- Tarrant County, Texas
About this file
This is a pre-bid conference presentation for the City of Fort Worth, Texas, Transportation and Public Works Department regarding the 2027 Concrete Restoration Contract 3 (City Project No. 106806). The project encompasses concrete pavement restoration across multiple street segments including N. Riverside Drive, Downing Drive, Chuparosa Drive, Grassy View Drive, and Qual Grove Drive. Major work items include 11,705 square yards of 9-inch panel replacement, 300 square yards of 11-inch panel replacement, 3,685 square yards of 7-inch panel replacement, 2,000 cubic yards of flex base installation, and 8,000 square yards of geogrid installation. The bid opening is scheduled for September 17, 2026, with the city aiming for a council bid award in October 2026. A pre-construction meeting is anticipated in November 2026, with construction beginning in December 2026. The selected vendor must have crews available to commence work immediately upon receiving the Notice to Proceed. Traffic control on N. Riverside Drive, a two-lane major arterial, may require temporary lane movements and flaggers during construction.
The engineer's estimate for this project is $2.8 million. A 30 percent small business utilization goal has been established, requiring bidders to meet or exceed this threshold through self-performance and/or small business subcontracting participation. Certified small businesses must be located within the five Fort Worth counties (Tarrant, Denton, Wise, Parker, and Johnson) and certified through approved agencies including the North Central Texas Regional Certifying Agency, Dallas/Fort Worth Business Council, Women's Business Council - Southwest, or Texas Department of Transportation. Bid submissions must include a bid form, conflict of interest statement, bid bond, contractor compliance documentation, vendor compliance statements, proposal forms, addendums, bid tables, and completed small business utilization forms with supporting certifications. The project manual is available online through Bonfire. Inquiries regarding the project should be directed to Project Manager Tariqul Islam at 817-392-2486 or tariqul.islam@fortworthtexas.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10-Sign in Sheet 2027 Concrete Restoration Contract 3.pdf | ||
| 7-00 45 42 Small Business Utilization Form (1).xlsx | XLSX spreadsheet | |
| 3-00 61 14 Payment Bond.doc | DOC document | |
| 8-00 61 13 Performance Bond.doc | DOC document | |
| 5-00 61 19 Maintenance Bond.doc | DOC document | |
| 6-00 11 13 Invitation to Bidders.docx | DOCX document | |
| 2-00 45 26 Contractor Compliance.doc | DOC document | |
| 13-Addendum No. 1.pdf | ||
| 1-00 52 43 Agreement.docx | DOCX document | |
| 14-Submission Instructions - 26-0306 (rev. 091026).docx | DOCX document | |
| 9-Project Manual CPN106806.pdf | ||
| 12-00 41 00 Bid Proposal Workbook - Addendum No. 1.xlsx | XLSX spreadsheet | |
| 4-00 21 13 Instruction to Bidders (1).docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Presented by Tariqul Islam
Project Manager Transportation & Public Works Department
September 4, 2026
2027 Concrete Restoration Contract 3 City Project No. 106806
Pre-Bid Conference
Transportation and Public Works
Project Limits
N. Riverside Dr (Timberland Blvd – Alliance Gateway)
Downing Dr (Mark IV Pkwy – I-35W NB Ramp)
Project Limits
Chuparosa Dr (Cresote Dr – N. Dead End)
Grassy View Dr (Prairie Hen Dr – White Swan Pl)
Qual Grove Dr (Prairie Hen Dr – Harmon Rd)
Project Details
3Transportation and Public Works
Engineer’s Estimate: $2.8MMajor Work Items:
• Major work items include:
• 11,705 SY- 9- inch Panel Replacement
• 300 SY- 11-inch Panel Replacement
• 3,685 SY- 7-inch Panel Replacement
• 2,000 CY – Flex Base
• 8,000 SY – Geogrid
3Transportation and Public Works
Traffic Control N. Riverside Dr
Two Lanes Major Arterial Two-way traffic may need to be moved to the other side of the street during construction
Construction may be done using flaggers Installation of temporary lane marking/tabs, warning signs, and using flaggers shall be considered subsidiary to the Traffic Control pay item
Anticipated Schedule
Schedule:
• Bid Opening September 17, 2026
• Council Bid Award – Aiming for October 2026
• Pre-construction meeting in November 2026
• Begin Construction in December 2026
Selected vendor must have crews available to start work after receiving the Notice to Proceed.
55Transportation and Public Works
4Transportation and Public Works
• Project Manual available on-line on Bonfire
• Required in Bid Proposal Submittal
• Follow Submission Instruction in Bonfire
• Bid Form
• Conflict of Interest Statement
• Bid Bond
• Contractor Compliance with WC
• Vendor Compliance to State Law
• Proposal Form
• Addendum
• Bid Table
• Completed Small Business Utilization Form
• Certificates identifying general contractor or subcontractors as Small Businesses
Project Requirements
4Transportation and Public Works
Small Business Goal
• Small Business Goal: 30%
• Compliance:
• Bidders shall comply with the Small Business Goal by meeting or exceeding the small business goal through self-performance and/or Small Business subcontracting participation.
• Small businesses are based on SBA definitions and must be located within the five Fort Worth counties: Tarrant, Denton, Wise, Parker, and Johnson.
• Small businesses shall be certified via one of the following certifying agencies:
• North Central Texas Regional Certifying Agency (NCTRCA)
• Dallas/Fort Worth Business Council (formerly DFW/MSDC)
• Women’s Business Council – Southwest (WBCS)
• Texas Department of Transportation (TxDOT)
5Transportation and Public Works
Questions/Discussion
5Transportation and Public Works
Fort Worth Project Manager
Tariqul Islam 817-392-2486 tariqul.islam@fortworthtexas.gov
Contact Information mailto:Tariqul.islam@fortworthtexas.gov mailto:Tariqul.islam@fortworthtexas.gov
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
File details come from the government source that posted it. Updated .