12-Geotechnical Report 242-5218A NM4 Multi Use Trails.pdf

PDF 47 MB Posted

Attached to
NM4 Crossing and Multi-Use Trail Project (CN5101730) And Pinon School Trail (CN5101970)
Solicitation number
IFB27-30
Issued by
Los Alamos County, New Mexico

About this file

This is a Geotechnical Report prepared for the NM4 Crossing and Multi-Use Trail Project in White Rock, New Mexico, involving the installation of a HAWK (High-intensity Activated crossWalK) crossing on NM4 and construction of the Pinon School Trail. The report provides subsurface investigation and soil analysis findings necessary to inform the design and construction of these infrastructure improvements. The geotechnical assessment includes boring locations, soil classification, groundwater conditions, and recommendations for foundation design and construction practices specific to the project site conditions.

The report serves as a supporting technical document for bidders and contractors to understand site-specific geotechnical constraints and requirements for the trail construction and crossing installation. Key information includes soil profiles, bearing capacity recommendations, and any special construction considerations required due to local soil and groundwater conditions. This geotechnical data is essential for contractors to develop accurate cost estimates and construction methodologies and for project managers to establish realistic timelines and specifications for the multi-use trail and pedestrian crossing components of the project.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .