25B-162 IRISH ACRES TO SILVER SPRINGS WATER MAIN INTERCONNECT (PH1)
Solicitation number
25B-162
Issued by
Marion County, Florida

About this file

This is an addendum to solicitation 25B-162 for the Irish Acres to Silver Springs Water Main Interconnect (Phase 1) project issued by Marion County Utilities (MCU) on August 21, 2025 at 3:15 PM. The addendum modifies the original solicitation by requiring that a specific portion of the water main construction be prioritized as the first phase to provide service to the Millwood Estates Subdivision. This priority section must be constructed, tested, cleared, and connected to provide service within 90 days of receiving the Notice to Proceed (NTP), and failure to meet this deadline will result in liquidated damages being assessed against the contractor.

The addendum includes an attached map that identifies the specific water main section requiring expedited completion, labeled as the "Required Expedited Section" on the project map. The map shows the existing water infrastructure including potable water lines of 8+ inches, water network structures, and streets within Marion County. Bidders must acknowledge receipt of this addendum by signing the Proposer Requirements/Acknowledgements Form, as failure to acknowledge receipt may result in bid rejection. The addendum clarifies that this expedited timeline requirement will not extend the overall project completion schedule.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM TO 25B-162 Irish Acres to Silver Springs Water Main Interconnect (Ph1) August 21, 2025 @ 3:15 PM

TO: Participating Bidders

RE: Addendum No.

25B-162 Irish Acres to Silver Springs Water Main Interconnect (Ph1) Please make note of the following changes, additions, deletions and clarifications to the above-mentioned solicitation:

Per the attached map, Marion County Utilities (MCU) requires the indicated portion of water main be the first portion constructed, tested, cleared, and connected to provide service to the Millwood Estates Subdivision. This portion of work will need to be in service within 90 days of Notice to Proceed (NTP) and will be subject to liquidated damages if not. This will not required additional time for the overall project.

By signing the Proposer Requirements/Acknowledgements Form, Bidders are acknowledging receipt of this addendum. Failure to acknowledge receipt of this addendum may be cause for rejection.

ArcGIS Web Map

Marion County, Marion County BOCC

Marion County

Municipalities

Streets

Water Mains

Potable Water

Potable Water 8+ Inches

Water Network Structures

Treatment Plant

8/21/2025, 1:03:29 PM

0 0.25 0.50.13 mi

0 0.4 0.80.2 km

1:18,056

ArcGIS Web AppBuilder

Map data © OpenStreetMap contributors, Microsoft, Facebook, Inc. and its affiliates, Esri Community Maps contributors, Map layer by Esri | FDOT | FGDL Download - Source: FDEP | Marion County Utilities Department, Marion County, Florida | Marion County | OCE |

Joshua.Kramer Line

Joshua.Kramer Line

Joshua.Kramer Callout Required Expedited Section

File details come from the government source that posted it. Updated .