12 A001 CDRL Status Report.pdf

PDF 127 KB Posted

Attached to
Ground Support Equipment
Solicitation number
FA8224-20-R-0026
Issued by

About this file

This document contains a Contract Data Requirements List (CDRL) and details of a related federal contract opportunity. The CDRL outlines reporting requirements for a monthly status report to be provided under an Air Force contract for inspection, maintenance, and handling support of Ground Support Equipment (GSE) at Joint Base San Antonio Randolph. It specifies the status report is to follow DI-MGMT-80368A with some tailoring and be submitted electronically by the 5th of each month to the Air Force Sustainment Center and AMXS at JBSA-Randolph.

The related federal contract opportunity is a solicitation for GSE support services with a one-year base period and four one-year options. The single-award, firm fixed price contract will be awarded by the Air Force Materiel Command Air Force Sustainment Center to provide inspection, maintenance, and handling of various GSE types in support of the T-38 workload at JBSA-Randolph, excluding AGE and equipment under other support agreements. The Performance Work Statement and other attachments provide additional requirement details.

View the file

Other files

File Type Posted
12 Updated Version 2_PWS Ground Support Equipment.pdf PDF
12 Updated Version 2_52.212-2-Evaluation _Ground Support Equipment.pdf PDF
12 Updated Version 2_Question Comment Resolution Matrix.xlsx XLSX spreadsheet
12 Updated Version 2_ 52.212-2-Evaluation _Ground Support Equipment.pdf PDF
12 Updated Question Comment Resolution Matrix.xlsx XLSX spreadsheet
12 Updated Version 2_52.212-1-Instructions _Ground Support Equipment.pdf PDF
12 Updated PWS Ground Support Equipment.pdf PDF
12 Updated 52.212-2-Evaluation _Ground Support Equipment.pdf PDF
12 Updated GSE TEP.xlsx XLSX spreadsheet
12 Updated 52.212-1-Instructions _Ground Support Equipment.pdf PDF
12 Question Comment Resolution Matrix.xlsx XLSX spreadsheet
12 Wage Determination.pdf PDF
12 52.212-2-Evaluation _Ground Support Equipment.pdf PDF
12 52.212-1-Instructions _Ground Support Equipment.pdf PDF
12 PWS Ground Support Equipment.pdf PDF
12 Appendix B Equipment List.xlsx XLSX spreadsheet
12 GSE TEP.xlsx XLSX spreadsheet
12 A002 CDRL SAFETY.pdf PDF
12 Solicitation - FA822420R0026.pdf PDF
12 52.212-2-Evaluation _Ground Support Equipment.docx DOCX document
12 A003 CDRL Accident_Report.pdf PDF
12 PWS Ground Support Equipment.docx DOCX document
12 52.212-1-Instructions _Ground Support Equipment.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A/B/C/D/E001
title: Status Report
sub: Monthly Performance / Status Report
auth: DI-MGMT-80368A/T
ref: PWS para 4.3., 6.2.2, 8.2.2 & 10.1
req_ofc: OO-ALC/OBC
dd250: LT
appcode: N/A
dist: D
freq: Block 16
asof: N/A
firstsub: Block 16
subsub: ASREQ
addressee1: Block 16
draft1: 0
reg1: 2
repro1: 0
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 2
total_repro: 0
remarks: (4) Tailor DI-MGMT-80368A as follows: delete paragraph 3.2.1. b-e, and 3.2.3.

(9) DISTRIBUTION STATEMENT D: Authorized to Department of Defense and U.S.

DoD contractors for Administrative or Operational Use Only, Oct 2014. Other requests for this document shall be referred to OO-ALC/OBC, Hill AFB, Utah.

(10)(12)(13) Submit written or e-mail copy by the fifth (5th) work day of each month for reporting of the previous month and before billing in Wide Area Workflow (WAWF).

TCIR/DART Rates. Date of first submission: NLT 15 January 2021, then annually.

The report will reflect data from 1 January through 31 December, annually.

(10)(12)(13) All other documents:

Date of first submission: NLT 30 days after Award, then monthly. Sec, 8.2.2 initially with submission of first status report, then as required.

(13) Date of Subsequent Submission NLT 5 business days from the start of each month.

DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

(14) One (1) copy of each submittal shall be provided electronically to each addressee in block 16 in Microsoft Office compatible format. Addressees:

OO-ALC COR

Juan Gaytan juan.gaytan@us,af,mil

DSN 775-5566

AFMC 575 AMXS

Justin Barry justin.barry.4@us.af.mil

DSN 487-4731

group: NSP
total_price:
prep_name: Brenda Keesler
line_item: TBD
exhibit: A
xtdp: Off
xtm: Off
othercat: MGMT
system: 7554 Ground Support Equipment (GSE)
ctr_no: TBD
contr: TBD
remarksb:
Page2:
Reset:
2020-07-14T17:03:36-0600
KEESLER.BRENDA.LEE.1388299009
prep_date: 14 Jul 20
app_by:
2020-07-16T13:50:52-0600
GAYTAN.JUAN.MANUEL.1296202157
app_date: 16-Jul-20
Page:
of_pages:
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .