This is a Performance Work Statement (PWS) for portable toilet rental and service support to the 120th Regiment Support Group (RSG) at three training locations in Maine during a 16-day period from May 29, 2026 to June 13, 2026.

The contractor must deliver, service, and remove 28 total portable latrines across three sites: 12 units at Specter Training Site (Cherryfield, ME), 12 units at Lola Dana Training Site (Woodville, ME), and 4 units at Deep Woods Training Site (East Hancock, ME). Services must be performed Monday through Friday, 7:00 AM to 6:00 PM, except on recognized U.S. federal holidays. Key requirements include: placement of units within 50 meters of designated locations no later than one day before scheduled use and by 8:00 AM EST on the designated date; servicing on June 1, 3, 6, and 10 (cleaning, waste removal, restocking toilet paper, and maintaining full tanks); response to emergency conditions within four hours and non-emergency conditions within twelve hours; replacement of unserviceable units within eight hours; and removal of all units by noon on June 12, 2026. The contractor must provide all personnel, equipment, tools, materials, supervision, and quality control. Invoicing must be submitted via Wide Area Workflow (WAWF) within seven business days after performance completion. The contractor must designate a Contract Manager with full authority to direct daily operations and must comply with all installation security and access requirements, including background checks, Awareness Training Level 1, and iWATCH training for all employees within 30 calendar days of contract start.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ver. October 2022

PERFORMANCE WORK STATEMENT (PWS)

FOR

120th RSG

Portable Toilet rental with service

1.0 General:

1.1 Scope: The contractor must provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to deliver, service, and pickup; portable latrines as defined in this PWS.

1.2 Background: The 120th RSG has a requirement for portable latrines at three training locations in order to provide field sanitation measures, for multiple units, during their various training events. The field Sanitation measures, needed for this event, are outlined in TB Med 593, Guidelines for field waste management for the Department of the Army.

1.3 Period of Performance (PoP): The Period of Performance must be for a sixteen-day period from 29 May 2026 to 13 Jun 2026.

1.4 General Information:

1.4.1 Place and performance of Services: The contractor must provide services between the hours of 0700 to 1800 (7am to 6 pm) on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. The contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons.

Performance must be at:

Specter Training Site, Route 9, Cherryfield, ME 04622 Lola Dana Training Site, 99 Pelkey Rd, Woodville, ME 04457 Deep Woods Training Site, 490 Bear Pond RD, East Hancock, ME 04457

1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework must be at no additional cost to the Government.

1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays.

Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.1.3 The contractor’s employees must become familiar with and obey the regulations of the installation, including fire, traffic, safety, and security regulations while on the installation.

Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees must always carry proper identification with them and must be subject to such checks as may be deemed necessary. The contractor must ensure compliance with all regulations and orders of the installation, which may affect performance.

The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.2 Recognized Holidays: The following are recognized United States (US) holidays. The contractor must not perform services on these days if requested:

1.4.2.1 New Year’s Day: January 1st

1.4.2.2 Martin Luther King, Jr.’s Birthday

1.4.2.3 President’s Day

1.4.2.4 Memorial Day

1.4.2.5 Juneteenth National Independence Day: June 19th

1.4.2.6 Independence Day: July 4th

1.4.2.7 Labor Day

1.4.2.8 Columbus Day

1.4.2.9 Veteran’s Day: November 11th

1.4.2.10 Thanksgiving Day

1.4.2.11 Christmas Day: December 25th

1.4.3 Quality Control (QC): The contractor must develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor must develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor must develop QC procedures that address the areas identified in Technical Exhibit 1, Performance

Requirements Summary (PRS). A final QCP must be submitted to the Contracting Officer Representative (COR) NLT 10 days after contract award. After acceptance of the QCP, the contractor must obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP.

1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.5 Installation Access and Security Requirements: The contractor must comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees must provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor must ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy (see PWS 6.0). Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.5.1 Reserved

1.4.5.1.1 Homeland Security Presidential Directive (HSPD) -12 Background Investigation Requirements: Reserved.

1.4.5.1.2 Trusted Associate Sponsorship System (TASS): Reserved

1.4.5.1.3 Reserved

1.4.5.1.4 Reserved

1.4.5.1.5 Reserved

1.4.5.1.5.1 Failure to comply with these requirements may result in withholding of final payment.

1.4.5.1.6 Reserved

1.4.5.2 For contractors that do not require a CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees must comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05), and applicable installation, facility and area commander installation/facility access, and local security policies and procedures (provided by a Government representative).

1.4.5.3 Awareness Training (AT) Level 1: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas must complete AT Level 1 training within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor must submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel. AT Level 1 awareness training is available at the following website:

https://jko.jten.mil/courses/atl1/launch.html

1.4.5.4 iWATCH Training: The contractor and all associated subcontractors with an area of performance within an Army-controlled installation, facilities or area must brief all employees on the local iWATCH program (training standards provided by the requiring activity Antiterrorism Officer (ATO)). This local developed training must be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the KO. This training must be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor must report completion for each contractor employee and subcontractor employee to the COR, within 15 calendar days after completion of training.

1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations.

Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor must ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor must abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.6 Reserved

1.4.5.6.1 Reserved

1.4.5.6.2 Reserved

1.4.5.6.3 Reserved

1.4.5.6.4 Reserved

https://jko.jten.mil/courses/atl1/launch.html

1.4.5.6.5 Reserved

1.4.5.7 Reserved

1.4.5.8 Reserved

1.4.5.9 Reserved

1.4.5.10 Protection of Personally Identifiable Information (PII). Reserved

1.4.5.11 Reserved

1.4.5.12 OPSEC SOP/Plan. Reserved

1.4.5.13 Reserved

1.4.5.14 Reserved

1.4.6 Physical Security. The contractor must safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials must be secured.

1.4.6.1 Key Control. Reserved

1.4.6.1.1 Reserved

1.4.6.1.2 Reserved

1.4.6.1.3 Reserved

1.4.6.2 Lock Combinations: Reserved

1.4.7 Special Qualifications: Reserved

1.4.8 Reserved

1.4.9 Contract Manager (CM): The contactor must designate a CM who must ensure performance under this contract. The name of this person, and an alternate who must act for the contractor when the CM is absent, must be designated in writing to the KO. The CM or alternate must have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM must work through the COR to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM must ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM must ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor must ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” must be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel must wear identification badges distinguishing themselves as such. The badges must have the company name, employee name and the word “contractor” displayed.

1.4.10.1 Reserved

1.4.11 Combating Trafficking in Persons: The United States Government has adopted a zero-tolerance policy regarding trafficking in persons. Contractors and contractor employees must not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor must notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor must take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.

1.4.12 Contractor Travel: Reserved

1.4.13 Data Rights: Reserved

1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor must notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and must promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.4.15 Phase In/Phase Out Periods: Reserved

SECTION 2

DEFINITIONS AND ACRONYMS

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service must meet contract requirements.

2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms

AEI Army Enterprise Infostructure AR Army Regulation AT/OPSEC Antiterrorism/Operational Security BI Background Investigation

CM Contract Manager COR Contracting Officer Representative DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DSCA Defense Counterintelligence and Security Agency FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IS Information System(s) KO Contracting Officer NGB National Guard Bureau OCI Organizational Conflict of Interest PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SCR Service Contract Reporting SSN Social Security Number TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence

PART 3

GOVERNMENT PROPERTY (GP) AND SERVICES

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: Reserved

3.2 Materials: Reserved

3.3 Equipment: Reserved

3.4 Services: Reserved

3.5 Utilities: Reserved

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor must furnish everything required to perform these services as indicated in Paragraph 1.1.

4.2 Secret Facility Clearance: Reserved

4.3 Contractor Security Clearance: Reserved

PART 5

SPECIFIC TASKS

5.0 Requirements: The contractor must:

5.1 Delivery and Placement: provide all necessary personnel, equipment, tools, labor, transportation, supervision, and any necessary equipment to deliver, set up, service, and pick up portable latrines at the dates specified in Technical Exhibit 2 of the PWS.

5.1.1 set the portable latrines in the designated location no later than one day before scheduled use and no greater than 5 business days prior to the scheduled first day of use upon request by the COR or designated government representative.

5.1.2 place and set up all portable latrines NLT 0800 am EST and date designated in Technical Exhibit 3. Each fully functional unit will be placed within 50 meters of the requested locations based on the convenience of the vendor in order to facilitate safe and efficient operations.

5.1.3 furnish all supplies and equipment necessary for full operation of the portable latrines.

The contractor must report initial placement and in-service status of all required items to the COR, by telephone or email, NLT noon on the first day of performance.

5.2 Equipment Servicing:

5.2.1 provide Units that are clean, in good condition, and without defects at time of delivery.

5.2.2 Service all portable latrines IAW the timeframes outlined in Technical Exhibit 3 unless otherwise specified.

5.2.3 pump out, extract, empty, or otherwise remove waste, trash from all portable latrines based upon on site services agreement.

5.2.3.2 replace, within 8 hours, any portable latrines that are unserviceable and/or undesirable.

5.2.3.3 respond to site directly to repair “emergency conditions” within four (4) hours; respond to “non-emergency conditions” on-site within twelve (12) hours of a report from the COR.”

5.2.3.4 ensure portable latrines are fully stocked with toilet paper and tanks full.

5.2.3.5 provide Additional Equipment, Movement of Equipment, or Servicing of equipment, Upon Request of the COR.

5.3 Removal of Equipment:

5.3.1 remove all portable latrines no later than 1200 (noon) on the last day of scheduled use.

Coordination will be done by the COR.

5.3.2 report final removal of units to the COR within one business day.

5.4 Invoicing:

5.4.1 All contractor invoices must be submitted via Wide Area Workflow (WAWF) using contract line-item numbers (CLINs). The contractor must be required to establish account(s), access method(s), log-in(s), and get all necessary training prior to submitting invoices through WAWF.

Invoices not submitted via WAWF must not be accepted or paid.

PART 6

APPLICABLE PUBLICATIONS

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

Publication (Chapter/Page)

Date of Publication

Mandatory or Advisory

Website

Federal Acquisition Regulation Mandatory https://www.acquisition.gov/?q=browsefar or http://farsite.hill.af.mil/

Defense Federal Acquisition Regulation Supplement

Mandatory http://www.acq.osd.mil/dpap/dars/dfarspgi/current/i nd ex.html or http://farsite.hill.af.mil/

AR 190-13

The Army Physical Security Program

02/25/2011 Mandatory http://www.apd.army.mil/ProductMaps/PubForm/AR.

a spx

DoDD 5400.11 Department of Defense Privacy

Program

10/29/2014 Mandatory http://www.dtic.mil/whs/directives/corres/dir.html#

DoD 5400.11-R Department of Defense Privacy

Program

05/14/2007 Mandatory http://www.dtic.mil/whs/directives/corres/pub1.html

AR 25-2

Information Assurance

10/24/2007 Advisory http://armypubs.army.mil/ProductMaps/PubForm/AR.

aspx

AR 530-1

Operations Security

09/26/2014 Advisory http://armypubs.army.mil/ProductMaps/PubForm/AR.

aspx

Army Directive 2014-05 Policy and Implementation Procedures for

Common Access Card Credentialing and Installation Access for

Uncleared Contractors

Army Directive 2014-05

Advisory Army Directive 2014-05

AR 525-13

Antiterrorism

12/09/2

Mandatory http://armypubs.army.mil/ProductMaps/PubFor m/AR.aspx https://www.acquisition.gov/?q=browsefar http://farsite.hill.af.mil/ http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://farsite.hill.af.mil/ http://www.apd.army.mil/ProductMaps/PubForm/AR.aspx http://www.apd.army.mil/ProductMaps/PubForm/AR.aspx http://www.apd.army.mil/ProductMaps/PubForm/AR.aspx http://www.dtic.mil/whs/directives/corres/dir.html http://www.dtic.mil/whs/directives/corres/pub1.html http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx

6.1 Applicable Forms: Forms applicable to the PWS are listed below:

Form Date Website

DD 1172-2

Application for Identification Card/DEERS

Enrollment

Mar 2017 http://www.dtic.mil/whs/directives/forms/index.htm

I-9 Employment Eligibility Verification

10/21/2019 https://www.uscis.gov/sites/default/files/files/form/i-9.pdf

DD 441

Department of Defense Security Agreement

Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms0001- 0499.htm

DD 250

Material Inspection and Receiving Report

Aug 2000 https://www.esd.whs.mil/Directives/forms/dd0001_0499/

TECHNICAL EXHIBIT 1

Performance Requirements Summary

Performance Objective Performance Standard Acceptable

Quality Levels

(AQL)

Surveillance Method / By Whom

PRS #1 – PWS para (5.1) The contractor must deliver and place portable latrines in the designated areas.

Contractor must place portable latrines within 50 meters of the requested locations, at least one business day prior to scheduled event.

AQL 00% Periodic Inspection / COR

PRS #2 – PWS para (5.2) The contractor must service equipment at the designated training locations.

Contractor must service all portable latrines during the designated time schedule outlined in TE 3.

AQL 100% Periodic Inspection / COR

PRS #3 – PWS Para (5.3) The contractor must remove equipment within the specified timeframe, at both training locations.

Contractor must remove portable latrines on the last day of the requirement but NLT 5 business days prior to event.

AQL 100% Random monitoring / COR

PRS #4 - PWS Para (5.4) All contractor invoices must be submitted via Wide Area Workflow (WAWF) using contract line-item numbers (CLINs), NLT 7 business days after the period of performance has been completed.

The contractor must have an establish account(s), access method(s), log-in(s), and get all necessary training prior to submitting invoices through

WAWF.

AQL 100% 100% inspection http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/index.htm https://www.uscis.gov/sites/default/files/files/form/i-9.pdf http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm https://www.esd.whs.mil/Directives/forms/dd0001_0499/

TECHNICAL EXHIBIT 2

Delivery Schedule

QTY Requirement Dates Location

12 Portable Latrines 29May26-12Jun26 Specter Training Site, Route 9, Cherryfield, ME 04622

Portable Latrines 29May26-12Jun26 Lola Dana Training Site 99 Pelkey Rd, Chester, ME

04457

4 Portable Latrines 29 May26-12Jun26 Deep Woods/ Sapper Hill

TECHNICAL EXHIBIT 3

Service Schedule

Service Dates Required Location

Cleaning of Portable Latrines 01 JUN26

03JUN26

06JUN26

10JUN26

Specter Training Site, Route 9, Cherryfield, ME 04622

Cleaning of Portable Latrines 01 JUN26

03JUN26

06JUN26

10JUN26

Lola Dana Training Site 99 Pelkey Rd, Chester, ME 04457

Cleaning of Portable Latrines 01 JUN26

03JUN26

06JUN26

10JUN26

Deep Woods/ Sapper Hill