11_-_AS1A_AS2A_FS1A_RFP1_Part_2.pdf
PDF 6 MB Posted
- Attached to
- DEVA- STRUCTURAL FIRE SYSTEMS REPAIR & ITM AND BAC Federal contract opportunity
- Solicitation number
- 140P8125Q0034
About this file
This image is an Adobe PDF portfolio splash screen recommending users open the document in Acrobat X or Adobe Reader X. The screen displays the Adobe PDF logo, a red and white document graphic, and a "Get Adobe Reader Now!" button. The document appears to be a preliminary screen before accessing the actual federal contract opportunity file.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8125Q0034.pdf | ||
| Contract_Price_Schedule.docx | DOCX document | |
| 5_-_Scope_of_Repairs_by_Building_Number.pdf | ||
| 7_-_Commercial_Sprinkler_Systems_List_for_ITM.pdf | ||
| 10_-_NPS_Standard_ITM_Forms.pdf | ||
| 12_-_Reference_Manual_58_Structural_Fire_Management_reduced.pdf | ||
| Scope_of_Services_Backflow_Replacement.pdf | ||
| Scope_of_Services_Structural_Fire_System_ITM_and_Repairs.pdf | ||
| 8_-_Residential_Sprinkler_Systems_List_for_ITM.pdf | ||
| SCA_Wage_Determination_Inyo_County_California.pdf | ||
| 1_2A_2B_3_-_Structural_Fire_-_Maps.pdf | ||
| 6__-_Fire_Alarm_Systems_List_for_ITM.pdf | ||
| 11_-_AS1A_AS2A_FS1A_RFP1_Part_1.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
National Park Service Residential Fire Protection System Annual Inspection and Testing Form (Form RFP-1)
Location No.
Park: Site No. and Park Name:
Location Description:
Sq. Ft.: Occupancy Type: Tenant Type:
Location Type: Rental Class:
Instructions: Inspection must be completed annually, and the results uploaded to the NPS Structural Fire Data Management System (SFDMS). Where a violation is discovered, and cannot be immediately corrected to the inspector ’s satisfaction, a check mark shall be placed in the 'No’ column. The inspector shall provide comment on all 'No' observations; describing the deficiency identified and recommended corrective action.
Smoke Alarms
Item No. Observation Yes No N/A
1 Does each bedroom have a smoke alarm installed on the ceiling/wall?
2 Does the common corridor leading to each bedroom have a smoke alarm installed on the ceiling/wall?
3 Are all smoke alarms in place and properly connected to the device base and the ceiling/wall?
Where smoke alarms are hard-wired to unit AC power, is circuit powering the fire sprinkler bell or horn identified as 'Fire Sprinkler Bell/Horn' in circuit panel
Have all smoke alarms been tested for proper operation:
1. Single Station: Activation of one device does not activate others
2. Interconnected: All devices sound simultaneously when any one device is activated
6 Are smoke alarms free of physical damage?
Carbon Monoxide Detectors (Required for attached garages, or where fuel-fired appliances are installed)
7 Are there carbon monoxide detectors installed outside of each bedroom door?
8 If the unit has a basement, are there carbon monoxide detectors installed in the basement?
Carbon monoxide detectors are properly connected to the device base and the ceiling/wall, and free of physical damage?
Carbon monoxide detectors are not 'required' to be installed near the floor.
10 Did carbon monoxide detectors work when tested?
47656
DEVA
343 Nevares
4-plex Apartment
CCQ343 Asset 412911
11 Were detectors inspected for physical damage?
12 Where carbon monoxide detector is plugged in to a wall outlet, is that outlet labeled 'CO Detector' in circuit panel?
Fire Extinguishers
13 If a fire extinguisher present?
14 Is the fire extinguisher properly mounted and secured?
15 Does fire extinguisher appear to be free of physical damage?
16 Does fire extinguisher gauge show in the green?
17 If there is an attached garage, is a separate fire extinguisher installed in the garage?
Fire Sprinkler System
Visually inspected all accessible sprinklers to ensure they are not blocked, being used to support decorations or wiring, and are not leaking or damaged?
19 Are all valves controlling water supply to the fire sprinkler system open and secured in the open position?
20 Verify designed static pressure (from hydraulic design placard, if available), and record static water pressure on riser gauge?
Record Static Pressure
21 Did system water flow switch activate local notification appliance (bell or horn), when water was flowed?
22 Is circuit powering the fire sprinkler system notification appliance (bell or horn), identified as 'Fire Sprinkler Bell/Horn' in circuit panel?
23 Self-contained System: Verify and record water level of any on-site water tank which solely supports the fire sprinkler system?
Record Tank Volume
Self-contained Systems: Verify and record fire sprinkler pump (if applicable, is fully operational and does not trip circuit breakers in operation?
25 Self-contained Systems: Is circuit powering the sprinkler system water pump identified as 'Fire Sprinkler Water Pump' in circuit panel?
Deficiency Comments and Recommended Corrective Actions
Item No.
Signatures
Tenant's Name: Park Inspector's Name:
Signature: Signature:
Date: Date:
Signature:
Nathan Sowle
Location No: Location Description :
Park: Site No and Park Name:
Historic: Year Built:
Work Order History Summary
Date Work Order: Work Order Status: Date of Last Change:
Work Order Description:
4-plex Apartment
47656
CCQ343 Asset 412911
343 Nevares
Instructions: Inspection must be completed annually, and the results uploaded to the NPS Structural Fire Data Management System (SFDMS). Where a violation is discovered, and cannot be immediately corrected to the inspector ’s satisfaction, a check mark shall be placed in the 'No’ column. The inspector shall provide comment on all 'No' observations; describing
99562
CCQ357 Old Ghost Rd Unit A
2Br Duplex
CCQ357 Old Ghost Rd. Asset 1332634 g
CCQ357 Old Ghost Rd. Asset 1332634
CCQ357 Old Ghost Rd Unit A
Instructions: Inspection must be completed annually, and the results uploaded to the NPS Structural Fire Data Management System (SFDMS). Where a violation is discovered, and cannot be immediately corrected to the inspector ’s satisfaction, a check mark shall be placed in the 'No’ column. The inspector shall provide comment on all 'No' observations; describing
357 Old Ghost Rd
CCQ357 Old Ghost Rd Unit B Asset 1240219
CCQ357 Old Ghost Rd Asset 1240219
357 Old Ghost Rd
Instructions: Inspection must be completed annually, and the results uploaded to the NPS Structural Fire Data Management System (SFDMS). Where a violation is discovered, and cannot be immediately corrected to the inspector ’s satisfaction, a check mark shall be placed in the 'No’ column. The inspector shall provide comment on all 'No' observations; describing
99565
358 Skyline Rd Duplex
CCQ358 Skyline Rd Duplex Asset 1678260
99565
CCQ358 Skyline Rd Duplex Asset 1678260
358 Skyline Rd Duplex
Instructions: Inspection must be completed annually, and the results uploaded to the NPS Structural Fire Data Management System (SFDMS). Where a violation is discovered, and cannot be immediately corrected to the inspector ’s satisfaction, a check mark shall be placed in the 'No’ column. The inspector shall provide comment on all 'No' observations; describing
99558
359 Skyline Rd Triplex
1Br Triplex
CCQ359 Skyline Rd Asset 1197876
99558
CCQ359 Skyline Rd Asset 1197876
359 Skyline Rd Triplex
Annual Inspection of Fire Detection and Notification System (Form FA-1A)
Information on this form covers the minimum requirements of NFPA 72 for fire detection and alarm systems. Separate forms are available to inspect, test an maintain other fire protection systems.
Date Previous Inspection:
Date of Inspection:
Asset ID No: Asset Description:
Park: Site No and Name:
Location ID No: Location Name:
Note: All questions are to be answered 'Yes', 'No', or 'N/A' (Non-applicable ). All 'No' answers, and additional comments, are to be explained in Part V of this form.
Part II – INSPECTION
1. Control panel fuses are satisfactory? Yes No N/A
2. Control panel interface equipment is satisfactory? Yes No N/A
3. Control panel lamps and LEDs are satisfactory? Yes No N/A
4. Control panel primary (main) power supply is satisfactory? Yes No N/A
5. Control panel trouble signals are satisfactory? Yes No N/A
6. Control panel lead-acid batteries are free of corrosion and leakage, connections are tight, and electrolyte levels is appropriate? Yes No N/A
7. Control panel nickel-cadmium batteries are free of corrosion and leakage and connections are tight? Yes No N/A
8. Control panel dry-cell primary batteries are free of corrosion and leakage and
9. Control panel sealed lead-acid batteries are free of corrosion and leakage, connections are tight, and electrolyte level is appropriate? Yes No N/A
10. Control panel transient suppressors are satisfactory? Yes No N/A
11. Control panel trouble signals are satisfactory? Yes No N/A
12. Emergency voice/alarm communications equipment is satisfactory? Yes No N/A
13. Remote annunciators are satisfactory? Yes No N/A
14. Air-sampling initiating devices are satisfactory? Yes No N/A
15. Duct detectors are satisfactory? Yes No N/A
16. Electromechanical releasing devices are satisfactory? Yes No N/A
17. Fire extinguishing system switches are satisfactory? Yes No N/A
Control panel fuses are satisfactory? Yes No N/A
18. Fire suppression system switches are satisfactory? Yes No N/A
19. Fire alarm boxes are satisfactory? Yes No N/A
20. Heat detectors are satisfactory? Yes No N/A
21. Radiant energy fire detectors are satisfactory? Yes No N/A
22. Smoke detectors are satisfactory? Yes No N/A
23. Supervisory signal devices are satisfactory? Yes No N/A
24. Water flow devices are satisfactory? Yes No N/A
10/9/2024
1582242
DEVA PV353 Salt Pan Vista Dormitory (West)
Salt Pan Vista West 99571
Fire Alarm
25. Video image smoke and fire detectors are satisfactory? Yes No N/A
26. Projected beam smoke detectors are satisfactory? Yes No N/A
27. Guard’s tour equipment is satisfactory? Yes No N/A
28. Interface equipment is satisfactory? Yes No N/A
29. Alarm notification appliances are satisfactory? Yes No N/A
Part III – TESTING
30. Control equipment receives correct receipt of alarm?
31. Control equipment alarm notification appliances are satisfactory? Yes No N/A
32. Control equipment interface equipment passed simulation test? Yes No N/A
33. Control equipment lamps and LEDs are illuminated? Yes No N/A
34. Control equipment primary power supply passed test by disconnecting all secondary power? Yes No N/A
35. Control equipment transponders passed test? Yes No N/A
36. Engine-driven generator passed test? Yes No N/A
37. Lead-acid batteries passed charger test? Yes No N/A
38. Lead-acid batteries passed 30-minute discharge test? Yes No N/A
39. Lead-acid batteries passed load voltage test? Yes No N/A
40. Lead-acid batteries passed specific gravity test? Yes No N/A
41. Nickel-cadmium batteries passed 30-minute discharge test? Yes No N/A
42. Nickel-cadmium batteries passed load voltage test? Yes No N/A
43. Dry-cell batteries passed load voltage test? Yes No N/A
44. Sealed lead-acid batteries passed charger test? Yes No N/A
45. Sealed lead-acid batteries passed 30-minute discharge test? Yes No N/A
46. Sealed lead-acid batteries passed load voltage test? Yes No N/A
47. Emergency voice/alarm communications equipment passed tests? Yes No N/A
48. Remote annunciators passed test and are operating properly? Yes No N/A
49. Duct smoke detectors are properly sampling the airstream? Yes No N/A
50. Correct operation of Electromechanical Releasing devices was verified by removing the fusible link and operating the associated drive? Yes No N/A
51. Fire extinguishing system switches were operated and receipt of signal by the control panel was verified? Yes No N/A
52. Fire detectors passed test and are operating at the proper sensitivity and alarm response? Yes No N/A
53. Heat detectors passed test and are operating properly? Yes No N/A
54. Fire alarm boxes passed test and are operating properly? Yes No N/A
55. Radiant energy fire detectors passed test? Yes No N/A
56. Horns and strobes operated properly? Yes No N/A
57. Supervisory signal devices, except tamper switches, passed test? Yes No N/A
58. Water flow devices passed test? Yes No N/A
59. Valve tamper switches passed test? Yes No N/A
60. Off-premises transmission equipment passed test? Yes No N/A
61. Guard’s tour equipment passed test? Yes No N/A
62. Interface equipment passed test? Yes No N/A
63. Special hazard equipment passed test and is operating properly? Yes No N/A
64. Sound pressure level for audible devices was measured with sound level meter? Yes No N/A
65. Sound pressure level for speakers was measured with sound level meter? Yes No N/A
66. Visible devices passed test and device locations are acceptable? Yes No N/A
Part IV – Maintenance
67. All components of the fire detection and alarm system have been maintained according to the manufacturer's instructions? Yes No N/A
Part V – Deficiency Notes and Additional Comments Any additional comments, test failures or other problems found with the fire detection and alarm system must be explained here. Also, note here any products noticed on the systems that have been the subject of a recall.
Item No. Comment
60 AES Radio doesn't communicate with Call Center
Part VI – Signatures I state that the information on this form is correct at the time and place of my inspection, and that all equipment tested at his time was left in operational condition upon completion of this inspection except as noted in Part III above.
Contractor Information Contractor or Representative's Name:
Company:
Company Address:
Company Phone:
Date:
NPS Information Employee’s Name:
Employee Signature:
Park Division and/or Office:
Employee's Phone:
Community Fire Protection 1700 Soto St. Seaside, CA 93955 775-772-1755
Asset ID No: Description:
Park: Site:
Location No: Name:
1582242 Fire Alarm, FACP
DEVA PV353 Salt Pan Vista Dormitory (West)
Salt Pan Vista Dorm West99571
Information on this form covers the minimum requirements of NFPA 72 for fire detection and alarm systems. Separate forms are available to inspect, test an maintain other fire protection systems.
Date of Inspection:
Asset ID No: Asset Description:
Park: Site No and Name:
Location ID No: Location Name:
Note: All questions are to be answered 'Yes', 'No', or 'N/A' (Non-applicable ). All 'No' answers, and additional comments, are to be explained in Part V of this form.
Part II – INSPECTION
1. Control panel fuses are satisfactory? Yes No N/A
2. Control panel interface equipment is satisfactory? Yes No N/A
3. Control panel lamps and LEDs are satisfactory? Yes No N/A
4. Control panel primary (main) power supply is satisfactory? Yes No N/A
5. Control panel trouble signals are satisfactory? Yes No N/A
6. Control panel lead-acid batteries are free of corrosion and leakage, connections are tight, and electrolyte levels is appropriate? Yes No N/A
7. Control panel nickel-cadmium batteries are free of corrosion and leakage and
8. Control panel dry-cell primary batteries are free of corrosion and leakage and
9. Control panel sealed lead-acid batteries are free of corrosion and leakage, connections are tight, and electrolyte level is appropriate? Yes No N/A
10. Control panel transient suppressors are satisfactory? Yes No N/A
11. Control panel trouble signals are satisfactory? Yes No N/A
12. Emergency voice/alarm communications equipment is satisfactory? Yes No N/A
13. Remote annunciators are satisfactory? Yes No N/A
14. Air-sampling initiating devices are satisfactory? Yes No N/A
15. Duct detectors are satisfactory? Yes No N/A
16. Electromechanical releasing devices are satisfactory? Yes No N/A
17. Fire extinguishing system switches are satisfactory? Yes No N/A
Control panel fuses are satisfactory? Yes No N/A
18. Fire suppression system switches are satisfactory? Yes No N/A
19. Fire alarm boxes are satisfactory? Yes No N/A
20. Heat detectors are satisfactory? Yes No N/A
21. Radiant energy fire detectors are satisfactory? Yes No N/A
22. Smoke detectors are satisfactory? Yes No N/A
23. Supervisory signal devices are satisfactory? Yes No N/A
24. Water flow devices are satisfactory? Yes No N/A
1582245
DEVA PV354 Salt Pan Vista Dormitory (East)
Salt Pan Vista East99572
Fire Alarm
25. Video image smoke and fire detectors are satisfactory? Yes No N/A
26. Projected beam smoke detectors are satisfactory? Yes No N/A
27. Guard’s tour equipment is satisfactory? Yes No N/A
28. Interface equipment is satisfactory? Yes No N/A
29. Alarm notification appliances are satisfactory? Yes No N/A
Part III – TESTING
30. Control equipment receives correct receipt of alarm?
31. Control equipment alarm notification appliances are satisfactory? Yes No N/A
32. Control equipment interface equipment passed simulation test? Yes No N/A
33. Control equipment lamps and LEDs are illuminated? Yes No N/A
34. Control equipment primary power supply passed test by disconnecting all secondary power? Yes No N/A
35. Control equipment transponders passed test? Yes No N/A
36. Engine-driven generator passed test? Yes No N/A
37. Lead-acid batteries passed charger test? Yes No N/A
38. Lead-acid batteries passed 30-minute discharge test? Yes No N/A
39. Lead-acid batteries passed load voltage test? Yes No N/A
40. Lead-acid batteries passed specific gravity test? Yes No N/A
41. Nickel-cadmium batteries passed 30-minute discharge test? Yes No N/A
42. Nickel-cadmium batteries passed load voltage test? Yes No N/A
43. Dry-cell batteries passed load voltage test? Yes No N/A
44. Sealed lead-acid batteries passed charger test? Yes No N/A
45. Sealed lead-acid batteries passed 30-minute discharge test? Yes No N/A
46. Sealed lead-acid batteries passed load voltage test? Yes No N/A
47. Emergency voice/alarm communications equipment passed tests? Yes No N/A
48. Remote annunciators passed test and are operating properly? Yes No N/A
49. Duct smoke detectors are properly sampling the airstream? Yes No N/A
50. Correct operation of Electromechanical Releasing devices was verified by removing the fusible link and operating the associated drive? Yes No N/A
51. Fire extinguishing system switches were operated and receipt of signal by the control panel was verified? Yes No N/A
52. Fire detectors passed test and are operating at the proper sensitivity and alarm response? Yes No N/A
53. Heat detectors passed test and are operating properly? Yes No N/A
54. Fire alarm boxes passed test and are operating properly? Yes No N/A
55. Radiant energy fire detectors passed test? Yes No N/A
56. Horns and strobes operated properly? Yes No N/A
57. Supervisory signal devices, except tamper switches, passed test? Yes No N/A
58. Water flow devices passed test? Yes No N/A
59. Valve tamper switches passed test? Yes No N/A
60. Off-premises transmission equipment passed test? Yes No N/A
61. Guard’s tour equipment passed test? Yes No N/A
62. Interface equipment passed test? Yes No N/A
63. Special hazard equipment passed test and is operating properly? Yes No N/A
64. Sound pressure level for audible devices was measured with sound level meter? Yes No N/A
65. Sound pressure level for speakers was measured with sound level meter? Yes No N/A
66. Visible devices passed test and device locations are acceptable? Yes No N/A
Part IV – Maintenance
67. All components of the fire detection and alarm system have been maintained according to the manufacturer's instructions? Yes No N/A
Part V – Deficiency Notes and Additional Comments Any additional comments, test failures or other problems found with the fire detection and alarm system must be explained here. Also, note here any products noticed on the systems that have been the subject of a recall.
Item No. Comment
60 AES Radio doesn't communicate with Calle Center
Part VI – Signatures I state that the information on this form is correct at the time and place of my inspection, and that all equipment tested at his time was left in operational condition upon completion of this inspection except as noted in Part III above.
Contractor Information Contractor or Representative's Name:
Company:
Company Address:
Company Phone:
NPS Information Employee’s Name:
Employee Signature:
Park Division and/or Office:
Employee's Phone:
Community Fire Protection 1700 Soto St. Seaside, CA 93955 775-772-1755
Asset ID No: Description:
Park: Site:
Location No: Name:
1582245 Fire Alarm, FACP
DEVA PV353 Salt Pan Vista Dormitory (East)
Salt Pan Vista Dorm East99572
Instructions: Inspection must be completed annually, and the results uploaded to the NPS Structural Fire Data Management System (SFDMS). Where a violation is discovered, and cannot be immediately corrected to the inspector ’s satisfaction, a check mark shall be placed in the 'No’ column. The inspector shall provide comment on all 'No' observations; describing
59160
332 Dunes View Dr
2br House
SPQ332 Dunes View Dr Asset 1315197 gnature:
59160
SPQ332 Dunes View Dr Asset 1315197
332 Dunes View Dr
Instructions: Inspection must be completed annually, and the results uploaded to the NPS Structural Fire Data Management System (SFDMS). Where a violation is discovered, and cannot be immediately corrected to the inspector ’s satisfaction, a check mark shall be placed in the 'No’ column. The inspector shall provide comment on all 'No' observations; describing
59159
333 Dunes View Dr
2Br Duplex Apartments
SPQ333 Dunes View Dr Asset 412358
59159
SPQ333 Dunes View Dr Asset 412358
333 Dunes View Dr
Instructions: Inspection must be completed annually, and the results uploaded to the NPS Structural Fire Data Management System (SFDMS). Where a violation is discovered, and cannot be immediately corrected to the inspector ’s satisfaction, a check mark shall be placed in the 'No’ column. The inspector shall provide comment on all 'No' observations; describing
47463
Canyon View Ct
2 Br House
CCQ1 Asset 408225
47463
CCQ1 Asset 408225
Canyon View Ct
Instructions: Inspection must be completed annually, and the results uploaded to the NPS Structural Fire Data Management System (SFDMS). Where a violation is discovered, and cannot be immediately corrected to the inspector ’s satisfaction, a check mark shall be placed in the 'No’ column. The inspector shall provide comment on all 'No' observations; describing
47464
Old Ghost Road
1 Br House
CCQ10 Asset 1320679
47464
CCQ10 Asset 1320679
Old Ghost Road
Instructions: Inspection must be completed annually, and the results uploaded to the NPS Structural Fire Data Management System (SFDMS). Where a violation is discovered, and cannot be immediately corrected to the inspector ’s satisfaction, a check mark shall be placed in the 'No’ column. The inspector shall provide comment on all 'No' observations; describing
47652
329 Skyline Rd
2Br House
CCQ329 Asset 1479046
47652
CCQ329 Asset 1479046
329 Skyline Rd
Instructions: Inspection must be completed annually, and the results uploaded to the NPS Structural Fire Data Management System (SFDMS). Where a violation is discovered, and cannot be immediately corrected to the inspector ’s satisfaction, a check mark shall be placed in the 'No’ column. The inspector shall provide comment on all 'No' observations; describing
47654
330 Skyline Rd
CCQ330 Asset 415741
47654
CCQ330 Asset 415741
330 Skyline Rd
Instructions: Inspection must be completed annually, and the results uploaded to the NPS Structural Fire Data Management System (SFDMS). Where a violation is discovered, and cannot be immediately corrected to the inspector ’s satisfaction, a check mark shall be placed in the 'No’ column. The inspector shall provide comment on all 'No' observations; describing
47716
331 Skyline Rd
2Br Duplex Apartments
CCQ331 Skyline Rd Asset 1678257
47716
CCQ331 Skyline Rd Asset 1678257
331 Skyline Rd
Instructions: Inspection must be completed annually, and the results uploaded to the NPS Structural Fire Data Management System (SFDMS). Where a violation is discovered, and cannot be immediately corrected to the inspector ’s satisfaction, a check mark shall be placed in the 'No’ column. The inspector shall provide comment on all 'No' observations; describing
47698
334 Coyote Loop
3Br House
CCQ334 Asset 1176843
3Br House
47698
CCQ334 Asset 1176843
334 Coyote Loop
Instructions: Inspection must be completed annually, and the results uploaded to the NPS Structural Fire Data Management System (SFDMS). Where a violation is discovered, and cannot be immediately corrected to the inspector ’s satisfaction, a check mark shall be placed in the 'No’ column. The inspector shall provide comment on all 'No' observations; describing
47708
335 Coyote Loop
Duplex- 2Br Apartments
CCQ335 Asset 414231
Duplex- 2Br Apartments
47708
CCQ335 Asset 414231
335 Coyote Loop
Instructions: Inspection must be completed annually, and the results uploaded to the NPS Structural Fire Data Management System (SFDMS). Where a violation is discovered, and cannot be immediately corrected to the inspector ’s satisfaction, a check mark shall be placed in the 'No’ column. The inspector shall provide comment on all 'No' observations; describing
47709
336 Coyote Loop
Duplex - 2Br Apartments
CCQ336 Asset 414213
47709
CCQ336 Asset 414213
336 Coyote Loop
Instructions: Inspection must be completed annually, and the results uploaded to the NPS Structural Fire Data Management System (SFDMS). Where a violation is discovered, and cannot be immediately corrected to the inspector ’s satisfaction, a check mark shall be placed in the 'No’ column. The inspector shall provide comment on all 'No' observations; describing
47711
337 Coyote Loop
Duplex - 2Br Apartment
CCQ337 Asset 1479031 nature:
Duplex - 2Br Apartment
47711
CCQ337 Asset 1479031
337 Coyote Loop
Instructions: Inspection must be completed annually, and the results uploaded to the NPS Structural Fire Data Management System (SFDMS). Where a violation is discovered, and cannot be immediately corrected to the inspector ’s satisfaction, a check mark shall be placed in the 'No’ column. The inspector shall provide comment on all 'No' observations; describing
47712
338 Coyote Loop
CCQ338 Asset 414078
Missing Smoke/CO Head2
10/09/24
47712
CCQ338 Asset 414078
338 Coyote Loop
Instructions: Inspection must be completed annually, and the results uploaded to the NPS Structural Fire Data Management System (SFDMS). Where a violation is discovered, and cannot be immediately corrected to the inspector ’s satisfaction, a check mark shall be placed in the 'No’ column. The inspector shall provide comment on all 'No' observations; describing
47713
339 Coyote Loop Dr
CCQ339 Coyote Loop Duplex Asset 413237
47713
CCQ339 Coyote Loop Duplex Asset 413237
339 Coyote Loop Dr
Annual Ins