(10) ROOF DRAIN DETAIL (1).pdf
PDF 248 KB Posted
- Attached to
- ROOF RENOVATION - ROOF SECTIONS
- Solicitation number
- RFP BEAL 180000002414 1
- Issued by
- Ingham County, Michigan
About this file
This is a technical specification document for the LA-PR-24 roofing project, detailing roof drain installation and waterproofing requirements. The project involves the restoration and installation of a liquid-applied waterproofing system around an existing roof drain assembly. The scope includes removal of existing flashings, installation of new fluid-applied systems, and integration of reinforcement materials into a cast-iron drain bowl with clamping ring and drain strainer. Key specifications require priming of the substrate per manufacturer recommendations, full saturation or encapsulation of reinforcement in base coat, trimming of existing flashings to the bowl transition point, and extension of the liquid-applied system into the drain. The reinforcement must be cut into triangular pieces that overlap into the bowl, with new flashings fully encapsulating old flashings.
The document emphasizes substrate preparation and quality control measures, including cleaning existing roof membranes to bright metal and applying primer before installation of new systems. The liquid-applied base coat serves as the primary waterproofing material with reinforcement to ensure durability and proper water drainage. Existing insulation and restoration deck clamp details are noted as integration points. No pricing information, contract timeline, bidding requirements, or award details are included in this technical specification sheet, which functions as a construction detail guide rather than a solicitation or contract agreement document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LA-PR-24
NOTES
1. PRIMING OF THE SUBSTRATE MAY BE REQUIRED, FOLLOW SPECIFICATIONS AND MANUFACTURER
RECOMMENDATIONS.
2. REINFORCEMENT MUST BE FULLY SATURATED OR ENCAPSULATED IN BASE COAT AS DESCRIBED IN
SPECIFICATIONS.
3. REMOVE EXISTING FLASHINGS PRIOR TO INSTALLATION OF NEW FLUID APPLIED SYSTEMS.
ROOF DRAIN
PARTIALLY REINFORCED RESTORATION
DECK CLAMP
EXISTING INSULATION SUMP
CAST-IRON DRAIN BOWL
CLAMPING RING
DRAIN STRAINER
LIQUID APPLIED BASE COAT
EXTEND LIQUID APPLIED
SYSTEM INTO DRAIN
N.T.S.
CLEAN TO BRIGHT
METAL AND PRIME
EXISTING ROOF MEMBRANE
TRIM EXISTING FLASHINGS TO
WHERE BOWL TURNS DOWN.
ENSURE NEW FLASHINGS FULLY
ENCAPSULATES OLD FLASHINGS.
CUT REINFORCEMENT INTO TRIANGLES
AND OVERLAP INTO BOWL.
LIQUID APPLIED REINFORCED BASE COAT
AutoCAD SHX Text
2017 TREMCO
AutoCAD SHX Text C
AutoCAD SHX Text R