FOREST ENGINEER DATE
VICINITY MAP
2019 PRINCE OF WALES ISLAND
AQUATIC ORGANISM PASSAGE
INDEX OF SHEETS
NO. DESCRIPTION
2 SITE LOCATION MAP
3 GENERAL NOTES & QUANTITIES
4 PLAN & PROFILE
5 STREAM SIMULATION
6 CHANNEL DETAILS
7 OVERLAY & EXCAVATION
8 STREAM DEWATERING TYPICALS
9 PIT & QUARRY DEVELOPMENT PLAN
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: K. CHERRY DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
132°136°138°140°142° 134°
JUNEAU
Craig
132°
KEY MAP
GULF OF ALASKA
56°
58° Sitka
138°
60°
Yakutat
ALAS
KA
142°
62°
C
AN
AD
A
140°
Skagway
136° 134°
56°
54°
Ketchikan
Wrangell
Petersburg
60°
58°
130° 128°
NFSR 2050400 MP 4.49 TITLE SHEET
CRAIG RANGER DISTRICT
MAY 2018
K. CHERRY MAY 2018
J. POWELL JULY 2018 1_TITLE SHEET
1 8
SCALE IN MILES
6 0 6 12
NFSR 2050400 MP 4.49
CLARENCE STRAIT
USGS QUAD, CRAIG C-3, C4, ALASKA
PROJECT LOCATION
PRINCE OF WALES ISLAND
KLAWOCK
CRAIG
KASAAN
THORNE BAY
MEYERS CHUCK
RECOMMENDED
DISTRICT RANGER DATE
RECOMMENDED
FOREST SUPERVISOR DATE
APPROVED
REGIONAL ENGINEER DATE
C F o r e s t
S e r v i c e E n g i n e e r i n g A
O P
D e s i g n
M
P
A h a T
I T
L E
S
H E
E T d w g
A
M
A u t o C
A
F i g h
Q u a l i t y
P r i n t p c
A
N S
I f u l l b l e e d
B x
I n c h e s
NOT FOR CONSTRUCTION
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text
PROJECT ROAD
OTHER ROADS
DESIGNATED ROCK SOURCE
OTHER ROCK SOURCES
PROJECT LOCATION
SITE LOCATION MAP
USDA FOREST SERVICE - TONGASS NATIONAL FOREST
SH. of
R-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION
TNFTYP:09/04
NFSR 2050400 MP 4.49 SITE LOCATION MAP
CRAIG RANGER DISTRICT
K. CHERRY MAY 2018
K. CHERRY
MAY 2018
J. POWELL JULY 2018 2_SITE LOCATION MAP
SCALE IN MILES
0.5 0 0.5 1
1. SITE LOCATIONS ARE APPROXIMATE.
2. NFSR 2050400 CLOSURES SHALL BE COORDINATED
WITH THE CO 14 DAYS IN ADVANCE (SEE FOREST
SERVICE SUPPLEMENTAL SPECIFICATION - FSSS 156)
3. THE QUARRY DESIGNATED FOR USE IN THIS PROJECT
IS LISTED IN THE ROCK SOURCE LOCATION TABLE
SHOWN BELOW. THE CONTRACTOR MAY USE OTHER
QUARRIES ON THE ROAD SYSTEM WHEN REQUESTED
IN WRITING & APPROVED BY THE CONTRACTING
OFFICER. OTHER QUARRIES ARE SHOWN ON THE SITE
LOCATION MAP.
4. AGGREGATE SURFACING IS STOCKPILED AT THE
DESIGNATED LOCATION. STREAMBED MATERIALS ARE
AVAILABLE AND SHALL BE SORTED TO MEET
CONTRACT SPECIFICATIONS.
DESIGNATED ROCK
SOURCE LOCATION
ROAD MILEPOST
2050000 0.52
2050400
2050401 2050402
2050000
2050300
PROJECT LOCATION
NOTES:
LEGEND
C F o r e s t
S e r v i c e E n g i n e e r i n g A s i g n
M
P
A h a S
I T
E
L O
C A
T I O
N
M
A P d w g
A
M
A u t o C i g h
Q u a l i t y
P r i n t p c
A
N S
I f u l l b l e e x
I n c h e s
NOT FOR CONSTRUCTION
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
CP1
CP3
CP2
UCP1
DCP1
E L
E V
A T
I O
N
F
E E
T
E L
E V
A T
I O
N
F
E E
T
STATION (FEET)
-0+030+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 1+60 1+70 1+801+83
LOWER VAP EL. 91'
DESIGN EL. 93.5'
4.7 1%
1.00%
1.00%
S T
B
E G
I N
X I S
T I N
G
A
L I G
N M
E N
T
G R
A D
E
B
R E
K
T
E
G R
A D
E
B
R E
K
E
S T
A
E
I S
T I N
G
A
L I G
N M
E N
T
E L
USDA FOREST SERVICE - TONGASS NATIONAL FOREST
R-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION
TNFTYP:09/04
NFSR 2050400 MP 4.49 PLAN & PROFILE
CRAIG RANGER DISTRICT
K. CHERRY MAY 2018
K. CHERRY MAY 2018
J. POWELL JULY 2018
NOTES:
1. SUITABLE EXCAVATED MATERIAL MAY BE USED AS BACKFILL FOR
INSTALLATION OF NEW CULVERT. UNSUITABLE MATERIAL WILL BE
DISPOSED AT A SITE DESIGNATED BY THE CO. REPLACEMENT
MATERIAL SHALL BE QUARRY BORROW PAID WITH BID ITEM 204.
2. CLEARING LIMITS SHALL BE 10 FEET BEYOND TOES OF SLOPES &
LIMITS OF CHANNEL WORK, UNLESS OTHERWISE DIRECTED BY THE
CO.
3. STAGING AREAS SHALL BE APPROVED BY THE CO.
4. ROAD SURFACING FOR THIS SITE IS LOCATED AT THE QUARRY ON
2050000 AT MP 0.52. STREAMBED MATERIAL AND CHANNEL ROCK
SHALL BE GENERATED BY THE CONTRACTOR AT THIS LOCATION.
5. CONSTRUCT THE PROJECT IN COMPLIANCE WITH FEDERAL
HIGHWAY ADMINISTRATION STANDARD SPECIFICATIONS FOR
CONSTRUCTION OF ROAD AND BRIDGES ON HIGHWAY LANDS
(FP-14) AND SUPPLIED FOREST SERVICE SUPPLEMENTAL
SPECIFICATIONS.
6. SUBMIT A DEWATERING AND SOIL EROSION PLAN TO THE CO FOR
APPROVAL AT LEAST 14 DAYS PRIOR TO BEGINNING WORK. SEE
SECTION 157 OF THE FS SUPPLEMENTAL SPECIFICATIONS FOR
DETAILS.
7. THE WORK WINDOW FOR THIS PROJECT IS JUNE 25TH THROUGH
SEPTEMBER 1ST.
8. ALIGN NEW PIPE WITH SURVEY POINTS. EXISTING PIPE AND NEW
PIPE ARE NOT ON THE SAME EXACT IMPRINT.
9. STEEL STRUCTURAL PLATE PIPE ARCH AND ASSEMBLY FASTENERS
FOR CONNECTING PLATES SHALL CONFORM TO AASHTO M 167.
10. PIPE ARCH PANEL THICKNESS: 10 GAGE (0.140 IN)
STANDARD 6" X 2" CORRUGATION
EDGE OF ROAD
CENTERLINE OF ROAD
INSTALL NEW
19'-11" DIA
PIPE ARCH
REMOVE & DISPOSE
EXISTING 60" CULVERT
CENTERLINE OF STREAM
(APPROXIMATE)
EDGE OF STREAM
(APPROXIMATE)
BEGIN STREAM WORK
END STREAM WORK
MINIMUM 36" COVER
FINAL ROAD GRADE
EXISTING ROAD GRADE
F
L
O
W
END ℄ STRUCTURE
STA 460
ELEV 91'
N: 5014.22'
E: 9979.96'
END ℄ STRUCTURE
STA 500
ELEV 89.3'
N: 4990.45'
E: 10012.13'
CONTINUE GRADE
AND MATCH WITH
EXISTING ROAD
CONTINUE GRADE
AND MATCH WITH
EXISTING ROAD
STRUCTURAL EXCAVATION
BOUNDARY TYP
19'-11" DIA PIPE ARCH
C F o r e s t
S e r v i c e E n g i n e e r i n g A s i g n
M
P
A h a
M
P d w g
A
M
A u t o C i g h
Q u a l i t y
P r i n t p c
A
N S
I f u l l b l e e x
I n c h e s
NOT FOR CONSTRUCTION
AutoCAD SHX Text SH. of
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text 2050400 MP4.49.dwg
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
E V
A T
I O
N
F
E E
T
E L
E V
A T
I O
N
F
E E
T
STATION (FEET)
4+17 4+20 4+30 4+40 4+50 4+60 4+70 4+80 4+90 5+00 5+10 5+20
USDA FOREST SERVICE - TONGASS NATIONAL FOREST
R-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION
TNFTYP:09/04
UCP-1
STA 421.5 FT
EL. 96.09 FT
GC-6.1
STA 450.5 FT
EL. 94.84 FT GC - 6.2
STA 479.5 FT
EL. 93.6 FT
DCP - 1
STA 508.5 FT
EL. 92.36 FT
EXISTING
ROAD PRISM
FINAL ROAD
PRISM
UCP-1
STA 421.5 FT
EL. 96.09 FT
M
A
T
C
I S
T
I N
G
S
T
R
E
M
I G
N
M
E
N
T
M A
T C
H E
X
IS
T
IN
G
S T
R E
A M
A L
IG
N M
E N
T
DCP - 1
STA 508.5 FT
EL. 92.36 FT
D
E
S
I G
R
I F
F
Y
P
L
E
N
G
T
H
G
R
A
D
I E
N
T
STREAM SIMULATION NOTES:
DESIGN RIFFLE: CONSTRUCT 29' LONG RIFFLE AT 4.29% GRADE. CONSTRUCT RIB
AT END OF RIFFLE TO PROVIDE CHANNEL STABILITY. PLACE FEATURE ROCKS
ALONG RIFFLE ADHERING TO CHANNEL ROCK CR-1 IN FSSS TABLE 705-5.
STREAMBED SIMULATION MATERIAL BED CLASS 10 - GRADE ACCORDING TO BED
CLASS DESIGNATED IN TABLE 705-4 (FSSS 705). FIELD MIXES SHALL CONFORM TO
THE FIELD MIX GUIDE ON SHEET 5.
STREAMBED SIMULATION MATERIAL - COMPACT IN ACCORDANCE WITH FSSS 648.10
STREAMBED CHANNEL ROCK SIZE CLASS SHOWN IN TABLE 705-5 (FSSS 705)
DURING STREAMBED CONSTRUCTION, WASH IN FINES IN 1' LIFTS DURING PLACING
OF STREAMBED MATERIAL TO MINIMIZE VOIDS.
EXISTING ROAD ALIGNMENT
FLOW
REBUILD CHANNEL BANKS
BASED ON DESIGN CROSS
SECTION UPSTREAM AND
DOWNSTREAM
19'-11" PIPE ARCH
40 FT LENGTH
PIPE INLET INVERT
STA 460 FT
EL 91 FT
PIPE OUTLET INVERT
STA 500
EL 89.3 FT
GC-6.1
STA 450.5 FT
EL 94.84 FT
GC-6.2
STA 479.5 FT
EL 93.6 FT
BEGIN STREAM WORK
END STREAM WORK
PIPE ARCH
℄ ROAD
PLACE CR-0 CHANNEL ROCK
AS FEATURE ROCKS ALONG
STREAM BOTTOM.
C F o r e s t
S e r v i c e E n g i n e e r i n g A s i g n
M
P
A h a
M
P d w g
A
M
A u t o C i g h
Q u a l i t y
P r i n t p c
A
N S
I f u l l b l e e x
I n c h e s
NOT FOR CONSTRUCTION
AutoCAD SHX Text SH. of
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
NFSR 2050400 MP 4.49
AutoCAD SHX Text
STREAM SIMULATION
AutoCAD SHX Text
CRAIG RANGER DISTRICT
AutoCAD SHX Text
K. CHERRY
AutoCAD SHX Text
MAY 2018
AutoCAD SHX Text
K. CHERRY
AutoCAD SHX Text
MAY 2018
AutoCAD SHX Text
J. POWELL
AutoCAD SHX Text
JULY 2018
AutoCAD SHX Text 2050400 MP4.49.dwg
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text C
USDA FOREST SERVICE - TONGASS NATIONAL FOREST
R-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION
TNFTYP:09/04
CLASS 10 STREAMBED
SIMULATION ROCK
12' CHANNEL WIDTH TYP
CONSTRUCT WEIR
USING CR-0 CHANNEL ROCK
CONSTRUCT BANKS USING
CR-1 CHANNEL ROCK
STREAMBED SIMULATION
MATERIAL BED CLASS 10 TYP
(DEPTH VARIES)
19' - 11" DIA
PIPE ARCH
19' - 11" DIA
PIPE ARCH
DESIGN ELEVATION
ESTABLISHED IN STREAM
SIMULATION SHEET
CONSTRUCT BANKS USING
CR-1 CHANNEL ROCK
STREAMBED SIMULATION
MATERIAL BED CLASS 10 TYP
(DEPTH VARIES)
CONSTRUCT BANKS USING
CR-1 CHANNEL ROCK. MATCH
WITH EXISTING BANKS.
STREAMBED SIMULATION
MATERIAL BED CLASS 10 TYP
(DEPTH VARIES)
DESIGN ELEVATION
ESTABLISHED IN STREAM
SIMULATION SHEET
CLASS 3 RIP RAP
1.5' DEPTH
KEY INTO BANK
STREAMBED SURFACE
APPROXIMATE
BANK ELEVATION
DESIGN CROSS SECTION
KEY IN RIP RAP
TO EXISTING GROUND
12' CHANNEL WIDTH TYP
12' CHANNEL WIDTH TYP
CHANNEL ROCK
NTS
A
DESIGN CHANNEL CROSS SECTION
NTS
B
DESIGN WEIR CROSS SECTION
NTS
C
RIP RAP DETAIL
NTS
D
1.25
1.5
1.5
1.5
Note: Mass / Pounds of channel is based on a sphere of the approximate cubic dimensions composed of granite. Mass will vary with rock type. Inspection should be performed by using the cube root of the A axis * B axis * C axis of each piece.
C F o r e s t
S e r v i c e E n g i n e e r i n g A s i g n
M
P
A h a
M
P d w g
A
M
A u t o C i g h
Q u a l i t y
P r i n t p c
A
N S
I f u l l b l e e x
I n c h e s
NOT FOR CONSTRUCTION
AutoCAD SHX Text SH. of
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
NFSR 2050400 MP 4.49
AutoCAD SHX Text
CHANNEL DETAILS
AutoCAD SHX Text
CRAIG RANGER DISTRICT
AutoCAD SHX Text
K. CHERRY
AutoCAD SHX Text
JUNE 2018
AutoCAD SHX Text
K. CHERRY
AutoCAD SHX Text
JUNE 2018
AutoCAD SHX Text
J. POWELL
AutoCAD SHX Text
JULY 2018
AutoCAD SHX Text 2050400 MP4.49.dwg
AutoCAD SHX Text
USDA FOREST SERVICE - TONGASS NATIONAL FOREST
R-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION
TNFTYP:09/04
NFSR 2050400 MP 4.49
CLEARING LIMITS
16' OR MATCH EXISTING
PROFILE GRADE
CRUSHED AGGREGATE
6" MIN COMPACTED THICKNESS
GRADE TO EXISTING GROUND
6" MINIMUM BEDDING
(CRUSHED AGGREGATE)
COMPACT TO MAX DENSITY
BELOW AND BESIDE HAUNCHES
EXISTING GROUND
36" MINIMUM FILL
PIPE ARCH
BACKFILL IN 6" COMPACTED
LIFTS. COMPACTION METHOD B.
2' MINIMUM
6" DEPTH ROAD BASE
FINISHED GROUND
LIMITS OF EXCAVATION
PER OSHA REQUIREMENTS
TYPICAL ROAD SECTION
NTS
E
STRUCTURAL EXCAVATION AND BACKFILL
NTS
F
CENTERLINE OF ROAD
2%
2%
1.5
NOTES
1. STRUCTURE EXCAVATION AND BACKFILL MUST CONFORM TO SECTION 209
OF FP-14.
2. LAY 6" THICK AGGREGATE BEDDING UNDER PIPE.
3. PLACE AND COMPACT BACKFILL MATERIAL TO A HEIGHT OF 12" ABOVE THE
TOP OF THE STRUCTURAL PLATE STRUCTURE.
4. COMPACTION MUST CONFORM TO SECTION 209.10 OF FP-14.
C F o r e s t
S e r v i c e E n g i n e e r i n g A s i g n
M
P
A h a
M
P d w g
A
M
A u t o C i g h
Q u a l i t y
P r i n t p c
A
N S
I f u l l b l e e x
I n c h e s
NOT FOR CONSTRUCTION
AutoCAD SHX Text SH. of
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
OVERLAY & EXCAVATION
AutoCAD SHX Text
CRAIG RANGER DISTRICT
AutoCAD SHX Text
K. CHERRY
AutoCAD SHX Text
JUNE 2018
AutoCAD SHX Text
K. CHERRY
AutoCAD SHX Text
JUNE 2018
AutoCAD SHX Text
J. POWELL
AutoCAD SHX Text
JULY 2018
AutoCAD SHX Text 2050400 MP4.49.dwg
AutoCAD SHX Text
X X
X
XE X E
D
X
D
X
XX
C C
FLOWFLOW
X X
X X
X
XX
X X
XX
X
X X
X X
X X
X X
XB
X
B
A
X X
A
FLOW
SILT FENCE
TEMPORARY DIVERSION
CHANNEL WITH PLASTIC
LINER OR RIPRAP
LIMITS OF
EARTHWORK
PERMANENT NATURAL
CHANNEL
USE SANDBAGS TO PREVENT
BACKFLOW INTO NATURAL
CHANNEL
TRASH PUMP SIZED TO DIRECT
TOTAL FLOW FROM STREAM
THROUGH FORCE MAINUSE SANDBAGS
TO CONSTRUCT
TEMPORARY
BARRIER
PERMANENT
CULVERT
ROADWAY
CENTERLINE
LIMITS OF
EARTHWORK
PERMANENT NATURAL
CHANNEL
TEMPORARY
FORCE MAIN
TEMPORARY RIPRAP
ENERGY DISSIPATER
USE SANDBAGS
TO CONSTRUCT
TEMPORARY
BARRIER
TEMPORARY
CULVERT
PERMANENT
CULVERT
ROADWAY
CENTERLINE
LIMITS OF
EARTHWORK
TEMPORARY
DIVERSION
CHANNEL WITH
PLASTIC LINER
OR RIPRAP
USE SANDBAGS TO PREVENT
BACKFLOW INTO NATURAL
CHANNEL
PERMANENT NATURAL
CHANNEL
USE SANDBAGS
TO CONSTRUCT
TEMPORARY
BARRIER
PERMANENT
CULVERT
ROADWAY
CENTERLINE
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
NFSR 2050400 MP 4.49 STREAM DEWATERING TYPICALS
CRAIG RANGER DISTRICT
SJC 1/25/05
M.WEINHOLD 2/9/18 3_7_8 STANDARD
7 8
PLAN - DIVERSION CHANNEL
PLAN - TRASH PUMP BYPASS PLAN -
TEMPORARY CULVERT DIVERSION
1. CONSTRUCT CHANNEL AT A MINIMUM
GRADE OF 0.5%.
2. IF USING A PLASTIC LINER, DO NOT
CONSTRUCT LONGITUDINAL JOINTS.
BURY THE UPSTREAM EDGE OF THE
LINER A MINIMUM OF 1-FT DEEP &
SECURE WITH RIP RAP OR SANDBAGS.
3. PUMP WATER AS NECESSARY DURING
EXCAVATION TO DOWNSTREAM PORTION
OF STREAM. TRAP ANY FISH IN
DE-WATERED AREA AND SAFELY MOVE
DOWNSTREAM DURING PROCESS.
4. ALL PUMPS SHALL HAVE A SCREENED
FOOT VALVE.
5. DEWATERING FLOWS DURING
CONSTRUCTION:
· NFSR 2050400 MP 0.16 - 10 CFS
NOTES:
C
F o r e s t
S e r v i c e E n g i n e e r i n g A s i g n
M
P
A h a
S
T A
N D
A R
D d w g
A
M
A u t o C i g h
Q u a l i t y
P r i n t p c
A
N S
I f u l l b l e e x
I n c h e s
NOT FOR CONSTRUCTION
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
PIT AND QUARRY DEVELOPMENT NOTES
1. ALL PITS AND QUARRIES SHALL BE APPROVED IN WRITING BY THE C.O.
PRIOR TO EXPLORATION, CLEARING OR DEVELOPMENT. FOR QUARRY
LOCATIONS, SEE KEY MAP ON SHEET 2.
2. REMOVE ALL OVERBURDEN TO SOLID ROCK FOR A MINIMUM DISTANCE
OF 15' FROM THE WORKING FACE.
3. SLOPE THE CUT BANK OF THE OVERBURDEN TO THE NATURAL ANGLE
OF REPOSE BUT IN NO CASE STEEPER THAN 1:1.
4. WITHIN THE CLEARING LIMITS:
- MAXIMUM STUMP HEIGHT SHALL BE IN ACCORDANCE WITH
SPECIFICATION NO. 201.
- STABLE TREES UP TO 6" dbh NEED NOT BE CUT IF THEY WILL NOT
INTERFERE WITH BACK SLOPE STABILITY.
- STUMPS AND BRUSH MAY BE LEFT IN PLACE, EXCEPT THAT ALL
STUMPS THAT PROTRUDE FROM EXCAVATED BANKS OR THAT HAVE
THE POTENTIAL TO BECOME DISLODGED AT ANY LATER DATE SHALL BE
REMOVED.
5. DISPOSE OF OR STOCKPILE FOR LATER USE ALL OVERBURDEN,
CLEARING, MERCHANTABLE TIMBER AND GRUBBING DEBRIS AS SHOWN
ON THE QUARRY DEVELOPMENT PLAN.
6. FELL ALL DEAD TREES AND SNAGS WHICH ARE SUFFICIENTLY TALL TO
REACH THE WORK AREA.
7. LEAVE THE PIT/QUARRY IN A NEAT, ORDERLY AND WELL-DRAINED
CONDITION. REMOVE ALL OVERHANGS AND LOOSE ROCK. ROCK
LOOSENED BY BLASTING OPERATIONS SHALL BE SCALED FROM FACES
PRIOR TO LEAVING THE SITE. MACHINE SCALING IS REQUIRED.
8. AFTER EXCAVATION IS COMPLETE CLEAN THE AREA AND LEAVE AS
SHOWN ON THE QUARRY DEVELOPMENT PLAN. TREAT ANY ACCESS
ROAD AS SHOWN ON THE QUARRY DEVELOPMENT PLAN.
9. NO MORE THAN 5% BY VOLUME OF OVERSIZE MATERIAL SHALL
REMAIN IN THE QUARRY. ALL OTHER MATERIAL SHALL BE BROKEN
DOWN AND USED AS SPECIFIED IN SPECIFICATIONS 203, 304, AND
611.
10. SEED AND FERTILIZE ALL DISTURBED AREAS SUCH AS OVERBURDEN
PILES AND BENCH SURFACES. SEEDING AND FERTILIZER IS INCIDENTAL
TO PIT AND QUARRY DEVELOPMENT PLAN.
11. PROVISIONS FOR FUTURE QUARRY DEVELOPMENT ACCESS WILL BE
PROVIDED, UNLESS THIS REQUIREMENT IS WAVED BY THE CO.
12. HAUL DISTANCES USED FOR HAUL CALCULATIONS FROM DESIGNATED
SOURCES WILL BE BASED ON TABLE "POTENTIAL ROCK SOURCE
LOCATIONS".
M A X.
15'
ROAD
QUARRY DEVELOPMENT PLAN
QUARRY IS LOCATED RIGHT OF STA 27+58 ON ROAD NO. 6030
CLEARING LIMIT FLAGGED
2+720
MIN
CONTRACTOR DATE
ELEV 1160
APPROX.
OBD
TOTAL POUNDS OF POWDER IN SHOT
(INCLUDING PRIMERS) = 3385 lbs.
MAX. POUNDS OF POWDER PER 8 ms DELAY = 1090
POWDER FACTOR = 1 lb. PER CUBIC YARD
NAME OF BLASTER IN CHARGE = T.J. BARRY
PLANNED SHOT DATE = JUNE 15, 1996
NUMBER OF CUBIC YARDS IN SHOT = 2670
"HI DRIVE" PRIMER WITH 125 to 250 ms DU PONT ELECTRIC
BLASTING CAP LOCATED AT
BOTTOM OF HOLE WITH ONE
3-IN x 6-IN STICK OF TOVEX
USED FOR CUSHION.
DISTRICT RANGER
MIN
15'
MIN
15'
COR
CLEARING LIMITS
DATE DATE
TYPICAL LOADED HOLE
5-FT STEMMING
3.5-IN DIA HOLE
250ms
19,620 CU.YD.
TYPE OF EXPLOSIVES = TOVEX 800, 3" X 16"
SECOND
QUARRY BLASTING PLAN
RIGHT OF STA. 27+58 ON ROAD NO. 6030
THIS PLAN IS FOR THE FIRST TEST SHOT IN THE QUARRY
ACTUAL MILLESECOND DELAY USING
FIRING SEQUENCE - SEQUENCE OF DELAYS
IS THE SAME FOR ALL 5 ROWS
PRODUCTION
STA 27+58
LOCATED IN BOTTOM OF HOLE
TOTAL NUMBER OF HOLES IN SHOT = 45
TYPE OF PRIMER & LOCATION IN HOLE =
40-FT
15-FT MIN
3% SLOPE
68%
OBD
ACCESS
ROADLC
CL
72%
SOIL
STEMMING = 5-FT
BURDEN = 8-FT
DENSITY = 20 lbs./cu. yd.
2" DIA STICK OF HI DRIVE
HOLE DEPTH = 10-FT to 30-FT
BOREHOLE SIZE = 3.5-IN
SPACING = 10-FT
APPROX.
ELEV 1260
OBD
RD. NO. 6030
PLAN VIEW
ESTIMATE OF VOLUME = 24,850 CU. YD.
OVERBURDEN
ACCESS ROAD
STREAM
18-IN CMP
15-FT MIN
SHOT
SEQUENTIAL TIMER
28920
307 17
23311
241 8
257 10
216 5
1016 3
SEQUENTIAL TIMER
282 13
30721
24112
23 20
25 24
18 11
22 19
FR
EE FA
C E
150ms 150ms
200ms
175ms
125ms
200ms
175ms
250ms
RD. NO. 6030
PRODUCTION
SHOT
TEST SHOT
13,080 CU.YD.
FIRST
FLOOR
QUARRY
ROCK F
ACE
EXIST.
OVERBURDEN
M A X.
DEVELOPMENT PLAN
1. ALL MERCHANTABLE TIMBER WILL BE REMOVED FROM THE QUARRY SITE AND DECKED IN THE
MUSKEG LEFT OF 27+20
2. OVERBURDEN WILL NOT BE PLACED IN THE SMALL STREAM BORDERING THE QUARRY.
3. DEVELOPMENT WILL COMPLY WITH THE GENERAL NOTES SHOWN ON THE PIT & QUARRY
DEVELOPMENT TYPICAL SHEET.
4. TEST SHOT OF APPROX. 2000 CU. YD. IS PLANNED.
REHABILITATION PLAN
1. THE ACCESS ROAD WILL BE OBLITERATED BY CUTTING A DITCH AT THE JUNCTION OF THE
ACCESS ROAD WITH ROAD NO. 6030 AND BY ROUGHING UP THE ACCESS ROAD SURFACE.
2. ALL OVERSIZE ROCK WILL BE PLACED AGAINST THE SIDES OF THE QUARRY NEXT TO THE
BACKWALL BENCH.
3. A MINIMUM OF 12-IN OF OVERBURDEN WILL BE EVENLY SPREAD OVER THE QUARRY FLOOR.
4. ALL DISTURBED AREAS, SUCH AS OVERBURDEN PILES, BENCH SURFACES, AND ACCESS ROAD
SURFACES, WILL BE SEEDED AND FERTILIZED IN ACCORDANCE WITH SPECIFICATIONS.
5. PROVISIONS FOR FUTURE QUARRY ACCESS WILL BE PROVIDED UNLESS THIS REQUIREMENT IS
WAIVED BY THE COR.
THIS AREA TO BE CLEARED ONLY IF THE
OVERBURDEN CANNOT BE CONTAINED
BETWEEN THE ACCESS ROAD AND ROAD
NO. 6030
CROSS SECTION VIEW
TIMBER FROM QUARRY SITE DECKED
IN MUSKEG
SAMPLE QUARRY BLASTING PLAN SAMPLE QUARRY DEVELOPMENT PLAN
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
NFSR 2050400 MP 4.49 PIT AND QUARRY DEVELOPMENT PLAN
CRAIG RANGER DISTRICT
R.GUBERNICK 2/9/17
M.WEINHOLD 2/9/18 3_7_8 STANDARD
8 8
C F o r e s t
S e r v i c e E n g i n e e r i n g A s i g n
M
P
A h a
S
T A
N D
A R
D d w g
A
M
A u t o C i g h
Q u a l i t y
P r i n t p c
A
N S
I f u l l b l e e x
I n c h e s
NOT FOR CONSTRUCTION
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| Sheets and Views |
| 1_TITLE SHEET-TITLE SHEET |
| 2_SITE LOCATION MAP-2 SITE LOCATION MAP |
| 2050400 MP4.49-PLAN & PROFILE ARCH |
| 2050400 MP4.49-SS PIPE ARCH |
| 2050400 MP4.49-STREAMBED DETAILS ARCH |
| 2050400 MP4.49-OVERLAY AND EXCAVATION |
| 7_8 STANDARD-7 STREAM DEWATERING |
| 7_8 STANDARD-8 Pit and Quarry Development |
File details come from the government source that posted it.