Haul and disposal of unsuitable and excess material is paid with Item 20806.
STRUCTURE EXCAVATION
Not to Scale
LOOKING UPSTREAM
Approximated limits of excavation, typ.
See STRUCTURE
EXCAVATION NOTE 2
Finish Ground Profile
Structure Excavation Area
960 CY
Class 3 Riprap.
See Sheet 8
Existing Ground (Representative)
1' typ.
ABUT. 1 ABUT. 2
Existing Culvert
Structural Backfill (704.04) behind bridge. See
"STRUCTURE BACKFILL
NOTES" on this sheet.
Road Embankment.
Material meeting FP-14 Specification 704.06 outside of the Structural Backfill limits shown.
6" Foundation Fill leveling course
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
6+
170175
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 3/1
9 1 0:
M
IK
EJ
F :\6
4 U
SF
S
- T
ON
GA
SS
N F
AO
P
SI
TE
S (1
4) \D
W G\
-R D2
-M
P1 0.3
6-
DE
SI
GN
_B
RI
DG
E
NO
S
KE
W
S
TR
EA
M.
DW
G;
REGION 10
ALASKAN REGION
RIPRAP PLAN
Jul-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050000-MP 10.36
17'Bankfull Width
FLO
W
Class 3 Riprap, typ.
Stream Thalweg
RIPRAP & STREAM PLAN
Centerline of Road/Centerline Structure
Wingwall Footing, typ.
Sill, typ.
NOT TO SCALE
A b u tm en t
A b u tm en t
2.1' Bank HeightClass 3 Riprap, See DETAIL on this sheet
TYPICAL CHANNEL SECTION
NOT TO SCALE
B en ch
B en ch
Glu-lam Sill, Typ.
Rock Bank to be installed after placement of Riprap slopes. See sheet 10
Bank
Bank
Toe of Riprap
Rock Bank to be installed after placement of Riprap slopes. See sheet 10
15°
5+
5+
17' Bankfull Width
12.2' Bed Width
32.1' Toe - Toe Riprap
Perpindicular to Channel Streambed Simulation Rock, Bed Class
10.36. See sheet 11
1.5H:1V 1.5H:1V
Rock Weir. See sheet 10
Existing Ground
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 3/1
9 1 0:
M
IK
EJ
F :\6
4 U
SF
S
- T
ON
GA
SS
N F
AO
P
SI
TE
S (1
4) \D
W G\
-R D2
-M
P1 0.3
6-
DE
SI
GN
_B
RI
DG
E
NO
S
KE
W
S
TR
EA
M.
DW
G;
REGION 10
ALASKAN REGION
RIPRAP DETAILS
Jul-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050000-MP 10.36
RIPRAP SECTION
NOT TO SCALE
3' 20.5' Toe-Toe Riprap
3'
Class 3 Riprap, typ. Streambed Simulation
Rock, Bed Class
10.36. See sheet 11
Abut. 2 Wingwall Footing
14.3'
Rock Bank to be installed after placement of Riprap slopes. See sheet 10
EL. 169.13
EL. 159.60
Abut. 1 Wingwall Footing
1.5H:1V
14.3'
Toe of Riprap
T yp
70.56' 3'Typ.
66.5'
70.56'
1.5H:1V
EL. 169.13
RIPRAP SECTION
NOT TO SCALE
3' 30.8' Toe-Toe Riprap
3'
Class 3 Riprap, typ. Streambed Simulation
Rock, Bed Class
10.36. See sheet 11
13.8'
Rock Bank to be installed after placement of Riprap slopes. See sheet 10
EL. 169.13
Abut. 1 Glu-Lam Sill
1.5H:1V
13.8'
T yp
4' Bench
4' Bench
3'Typ.
1.5H:1V
EL. 169.13
RIPRAP SECTION
NOT TO SCALE
3' 31.7' Toe-Toe Riprap
3'
Class 3 Riprap, typ. Streambed Simulation
Rock, Bed Class
10.36. See sheet 11
Abut. 2 Wingwall Footing
13.4'
Rock Bank to be installed after placement of Riprap slopes. See sheet 10
Abut. 1 Wingwall Footing
1.5H:1V
13.4'
T yp
3'Typ.
1.5H:1V
EL. 159.90
Toe of Riprap
EL. 165.90
Top of Riprap
EL. 166.20
Top of Riprap
EL. 160.20
Toe of Riprap
EL. 165.60
Top of Riprap
9'9'
9'9'
9'9'
Existing ground
Existing ground
Existing ground
Abut. 2 Glu-Lam Sill
6.03'
EL. 169.13EL. 169.13
6.03'
Outline of Sill beyond, typ.
6.03' 6.03'
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
6+00
Layout Pt.
Culvert
5+10 5+20 5+40 5+60 5+80 6+00 6+20
Rock Weir
EL 160.6
STA 5+31
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 3/1
9 1 0:
M
IK
EJ
F :\6
4 U
SF
S
- T
ON
GA
SS
N F
AO
P
SI
TE
S (1
4) \D
W G\
-R D2
-M
P1 0.3
6-
DE
SI
GN
_B
RI
DG
E
NO
S
KE
W
S
TR
EA
M.
DW
G;
REGION 10
ALASKAN REGION
STREAM PLAN &
PROFILE
Jul-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050000-MP 10.36
STREAM PLAN
B an kf u ll
W id th
FLOW
Construct Rock Bank.
See DETAIL on this sheet
Stream Thalweg
Streambed Simulation Rock, Bed Class 10.36. See sheet 11
B an k
Abutment 1
B an k
5+80
Class 3 Riprap, typ.
Place and embed Isolated Boulder, Class CR-3. See sheet 11 for layout locations
Abutment 2
5+605+40
5+
STREAM PROFILE
NOT TO SCALE
Existing ground along stream thalweg
Bridge Abutment
Streambed Simulation Rock, Bed Class 10.36.
See sheet 10
Top of Rock Bank
2.0%
Channel Bottom EL.
Toe of Riprap EL.
STA 6+00 End Simulation Rock. Transition into existing steam.
STA 5+31 Begin Simulation Rock. Tie into existing steam.
10'
TYPICAL CHANNEL DIMENSIONS
± 17' Bankfull
±1' Typ.
Top of Bank Width Varies
Rock Bank. See DETAIL on this sheet
Class 3 Riprap, typ.
Streambed Simulation Rock, Bed Class 10.36.
18" min. thickness. See FOOTNOTES on sheet 11
Toe of Riprap EL.
Channel Bottom EL.
Channel Bottom EL
Toe of Riprap EL
±2.1'
Toe of Riprap EL.
Channel Bottom EL.
ROCK BANK DETAIL
NOT TO SCALE
Streambed
Construct Rock Banks with Class 3 Riprap intermixed with Stream Simulation Rock and fines
Construct Rock Weirs from Class CR-3 Channel Rock, typ.
See DETAIL on sheet 11
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 3/1
9 1 0:
M
IK
EJ
F :\6
4 U
SF
S
- T
ON
GA
SS
N F
AO
P
SI
TE
S (1
4) \D
W G\
-R D2
-M
P1 0.3
6-
DE
SI
GN
_B
RI
DG
E
NO
S
KE
W
S
TR
EA
M.
DW
G;
REGION 10
ALASKAN REGION
STREAM DETAILS
Jul-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050000-MP 10.36
PROPORTIONS CLASS 10.36
1 UNITS 10" - 4"
2 UNITS 4" - 2"
2 UNITS 2" - 1"
1 UNITS 1" - No. 10 (Fines)"
1/2 UNITS <No. 10 (FINES)
BED CLASS 10.36 STREAMBED SIMULATION ROCK
FIELD MIX GUIDE
ROCK WEIR PLAN
Not to Scale
FL
O
W
W
W/3 W/3 W/3
Apex
60° m ax.60° max.
Backfill with native streambed material flush with top of surface rocks.
Layout PT.
location
Bank
Provide gaps in Surface Rocks in the middle 13 of the channel
4'-0"±
Key rocks into bank
Place Surface Rocks and Footer Rocks as close together as possible so that gaps between any of the rocks are minimized, except as noted.
FLOW
B u ry
1 2 R oc k
D ia m et er
Channel Rock, Class CR-3. Extend above streambed as shown.
New Streambed
ISOLATED BOULDER DETAIL
Not to Scale
FLOW
Surface rock.
Surface and Footer Rocks to be 24"-30" dia.
(Channel Rock Class CR-3 )
FLOW
Pool Length
Varies 6' to 8'
2.0%
ROCK WEIR PROFILE
NOT TO SCALE
Step Height Varies: 4" to 6"
Pool Depth Varies: 8" to 12"
Footer rock to control scour.
Layout PT.
location
See sheet 3 for Rock Weir Layout Point Coordinates
FOOTNOTES:
1 The final channel bottom should be a dense, well interlocked streambed with low permeability.
Compact each layer and fill surface voids by washing in fine material. Use water pressure, tamping rods, and similar hand operated equipment to force fine material into all surface voids.
THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT THE STREAM FLOW DOES NOT GO
SUBSURFACE THROUGH THE CULVERT FOR A 48 HOUR PERIOD AFTER RE-WATERING.
Native material meeting the gradation for the specified Bed Class, and Channel Rock may be salvaged and incorporated into the simulated streambed.
Rock Weir placement is 1'± from designated station shown in profile. The spacing and configuration of rock weirs maybe adjusted in the field by the CO to fit actual streambed conditions.
ISOLATED BOULDER LOCATIONS
STATION
OFFSET
DISTANCE
FROM CL
PIPE (FT)
OFFSET
DIRECTION
BOULDER
DIAMETER SIZE
(IN)
PROTRUSION
ABOVE
SURFACE
(IN)
5+48.2 2.7' RIGHT 24" - 30" (CLASS CR-3) 12" - 15"
5+50.0 3.8' LEFT 24" - 30" (CLASS CR-3) 12" - 15"
5+53.4 4.9' RIGHT 24" - 30" (CLASS CR-3) 12" - 15"
5+59.6 2.1' LEFT 24" - 30" (CLASS CR-3) 12" - 15"
5+66.2 3.1' LEFT 24" - 30" (CLASS CR-3) 12" - 15"
5+72.3 0.8' LEFT 24" - 30" (CLASS CR-3) 12" - 15"
5+76.8 4.9' RIGHT 24" - 30" (CLASS CR-3) 12" - 15"
5+80.9 5.2' LEFT 24" - 30" (CLASS CR-3) 12" - 15"
5+82.3 4.7' RIGHT 24" - 30" (CLASS CR-3) 12" - 15"
5+90.1 5.0 LEFT 24" - 30" (CLASS CR-3) 12" - 15"
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Layout Pt.
Layout Pt.
7001 EL 169.13
Bottom of Footing
EL 169.13
Bottom of Footing
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 3/1
9 1 0:
M
IK
EJ
F :\6
4 U
SF
S
- T
ON
GA
SS
N F
AO
P
SI
TE
S (1
4) \D
W G\
-R D2
-M
P1 0.3
6-
DE
SI
GN
_B
RI
DG
E
NO
S
KE
W
.D W
G;
REGION 10
ALASKAN REGION
FOUNDATION PLAN
Jul-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
RD 2050000-MP 10.36
PLAN SCALE IN FEET
0 5 10
STA 12+71.26
Centerline Brg. Abut. 1
STA 13+41.76
Centerline Brg. Abut. 2
2' 2'
4'
DOWNSTREAM
END
UPSTREAM
END
SECTION ALONG C/L BEARING:
ABUTMENT NO. 1
Existing ground
Centerline Road, Centerline of Structure
FL
O
W 70.50'
Centerline Brg. to Centerline Brg.
SECTION ALONG C/L BEARING:
ABUTMENT NO. 2
Existing ground
14'-6"14'-6"
14'-6"14'-6"
6"
UPSTREAM
END
DOWNSTREAM
END
Centerline Structure
Existing ground
Slope determined by contractor
Excavation limits shown are for illustrative purposes and estimation of Structural Backfill quantity. The contractor is solely responsible for excavation support and compliance with all applicable OSHA Regulations.
5' min.
Layout PT (At Centerline Road/Centerline of Bearing)
Place footings on 6" min.
compacted leveling course material meeting the requirements of Foundation Fill (Incidental to other items)
6"
Structural Backfill. Use material conserved from excavation meeting FP-14 Specification
704.04. See sheet 7
6"
Notes: All Dimensions are typical. See Appendix A for Abutment Details. See Sheet 3 for Layout Point coordinates
10'-0" 10'-0"
Centerline Structure
10'-0" 10'-0"
Glu-lam Sill Extension, typ.
Glu-Lam Sill
Glu-Lam Bearing Block
Glu-lam Sill, typ.
See Appendix A
Glu-lam Wingwall Footing, typ.
See Appendix A
160160
6"
Place footings on 6" min.
compacted leveling course material meeting the requirements of Foundation Fill (Incidental to other items)
Glu-lam Sill Extension, typ.
Glu-Lam Sill
Glu-Lam Bearing Block
6"
EXCAVATION & BACKFILL DETAIL
Road Finished Grade
Leveling course material meeting the requirements of Foundation Fill (704.01)
90°Typ.
Existing edge of road, typ.
Existing Shoulder, typ.
1'-3"
8"
C/L Brg.
Slope
4'-0"
4' Wide Glu-lam Sill
Bench
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/1 3/1
9 1 0:
M
IK
EJ
F :\6
4 U
SF
S
- T
ON
GA
SS
N F
AO
P
SI
TE
S (1
4) \D
W G\
-R D2
-M
P1 0.3
6-
DE
SI
GN
_B
RI
DG
E
NO
S
KE
W
.D W
G;
REGION 10
ALASKAN REGION
DEWATERING
REQUIREMENTS
Jul-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
RD 2050000-MP 10.36
13BYPASS DAM PROFILE VIEW
Impervious membrane key trench, fill with clean gravel as needed to control seepage under impervious membrane
Anchor impervious membrane (sandbags, stones, etc.)
Impervious membrane
Sandbags
Bypass pipe 18" diameter minimum
Streambed
Existing Culvert
PUMP
PUMP
Top of excavation (estimated)
Remove sediment from pumped water using filtration (e.g. "siltbags"), dispersion onto landscape (e.g. using perforated pipe), settling basin and/or addition of flocculates.
modify as needed to meet downstream turbidity requirements.
To downstream energy dissipater
Sandbag by-pass & "feeder" dams location to be staked by contractor and approved by the CO
By-pass pump use for installing and removing gravity by-pass dams and diversions
Construct backwater dam to prevent water from entering work area from downstream
D/S Flo w
(No turbidity)
Energy dissipater as needed to prevent turbidity (e.g.
plastic sheets, stones).
By-pass discharge location to be staked by contractor and approved by CO.
PUMP
Stream by-pass pipe. Diameter as specified, watertight joints, minimum grade 2% downstream.
PLAN
Upstream sump pump place in cutoff trench or sump at depth needed to dewater excavation
Sedimats- details & number of rows per manufacturer
Elbow joints as needed, typ.
Edge of exiting road, typ.
Edge of active channel, typ.
BYPASS DAM ELEVATION VIEW
4' Overflow
12" min. Varies
Sandbags
Streambed Pipe as needed
GEOTEXTILE-WRAPPED STRAW
BALE SEDIMENT CONTROL WEIR
SECTION VIEW PLAN VIEW
STREAM FLOW
Granular Backfill Section 703.03(a)
Straw bales
Granular Backfill Section 703.03(a)
Straw bales
Geotextile mirafi 140N or equal
Stream Flow
SANDBAG BYPASS DAM DETAILS
Anti-seep collar. place anti-seep collar over membrane & pipe, then cut membrane to allow water through pipe.
6 mil plastic sheeting minimum
Bypass pipe
Downstream sump pump place in cutoff trench or sump at depth needed to dewater excavation
NOTES:
1. Design dewatering flow for construction is 130 CFS.
2. The plan shown here is intended to represent the general dewatering requirements and not applicable to a specific site.
submit a plan specific to the site.
3. Contractor to determine the size of the bypass pipe based on the specified flow.
4. Ensure that the bypass pipe and dam are leak-proof. Do not proceed with construction until the implemented dewatering plan has been inspected and accepted by the CO in writing.
5. Ensure pumps are be clean and free of leaks and placed in a containment kit.
6. Excavate draw down pool for sumps a minimum of 2 feet below the bottom of the excavation and a minimum of 5 feet in diameter.
7. Maintain all elements of the operation in order to dewater the foundation, facilitate construction, prevent harm to aquatic organisms (not just fish) and prevent sediment and turbidity from entering the stream. Construct the dewatering system in a manner which enables USFS biologists to collect and transport organisms from the live channel, just before completion of the diversion dam.
8. Operate pumps (preferably electric) downstream of the bypass dam if the dam does not seal thoroughly. Maintain a pump running 24 hours a day in the downstream sediment retention dam to divert water containing sediment to the forest floor where it will be filtered before entering back into the stream.
Leave pumps in position on site even if water discharge drops considerably, to be prepared for storm flows.
Provide ditches and/or sumps as necessary to form channel and place stream features
New Bridge Abutment, typ.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/8 /19
:0
0 M
IK
EJ
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P1
0.3 6_
4-
BM
T
IM
BE
R
AB
UT
ME
NT
_T L2
_4 8_
.D
W G;
(R10)
ALASKA REGION
AOP CULVERT
REPLACEMENTS
PRINCE OF WALES
RD 2050000 MP 10.36
TONGASS
NATIONAL FOREST
THORNE BAY RANGER
DISTRICT
TIMBER ABUTMENT
4 BEAM STEEL TL2
48' - 72' SPANS
FEB., 2019
.dwg
AG
MTJ
AG
A.1
TIMBER NOTES
GLU-LAM ABUTMENT
(4) BEAM STEEL WITH TL2 TRAFFIC BARRIER
GLUED LAMINATED MEMBERS: FURNISH SILLS AND BACKWALLS TO THE DIMENSIONS SHOWN. GLUED LAMINATED MEMBERS MUST CONFORM TO THE CURRENT NATIONAL DESIGN SPECIFICATIONS FOR WOOD CONSTRUCTION (NDS), COMBINATION SYMBOL 5, WITH AN INDUSTRIAL APPEARANCE AND FABRICATED FOR WET USE, USING RESORCINOL GLUES.
SOLID SAWN MEMBERS: FURNISH SOLID SAWN MEMBERS OF COASTAL REGION DOUGLAS FIR-LARCH, ROUGH SAWN, NO. 2
OR BETTER GRADE, AS SPECIFIED IN THE WWPA OR WCLIB GRADING RULES.
TREATMENT: TREAT ALL ABUTMENT MEMBERS IN CONFORMANCE WITH AWPA UC4B (GROUND CONTACT, HEAVY DUTY) USING COPPER NAPHTHENATE. TREAT ALL TIMBER IN STRICT CONFORMANCE WITH THE CURRENT EDITION OF WWPI'S
“BEST MANAGEMENT PRACTICES FOR THE USE OF TREATED WOOD IN AQUATIC ENVIRONMENTS”.
FIELD TREATMENT: FIELD TREAT ALL ABRASIONS AND APPROVED FIELD CUTS WITH WITH THREE BRUSH COATS OF COPPER NAPHTHENATE (2% SOLUTION). POUR THE FIELD TREATMENT INTO ANY FIELD-DRILLED HOLES OR NAIL HOLES
PRIOR TO INSERTING THE FASTENERS.
TIMBER FASTENERS: USE BOLTS AND NUTS CONFORMING TO ASTM A307, GALVANIZED. USE MALLEABLE IRON WASHERS
AGAINST WOOD, EXCEPT WHERE NOTED.
FABRICATION: SUBMIT SHOP DRAWINGS FOR ALL BRIDGE COMPONENTS EXCEPT TIMBER RUNNING PLANKS. SHOW ALL DIMENSIONS AND FABRICATION DETAILS FOR ALL CUT OR BORED TIMBER. NO FIELD DRILLING WILL BE ALLOWED UNLESS
OTHERWISE NOTED IN THE PLANS.
DESIGN NOTES
BRIDGE DESIGN: THESE STRUCTURES ARE DESIGNED IN ACCORDANCE WITH AASHTO LRFD BRIDGE
DESIGN SPECIFICATIONS, 8TH EDITION WITH CURRENT INTERIMS.
DESIGN LOADS: LIVE LOADS: HL-93 LOADING
ALASKA U-80 TRUCK
5-1/8" WIDE CONTINUOUS
GLU-LAM BACKING PLANK
10-3/4" DEEP x 48" WIDE GLU-LAM SILL
3/4" THICK ELASTOMERIC BEARING PAD
10-3/4" DEEP x 15" WIDE
FOOTING
CONNECTING ANGLES
10-3/4" DEEP x 18" WIDE BEARING BLOCK
STEEL SOLE PLATE
6" x 6" ROUGH SAWN WINGWALL CHEEK
USE STRUCTURAL STEEL SHAPES AND PLATES CONFORMING TO THE REQUIREMENTS OF ASTM A36.
HOT DIP GALVANIZE (SINGLE DIP) ALL STRUCTURAL STEEL MEMBERS IN ACCORDANCE WITH AASHTO M111 (ASTM A123).
WELDING: WELD IN ACCORDANCE WITH THE BRIDGE WELDING CODE, AWS D1.5. A CERTIFIED WELDER IS REQUIRED.
STEEL NOTES
GLU-LAM ABUTMENT
INSTALLATION DETAIL
4'-0" MIN.
6"
RIPRAP. REFER TO
BRIDGE LAYOUT
SHEETS FOR DETAILS
COMPACTED
LEVELING
COARSE
GLU-LAM SILL
BACKING PLANK
BEARING BLOCK
FINISHED
SLOPE
CONCRETE: USE CLASS A(AE) CONCRETE FOR PRECAST MEMBERS. THE REQUIRED 28-DAY COMPRESSIVE STRENGTH (F'C) IS 3,500 PSI WITH AN ENTRAINED AIR CONTENT OF 5% ± 1%. FINISH ALL PRECAST ELEMENTS WITH AN ORDINARY SURFACE FINISH. MAKE ALL CONCRETE IN ACCORDANCE WITH AN APPROVED MIX DESIGN. CHAMFER ALL EXPOSED
EDGES OF CONCRETE 3/4" AND FILLET ALL ACUTE ANGLES 3" UNLESS OTHERWISE NOTED.
REINFORCING STEEL: USE REINFORCING STEEL OF THE DEFORMED TYPE CONFORMING TO AASHTO M31 (ASTM A615) GRADE 60. CONCRETE COVER IS AS SHOWN; WHERE NOT SHOWN IT MUST CONFORM TO AASHTO. CUT AND BEND
REINFORCING STEEL IN CONFORMANCE WITH ACI 315. LAP SPLICE BARS 24" MIN.
CONCRETE NOTES
APPENDIX A-
ABUTMENT STANDARDS
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/8 /19
:0
0 M
IK
EJ
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P1
0.3 6_
4-
BM
T
IM
BE
R
AB
UT
ME
NT
_T L2
_4 8_
.D
W G;
(R10)
ALASKA REGION
AOP CULVERT
REPLACEMENTS
PRINCE OF WALES
RD 2050000 MP 10.36
TONGASS
NATIONAL FOREST
THORNE BAY RANGER
DISTRICT
ABUTMENT PLAN &
ELEVATION
TIMBER OPTION -
GLU-LAM BACKWALL
FEB., 2019
.dwg
AG
MTJ
AG
A.2
ABUTMENT PLAN
SCALE: 1/4"=1'-0"
ABUTMENT ELEVATION
SCALE: 1/4"=1'-0"
CENTERLINE ROAD,
CENTERLINE STRUCTURE
CENTERLINE ROAD,
CENTERLINE STRUCTURE
29'-0" OUT-TO-OUT BACKWALL
3'-6"4'-0"2'-6"
'-0
T Y
P
℄ BRG
10-3/4"
GLU-LAM
FOOTING
4'-6"
SYMMETRICAL ABT
CENTERLINE
10-3/4" GLU-LAM SILL
'-0
S
IL
L
10'-0"
10-3/4" x 48" x 20'-0" GLU-LAM SILL
10-3/4" x 18" x 18'-0" GLU-LAM BEARING BLOCK
1'-6"
"H
03 4
5-1/8" GLU-LAM
BACKWALL
PANEL
3'-10" 2'-01 2"
SYMMETRICAL
ABOUT
CENTERLINE
BUTT TIMBER
AGAINST DECK
8'-71 2"
4'-0" GLU-LAM SILL
18"
03 4
B
A C
K W
A L L H
E
IG
H T
"H
S E
E T
A B
L E
T
H
IS
S H
E E
T
8" 51
8"
2'-0"
CONNECT 6x6 TIMBER TO
BACKING PLANKS WITH (3)
1/2" x 12" LAG BOLTS WITH
MALLEABLE IRON WASHERS
CONNECT MEMBERS WITH
4x4x1/4 ANGLE AND (4) 1/2" x 4"
LAG BOLTS. SEE CONNECTION
ANGLE DETAIL THIS SHEET.
(6 EA. ABUTMENT)
CONNECT SILL AND BEARING BLOCK
WITH 1"Ø x 1'-9" TIMBER BOLTS
SEE BEARING DETAIL
ON SHEET A.6
ABUTMENT 1 SHOWN
ABUTMENT 2 SIMILAR
CENTERLINE BEARING
℄ GIRDER
SEE DETAIL
A
A.6
SEE BEARING DETAIL
ON SHEET A.6
10-3/4" x 15" x 4'-6"
GLU-LAM FOOTING
1'-0" 1'-0"
2'-9" 6"
CONNECTION ANGLE
2"5"11
2"
8"
21 2
5/16"Ø HOLE, TYP.
4"
L4 x 4 x 1/4 x 0'-8", GALVANIZED
10-3/4"x18" GLU-LAM
BEARING BLOCK
10-3/4"
GLU-LAM
BEARING
BLOCK
'-1
A.3
A.3
3"
'-4
T yp
2'-0"
Typ.
3'-6"
ROAD
SHLDR
03 4
6.0000
A.2
2'-0"2'-0"
A.2
CONNECT SILL AND BEARING BLOCK
WITH 1"Ø x 1'-9" TIMBER BOLTS
6" x 6"
TREATED
WINGWALL
CHEEK
A.2
SECTION
Scale: 1/2" = 1'-0"
FILL SLOPE
BEHIND
WINGWALL
BRIDGE
NOMINAL
BACKWALL
29'-0"
29'-0"
TABLE 1- BACKWALL PANEL DIMENSIONS
LENGTH
BACKWALL
"H"
43"
48-1/2"
HEIGHT
BACKWALL
THICKNESS
5-1/8"
PANEL
LENGTH
48'-0"
56'-0" 5-1/8"
GLU-LAM DECK PANEL TO
OVERHANG END OF BRIDGE
GIRDER. REFER TO
SUPERSTRUCTURE DRAWINGS
29'-0"
29'-0"
49-1/4"
49-1/4"
5-1/8"64'-0"
72'-0" 5-1/8"
A.3
A.3
OPTIONAL
BACKWALL
SPLICE.
SEE
DETAIL
A
A.3
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/8 /19
:0
0 M
IK
EJ
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P1
0.3 6_
4-
BM
T
IM
BE
R
AB
UT
ME
NT
_T L2
_4 8_
.D
W G;
(R10)
ALASKA REGION
AOP CULVERT
REPLACEMENTS
PRINCE OF WALES
RD 2050000 MP 10.36
TONGASS
NATIONAL FOREST
THORNE BAY RANGER
DISTRICT
ABUTMENT DETAILS
48' - 72' SPANS
TIMBER OPTION-
GLU-LAM BACKWALL
FEB., 2019
.dwg
AG
MTJ
AG
A.3
ELEVATION
PLAN
CONNECTION ANGLE
4" 9"
2" 6" 11
2"
5/8"Ø HOLE
L8x4x1/2x0'-9"
GALVANIZED
8"
GLU-LAM PANEL
BACKWALL
1/2" x 4" LAG BOLT
(2) 1/2"Ø " GALVANIZED
BOLT WITH HEX HEAD
NUT & WASHERS
L8x4 x1/2 x 0'-9"
CONNECTION ANGLE.
SEE DETAIL ON THIS
SHEET.
3/8" x 9" LAG BOLT
SPACED AT 24"
FULL WIDTH OF
BRIDGE DECK
TOP OF SILL
BEARING BLOCK &
SILL NOT SHOWN
FOR CLARITY
SCALE: 1-1/2" = 1'-0"
6x6 x 3'-10" S4S
TREATED TIMBER
(3) 1/2"x12" LAG BOLTS
WITH MALLEABLE IRON
WASHERS
FILL FACE
9/16"Ø HOLE
GLU-LAM PANEL
BACKWALL
A.3
SECTION
SCALE: 3/4" = 1'-0"
BACKWALL
CONNECTION DETAIL
2.5000
A.3
SECTION
SCALE: 3/4" = 1'-0"
ABUTMENT
BEARING BLOCK
ATTACHMENT ANGLE
SEE DETAIL ON
SHEET A.2.
GLU-LAM
BACKWALL
1'-3"
03 4
8"
8"
ABUTMENT SILL
PLAN SECTION A-A
A A.3
DETAIL
Scale: 3/4" = 1'-0"
ABUTMENT SILL
GLU-LAM
PANEL
BACKWALL
3"3"
1 8 "2 9 1
SHIP LAP SPLICE
CENTERLINE
STRUCTURE
5/8"Ø x 6-1/4" BOLT
W/ MALL.
WASHERS. FIELD
DRILL AND TREAT
11/16"Ø HOLES
A A
ATTACH BOTTOM
PLANK WITH 8"
SPIKES AS REQ'D 1
'-2 1 2
DECK PANEL
B A
C K
W A
L L P
A N
E L
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/8 /19
:0
0 M
IK
EJ
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P1
0.3 6_
4-
BM
T
IM
BE
R
AB
UT
ME
NT
_T L2
_4 8_
.D
W G;
(R10)
ALASKA REGION
AOP CULVERT
REPLACEMENTS
PRINCE OF WALES
RD 2050000 MP 10.36
TONGASS
NATIONAL FOREST
THORNE BAY RANGER
DISTRICT
ABUTMENT PLAN &
ELEVATION
TIMBER OPTION -
PLANK BACKWALL
FEB., 2019
.dwg
AG
MTJ
AG
A.4
ABUTMENT PLAN
SCALE: 1/4"=1'-0"
ABUTMENT ELEVATION
SCALE: 1/4"=1'-0"
ABUTMENT 1 SHOWN
ABUTMENT 2 SIMILAR
CONNECTION ANGLE
2"5"11
2"
8"
21 2
5/16"Ø HOLE, TYP.
4"
L4 x 4 x 1/4 x 0'-8", GALVANIZED
A.4
SECTION
Scale: 1/2" = 1'-0"
BRIDGE
NOMINAL
BACKWALL
29'-0"
29'-0"
TABLE 1- BACKWALL PANEL DIMENSIONS
LENGTH
BACKWALL
"H"
43"
48-1/2"
HEIGHT
BACKWALL
THICKNESS
6" (NOM.)
PLANK
LENGTH
48'-0"
56'-0"
29'-0"
29'-0"
49-1/4"
49-1/4"
64'-0"
72'-0"
CENTERLINE ROAD,
CENTERLINE STRUCTURE
10-3/4" x 48" x 20'-0" GLU-LAM SILL
10-3/4" x 18" x 18'-0" GLU-LAM BEARING BLOCK
"H
03 4
3'-9"
SYMMETRICAL
ABOUT
CENTERLINE
BUTT TIMBER
AGAINST DECK
8'-71 2"
CONNECT 6x6 TIMBER TO
BACKING PLANKS WITH (3)
1/2" x 12" LAG BOLTS WITH
MALLEABLE IRON WASHERS
CONNECT MEMBERS WITH
4x4x1/4 ANGLE AND (4) 1/2" x 4"
LAG BOLTS. SEE CONNECTION
ANGLE DETAIL THIS SHEET.
(6 EA. ABUTMENT)
CONNECT SILL AND BEARING BLOCK
WITH 1"Ø x 1'-9" TIMBER BOLTSSEE DETAIL
A
A.6
10-3/4" x 15" x 4'-6"
GLU-LAM FOOTING
1'-0" 1'-0"
2'-9" 6"
A.5
3'-6"
ROAD
SHLDR
A.4
FILL SLOPE
BEHIND
WINGWALL
A.5
CENTERLINE ROAD,
CENTERLINE STRUCTURE
29'-0" OUT-TO-OUT BACKWALL
3'-6"4'-0"2'-6"
'-0
T Y
P
℄ BRG
10-3/4"
GLU-LAM
FOOTING
4'-6"
SYMMETRICAL ABT
CENTERLINE
10-3/4" GLU-LAM SILL
'-0
S
IL
L
10'-0"
1'-6"
℄ GIRDER
SEE BEARING DETAIL
ON SHEET A.6
10-3/4"
GLU-LAM
BEARING
BLOCK
'-1
A.5
A.4
2'-0"2'-0"
CONNECT SILL AND BEARING BLOCK
WITH 1"Ø x 1'-9" TIMBER BOLTS
6" x 6"
TREATED
WINGWALL
CHEEK 1
A.5
4'-0" GLU-LAM SILL
18"
03 4
B
A C
K W
A L L H
E
IG
H T
"H
S E
E T
A B
L E
T
H
IS
S H
E E
T
12" 6"
2'-0"
SEE BEARING
DETAIL ON
SHEET A.6
CENTERLINE BEARING
10-3/4" x 18" GLU-LAM
BEARING BLOCK
3"
03 4
6"
GLU-LAM DECK PANEL TO
OVERHANG END OF BRIDGE
GIRDER. REFER TO
SUPERSTRUCTURE DRAWINGS
6" x 10" or 6" x 12"
TREATED BACKWALL
PLANKS. RIP TOP PLANK
IF REQUIRED TO FIT
UNDER DECK PANEL AS
SHOWN
3" x 10" NAILER
BEHIND BACKING
PLANKS
ATTACH BACKING
PLANKS TO NAILER
WITH 1/2"Ø X 10"
MACHINE BOLT W/
MALLEABLE IRON
WASHERS AND HEX
HEAD NUTS PER
PLANK, TYP.
3" x 10" NAILER
BEHIND BACKING
PLANKS 6" (NOM.)
6" (NOM.)
6" (NOM.)
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
7/8 /19
:0
0 M
IK
EJ
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P1
0.3 6_
4-
BM
T
IM
BE
R
AB
UT
ME
NT
_T L2
_4 8_
.D
W G;
(R10)
ALASKA REGION
AOP CULVERT
REPLACEMENTS
PRINCE OF WALES
RD 2050000 MP 10.36
TONGASS
NATIONAL FOREST
THORNE BAY RANGER
DISTRICT
ABUTMENT DETAILS
48' - 72' SPANS
TIMBER OPTION-
PLANK BACKWALL
FEB., 2019
.dwg
AG
MTJ
AG
A.5
ELEVATION
PLAN
CONNECTION ANGLE
4"
5/8"Ø HOLE L8x4…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.