This document is a Request for Qualifications (RFQ) issued by the City of Lubbock, Texas, in collaboration with the Federal Emergency Management Agency (FEMA) and the Texas Division of Emergency Management (TDEM) for a Hazard Mitigation Grant Program project. The RFQ seeks to identify and select an engineering consultant to provide professional engineering services for designing 5 portable diesel generators and automatic transfer switches for the Southeast Water Reclamation Plant and Lubbock Civic Center. Responses are due by August 12, 2025, at 2:00 p.m. through the Bonfire Hub online submission platform, with the City planning to short-list up to five firms based on qualifications and potentially conduct interviews to select a final consultant.

The project is funded through a Hazard Mitigation Grant Program and requires strict compliance with federal and state grant regulations, including 2 CFR 200.322 on domestic preferences for procurements and 2 CFR 200.323 on procurement of recovered materials. The selected consultant will be responsible for evaluating electrical systems, developing technical specifications and drawings, preparing cost estimates, and providing bid phase services. The contract is subject to City Council approval and annual appropriation, with the City reserving the right to cancel the RFQ or reject any submissions. Key compliance requirements include prioritizing U.S.-made goods, purchasing EPA-designated items with recycled content, and adhering to both FEMA and TDEM grant rules.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUALIFICATIONS

RFQ 25-18963-TF

Portable Generators and ATS Design for Emergencies

City of Lubbock, TX

RFQ 25-18963-TF

Portable Generators and ATS Design for Emergencies

1. BACKGROUND

The City of Lubbock is working with the Federal Emergency Management Agency and Texas Division of Emergency Management on a Hazard Mitigation Grant Program. Lubbock has a need for emergency backup power in the case of a power outage at our Southeast Water Reclamation Plant due to severe weather and other emergencies, as well as during an emergency situation requiring the safe housing of citizens at the Lubbock Civic Center. The purpose of this RFQ is to identify and select an engineering consultant to provide professional engineering services for the design of 5 portable diesel generators and automatic transfer switches as needed to be housed in our Southeast Water Reclamation Plant and Lubbock Civic Center.

B. PROJECT SCOPE OF WORK

This process will select a qualified engineering firm for professional engineering services. The scope of work described in this section are neither limited nor comprehensive in nature. The chosen consultant shall, at a minimum, perform or make provisions for the following as applicable.

· Evaluate the Southeast Water Reclamation Plant and Lubbock Civic Center for emergency generator design and procurement.

· Perform a thorough analysis of the Southeast Water Reclamation Plant and Lubbock Civic Center electrical systems, electrical loads, and emergency power needs.

· Determine best design and practices utilizing automatic transfer switches to minimize downtime in emergency power situations.

· Integrate new components with SCADA as needed.

· Develop complete set of sealed contract documents, technical specs, plans and drawings for bidding by the City to install and construct the emergency generators and automatic transfer switches.

· Prepare cost estimates and Engineer’s Opinion of Probable Construction Cost for the project.

· Provide bid phase services including conducting pre bid conference, responding to bidder’s questions and issuing addendums.

· Comply with 2 CFR 200.322 Domestic Preferences for Procurements.

· Comply with 2 CFR 200.323 Procurement of Recovered Materials.

· Follow all state and federal grant rules required by FEMA and TDEM.

2 CFR 200.322 – Domestic Preferences for Procurements is a federal regulation that encourages recipients of federal financial assistance to prioritize American-made goods and materials in their purchasing decisions.

Here’s what it means in practice:

· Preference Requirement: To the greatest extent practicable and consistent with law, entities receiving federal funds (like cities, counties, or school districts) should prefer goods, products, or materials produced in the United States.

· Scope of Materials: This includes items such as iron, aluminum, steel, cement, and other manufactured products like PVC pipe, concrete, glass (including optical fiber), and lumber.

· Definition of “Produced in the U.S.”: For iron and steel, all manufacturing processes—from melting to coating—must occur in the U.S..

· Contractual Obligations: These preferences must be included in all subawards, contracts, and purchase orders under federal awards.

· Buy America Tie-In: Federal agencies funding infrastructure projects must implement Buy America preferences as outlined in 2 CFR Part 184.

This regulation is part of the broader push to support domestic manufacturing and ensure federal dollars stimulate the U.S. economy. If you're drafting procurement policies or federal grant compliance documents, this clause is a must-have.

2 CFR 200.323 – Procurement of Recovered Materials is a federal regulation that promotes environmentally responsible purchasing by recipients of federal financial assistance.

Here’s what it requires:

· Who Must Comply: State agencies, political subdivisions (like cities and counties), and their contractors must follow this rule when using federal funds.

· Key Requirements:

· Purchase items designated by the EPA in 40 CFR Part 247 that contain the highest practicable percentage of recovered materials, especially when:

· The item costs more than $10,000, or

· The total quantity purchased in the previous fiscal year exceeded $10,000.

· Procure solid waste management services in ways that maximize energy and resource recovery.

· Establish an affirmative procurement program to ensure compliance with EPA guidelines.

· Sustainability Goals: Entities should prioritize products and services that:

· Can be reused, refurbished, or recycled

· Contain recycled content

· Are biobased, energy-efficient, or water-efficient

· Reduce reliance on single-use plastics This regulation ties into broader federal sustainability efforts, including Executive Order 14057, which promotes climate-conscious procurement practices.

Follow all state and federal grant rules required by FEMA and TDEM means that any entity receiving federal or state emergency management funding—such as cities, counties, or school districts—must comply with a comprehensive set of regulations and guidelines issued by:

🏛️ FEMA (Federal Emergency Management Agency)

· Federal Procurement Standards: Entities must follow rules in 2 CFR §§ 200.317–200.327, which include:

· Competitive bidding requirements

· Conflict of interest policies

· Contract provisions and cost principles

· Domestic Preferences: Prioritize U.S.-made goods and materials (2 CFR § 200.322)

· Recovered Materials: Purchase EPA-designated items with recycled content (2 CFR § 200.323)

· Emergency Procurement: Special rules apply during exigency or emergency situations (noncompetitive procurement may be allowed) 🛡️ TDEM (Texas Division of Emergency Management)

· State Administrative Plans: Entities must follow Texas-specific grant conditions, such as:

· Procurement policies that meet or exceed federal standards

· Timely reporting and reimbursement procedures

· Compliance with Texas Government Code Chapter 783 (Uniform Grant Management)

· Subrecipient Agreements: Entities must sign formal agreements acknowledging all terms and conditions, including audit and performance requirements

C. SELECTION AND AWARD PROCESS

The City of Lubbock uses a two-step process for the final selection of a qualified consultant.

Step 1 consists of a Qualifications package submitted by firms interested in being considered. The City may select up to five (5) short-listed firms based on an evaluation of the written materials submitted. Short-listed firms may be asked to submit additional information.

Step 2 consists of the selection of one finalist from with the short-listed firms. The City reserves the rights to expand the selection process to include interviews if deemed necessary. The City initiates negotiations with the selected consultant to develop a scope of work. If negotiations are unsuccessful, the City enters into the process with the next highest ranked short-listed firm. The contract is subject to approval by the City Council.

Professional services are procured in accordance with Chapter 2254 of the Government Code, Facilities Envelope Consulting Services 10, Subchapter A, and Professional Services. Selection of the most highly qualified respondent is made based on demonstrated competence and qualifications as determined by the City of Lubbock based on information provided in response to the RFQ.

NO INDIVIDUAL OF ANY CITY DEPARTMENT HAS THE AUTHORITY TO LEGALLY AND/OR FINANCIALLY COMMIT THE CITY TO ANY CONTRACT, AGREEMENT OR PURCHASE ORDER FOR GOODS OR SERVICES, UNLESS SPECIFICALLY SANCTIONED BY THE REQUIREMENTS OF THE REQUEST FOR QUALIFICATIONS.

D. ELECTRONIC SUBMISSION PROCESS, DUE DATE, AND REQUIRED DOCUMENTS

Responses must be submitted not later than August 12, 2025, @ 2:00 p.m. though https://ci-lubbock-tx.bonfirehub.com. Allow time to upload.

E. CONTENTS OF STATEMENT OF QUALIFICATIONS ARE AS FOLLOWS AND MUST BE SUBMITTED AS REQUESTED

· A Letter of Interest addressed to the Honorable Mayor and City Council summarizing the Consultant’s understanding of the project and a brief description of the Consultant’s strengths to perform the work successfully.

· Cover sheet

· Table of Contents

· Statement of Qualifications Form

· Response to the Selection Submittals & Description of the Selection Criteria NOTE: The response should not exceed the maximum of 35 pages. Requested forms and the statement of qualifications form are not included in this maximum.

Include any information deemed pertinent that has not been included elsewhere in the response under: Appendix Page Limit: 10

F. SELECTION PROCESS

A Screening Committee reviews submittal and determines which qualified candidates are invited to present their qualifications further at an interview with the Screening Committee.

G. RIGHT OF CITY TO CANCEL REQUEST FOR QUALIFICATIONS, TO ELECT NOT TO AWARD, TO REJECT SUBMITTALS, AND TO WAIVE INFORMALITIES OR IRREGULARITIES The City expressly reserves the right to cancel the RFQ at any time, to elect not to award contracts cited in the RFQ, to reject any or all submittals, to waive any informality or irregularity in any submittal received, and to be the sole judge of the merits of the respective submittals received.

H. EQUAL OPPORTUNITY IN CITY BUSINESS CONTRACTING

Race, religion, sex, color, ethnicity, and national origin are not used as criteria in the City’s business contracting practices. Every effort is made to ensure that all persons regardless of race, religion, sex, color, ethnicity and national origin have equal access to contracts and other business opportunities with the City.

I. INQUIRIES AND INTERPRETATIONS

Responses to inquiries that directly affect an interpretation or change to the RFQ are issued in writing by the Purchasing and Contract Management Office as an addendum to the RFQ and posted on www. https://ci-lubbock-tx.bonfirehub.com. All such addenda issued by the Purchasing and Contract Management Office before the time that Qualification packages are received shall be considered part of the RFQ. Only those inquiries the Purchasing and Contract Management Office replies to by addenda and posts on https://ci-lubbock-tx.bonfirehub.com. shall be binding. Oral and other interpretations or clarifications are without legal effect

J. THE CITY RIGHT TO AUDIT

At any time during the term of the contract, or thereafter, the City, or a duly authorized audit representative of the City, at its expense and at reasonable times, reserves the right to audit Contractor's records and books relevant to all services provided to the City under the Contract. In the event such an audit by the City reveals any errors or overpayments by the City, Contractor shall refund the City the full amount of such overpayments within thirty (30) days of such audit findings, or the City, at its option, reserves the right to deduct such amounts owing the City from any payments due Contractor.

K. NONAPPROPRIATION

All funds for payment by the City under this Agreement are subject to the availability of an annual appropriation for this purpose by the City. In the event of non-appropriation of funds by the City Council of the City of Lubbock for the services provided under the Agreement, the City will terminate the Agreement, without termination charge or other liability, on the last day of the then-current fiscal year or when the appropriation made for the then-current year for the services covered by this Agreement is spent, whichever event occurs first (the “Non-Appropriation Date”). If at any time funds are not appropriated for the continuance of this Agreement, cancellation shall be accepted by the Engineer on thirty (30) days prior written notice, but failure to give such notice shall be of no effect and the City shall not be obligated under this Agreement beyond the Non-Appropriation Date.

L. NON-ARBITRATION

The City reserves the right to exercise any right or remedy available to it by law, contract, equity, or otherwise, including without limitation, the right to seek any and all forms of relief in a court of competent jurisdiction. Further, the City shall not be subject to any arbitration process prior to exercising its unrestricted right to seek judicial remedy. The remedies set forth herein are cumulative and not exclusive, and may be exercised concurrently. To the extent of any conflict between this provision and another provision in, or related to, this document, this provision shall control.

M. ASSIGNING OR SUBLETTING THE CONTRACT

The contractor shall not assign or sublet the contract, or any portion of the contract, without written consent from the Director of Purchasing and Contract Management. Should consent be given, the Contractor shall insure the Subcontractor or shall provide proof of insurance from the Subcontractor that complies with all contract Insurance requirements document, this provision shall control.

N. DISCLOSURE OF INTERESTED PARTIES

House Bill 1295, adopted by the 84th Legislature, created §2252.908, Texas Government Code. Section 2252.908 requires a business entity entering into certain contracts with a governmental entity or state agency to file with the governmental entity or state agency a disclosure of interested parties at the time the business entity submits the signed contract to the governmental entity or state agency. Section 2252.908 requires the disclosure form to be signed by the authorized agent of the contracting business entity, acknowledging that the disclosure is made under oath and under penalty of perjury. Section 2252.908 applies only to a contract that requires an action or vote by the governing body of the governmental entity or state agency before the contract may be signed or has a value of at least $1 million. Instructions for completing Form 1295 are available at: https://ci.lubbock.tx.us/departments/purchasing/vendor-information

A contract described by Subsection (b) of Government Code Section 2252.908 entered into by a governmental entity or state agency is voidable for failure to provide the disclosure of interested parties required by this section only if: (1) the governmental entity or state agency submits to the business entity written notice of the business entity ’s failure to provide the required disclosure; and (2) the business entity fails to submit to the governmental entity or state agency the required disclosure on or before the 10th business day after the date the business entity receives the written notice under Subdivision (1).

O. TEXAS GOVERNMENT CODE 2271.002

No Boycott of Israel. Pursuant to Section 2271.002 of the Texas Government Code, a) This section applies only to a contract that: (1) is between a governmental entity and a company with 10 or more full-time employees; and (2) has a value of $100,000 or more that is to be paid wholly or partly from public funds of the governmental entity. (b) A governmental entity may not enter into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract.

P. TEXAS GOVERNMENT CODE 2252.152

Contracts with Companies Engaged in Business with Iran, Sudan, or Foreign Terrorist Organization Prohibited. Pursuant to Section 2252.152 of the Texas Government Code, prohibits the City from entering into a contract with a vendor that is identified by The Comptroller as a company known to have contracts with or provide supplies or service with Iran, Sudan or a foreign terrorist organization.

Q. TEXAS GOVERNMENT CODE 2274

By entering into this Agreement, Contractor verifies that: (1) it does not, and will not for the duration of the contract, have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association or (2) the verification required by Section 2274.002 of the Texas Government Code does not apply to the contract.

If Contractor is a company with 10 or more full-time employees and if this Agreement has a value of at least $100,000 or more, Contractor verifies that, pursuant to Texas Government Code Chapter 2274, it does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and will not discriminate during the term of the contract against a firearm entity or firearm trade association.

Contractor represents and warrants that: (1) it does not, and will not for the duration of the contract, boycott energy companies or (2) the verification required by Section 2274.002 of the Texas Government Code does not apply to the contract.

If Contractor is a company with 10 or more full-time employees and if this Agreement has a value of at least $100,000 or more, Contractor verifies that, pursuant to Texas Government Code Chapter 2274, it does not boycott energy companies; and will not boycott energy companies during the term of the Agreement. This verification is not required for an agreement where a governmental entity determines that these requirements are inconsistent with the governmental entity’s constitutional or statutory duties related to the issuance, incurrence, or management of debt obligations or the deposit, custody, management, borrowing, or investment of funds.

R. ANTI-LOBBYING PROVISION

During the period between proposal submission date and the contract award, proposers, including their agents and representatives, shall not discuss or promote their proposal with any member of the Lubbock City Council or city staff except upon the request of the City of Lubbock Purchasing Department in the course of city-sponsored inquiries, briefings, interviews, or presentations.

S. PROTEST

All protests regarding the RFQ process must be submitted in writing to the City Director of Purchasing and Contract Management within 5 working days after the protesting party knows of the occurrence of the action which is protested relating to advertising of notices deadlines, proposal opening and all other related procedures under the Local Government Code, as well as any protest relating to alleged improprieties with the RFQ process. This limitation does not include protests relating to staff recommendations as to award of contract. Protests relating to staff recommendations may be directed to the City Manager. All staff recommendations will be made available for public review prior to consideration by the City Council as allowed by law.

FAILURE TO PROTEST WITHIN THE TIME ALLOTTED SHALL CONSTITUTE A WAIVER OF ANY PROTEST.

T. ANTI-LOBBYING PROVISION

DURING THE PERIOD BETWEEN PROPOSAL SUBMISSION DATE AND THE CONTRACT AWARD, PROPOSERS, INCLUDING THEIR AGENTS AND REPRESENTATIVES, SHALL NOT DISCUSS OR PROMOTE THEIR PROPOSAL WITH ANY MEMBER OF THE LUBBOCK CITY COUNCIL OR CITY STAFF EXCEPT UPON THE REQUEST OF THE CITY OF LUBBOCK PURCHASING DEPARTMENT IN THE COURSE OF CITY-SPONSORED INQUIRIES, BRIEFINGS, INTERVIEWS, OR PRESENTATIONS.

This provision is not meant to preclude offerors from discussing other matters with City Council members or City staff. The policy is intended to create a level playing field for all potential offerors, assure that contract decisions are made in public, and to protect the integrity of the RFQ process. Its purpose is to stimulate competition, prevent favoritism and secure the best work and materials at the lowest practicable price, for the best interests and benefit of the taxpayers and property owners. Violation of this provision may result in rejection of the offeror's proposal.

image1.jpeg

File details come from the government source that posted it. Updated .