This is a performance measures and liquidated damages exhibit (Exhibit B) for RLI 25004JD issued by the Broward County Sheriff's Office. The document establishes minimum performance standards and associated penalties for a contractor providing occupational health services including pre-employment medical exams, drug testing (pre-employment, random, and reasonable suspicion), hepatitis B vaccinations, fitness for duty examinations, and an online platform for managing these services. All services must comply with HIPAA, OSHA, and applicable federal, state, and local regulations, with specific turnaround times ranging from 2 hours for reasonable suspicion drug testing response to 5 working days for various medical exams and test results reporting.
The performance standards include strict timing requirements with 100% compliance expected across all service categories, and liquidated damages ranging from 25% discounts off individual services for timing failures to $50 per inaccurate invoice for billing errors. More significant penalties include 3-4% of service fees for inaccurate reports or regulatory non-compliance, and $500 per 0.1% downtime below 99% daily uptime for the online platform. Performance will be audited annually through statistically valid random sampling with a 95% confidence level and 3% deviation margin, conducted either by the Sheriff's Office personnel or an independent third-party auditor. The cost of annual audits will be shared equally between both parties, and liquidated damages become due within 30 days of written notification, payable either through invoice credits or direct payments to the Sheriff's Office.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT B | Performance Measures and Liquidated Damages | RLI 25004JD
EXHIBIT B - PERFORMANCE MEASURES AND LIQUIDATED DAMAGES
The PROPOSER must agree to the following minimum performance standards and applicable liquidated damages. At the
Broward County Sheriff’s Office discretion, an audit of the accuracy of the PROPOSER’s results will be performed via a randomly selected, statistically verifiable sample of claims by a qualified, independent third party. The results of the audit after appropriate review and comment by the PROPOSER will be the final determinant of performance standard compliance.
When sampling methods are used to estimate performance for the universe of PROPOSER’S delivered services, audit samples will be large enough to ensure a confidence interval whose deviation is no greater than plus or minus three percent
(3%) and whose confidence level is at least ninety-five percent (95%). The Broward County Sheriff’s Office will consider the point estimate for the sample as the PROPOSER’s performance level in calculating liquidated damages.
The Broward County Sheriff’s Office’s reserves the right to reduce or waive any liquidated damages if, in the Broward County
Sheriff’s Office’s sole discretion, failure to meet a performance standard was due to extraordinary circumstances.
PERFORMANCE GUARANTEES
It is the intent of the Broward County Sheriff’s Office to assess liquidated damages to any PROPOSER vendor who fails to meet the minimum performance standards listed below. The final contract between the Broward County Sheriff’s Office and the PROPOSER vendor will incorporate (by reference to this Exhibit to the RLI or otherwise) the specific terms and conditions under which such damages may be assessed, including the measurement methodology, amounts, and recovery provisions. Unless otherwise agreed to in writing, the Broward County Sheriff’s Office will evaluate the PROPOSER’S compliance with these standards by way of: (i) conducting its own auditing with its own personnel; or (ii) an independent claim reviewer/performance auditor contracted with by the Broward County Sheriff’s Office.
The following performance standards and discount guarantees will apply separately to each year of the resulting contract:
Performance
Standard Topic
Description of Standard Guarantee Liquidated Damage Amount )
1. Pre-Employment Medical Exam Turnaround
All pre-employment medical exams completed, with wait time not exceeding 30 minutes from appointment time, and results reported to BSO Human Resources within 5 working days of candidate appointment.
Measurement and Assessment Period: Per occurrence, verified by audit.
100% 25% discount off each individual untimely exam
2. Pre-Employment
Drug Testing
All pre-employment drug test results (negative and non-controverted positive) reported to BSO Human Resources within 3 working days of sample collection, with wait time not exceeding 30 minutes from appointment time.
untimely test
3. Random Drug
Testing
Random drug test results reported to BSO within 5 working days of sample collection, with collections performed at a NIDA-certified site operational by 6:00 AM on designated dates.
untimely test
4. Reasonable
Suspicion Drug
Testing Response
Certified Professional Collector and/or Breath Alcohol Technician available at a NIDA-certified site within 2 hours of BSO notification, 24/7/365.
untimely response
5. Hepatitis B
Vaccination
Hepatitis B vaccinations administered within 5 working days of request, with wait time not exceeding 30 minutes from appointment time.
untimely vaccination
6. Fitness for Duty Examination
Fitness for Duty examinations completed and results (including return-to-work assessments) reported to BSO Human Resources within 5 working days of appointment.
untimely exam
Standard Topic
Description of Standard Guarantee Liquidated Damage Amount
7. Billing
Accuracy
All invoices submitted to BSO must be accurate and in accordance with the agreed fee schedule.
Measurement and Assessment Period: Per occurrence, based on PROPOSER-provided reports.
100% $50 per inaccurate invoice
8. Accuracy of
Medical Exam and Drug Test
Reports
All medical exam and drug test reports must be accurate and complete, with no discrepancies as verified by audit.
100% 3% of Service Fees per non-compliant report
9. Compliance with Regulatory
Standards
All services (medical exams, drug tests, vaccinations, etc.) conducted in compliance with HIPAA, OSHA, and applicable federal, state, and local regulations.
Measurement and Assessment Period: annual, verified by audit.
100%
4% of Service Fees per non-compliant instance
10. Online
Platform
Secure, HIPAA-compliant online platform with role-based access, multi-factor authentication, automated random drug test selection, and integration with BSO HR systems fully operational with less than 1% downtime annually.
Measurement and Assessment Period:
Annually based on PROPOSER-provided uptime reports or anytime upon Broward County Sheriff’s Office becoming aware of this performance deficiency anytime during the term of the contract.
> 99% uptime per day
$500 per 0.1% downtime below 99% per day (continuous 24 hours after the first time of each occurrence) performance measure is not met.
As indicated in the aforementioned table, compliance with the performance standards 1 through 8 will be measured and determined based on per-occurrence verification during an annual performance review to be conducted by, at the Broward
County Sheriff’s Office’s option by way of: (i) conducting its own auditing with its own personnel; or (ii) an independent performance auditor contracted with by the Broward County Sheriff’s Office. Compliance with standards 9 and 10 will be measured annually, except more frequently as otherwise provided herein relative to compliance standard 10, by performance reports provided by the PROPOSER. For the purpose of determining performance compliance with standards
1 through 9, the performance review will utilize statistically valid, random samples, and will be conducted no more frequently than once per contract year. The PROPOSER agrees to cooperate with this process and make available the requested records, data, reports, and the necessary system access to the reviewer at no cost to the Broward County Sheriff’s Office or reviewer. The reviewer will make their workpapers available to the PROPOSER and the Broward County Sheriff’s Office, and either will have the opportunity to respond to the review report before it is finalized. Unless one of the parties can conclusively demonstrate that the results of the review are incorrect, such results will be accepted and will become the basis for determining if liquidated damages should apply. The PROPOSER’s reports and/or any data supporting the
PROPOSER’s reports relative to performance standards 10 may also be reviewed by, at the Broward County Sheriff’s
Office’s option by way of: (i) conducting its own auditing with its own personnel; or (ii) an independent performance auditor contracted with by the Broward County Sheriff’s Office; or (iii) anytime upon Broward County Sheriff’s Office becoming aware of this performance deficiency anytime during the term of the contract. If so reviewed, the report and determination of the performance review professional shall be final, binding, and conclusive; provided, however, that before a final report and determination is issued, the Broward County Sheriff’s Office and the PROPOSER shall each have a reasonable opportunity to review the non-proprietary supporting documentation and proposed report and to provide any comments to the performance review professional.
Any liquidated damages assessed as the result of documented noncompliance with any of the aforementioned performance standards and/or discount guarantees will become due and payable within 30 days after the PROPOSER receives written notification of same by either: 1) Broward County Sheriff’s Office elects to take a credit on the next PROPOSER’S monthly invoice; or 2) Broward County Sheriff’s Office accepts such payments that become due may be made directly to the Broward
County Sheriff’s Office by the PROPOSER.