100.631-Paint.pdf
PDF 191 KB Posted
- Attached to
- 123-098 RFQQ - 75' MV Thunderbird Refurbishment
- Solicitation number
- 123-098
About this file
The document provided contains details regarding a state and local contract opportunity for the refurbishment and repair of the 75' MV Thunderbird vessel, issued by the Washington State Parks and Recreation Commission (WSPRC). The project requires substantial completion by March 4, 2022, to allow the vessel's operational work to commence on March 21, 2022. The contract opportunity is open to qualified firms and covers various aspects of the vessel's preservation, including surface preparation, coating application, and other necessary repairs. The contract covers multiple jurisdictions in the state of Washington, including King, Snohomish, Skagit, Whatcom, San Juan, Kitsap, Pierce, Jefferson, and Snohomish counties.
The document also provides detailed technical specifications and procedures for the surface preparation and coating application on the vessel's underwater hull, freeboard, bin walls, house, rails, engine room, and other areas. The contract will be awarded based on the submitted proposals, and the successful bidder will be responsible for providing the required services and products to the WSPRC within the specified timeline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 123-098 - Orig Drawings.pdf | ||
| Thunderbird_TechSpecs_211025.pdf | ||
| 000007B-2020 MV Thunderbird Survey.pdf | ||
| 000010B Supplemental Conditions.docx | DOCX document | |
| 123-098 - Orig Construc Photos.pdf | ||
| Thunderbird General Shipyard Spec 211025.docx | DOCX document | |
| 123-098 RFQQ MV Thunderbird Refurbishment.docx | DOCX document | |
| 123-098 RFx Amd #1.docx | DOCX document | |
| 000007A-Conditions Found & Struct Assess Rpt.pdf | ||
| 000007C-Thunderbird Final Report.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Owner: Parks Department Washington State
Vessel: Thunderbird
Size: 75 L x 20 W x 3.5 D
Substrate: Hull Carbon Steel / House Aluminum
Scope: Full preservation by area listed below.
Surface Preparation & Application (Revision 2)
Preparation Procedure: Underwater Hull
I. To remove existing salts. Pressure wash underwater hull, freeboard, & bin walls and with a pressure washer that shall not exceed 4000 Psi. Should remove all marine growth and lose foreign material.
II. Using blast nozzle SSPC-SP7 III. Blow down and inspect blasted steel
Preparation Procedure: Decks (forward well and aft raised), Freeboard, Bin Walls and Bow Door Gate Exterior & Interior Bow Door
I. To remove existing salts. Pressure wash with a pressure washer Should remove all marine growth and lose foreign material.
II. Using blast nozzle SSPC-SP 6 2.0-3.0 mil profile III. Followed by SSPC-SSP1, SSPC-SP2, & SSPC-SP3 as needed in non-accessible areas.
IV. Blow down and inspect blasted steel for cleanliness.
Preparation Procedure: House (Aluminum) Including Mast I. To remove existing salts. Pressure wash house with a pressure washer that shall not exceed 4000 Psi. Should remove all marine growth and lose foreign material.
II. SSPC-SSP1, SSPC-SP2, & SSPC-SP3 Abrade any glossy surface if any.
III. Inspect area for cleanliness prior to coating application.
Preparation Procedure: Rails, Cleats, Ladders, Winch Box
I. To remove existing salts. Pressure wash with a pressure washer.
II. Use blast nozzle to remove existing to SSPC-SP-6 1.5-2.0 profile III. Blow down and inspect blasted steel for cleanliness
Preparation Procedure: Engine Room Bilge and Foundations
I. This area degrease SSPC-SP1 II. Prepare steel to SP-11 in accesable areas with Bristle Blasters hand
Held providing 1.5 mil profile in bilge areas III. In acessible areas SSPC-SP-3 power tool clean IV. SSPC-SP-1 prior to coating application
Preparation Procedure: Storage Room Deck only location Forward Port
I. This area degrease SSPC-SP1 II. Prepare steel to SP-11 in accesable areas with Bristle Blaster III. In acessible areas SSPC-SP-3 power tool clean IV. SSPC-SP-1 prior to coating application
Preparation Procedure: Forepeak Tank Void and Engine Room Walls
I. SSPC-SP-1 Clean II. SSPC SP-3 to spots as needed
Preparation Procedure: Other Voids
I. Once tanks open survey to determine scope.
Action same as Forepeak.
Application Procedure:
Underwater Hull I. Apply 2 spot coats of Sherwin-Williams Seagaurd 6000 to all entire underwater hull
II. Apply 1 spot and 1 full of Sherwin-Williams Seagaurd Ablative coating. Follow tie coat procedures during this process.
1 Spot Seaguard 6000 Black 5-8 mils DFT 1 Spot Seaguard 6000 Gray 6-12 wet apply AF at tack point or Apply tack coat next day 1 Spot Seaguard Ablative Black 5-6 mils DFT 1 coat Full Seaguard Ablative Red 5-6 mils DFT Anchor to be black 2 coats Seaguard 6000 Black 5-6 mils each coat.
Freeboard I. Apply 2 coat of Sherwin-Williams Seagaurd 6000 to all entire freeboard
II. Apply 1 coat of Hi-Solids Polyurethane Color SW Electric Blue Thunderbird 1 Coat Seaguard 6000 Black 5-8 mils DFT 1 stripe coat all welds and edges Seaguard 6000 Gray 1 Coat Seaguard 6000 Gray 5-8 mils DFT 1 Coat Hi Solids Polyurethane SW Electric Blue Thunderbird 3-4 mils DFT system 13-16 mils
Bin Walls I. Apply 2 coats of Sherwin-Williams Seaguard 6000
II. Apply 1 coat of Sherwin-Williams Hi Solids Polyurethane
1 Coat Seaguard 6000 Black 5-8 mils DFT
1 Stripe coat on welds and edges Seaguard 6000 Gray
1 Coat Seaguard 6000 Gray 5-8 mils DFT
1 Coat Hi Solids Polyurethane SW Electric Blue Thunderbird 3-4 mils DFT system 13-15 mils
House / Mast
I. Apply spot coat on bare aluminum Corothane I Aluminum
II. Apply 1 coat SW Hi-Solids Polyurethane White
1 spot coat on bare aluminum Corothane I Mio Aluminum 1-2 mils DFT
1 Coat Hi Solids Polyurethane White Gloss 3-4 mils DFT
Decks and interior Bow Door
I. Apply 1 coat of Sher-Glass FF Epoxy 18-20 mils DFT Gray
II. Apply 1 coat of AST 7CZ 5-6 mils
III Apply 1 coat of AST 400 G non -skid Haze Gray 30 sq ft gallon
(non- skid applied to diamond plate area only on Bow Door)
(note keep Non-Skid 4 inch from side shell and 4 inches away from
Equipment on deck or openings.)
Rails, Cleats, Winch Box and Ladders
I. Apply 1 coat Seaguard Gray 5-6 mils DFT II. Apply 1 coat Seaguard Black 5-6 mils DFT III. Apply 1 coat Hi Solids Polyurethane Black Gloss
(stainless rail no paint)
Engine Room, Bilge and Foundations I Apply 1 coat of Seaguard 6000 Gray 5-6 mils DFT II Apply stripe coat on welds and edges Seaguard 6000 Red
Engine Room, walls (as required) I Apply 1 spot coat Seaguard 6000 White 3-4 mils DFT
Storage Room FWD Port Deck only I Apply 1 coat of Seaguard 6000 Gray 5-6 mils DFT II Apply stripe coat on welds and edges Seaguard 6000 Red III Apply 1 coat of Seaguard 6000 Red 5-6 mils DFT
Forepeak Void I Apply 1 spot coat Seaguard 6000 Red 5-6 mils DFT II Apply 1 spot coat Seaguard 6000 Gray 5-6 mils DFT III Other voids need spot repair use above system
References:
The procedures for preparing the Thunderbird Vessel were created using basic standards for preparing metal substrates from Society for Protective Coatings (SSPC) and the National Association of Corrosion Engineers International (NACE).
Commercial Blast Cleaning SSPC-SP6/NACE 3; ISO 8501-1 Sa 2 A Commercial Blast Cleaned surface, when viewed without magnification, shall be free of all visible oil, grease, dirt, dust, mill scale, rust, paint, oxides, corrosion products and other foreign matter, except for staining. Staining shall be limited to no more than 33% of each square inch of surface area and may consist of light shadows, slight streaks or minor discoloration caused by stains of rust, stains of mill scale or stains of previously applied paint. Before blast cleaning, visible deposits of oil or grease shall be removed by any of the methods specified in SSPC-SP1 or other agreed upon methods.
Brush-Off Blast Cleaning SSPC-SP7/NACE 4; ISO 8501-1 Sa 1 A Brush-Off Blast Cleaned surface, when viewed without magnification, shall be free of all visible oil, grease, dirt, dust, loose mill scale, loose rust, and loose paint. Tightly adherent mill scale, rust and paint may remain on the surface. Mill scale, rust and coating are considered adherent if they cannot be removed by lifting with a dull putty knife after abrasive blast cleaning has been performed. Before blast cleaning, visible deposits of oil or grease shall be removed by any of the methods specified in SSPC-SP1 or other agreed upon methods.
Near-White Blast Cleaning SSPC-SP10/NACE 2; ISO 8501-1 Sa 2.5
A Near-White Blast Cleaned surface, when viewed without magnification, shall be free of all visible oil, grease, dirt, dust, mill scale, rust, paint, oxides, corrosion products and other foreign matter, except for staining. Staining shall be limited to no more than 5 percent of each square inch of surface area and may consist of light shadows, slight streaks or minor discoloration caused by stains of rust, stains of mill scale or stains of previously applied paint. Before blast cleaning, visible deposits of oil or grease shall be removed by any of the methods specified in
SSPC-SP1 or other agreed upon methods. For complete instructions, refer to Joint Surface
Preparation Standard SSPC-SP10/NACE 2 or ISO 8501-1 Sa 2.5
Pressure Washing Pressure washer shall not exceed 4000 Psi with Flat tips only NO Rotary Tip light cleaning. Any residual material shall be tightly adhered to the metal substrate and may consist of randomly dispersed stains of rust and other corrosion products or previously applied coating, tightly adherent thin coatings, And other tightly adherent foreign matter.
SSPC-SP1 Solvent Cleaning Removal of all visible oil, grease, soil, drawing and cutting compounds, and other soluble contaminants from steel surfaces with solvent, vapor, cleaning compound, alkali, emulsifying agent, or steam.
SSPC-SP2 Hand Tool Cleaning Removes all loose mill scale, loose rust, loose paint, and other loose detrimental foreign matter by hand chipping, scraping, sanding, and wire brushing.
SSPC-SP3 Power Tool Cleaning Removes all loose mill scale, loose rust, loose paint, and other loose detrimental foreign matter by power wire brushing, power sanding, power grinding, power tool chipping, and power tool descaling. In conclusion, Primer colors could vary depending on final topcoat
SSPC-SP11 Bare Metal Power Cleaning When viewed without magnification, the surface shall be free of all visible oil, grease, dirt, dust, mill scale, rust, paint, oxides,corrosion products,and other foreign matter. Slight residues in pits if original surface is pitted. The surface profile shall not be less than 1 mil.
All specification data is supported by manufactures data page.
Please allow 12-24 hours before undocking after final coat of antifouling has been applied.
Thank you for opportunity to survey your vessel. And provide long term protection with SW marine coatings.
The Sherwin-Williams Company
Ray Meador
File details come from the government source that posted it. Updated .