10-Drawings PNC2131637C1.pdf
PDF 6 MB Posted
- Attached to
- Secret Woods Tower Demolition
- Solicitation number
- PNC2131637C1
- Issued by
- Florida
About this file
This document set comprises detailed architectural and engineering drawings and specifications for the Secret Woods Nature Center Walkway and Observation Tower Demolition project, prepared for the Broward County Parks and Recreation Division by Edward Dvorak, P.E. (Florida Engineer No. 40961). The project, located at 2701 W State Road 84 in Dania Beach, Florida 33312 (Secret Woods Nature Center in the South Fork New River mangrove swamp area), involves the complete demolition and removal of approximately 85 linear feet of existing boardwalk structures, an observation tower, and all associated concrete and wood piling. The scope of work includes extraction of prestressed concrete piles and pressure-treated wood piles from the riverbed, removal of beams, joists, floor planks, handrails, and aluminum pipe piling, with all material removal to be performed using barges to minimize impact to the river environment. The contractor must install turbidity barriers and debris screens to protect water quality and maintain marine traffic patterns, erect Coast Guard-required safety lighting and signage, and properly dispose of all demolished materials at state-certified waste facilities within Broward County. Work may be performed from both landside and waterside, with one leg of the boardwalk and designated parking lot areas dedicated for contractor use and material stockpiling.
The specifications are governed by the 2023 Florida Building Code (8th Edition) and ANSI A10.6 demolition safety standards, with coordination required between Parks Services and Utilities Services to minimize operational interruptions. The contractor is responsible for all utility provision (electric, pneumatic, water, and sewer), debris removal, and daily cleaning operations to maintain river conditions and public access. Environmental protections include mandatory preservation of all mangrove resources per Florida Statutes Sections 403.9321 through 403.9333 and protocols for hazardous materials (which are not expected but must be immediately reported if encountered). The county assumes no responsibility for actual existing conditions and requires pre- and post-demolition inspections and documentation with the county project manager to confirm structural integrity of adjacent facilities. All materials and structural elements removed become contractor property, requiring proper handling, transportation, and legal disposal, with treated wood specifically prohibited from burning and required to be disposed of at solid waste or recycling facilities.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOUTH FORK
NEW RIVER
MANGROVE
SWAMP
AREA
AREA OF WORK
SECRET WOODS NATURE CENTER
WALKWAY AND OBSERVATION TOWER
DEMOLITION
Project No.422-25A
2701 W STATE RD 84
DANIA BEACH, FLORIDA 33312
PARKS AND RECREATION DIVISION
PLANNING & DESIGN SECTION
1 NORTH UNIVERSITY DRIVE, SUITE 3200B
PLANTATION, FLORIDA 33324-2038
SHEET LIST TABLE
DESC. SHEET TITLE
CV-1 COVER SHEET
GN-1 GENERAL NOTES AND SPECIFICATIONS
DM-1 WALKWAY AND PLATFORM DEMOLITION PLAN
MISC-1 WALKWAY AND DECK PHOTOGRAPHS
SCOPE OF WORK
GENERAL CODES
LOCATION MAP
www.broward.org
ARCHITECT / ENGINEER
OF RECORD
REVISION
NO. DATE DESCRIPTION
COVER
SITE LOCATION
N
· REMOVE ALL CONCRETE AND WOOD PILES
· REMOVE ALL BEAMS, JOIST AND HORIZONTAL MEMBERS
· REMOVE ALL FLOOR PLANKS AND HANDRAILINGS
· ALL CONCRETE AND WOOD PILING REMOVAL TO BE
PERFORMED FROM A BARGE
· REMOVE SECTIONS OF BOARDWALK AS SHOWN ON PLAN
SITE LOCATION
SHEET:
CV-1
N.T.S.
Edward Dvorak, P.E.
Florida Engineer No. 40961
Broward County Board of County Commissioners www.broward.org
2023 FLORIDA BUILDING CODES, 8TH EDITION
· BUILDING CODE (FBC)
· ACCESSIBILITY CODE (FBC-A)
· EXISTING BUILDING CODE (FBC-EB)
FLORIDA BUILDING CODES - ICC DIGITAL CODES (ICCSAFE.ORG)
BUILDING CODES AND STANDARDS - MYFLORIDALICENSE.COM
This item has been digitally signed and sealed by Edward Dvorak on the date adjacent to the seal.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
G:
\P la nn in g\
Au to
CA
D
\P
AR
KS
\4
S ec re t w oo ds
N at ur e
Ce nt er \2
5A W
AL
KW
AY
A
N D
D
EC
K D
EM
O
\C V-
Co ve r S he et
.d w g, /1 0/
2:
:0
PM
, D W
G To
P D
F.
pc
PROJECT #:
PHASE:
DATE:
PROJ MGR: ED. DVORAK
NO. DATE DESCRIPTION
REVISIONS
PA
R
K S
A N
D R
EC
R
EA
TI
O N
D
IV
IS
IO
N
PA
R
K S
PL
A
N N
IN
G
D
ES
IG
N S
EC
TI
O N
PARKS AND RECREATION DIVISION
PLANNING AND DESIGN SECTION
1 NORTH UNIVERSITY DRIVE, SUITE 3200B
PLANTATION, FLORIDA 33324-2038
PH: (954) 577-4567
This item has been digitally signed and sealed by Edward Dvorak on the date adjacent to the seal.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
#422-25A
#Printed Issue Date
#Project Status
G :\P la nn in g\
A ut oC A
D \P
A R
K S re t w oo ds N at ur e C en te r\2 5A
W A
LK
W
A Y
A N
D D
E C
K D
E M
O \G
N -1
G en er al
N ot es .d w g
P rin te d:
/1
0/
0:
A M
SHEET No:
W . S ta te
R d.
4, F
OR
T
LA
UD
ER
DA
LE
, F L
SE
C R
ET
W
O O
D S
N
AT
U R
E C
EN
TE
R
W A
LK
W
A Y
O
B
SE
R
VA
TI
O
N D
EM
O
LI
TI
O N lo ca te d at
Edward Dvorak, P.E.
Florida Engineer No. 40961
SECTION 02 41 19
SELECTIVE DEMOLITION
PART 1 GENERAL
1.01 SUMMARY
A. SECTION INCLUDES SELECTIVE DEMOLITION AS DESIGNATED ON THE DRAWINGS TO
PROVIDE FOR NEW WORK. REFER TO THE DRAWINGS FOR ADDITIONAL DEMOLITION
NOTES. WORK INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING:
1. REMOVAL (EXTRACTION) OF PIER CONCRETE PILES IN THE SOUTH FORK OF THE NEW
RIVER AT SECRET WOODS BROWARD COUNTY PARK LOCATED ON SR 84.
2. REMOVAL OF EXISTING SECOND FLOOR BEAMS AND JOISTS.
3. REMOVAL OF ALUMINUM AND STEEL GUSSET PLATES AND CONNECTORS.
4. REMOVAL (EXTRACTION) OF PIER TREATED WOOD PILES.
5. REMOVAL OF WALKWAY PILES AND WALKWAY AND HANDRAILING AND GATES.
6. PROTECTION OF ITEMS TO REMAIN AS INDICATED ON THE DRAWINGS.
7. INSTALL TURBIDITY SCREENS AND DEBRIS SCREENS IN THE RIVER SO AS NOT TO
INTERFERE WITH MARINE TRAFFIC PATTERNS.
8. INSTALL COAST GUARD REQUIRED ALERTS & SAFETY SIGNS AND LIGHTS IN THE
RIVER TO PROTECT MARINE TRAFFIC DAY AND NIGHT.
9. REMOVAL, HAULING, AND DISPOSAL OF ALL DEMOLISHED PILES AND MEMBERS TO A
STATE CERTIFIED TRASH DISPOSAL SITE WITHIN BROWARD COUNTY.
B. WORK MAY BE PERFORMED FROM BOTH THE LANDSIDE AND THE WATERSIDE. ONE LEG
OF THE BOARDWALK WILL BE DEDICATED FOR EXCLUSIVE USE BY THE CONTRACTOR.
AN AREA OF THE PARKING LOT WILL BE DEDICATED TO THE CONTRACTOR FOR USE FOR
STOCKPILING DEBRIS, STORING EQUIPMENT AND MATERIALS, AND TO SET UP A
'PORT-A-LET', ETC. THESE AREAS IN THE PARKING LOT SHALL BE CLOSED AND
CORDONED OFF WITH A 6-FOOT-HIGH CHAIN-LINK FENCE OR SIMILAR.
1.02 DEFINITIONS
A. REMOVAL (EXTRACTION): PULL UP AND OUT OF THE RIVERBED THE ENTIRE
PRESTRESSED CONCRETE AND TREATED WOOD PILES. LEAVING PARTS OF PILES IN
THE RIVERBED IS UNACCEPTABLE.
B. AMERICAN NATIONAL STANDARDS INSTITUTE: ANSI A10.6 - AMERICAN NATIONAL
STANDARD SAFETY REQUIREMENTS FOR DEMOLITION.
1.03 PERFORMANCE REQUIREMENTS NOT USED
1.04 ADMINISTRATIVE REQUIREMENTS
A. COORDINATION: COORDINATE INTERRUPTIONS WITH PARKS SERVICES AND UTILITIES
SERVICES. COORDINATE WORK TO ENSURE EMERGENCY SIGNS AND LIGHTING, EXIT
SIGNS, AND OTHER SAFETY SYSTEMS ARE IN FULL OPERATION IN THE RIVER AND ON
LAND.
B. PRE-DEMOLITION MEETING: CONDUCT A PRE-DEMOLITION MEETING TO OUTLINE ALL
WORK TO BE PERFORMED AND ALL MATERIALS TO BE HAULED AWAY.
C. SEQUENCING: SEQUENCE OPERATIONS TO MAINTAIN SAFE WORKING CONDITIONS AND
PRESERVE EXISTING WORK THAT IS TO REMAIN. SEQUENCE DEMOLITION SO AS NOT TO
UNDERMINE OR COMPROMISE LOADING OF THE REMAINING STRUCTURES.
D. SCHEDULING: SCHEDULE WORK SO AS NOT TO INTERFERE WITH THE PARKS PLANNED
OPERATIONS. COOPERATE WITH THE COUNTY SCHEDULING WASTE REMOVAL THAT
MAY IMPACT PARKS OPERATIONS.
1.05 SUBMITTALS
A. SUBMITTALS, IF ANY, WILL BE NOTED IN DIVISION ONE SPECIFICATIONS. SUBMIT A WORK
PLAN SHOWING THE DEMARCATION LINE WHERE DEMOLITION WORK SHALL START AND
WHERE IT SHALL END.
1.06 QUALITY ASSURANCE
A. REQUIREMENTS OF REGULATORY AGENCIES: PERFORM WORK IN ACCORDANCE WITH
RULES AND REGULATION OF STATE AND LOCAL GOVERNMENTS HAVING JURISDICTION
FOR DEMOLITION WORK, SAFETY, ENVIRONMENTAL, AND DISPOSAL OF HAZARDOUS
MATERIALS AND DEBRIS. CONFORM TO FEDERAL, STATE AND COAST GUARD RULES
HAVING JURISDICTION OVER SUCH ITEMS.
1.07 SITE CONDITIONS
A. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH ADJACENT, AND OCCUPIED,
AREAS AND NAVIGATIONAL ROUTES.
B. COUNTY ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITIONS OF THE EXISTING PIER
AND WALKWAY TO BE DEMOLISHED.
C. CONDUCT DEMOLITION AND DEBRIS REMOVAL OPERATIONS DAILY WITH MINIMUM
INTERFERENCE TO PUBLIC AND PRIVATE ACCESS. ALWAYS MAINTAIN PROTECTED
EGRESS AND ACCESS FROM ADJACENT AREAS.
D. CEASE DEMOLITION IMMEDIATELY IF STRUCTURES APPEAR TO BE IN DANGER OF
COLLAPSE AND OR BREAKING UP. NOTIFY THE COUNTY PROJECT MANAGER. DO NOT
RESUME OPERATIONS UNTIL DIRECTED.
E. WHERE EXISTING CONDITIONS CONFLICT WITH THAT SHOWN ON THE CONTRACT
DOCUMENTS, NOTIFY COUNTY PROJECT MANAGER AND OBTAIN CLARIFICATIONS.
F. HAZARDOUS MATERIALS:
· HAZARDOUS MATERIALS ARE NOT EXPECTED TO BE ENCOUNTERED IN THIS
AREA. ASBESTOS IS NOT IN THE PRECAST CONCRETE PILES, NOR THE
TREATED WOOD PILES, NOR THE WOOD HANDRAILS AND WOOD FLOOR PLANKS.
· HAZARDOUS MATERIALS ARE EXCLUDED FROM WORK IN THIS SECTION.
IMMEDIATELY INFORM THE COUNTY PROJECT MANAGER IF HAZARDOUS
MATERIAL IS ENCOUNTERED, STOP WORK IN SUSPECT AREAS. DO NOT
PROCEED WITH WORK IN SUSPECT AREAS UNTIL APPROVED BY THE COUNTY
PROJECT MANAGER.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 EXISTING STRUCTURES DOCUMENTATIONS
A. BEFORE PROCEEDING WITH THE WORK, MAKE INSPECTIONS AND REPORT DEFECTS AND
STRUCTURAL WEAKNESSES OF THE NEARBY STRUCTURES TO BE PARTIALLY
DEMOLISHED, CUT OR REMOVED.
B. AFTER THE WORK, MAKE INSPECTION AND DOCUMENT CONDITIONS INCLUDING
DEFECTS AND WEAKNESSES OF:
· ADJACENT STRUCTURES INDICATED TO REMAIN
· STRUCTURES PARTIALLY DEMOLISHED, CUT, OR REMOVED
· IMPROVEMENTS INDICATED TO REMAIN
C. COUNTY PROJECT MANAGER WILL ACCOMPANY THE CONTRACTOR BEFORE AND
AFTER THE WORK TO CONFIRM PHYSICAL CONDITION OF EXISTING STRUCTURES OR
IMPROVEMENTS TO REMAIN.
3.02 EXAMINATION
A. REVIEW PROJECT RECORD DOCUMENT OF EXISTING CONSTRUCTION PROVIDED BY THE
OWNER.
B. DETERMINE WHERE REMOVALS MAY RESULT IN STRUCTURAL DEFICIENCY OR
UNPLANNED COLLAPSES DURING DEMOLITION.
C. DETERMINE WHERE DEMOLITION MAY AFFECT STRUCTURAL INTEGRITY OF ADJACENT
STRUCTURES TO REMAIN.
· IDENTIFY MEASURES REQUIRED TO PROTECT STRUCTURES FROM COLLAPSE.
· IDENTIFY REMEDIAL WORK INCLUDING PATCHING, REPAIRING, BRACING, AND
OTHER WORK REQUIRED TO LEAVE STRUCTURES TO REMAIN IN
STRUCTURALLY SOUND CONDITION.
D. WHEN UNANTICIPATED ELEMENTS ARE ENCOUNTERED DETERMINE EXTENT OF THE
ELEMENT. PROMPTLY SUBMIT A REPORT TO THE COUNTY PROJECT MANAGER.
3.03 PREPARATION
A. PLAN WORK TO BE DEMOLISHED AT SITE AND COORDINATE WITH NEARBY RELATED
WORK FOR WHICH CUTTING IS REQUIRED.
B. REVIEW YOUR PLAN OF WORK WITH THE COUNTY PROJECT MANAGER PRIOR TO
DEMOLITION.
C. MAINTAIN TEMPORARY SUPPORTS AND ENCLOSURES DURING DEMOLITION WORK.
D. ERECT AND MAINTAIN TEMPORARY TURBIDITY BARRIERS IN THE RIVER AND AS
NECESSARY ON LAND IN THE LOW-LAYING AREAS OF THE NEARBY PARKS UPLANDS.
DEMOLITION WITHIN THE RIVER MUST BE KEPT TO A CONFINED AREA WITH THE USE OF
TURBIDITY SCREENING EXTENTS FROM THE SURFACE DOWN TO THE BOTTOM OF THE
RIVERBED.
E. ERECT AND MAINTAIN WARNING SIGNS, SAFETY SIGNS, AND GUARDS NECESSARY TO
PROTECT THE MARINE TRAFFIC AND THE PUBLIC AND PARKS EMPLOYEES. SECURITY
SIGNS AND OTHER DEVICES ARE PARTICULARLY NECESSARY AT NIGHTTIME INCLUDING
SOLAR LIGHTS AND STROBES AS NEEDED IN THIS AREA OF THE RIVER.
F. EXISTING UTILITIES: THERE ARE NO EXISTING UTILITIES ON SITE. ALL ELECTRIC,
PNEUMATIC, WATER, AND SEWER UTILITIES SHALL BE PROVIDED BY THE CONTRACTOR
FOR THE DURATION OF THE PROJECT.
G. PROVIDE BRACING AND SHORING TO EXISTING ADJACENT STRUCTURES TO PREVENT
SETTLEMENT AND MOVEMENT.
3.04 SALVAGE REQUIREMENTS - NOT USED
3.05 DEMOLITION REQUIREMENTS
A. DISPOSE OF DEMOLITION MATERIALS:
· MATERIALS AND STRUCTURAL ELEMENTS BECOME THE PROPERTY OF THE
CONTRACTOR, AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER
REMOVAL, TRANSPORTATION, HAULING, AND DISPOSAL OF THESE MATERIALS.
3.06 DEMOLITION
A. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCES WITH ADJACENT MARINE TRAFFIC
AND OTHER NEARBY AREAS.
B. MAINTAIN SUFFICIENT AND PROTECTED MARINE TRAFFIC ON THE SOUTH FORK NEW
RIVER.
C. DO NOT CLOSE OR OBSTRUCT MARINE TRAFFIC.
D. CEASE OPERATIONS IMMEDIATELY WHEN STRUCTURE APPEARS TO BE IN DANGER OF
COLLAPSE AND NOTIFY THE COUNTY PROJECT MANAGER.
E. CONCRETE PILES: DEMOLISH BY MEANS OF EXTRACTING AND PULLING-OUT THE ENTIRE
PRE-STRESSED CONCRETE PILE ONE AT A TIME WITHOUT BENDING, AND CRACKING.
CUTTING PILES IS ACCEPTED AS LONG AS NOT LEFT IN THE RIVER. LEAVING ANY PART
OF THE CONCRETE PILE IN THE RIVERBED IS NOT CONSIDERED A FULL PILE
EXTRACTION.
F. LOWER HEAVY STRUCTURAL FRAMING ELEMENTS BY HOIST OR CRANE.
3.07 DEBRIS REMOVAL
A. REMOVE DEBRIS IN ACCORDANCE WITH LOCAL, COUNTY AND STATE REQUIREMENTS.
B. REMOVE DEMOLISHED MATERIALS FROM THE SITE VIA BARGE AND/OR LANDSIDE
DUMPSTER.
C. REMOVE MATERIALS AS WORK PROGRESSES; LEAVE RIVER IN A CLEAN AND CLEAR
CONDITION.
D. BARGE MAY BE LEFT ON SITE IF PERMITS ALLOW.
E. NOTHING REMOVED FROM THE SITE SHALL BE STORED, SOLD, BURNED, NOR BURIED.
CONSTRUCTION DEBRIS SHALL BE DISPOSED OF LEGALLY.
F. TREATED WOOD MUST BE HANDLED AND DISPOSED OF PROPERLY DURING REMOVAL.
TREATED WOOD SHOULD NOT BE CUT ON SITE NOR ALTERED IN A MANNER THAT WOULD
GENERATE DUST AND PARTICLES IN OR NEAR THE RIVER. TREATED WORK SHOULD BE
DISPOSED OF IN A SOLID WASTE FACILITY OR A RECYCLING FACILITY. TREATED WOOD
SHALL NOT BE BURNED.
3.08 REPAIRS
A. PROMPTLY REPAIR DAMAGE TO ADJACENT ELEMENTS CAUSED BY DEMOLITION
OPERATIONS. REPAIR TO ORIGINAL OR BETTER CONDITION.
3.09 CLEANING
A. CLEAN ADJACENT ELEMENTS SCHEDULED TO REMAIN OF DUST, DIRT, AND DEBRIS
CAUSED BY DEMOLITION OPERATIONS.
END OF SECTION
GENERAL NOTES AND
SPECIFICATIONS
GN-1
WALKWAY
WALKWAY
SLO
PE DN 1:2
SL
OPE
DN 1:
X -2.
X -2.
X -2.
X -2.
X -1.
X -1.
X -2.
X -2.
X 6.1
X -2.
X -1.
X -3.
X -2.
X -2.
X -2.
X -1.
X -2.
X -2.
X -1.
X -1.
X -1.
20'-4"
'-1
'-4
9'-0"
'-5
4 X 4 WOOD
@ 4'-0" O.C
EXISTING
WOOD DECK
WALKWAY FRAMING
2 X 4 WOOD
(2)- 5/8" 316 STAINLESS
STEEL BOLTS WITH
OVERSIZED FENDER
WASHERS
2 X 6 WOOD 2 X 4 WOOD
2"
M
AT
C H
S
PA
C
IN
G A
T
EX
IS
TI
N G
W
AL
KW
AY
N.T.S.
WALKWAY RAILING DETAIL
& DISCONTINUED ENDS
2 X 4 WOOD
'-6
PCP
TP
PRESTRESSED CONCRETE PILES TO BE REMOVED
WOOD PRESSURE TRENTED PILES TO BE REMOVED
LEGEND
X -2.
SHOWS APPROXIMATE LOCATION OF RIVER BED ELEVATIONS
(REFERENCED TO NAVD 88 DATAUM) (REFERENCED TO NAVD 88
DATUM)
1/4" = 1'-0"
WALKWAY AND PLATFORM DEMOLITION PLAN
N
PROJECT #:
PHASE:
DATE:
PROJ MGR: ED. DVORAK
NO. DATE DESCRIPTION
REVISIONS
PA
R
K S
A N
D R
EC
R
EA
TI
O N
D
IV
IS
IO
N
PA
R
K S
PL
A
N N
IN
G
D
ES
IG
N S
EC
TI
O N
PARKS AND RECREATION DIVISION
PLANNING AND DESIGN SECTION
1 NORTH UNIVERSITY DRIVE, SUITE 3200B
PLANTATION, FLORIDA 33324-2038
PH: (954) 577-4567
This item has been digitally signed and sealed by Edward Dvorak on the date adjacent to the seal.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
#422-25A
#Printed Issue Date
#Project Status
G :\P la nn in g\
A ut oC A
D \P
A R
K S re t w oo ds N at ur e C en te r\2 5A
W A
LK
W
A Y
A N
D D
E C
K D
E M
O \D
M -1
D em ol iti on P la n.
dw g
P rin te d:
/1
0/
:5
A M
SHEET No:
W . S ta te
R d.
4, F
OR
T
LA
UD
ER
DA
LE
, F L
SE
C R
ET
W
O O
D S
N
AT
U R
E C
EN
TE
R
W A
LK
W
A Y
O
B
SE
R
VA
TI
O
N D
EM
O
LI
TI
O N lo ca te d at
Edward Dvorak, P.E.
Florida Engineer No. 40961
INSTALL AND ANCHOR NEW
TURBIDITY BARRIER UNTIL
WORK IS COMPLETE
MANGROVE
SWAMP AREA
NOTES:
1. EXISTING WALKWAY GATES TO BE REMOVED AND REPLACED
WITH A FIXED WOOD HAND RAILING AS SHOWN.
2. ALL WOOD MEMBERS TO BE PRESSURE TREATED
3. ALL HARDWARE SHALL BE 316 STAINLESS STEEL
WALKWAY AND
PLATFORM DEMOLITION
PLAN
DM-1
LIMITS OF
DEMOLITION
WORK
SOUTH FORK
OF NEW RIVER
NOTE:
PROTECT AND PRESERVE ALL MANGROVE RESOURCES
AS PER THE MANGROVE PROTECTION RULES SECTION
403.9321 THROUGH 403.9333 FLORIDA STATUTES.
DEMOLITION
1. REMOVE ALL CONCRETE PILES.
2. REMOVE ALL WOOD PILES.
3. REMOVE ALL BEAMS JOISTS AND HORIZONTAL MEMBERS.
4. REMOVE ALL FLOOR PLANKS AND RAILINGS AS DESIGNATED.
REMOVE APPROXIMATELY 39' FEET
OF EXISTING BOARDWALK
STRUCTURE AND ALUMINUM PIPE
PILING IN ITS ENTIRETY
REMOVE APPROXIMATELY 46' FEET
OF EXISTING BOARDWALK
STRUCTURE AND ALUMINUM PIPE
PILING IN ITS ENTIRETY
EXACT LOCATION OF NEW
WALKWAY RAILING TO BE
DETERMINED IN FIELD (TYP.)
NEW
HANDRAILS
NEW
HANDRAILS
REMOVE REMAINING
OBSERVATION TOWER AND ALL
CONCRETE AND WOOD PILING IN
ITS ENTIRETY
PROJECT #:
PHASE:
DATE:
PROJ MGR: ED. DVORAK
NO. DATE DESCRIPTION
REVISIONS
PA
R
K S
A N
D R
EC
R
EA
TI
O N
D
IV
IS
IO
N
PA
R
K S
PL
A
N N
IN
G
D
ES
IG
N S
EC
TI
O N
PARKS AND RECREATION DIVISION
PLANNING AND DESIGN SECTION
1 NORTH UNIVERSITY DRIVE, SUITE 3200B
PLANTATION, FLORIDA 33324-2038
PH: (954) 577-4567
This item has been digitally signed and sealed by Edward Dvorak on the date adjacent to the seal.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
#422-25A
#Printed Issue Date
#Project Status
G :\P la nn in g\
A ut oC A
D \P
A R
K S re t w oo ds N at ur e C en te r\2 5A
W A
LK
W
A Y
A N
D D
E C
K D
E M
O \M
IS
C
-1 W
A
LK
W A
Y P
H O
TO
S
.d w g P rin te d:
/1 0/
:5
A
M
SHEET No:
W . S ta te
R d.
4, F
OR
T
LA
UD
ER
DA
LE
, F L
SE
C R
ET
W
O O
D S
N
AT
U R
E C
EN
TE
R
W A
LK
W
A Y
O
B
SE
R
VA
TI
O
N D
EM
O
LI
TI
O N lo ca te d at
Edward Dvorak, P.E.
Florida Engineer No. 40961
WALKWAY & DECK PHOTOGRAPHS WALKWAY & DECK
PICTURES
MISC-1
| COVER-SHT-CV-1 |
| Sheets and Views |
| CV-1 |
| GN-1 General Notes |
| Sheets and Views |
| GN-1 |
| DM-1 Demolition Plan |
| Sheets and Views |
| SP-1 |
| MISC-1 WALKWAY PHOTOS |
| Sheets and Views |
| MISC-1 |
| CV-1 Cover Sheet.pdf |
| Sheets and Views |
| CV-1 |
File details come from the government source that posted it. Updated .