10-2026-04 ees PHASE 3 DRAWINGS 216709 CD Dwgs 20250925.pdf
PDF 18 MB Posted
- Attached to
- Manufacturer Direct-to-District Commercial State and local contract opportunity
- Solicitation number
- 2026-04
- Issued by
- Bastrop County, Texas
About this file
This document contains contract documents and drawings for the Elgin Elementary School MEP (Mechanical, Electrical, Plumbing) Upgrades Phase 3 project located at 1005 W 2nd St, Elgin, Texas 78621 for the Elgin Independent School District.
The project involves mechanical, electrical, and plumbing upgrades to the existing elementary school building. The project is divided into three phases: Base Bid, Alternate #1, and Alternate #2, with estimated construction dates ranging from June 2026 to May 2027. The base bid phase is scheduled for June 1, 2026 to August 1, 2026, Alternate #1 is planned for September 2026 to December 2026, and Alternate #2 is scheduled for January 2027 to May 2027.
The project documents include detailed architectural, structural, mechanical, and electrical drawings with comprehensive notes on demolition, renovation, and installation requirements. The existing school building is approximately 63,761 square feet, consisting of a gymnasium and school building constructed under the 2021 International Building Code with local amendments. The project involves careful phasing, furniture storage, and coordination with the school district to minimize disruption to school operations.
View the file
Other files for this state and local contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revisions:
Engineering Firm:
O'CONNELL ROBERTSON
Firm Registration No. F-2708
A u st in
S a n A n to n io
H o u st o n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
C U s e rs \g w h a le n \D o c u m e n ts \2
.0
E lg in
M
E P
C e n tr a l_ g w h a le n U
S K
V .r v t
/2
/2
:1
:4
P
M
E
LG
IN
E
LE
M
E N
TA
R
Y S
C H
O O
L M
E P U
P G
R A
D E S P
H A
S E
W
N D
S T, E
LG
IN
TE
X A
S
E
LG
IN
I N
D E P
E N
D E N
T S C
H O
O L
D
IS
TR
IC
T
ELGIN ELEMENTARY SCHOOL MEP UPGRADES PHASE 3
1005 W 2ND ST, ELGIN, TEXAS, 78621
09/25/25
CONTRACT DOCUMENTS
Mission: We believe every project has a mission and strive to design environments that have a purpose that extends far beyond form and function.
09/25/25 Project No. 2167.09
CONTRACT DOCUMENTS
COVER SHEET
G1.0
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
1002 N AVENUE C
ELGIN , TX 78621
ELGIN I.S.D.
811 BARTON SPRINGS ROAD, SUITE 900
AUSTIN, TEXAS 78704
Architecture - Engineering - Interiors
TAS COMPLIANCE NOTE:
THIS PROJECT DOES NOT QUALIFY AS
AN ALTERATION PER TAS 106.5.5.
SHEET LIST
GENERAL
G1.0 COVER SHEET
G1.1 PHASING PLAN
G1.2 FURNITURE STORAGE PLAN
STRUCTURAL
S0.0 STRUCTURAL NOTES
S1.0 EXISTING FOUNDATION PLAN - ELGIN ELEMENTARY SCHOOL
ARCHITECTURAL
A1.1 ARCHITECTURAL NOTES, SYMBOLS, AND ABBREVIATIONS
A1.2 EQUIPMENT YARD PLANS
A2.1 DEMOLITION REFLECTED CEILING PLANS
A2.1B DEMOLITION REFLECTED CEILING PLAN - AREA B
A2.1C DEMOLITION REFLECTED CEILING PLAN - AREA C
A2.2 DEMOLITION REFLECTED CEILING PLANS - ALTERNATES
A2.3 DEMOLITION REFLECTED CEILING PLAN - ALTERNATE 2
A7.3 PARTITION DETAILS
A9.1 REFLECTED CEILING PLANS AND DETAILS
A9.2 REFLECTED CEILING PLANS AND DETAILS - ALTERNATES
PLUMBING
P1.1 PLUMBING NOTES, SYMBOLS, AND ABBREVIATIONS
MECHANICAL
M1.1 MECHANICAL NOTES, SYMBOLS, AND ABBREVIATIONS
M1.2 TEMPORARY AIR CONDITIONING PLAN
M2.1A MECHANICAL DEMOLITION PLAN – AREA A
M2.1B MECHANICAL DEMOLITION PLAN – AREA B
M2.1C MECHANICAL DEMOLITION PLAN – AREA C
M2.2 MECHANICAL DEMOLITION PLAN – AREA C – ALTERNATE 1
M2.3 MECHANICAL DEMOLITION PLAN – AREA A – ALTERNATE 2
M3.1A MECHANICAL PLAN – AREA A
M3.1B MECHANICAL PLAN – AREA B
M3.1C MECHANICAL PLAN – AREA C
M3.2 MECHANICAL PLAN – AREA C – ALTERNATE 1
M3.3 MECHANICAL PLAN – AREA A – ALTERNATE 2
M5.1 MECHANICAL ENLARGED PLAN
M5.2 MECHANICAL ENLARGED PLAN – ALTERNATE 1
M5.3 MECHANICAL ENLARGED PLAN – ALTERNATE 2
M6.1 MECHANICAL PIPING DIAGRAMS
M6.2 MECHANICAL PIPING DIAGRAMS
M7.1 MECHANICAL CONTROLS
M7.2 MECHANICAL CONTROLS
M7.3 MECHANICAL CONTROLS
M7.4 MECHANICAL CONTROLS
M8.1 MECHANICAL SCHEDULES
M8.2 MECHANICAL SCHEDULES
M9.1 MECHANICAL DETAILS
M9.2 MECHANICAL DETAILS
ELECTRICAL
E1.1 ELECTRICAL NOTES, SYMBOLS AND ABBREVIATIONS
E2.1A ELECTRICAL DEMO PLAN – AREA A
E2.1B ELECTRICAL DEMO PLAN – AREA B
E2.1C ELECTRICAL DEMO PLAN – AREA C
E2.2 ELECTRICAL DEMOLITION PLAN – AREA C2 - ALTERNATE 1
E2.3 ELECTRICAL DEMOLITION PLAN – AREA A2 – ALTERNATE 2
E3.1A ELECTRICAL POWER PLAN – AREA A
E3.1B ELECTRICAL POWER PLAN – AREA B
E3.1C ELECTRICAL POWER PLAN – AREA C
E3.2 ELECTRICAL POWER PLAN – AREA C2 – ALTERNATE 1
E3.3 ELECTRICAL POWER PLAN – AREA A2 – ALTERNATE 2
E4.1A ELECTRICAL LIGHTING PLAN – AREA A
E4.1B ELECTRICAL LIGHTING PLAN – AREA B
E4.1C ELECTRICAL LIGHTING PLAN – AREA C
E4.2 ELECTRICAL LIGHTING PLAN – AREA C2 – ALTERNATE 1
E4.3 ELECTRICAL LIGHTING PLAN – AREA A2 – ALTERNATE 2
E8.1 ELECTRICAL SCHEDULES
E8.2 ELECTRICAL SCHEDULES
E8.3 ELECTRICAL SCHEDULES
NO. DESCRIPTION DATENO. DESCRIPTION DATE
09/25/2025
TRUE NORTH PLAN NORTH
N N
BASE BID
ALTERNATE #1
ALTERNATE #2
GENERAL PHASING NOTES
1. PHASING AREAS ARE SHOWN FOR GENERAL
REQUIREMENTS AND INDICATE WHERE THE MAJORITY OF
WORK WILL OCCUR. WORK OUTSIDE THE PHASING
BOUNDARY MAY BE REQUIRED - REFER TO INDIVIDUAL
SHEETS FOR SPECIFIC PROJECT REQUIREMENTS.
2. CONTRACTORS SHALL COORDINATE THEIR SCHEDULE
WITH ELGIN ISD AND ELGIN ELEMENTARY SCHOOL
SPECIFIC REQUIREMENTS. THE FOLLOWING KEY DAYS
SHOULD BE IDENTIFIED IN THE PROJECT.
PHASING SCHEDULE
PHASE APPROX. AREA ESTIMATED DATES
1 BASE BID JUNE 01, 2026 - AUGUST 01, 2026
3 ALTERNATE #2 JANUARY 2027 - MAY 2027
2 ALTERNATE #1 SEPTEMBER 2026 - DECEMBER 2026
PHASING LEGEND
BASE BID
ALTERNATE #1
ALTERNATE #2
Revisions:
A u st in
S a n A n to n io
H o u st o n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
Engineering Firm:
O'CONNELL ROBERTSON
Firm Registration No. F-2708
C U s e rs \g w h a le n \D o c u m e n ts \2
.0
E lg in
M
E P
C e n tr a l_ g w h a le n U
S K
V .r v t
/2
/2
:1
:4
P
M
E
LG
IN
E
LE
M
E N
TA
R
Y S
C H
O O
L M
E P U
P G
R A
D E S P
H A
S E
W
N D
S T, E
LG
IN
TE
X A
S
E
LG
IN
I N
D E P
E N
D E N
T S C
H O
O L
D
IS
TR
IC
T
09/25/25 Project No. 2167.09
CONTRACT DOCUMENTS
PHASING PLAN
G1.1
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
SCALE: 1/16" = 1'-0"1
PHASING PLAN
NO. DESCRIPTION DATE
N
BASE BID
ALTERNATE #1
ALTERNATE #2
OWNER SHALL SELF PERFORM
STORAGE OF LIBRARY
FURNITURE, LIBRARY BOOKS AND
OFFICE FURNITURE IN GYM
DURING BASE BID SUMMER
CONSTRUCTION.
CONTRACTOR SHALL MOVE AND STORE
NORTHEAST CLASSROOM WING FURNITURE
IN CLASSROOMS TO ALLOW FOR
MECHANICAL SCOPE OF WORK
CONSTRUCTION. CONTRACTOR SHALL
RETURN FURNITURE TO ROOM OF ORIGIN
UPON COMPLETION OF CONSTRUCTION.
CONTRACTOR SHALL MOVE AND STORE
SOUTHEAST CLASSROOM WING FURNITURE
IN CLASSROOMS TO ALLOW FOR
MECHANICAL SCOPE OF WORK
CONSTRUCTION. CONTRACTOR SHALL
RETURN FURNITURE TO ROOM OF ORIGIN
UPON COMPLETION OF CONSTRUCTION.
CONTRACTOR SHALL MOVE AND STORE
SOUTHWEST CLASSROOM WING FURNITURE
IN CLASSROOMS TO ALLOW FOR
MECHANICAL SCOPE OF WORK
CONSTRUCTION. CONTRACTOR SHALL
RETURN FURNITURE TO ROOM OF ORIGIN
UPON COMPLETION OF CONSTRUCTION.
FOR BASE BID SCOPE OF
WORK, ELGIN ISD SHALL
STORE EXISTING FURNITURE
WITHIN OUTLINE. ALL
FURNITURE OUTSIDE OF
OUTLINE SHALL BE MOVED
INTO STORAGE ON CAMPUS
BY THE CONTRACTOR.
GENERAL PHASING NOTES
1. PHASING AREAS ARE SHOWN FOR GENERAL
REQUIREMENTS AND INDICATE WHERE THE MAJORITY OF
WORK WILL OCCUR. WORK OUTSIDE THE PHASING
BOUNDARY MAY BE REQUIRED - REFER TO INDIVIDUAL
SHEETS FOR SPECIFIC PROJECT REQUIREMENTS.
2. CONTRACTORS SHALL COORDINATE THEIR SCHEDULE
WITH ELGIN ISD AND ELGIN ELEMENTARY SCHOOL
SPECIFIC REQUIREMENTS. THE FOLLOWING KEY DAYS
SHOULD BE IDENTIFIED IN THE PROJECT.
PHASING LEGEND
BASE BID
ALTERNATE #1
ALTERNATE #2
Revisions:
A u st in
S a n A n to n io
H o u st o n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
Engineering Firm:
O'CONNELL ROBERTSON
Firm Registration No. F-2708
C U s e rs \g w h a le n \D o c u m e n ts \2
.0
E lg in
M
E P
C e n tr a l_ g w h a le n U
S K
V .r v t
/2
/2
:1
:5
P
M
E
LG
IN
E
LE
M
E N
TA
R
Y S
C H
O O
L M
E P U
P G
R A
D E S P
H A
S E
W
N D
S T, E
LG
IN
TE
X A
S
E
LG
IN
I N
D E P
E N
D E N
T S C
H O
O L
D
IS
TR
IC
T
09/25/25 Project No. 2167.09
CONTRACT DOCUMENTS
FURNITURE STORAGE
PLAN
G1.2
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
O
'C O
N N
E
LL
R O
B E R
TS
O
N
IN
C
SCALE: 1/16" = 1'-0"1
FURNITURE STORAGE PLAN
ABBREVIATIONS
ARCH ARCHITECT, ARCHITECTURAL
BOD BOTTOM OF DECK (METAL DECK ONLY)
BP BASEPLATE
CFMF COLD FORMED METAL FRAMING
CJP COMPLETE JOINT PENETRATION
CL CENTERLINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONT CONTINUOUS
DBA DEFORMED BAR ANCHOR
(E) EXISTING
EJ EXPANSION JOINT
ENG ENGINEER
EOD EDGE OF DECK
EOS EDGE OF SLAB
EQ EQUAL
FFE FINISH FLOOR ELEVATION
FTG FOOTING
FV FIELD VERIFY
GT GIRDER TRUSS
HCA HEADED CONCRETE ANCHOR
HDG HOT-DIP GALVANIZED
HDR HEADER
HORIZ HORIZONTAL
HSS HOLLOW STEEL SECTION
INFO INFORMATION
KSI KIPS PER SQUARE INCH
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LSH LONG SIDE HORIZONTAL
LSV LONG SIDE VERTICAL
LW LIGHT WEIGHT
MAX MAXIMUM
MCJ MASONRY CONTROL JOINT
MEP MECHANICAL, ELECTRICAL, PLUMBING
MFR MANUFACTURER
MIN MINIMUM
NTS NOT TO SCALE
NW NORMAL WEIGHT
O.C. ON CENTER
O.H. OPPOSITE HAND
PCF POUNDS PER CUBIC FOOT
PJP PARTIAL JOINT PENETRATION
PLF POUNDS PER LINEAR FOOT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
REF REFER, REFERENCE
REINF REINFORCED, REINFORCEMENT
REQ'D REQUIRED
SIM SIMILAR
SOG SLAB ON GRADE
SQ SQUARE
SS STAINLESS STEEL
T.O. TOP OF
TOW TOP OF WALL
TOC TOP OF CONCRETE
TOS TOP OF STEEL
TYP TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
VERT VERTICAL
WWF WELDED WIRE FABRIC
SHEET INDEX
S0 SERIES STRUCTURAL NOTES
S1 SERIES EXISTING FOUNDATION PLAN AND
DETAIL
GENERAL
1. Refer to Architectural, Mechanical, Electrical, and Plumbing series drawings for floor elevations, slopes, drains, and location of depressed and elevated floor areas.
2. Structural series drawings shall be compared with drawings of other series; differences shall be referred to the Architect for instruction.
3. The general contractor is responsible for coordination of all resulting revisions to the structural system or other trades as a result of acceptance of contractor proposed alternatives or substitutions.
4. The general contractor and sub-contractors shall determine the scope of the structural work from the contract documents taken as a whole. The structural drawings shall not be considered separately for purposes of bidding the structural work. Due consideration shall be given to other structural work or work related to the structure, including necessary coordination described or implied by the Architectural, Civil and MEP drawings.
5. Safety Measures: At all times the Contractor shall be solely and completely responsible for the conditions of the job site, including, but not limited to:
A. Safety of the persons and property, B. Means and methods of construction, C. Compliance with applicable OSHA requirements and guidelines, D. All necessary independent engineering reviews of these conditions.
6. Scales noted on the drawings are for general reference only. No dimensional information shall be obtained by direct scaling of the drawing.
7. These drawings do not, nor are intended to, locate property lines, building set backs nor height limitations. It is the contractor's responsibility to locate the building and construct it to, and within, applicable code restrictions. Further, it is the Civil Engineer's responsibility to address site drainage appropriate to the site and in consideration of adjoining properties.
8. The general contractor is responsible for fitting new work with existing construction. Information on existing buildings shown in the drawings was based upon the information supplied to Structures. This information is not as-built data and the actual as-built construction may differ from that represented in the drawings. Contractors shall verify all information. Variations from the dimensions indicated on the contract documents shall be brought to the attention of the architect and/or Structures.
CODES
1. The structure and components shown in these drawings have been designed under the guidelines of the structural requirements listed in the 2021 International Building Code with required amendments.
2. Minimum Design Loads & Associated Criteria for Buildings & Other Structures, ASCE/SEI 7-16
3. Structural Concrete: American Concrete Institute, ACI 318-19
FOUNDATION AND SITE PREPARATION
1. The subgrade under building slab patches shall be properly compacted and shall be free of standing water, mud and frozen soil.
2. A 15 mil vapor barrier shall be placed beneath the slab and sealed at all perimeter edges using 3" Stego Crete Claw tape (see Stego installation video for guidance). An acceptable alternative is to provide a continuous vapor barrier under the grade beams and slab. Vapor barrier shall also be sealed along all seams, penetrations, and tears with approved tape or mastic as specified by the vapor barrier manufacturer. Refer to specifications, when provided, for additional information.
Acceptable sheet vapor retarder products include:
A. Stego Wrap 15 mil Class A B. W.R. Meadows Perminator 15 mil C. Fortifiber Building Systems Group Moistop Ultra 15 mil D. No Substitutions
3. Under pavement and building slab patches, bring pads to grade with select fill material conforming to the following:
• Retained on 2-1/2" screen 0%
• Retained on 7/8" screen 5% - 50%
• Retained on 3/8" screen 25% - 65%
• Retained on 1/4" screen 35% - 75%
• Retained on #40 mesh sieve 60% - 90%
• Material passing the #40 sieve shall meet the following plasticity requirements:
• PASSING MAXIMUM MINIMUM
• No. 40 Sieve Plasticity Index Plasticity Index
• 25% - 40% 15 3
• 10% - 25% 20 4
Sandy loam is not acceptable fill material.
4 . Contractor shall bring the pads to grade with select fill material and certify the compaction of the select fill material. Where no geotechnical report is provided, certify compaction to at least 95% of the maximum dry density as determined using SDHPT Test Method TEX-113-E conducted with a laboratory compactive effort of 6.63 ft lbs/cu. in. Hold water contents to within + 2% of the optimum, and maintain compacted lift thickness to 6" or less.
5. Means and methods of utility attachment shall be the responsibility of the contractor and do not fall under the scope of these structural documents.
6. Do not allow water or debris to stand in trenches. If bottoms of trenches become softened due to rain or slurry or other water before concrete is placed, excavate softened material and replace with properly compacted backfill or concrete.
CONCRETE
1. Concrete in the following areas shall have the following characteristics:
28-day Max Max Usage Strength (f'c) Slump (in.)A w/cm Ratio Air contentB/C Agg. Size
Slabs on Grade: 4000 psi 2-4 0.45 3-6% 1"
A. Slump shall be measured before adding water reducing admixture or plasticizing mixture.
B. Do not allow air content to exceed 3 percent for trowel-finished floors or for concrete slabs receiving a polished finish.
C. Specified air content is only required when elements are permanently exposed to weather and outside of the conditioned building envelope perimeter.
2. The minimum amounts of cementitious material may be changed if a concrete performance mix is submitted to the structural engineer for approval two weeks prior to placing any concrete. The performance mix shall include the amounts of cement, fine and course aggregate, water and admixtures, as well as the water-cement ratio, slump, and strength data in accordance with ACI 318. The use of a performance mix requires batch plant inspection, the cost of which shall be paid by the general contractor. Review of mix submittals by the Engineer of Record indicates only that information presented conforms generally with contract documents. Contractor or supplier maintains full responsibility for specified performance.
3. All concrete mix designs shall be reviewed and approved by the testing agency prior to sending to the engineer of record for approval.
4. Use the following cementitious materials, of the same type, brand and source throughout the Project:
A. Portland Cement: ASTM C 150, Type I/II
5. Fly ash may be used as a pozzolan to replace up to 25% of the portland cement in a concrete mix, subject to the approval of the structural engineer. Fly ash, when used, shall conform to ASTM C618, Type C or F. Concrete mixes using fly ash shall be proportioned to account for the properties of the specific fly ash used and to account for the specific properties of the fly ash concrete thus resulting.
6. Normal weight aggregates shall conform to ASTM C33 and be provided from a single source. Fine aggregates shall be free of materials with deleterious reactivity to alkali in cement
7. Water shall conform to ASTM C 94/C 94M and be potable.
8. Admixtures if used shall be subject to the approval of the structural engineer.
9. Water shall not be added to the concrete at the jobsite unless the total water quantity including the water added at the jobsite does not exceed the total water quantity of the reviewed mix design. It shall be the responsibility of the contractor to coordinate the requirements of the concrete supplier and pumper to meet this requirement and to ensure a pumpable and workable mix. The use of plasticizers, retardants, and other additives shall be at the option of the contractor subject to the approval of StructuresPE, LLP. Follow the recommendations of the manufacturer for the proper use of additives. the use of calcium chloride or other chloride bearing salts is not permitted.
10. Mixing, transporting, and placing of concrete shall conform to ACI 301 and ASTM C 94.
11. Conformance to ACI 305.1 "Specification for Hot Weather Concreting" is required when air temperature is above 90 deg F.
12. Conformance to ACI 306 "Cold Weather Concreting" is required when a period for more than three (3 consecutive days, the average daily air temperature is below 40 deg F and the air temperature is not greater than 50 deg F for more than one-half of any 24 hour period.
13. Reinforcing steel shall be deformed new billet steel bars in accordance with A.S.T.M. Specification A615 Grade 60.
14. Reinforcement bars shall not be tack welded, welded, heated, or cut unless indicated on the Contract Documents or approved by StructuresPE, LLP.
15. Minimum concrete cover protection for reinforcement bars shall be as follows: (see ACI 318 for conditions not noted)
Concrete exposed to weather #5 bars and smaller 1-1/2 inches All other bars 2 inches Concrete cast against earth 3 inches
Grade beams Top 1-1/2 inches Board formed sides 2 inches Earth formed sides 3 inches Bottom 3 inches
Slabs on grade:
Single layer or top layer 2 inches Bottom layer cast against soil 3 inches Bottom layer not cast against soil 2 inches
Columns 1-1/2 inches Pilasters & plinths 2 inches Slabs on metal forms 3/4 inches (top) Walls below grade (backfilled side) 2 inches Walls below grade (no backfill) 3/4 inches
Revisions:
A u st in
S a n A n to n io
H o u s to n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
S P ro je c t L is t\
\C o m m e rc ia l\
.1
.O
R A
.E lg in
IS
D
R T
U C h e c k s \E
N G
R \P
R O
D U
C T
IO
N
\C A
D -R
E V
IT
\2
.1
E lg in I S
D
E lg in E
S M
E P
U p g ra d e s P h a s e
R
.r v t
/1
/2
:0
:3
A
M
E L G
IN
E
L E M
E N
TA
R
Y S
C H
O O
L M
E P U
P G
R A
D E S P
H A
S E
W
N
D S
T, E
LG
IN
TE
X A
S
E
LG
IN
I N
D E P
E N
D E N
T S C
H O
O L
D
IS
TR
IC
T
09/25/25
Project No. 2167.09
CONTRACT DOCUMENTS
STRUCTURAL NOTES
S0.0
4315 GUADALUPE ST
SUITE 301
AUSTIN, TX 78751
PHONE: (512) 499 0919
WWW.STRUCTURESTX.COM
FIRM NO.: F-3323
Project No. 23.139
STRUCTURES
09/03/2509/17/2509/18/25
NOTE: DETAIL ASSUMES EXISTING SLAB
BEARS ON COMPACTED SELECT FILL. THE
CONTRACTOR SHALL NOTIFY THE
ENGINEER SHOULD THE EXISTING SLAB
CONSTRUCTION DIFFER THAN SHOWN -
REPLACE ANY REMOVED FILL WITH
SELECT COMPACTED FILL AND REPLACE
OR REPAIR ANY DAMAGED VAPOR
RETARDER WITH APPROVED MATERIAL
#3 @ 16" O.C. PARALLEL TO CUT
PROVIDE 2 BARS MINIMUM
COMPACT EXISTING
DISTURBED FILL
- SEE STRUCTURAL NOTES
NEW CONC. - MATCH
EXIST THICKNESS (4" MIN.)
#3 REBAR @ 16" O.C. SET INTO
EXIST CONCRETE 3 1/2" MIN W/
HILTI HIT RE 500-SD ADHESIVE
SYSTEM OR APPROVED EQUAL
3 1/2"BARRIER LAP
6" VAPOR
EXISTING VAPOR BARRIER
(INSIDE BUILDING ONLY)
-FIELD VERIFY
NEW VAPOR BARRIER AT INSIDE OF BUILDING ONLY
- SEE STRUCTURAL NOTES
- ADHERE TO UNDERSIDE OF EXISTING SLAB WITH
STEGO MASTIC OR APPROVED EQUAL
-VAPOR BARRIER NOT NEEDED AT EXTERIOR PAVING
FV
1' - 0"
(F V
EXISTING FILL
EXISTING
REINF.
EXISTING SLAB
REINF.
EXISTING BRICK OR
STONE VENEER
D E
E P
(M E
P T
O C
O N
F
IR
M
ROW OF
CONDUITS
EXISTING
GRADE BEAM
EXISTING
WIDENED GRADE
BEAM BEYOND
Revisions:
A u st in
S a n A n to n io
H o u s to n
B a rt o n
S p ri n g s
R o a d
S u it e
A u st in Te xa s
B ro a d w a y S u it e
S a n A n to n io
Te xa s
F a n n in
S tr e e t, S u it e
H o u st o n Te xa s p
.4
.7 f
.4
.7 p
.2
.6 f
.2
.6 p
.4
.1 f
.4
.1
S P ro je c t L is t\
\C o m m e rc ia l\
.1
.O
R A
.E lg in
IS
D
R T
U C h e c k s \E
N G
R \P
R O
D U
C T
IO
N
\C A
D -R
E V
IT
\2
.1
E lg in I S
D
E lg in E
S M
E P
U p g ra d e s P h a s e
R
.r v t
/1
/2
:0
:3
A
M
E L G
IN
E
L E M
E N
TA
R
Y S
C H
O O
L M
E P U
P G
R A
D E S P
H A
S E
W
N
D S
T, E
LG
IN
TE
X A
S
E
LG
IN
I N
D E P
E N
D E N
T S C
H O
O L
D
IS
TR
IC
T
09/25/25
Project No. 2167.09
CONTRACT DOCUMENTS
EXISTING FOUNDATION
PLAN AND DETAIL
S1.0
1/8" = 1'-0"
EXISTING FOUNDATION PLAN
NO. DESCRIPTION DATE
4315 GUADALUPE ST
SUITE 301
AUSTIN, TX 78751
PHONE: (512) 499 0919
WWW.STRUCTURESTX.COM
FIRM NO.: F-3323
Project No. 23.139
STRUCTURES
1 1/2" = 1'-0"
TYPICAL CONCRETE PATCH DETAIL
3/4" = 1'-0"
DUCTBANK BELOW EXISTING GRADE BEAM
D
C
B
KEY PLAN
A A2
C2
N.T.S.
EXISTING WIDENED
GRADE BEAM
EXISTING INTERIOR
GRADE BEAM
EXISTING 12" WIDE
(APPROX. 36" DEEP)
PERIMETER GRADE BEAM
- FIELD VERIFY
EXISTING PIER
APPROXIMATE ROUTE OF
NEW ELECTRICAL
CONDUITS FROM
TRANSFORMER
- ELECTRICAL TO CONFIRM
- RUN ELECTRICAL CONDUITS
UNDER PERIMETER GRADE BEAM
(3/S1.0)
- DO NOT CHIP OR CORE EXISTING
GRADE BEAM
2' WIDE TRENCH FOR
ELECTRICAL
CONDUITS
REPLACE TRENCHED
CONCRETE AT STOOP IN KIND
- REF. 2/S1.0 FOR ADDITIONAL
INFO
09/03/2509/17/2509/18/25
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
GENERAL NOTES APPLY TO ALL SHEETS.
THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS,
TOOLS, EQUIPMENT, AND RELATED ITEMS REQUIRED TO
COMPLETE THE DEMOLITION WORK AS INDICATED BY THE
CONTRACT DOCUMENTS.
CONTRACTOR TO VERIFY ALL DIMENSIONS.
ALL ACCESSIBLE ROUTES (OTHER THAN RAMPS) SHALL NOT
EXCEED A SLOPE OF 1:20, AND CROSS SLOPES SHALL NOT
EXCEED A SLOPE OF 1:50
THE DRAWINGS INDICATE BUILDING CONDITIONS PER EXISTING
DRAWINGS AND ACTUAL PROJECT INVESTIGATION. THE
CONTRACTOR SHALL ANTICIPATE POSSIBLE SLIGHT DEVIATION
FROM THESE DRAWINGS. REFER TO ARCHITECTURAL & MEP
DRAWINGS AND DETAILS FOR EXTENT OF DEMOLITION.
THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK,
USING HIS BEST SKILL AND ATTENTION. HE SHALL BE SOLELY
RESPONSIBLE FOR ALL MEANS, METHODS, TECHNIQUES,
SEQUENCES AND PROCEDURES AND FOR COORDINATING ALL
PORTIONS OF THE WORK UNDER THE CONTRACT.
INSTALL TEMPORARY DUST PARTITIONS WITH DOORS FOR
CONSTRUCTION ACCESS AROUND AREAS OF WORK SO THAT
OPERATIONS IN EXISTING ADJACENT AREAS REMAIN DUST
FREE AND ACCESSIBLE TO BUILDING OCCUPANTS. MAINTAIN IN
PLACE UNTIL COMPLETION OF CONSTRUCTION.
REMOVE ALL BUILDING PARTS AND/OR OTHER ITEMS TO ALLOW
FOR THE INSTALLATION AND CONNECTION OF NEW WORK,
COORDINATE THE WORK WITH THE HVAC, PLUMBING AND
ELECTRICAL DEMOLITION DRAWINGS.
REMOVAL OF THE BUILDING PARTS SHALL BE PERFORMED IN A
SAFE, ORDERLY AND CAREFUL MANNER, WITH THE
CONSIDERATION AT ALL TIMES FOR THE SAFETY AND WELFARE
OF THE OWNER, BLDG. OCCUPANTS, & PERSONNEL OF THE
CONTRACTOR AND/OR SUBCONTRACTOR.
MAINTAIN THE UTILITIES TO OCCUPIED SPACES AT ALL TIMES.
COORDINATE ANY UTILITY DOWNTIMES W/ OWNER. PROVIDE 72
HOUR ADVANCE NOTICE TO THE OWNER OF INTENDED UTILITY
SHUT DOWN AND/OR DISRUPTION.
ANY QUESTIONS CONCERNING OWNERSHIP OF SALVAGEABLE
MATERIAL SHALL BE ANSWERED BY THE OWNER, OR OWNER'S
REPRESENTATIVE. ALL ITEMS OTHER THAN FINISH MATERIALS
TO BE REMOVED AS PART OF THIS CONTRACT ARE INDICATED
WITH DASHED LINES ON DEMOLITION SHEETS. DISPOSE OF
THESE MATERIALS AND ITEMS AFTER CHECKING WITH OWNER
FOR ITEMS TO BE SALVAGED. SALVAGE ANY ITEMS REQUIRED
TO COMPLETE NEW WORK.
REMOVE ALL MISCELLANEOUS DEVICES AS REQUIRED TO
INSTALL NEW FINISHES, INCLUDING BUT NOT LIMITED TO:
PLUMBING FIXTURES, SIGNAGE, SWITCH PLATES, TELEVISION
BRACKETS, WALL OUTLET COVERS, TOILET ACCESSORIES,
CORNER GUARDS, ETC. SAVE FOR REINSTALLATION AFTER
COMPLETION OF FINISH WORK.
PROTECT ALL EXISTING FINISHES, DOOR FRAMES, EQUIPMENT
AND MATERIALS THAT ARE TO REMAIN IN PLACE. DAMAGE TO
EXISTING COMPONENTS BY CONTRACTOR SHALL BE REPLACED
WITH NEW MATERIAL OF LIKE KIND AND QUALITY THAT MATCH
THE EXISTING STANDARDS. THE CONTRACTOR IS
RESPONSIBLE FOR PREPARING EXISTING SURFACES TO
RECEIVE NEW FINISHES SCHEDULED.
PROTECT EXISTING VEGETATION, INCLUDING EXISTING TREES
DURING CONSTRUCTION. REVEGETATE DAMAGED AREAS
ADJACENT TO NEW CONSTRUCTION; CONTRACTOR SHALL
MAINTAIN VEGETATED AREAS FOR 3 WEEKS AFTER INITIAL
PLANTING
REFER TO MECHANICAL, PLUMBING AND ELECTRICAL
DRAWINGS FOR OTHER WORK.
ELECTRICAL AND MECHANICAL INSTALLATIONS MAY REQUIRE
WORK ABOVE EXISTING CEILINGS BOTH IN THE AREA OF WORK
AND IN ADJACENT AREAS (POSSIBLY ON OTHER FLOORS).
REMOVE AND REINSTALL (OR REPLACE) CEILING TILES AND
GRID AS REQUIRED. REMOVE GYPSUM BOARD AT WALLS AND
CEILINGS AND REPLACE AS REQUIRED.
UNLESS NOTED OTHERWISE, ALL EXISTING ELECTRICAL
OUTLETS & FIXTURES IN REMODELED AREAS ARE TO BE
REMOVED & RETURNED TO OWNER. SEE ELECTRICAL SHEETS
FOR DEVICES & CIRCUITS TO BE REUSED.
ALL ITEMS AND ASSOCIATED CONNECTIONS ARE TO BE
REMOVED AND TERMINATED AT DESIGNATED POINTS. SERVICE
CONNECTIONS SHALL BE SAFELY REMOVED, CAPPED OR
PLUGGED IN CONFORMITY WITH LOCAL LAWS AND
ORDINANCES, REQUIREMENTS OF PUBLIC UTILITY COMPANIES,
AND OF THE NATIONAL BOARD OF FIRE UNDERWRITERS, AND IN
SUCH MANNER AS NOT TO INTERFERE WITH THE USE OF THE
OCCUPIED SPACES IN THE BUILDING.
IF A CONDUIT OR UTILITY LINE IS CUT WHILE SLEEVING OR
CUTTING THE SLAB OR REMOVING A PARTITION, THE
CONTRACTOR IS RESPONSIBLE FOR REPAIRING IT
IMMEDIATELY.
ANY EXISTING TO REMAIN FIREPROOFING OR FIRE ASSEMBLIES
DAMAGED DURING CONSTRUCTION ARE TO BE REPAIRED TO
ORIGINAL FIRE PROTECTION REQUIREMENTS.
IMMEDIATELY SEAL ALL PENETRATIONS IN EXISTING
STRUCTURE OPENED DURING DEMOLITION WITH
FIRESTOPPING MATERIAL AND/OR WATERPROOFING.
SEAL ALL PENETRATIONS, NEW AND EXISTING, ABOVE CEILINGS
AT RATED FIRE WALLS IN AREAS OF WORK.
ABV ABOVE D DRAIN FRT FIRE RESISTANT TREATED M METER PSF POUNDS PER SQUARE FOOT TB TACK BOARD ACOUS ACOUSTICAL DBL DOUBLE FT FOOT MAS MASONRY PSI POUNDS PER SQUARE INCH TOC TOP OF CURB ADJ ADJUSTABLE DEMO DEMOLISH, DEMOLITION FURR FURRING MAX MAXIMUM PT PRESSURE TREATED TOSC TOP OF STRUCTURAL CONCRETE AFF ABOVE FINISH FLOOR DEPT DEPARTMENT FWC FABRIC WALL COVERING MDF MEDIUM DENSITY FIBER BOARD TEL TELEPHONE
ALUM ALUMINUM DF DRINKING FOUNTAIN MED MEDIUM QT QUARRY TILE THK THICK
ALT ALTERNATE DIA or Ø DIAMETER GA GAUGE MEMB MEMBRANE QTB QUARRY TILE BASE TOB TOP OF BEAM
ANOD ANODIZED DIM DIMENSION GALV GALVANIZED MTL METAL TOP TOP OF PAVEMENT
APPROX APPROXIMATELY DIV DIVISION GB GRAB BAR MFGR MANUFACTURER RI RISER TOM TOP OF MASONRY AWP ACOUSTICAL WALL PANEL DL DEAD LOAD GC GENERAL CONTRACTOR MH MANHOLE R RADIUS TOS TOP OF STEEL (BOTTOM OF ROOF DECK)
DN DOWN GCLU GLAZED CMU MIN MINIMUM RB RUBBER BASE TP TOILET PARTITION
BD BOARD DS DOWN SPOUT GI GALVANIZED IRON MISC MISCELLANEOUS RCP REFLECTED CEILING PLAN TV TELEVISION BLDG BUILDING DSP DRY STAND PIPE GL GLASS MM MILLIMETER RD ROOF DRAIN TYP TYPICAL BOT BOTTOM DTL DETAIL GLB GLASS BLOCK MO MASONRY OPENING REF REFERENCE TZ TERRAZZO BW BOTH WAYS DWG DRAWING GMT GLASS MOSAIC TILE MOD MODULAR REFR REFRIGERATOR TZB TERRAZZO BASE
BM BENCH MARK GMTW GLASS MOSAIC TILE WALL MTD MOUNT(ED) (ING) REINF REINFORCING
E EAST GR GRADE MUL MULLION REQ REQUIRE(D) (ING) UC UNDERCUT
C CHANNEL EA EACH GYP GYPSUM REV REVISION UNO UNLESS OTHERWISE NOTED
CC CUBICAL CURTAIN EF EPOXY FLOOR GYP BD GYPSUM BOARD N NORTH RH RIGHT HAND USC UNDER SEPARATE CONTRACT
CK CORK EFB EPOXY FLOOR BASE NAT NATURAL RM ROOM(S)
CAB CABINET EJ EXPANSION JOINT HC HOLLOW CORE NIC NOT IN CONTRACT ROW RIGHT OF WAY VAR VARNISH CB CHALK BOARD EG END GUARD HDR HEADER NO or # NUMBER RVWC RIGID VINYL WALL COVERING VB VAPOR BARRIER CFCI CONTRACTOR FURNISH CONTRACTOR INSTALL EL ELEVATION HDW HARDWARE NOM NOMINAL VB VINYL BASE CFOI CONTRACTOR FURNISH OWNER INSTALL ET EPOXY TERRAZZO FLOOR HDWD HARDWOOD NRC NOISE REDUCTION COEFFICIENT S SOUTH VCT VINYL COMPOSITION TILE CFT CUBIC FOOT ETB EPOXY TERRAZZO BASE HGT HEIGHT NTS NOT TO SCALE SB SPLASH BLOCK VERT VERTICAL
CG CORNER GUARD ELECT ELECTRICAL HM HOLLOW METAL SC SOLID CORE VEST VESTIBULE
CL, CENTER LINE EM ENTRANCE MAT HORIZ HORIZONTAL OC ON CENTER SCHED SCHEDULE VT VINYL TILE CLG CEILING EMER EMERGENCY HP HIGH POINT OD OUTSIDE DIAMETER SECT SECTION VTR VENT THROUGH ROOF CI CAST IRON ENCL ENCLOSURE HR HANDRAIL OFD OVERFLOW ROOF DRAIN SHR SHOWER VWC VINYL WALL COVERING CLO CLOSET EP EPOXY PAINT HVAC HEATING VENTILATION AIR CONDITIONING OFF OFFICE SIM SIMILAR CLR CLEAR EQ EQUAL OFOI OWNER FURNISH OWNER INSTALL SPECS SPECIFICATION(S) W WEST CMP CROWN MOLDING PAINTED EQUIP EQUIPMENT ID INSIDE DIAMETER OFCI OWNER FURNISH CONTRACTOR INSTALL SPK SPEAKER W/ WITH CMS CROWN MOLDING STAINED EWC ELECTRIC WATER COOLER INCL INCLUDING OVH OVERHEAD SQ SQUARE WBP WOOD BASE PAINTED CMT CERAMIC MOSAIC TILE EXP EXPANSION INSUL INSULATION OH OPPOSITE HAND SS STAINLESS STEEL WBS WOOD BASE STAINED CMTB CERAMIC MOSAIC TILE BASE EXIST EXISTING INT INTERIOR OPNG OPENING ST STONE WC WATER CLOSET CMTW CERAMIC MOSAIC TILE WALL EXT EXTERIOR IPS IRON PIPE SIZE OPP OPPOSITE STC STONE COUNTERTOP WD WOOD
CMU CONCRETE MASONRY UNIT STW STONE WALL WDS WOOD STAINED
CO CASED OPENING FA FIRE ALARM J JOIST P PAINT(ED) STB STONE BASE WIN WINDOW
COL COLUMN FBO FURNISHED BY OTHERS JAN JANITOR PARA PARALLEL STC STAINED CONCRETE W/O WITHOUT CONC CONCRETE FD FLOOR DRAIN JT JOINT PBD PARTICLE BOARD STD STANDARD WP WOOD PANELING PREFINISHED
CONST CONSTRUCTION
FE FIRE EXTINGUISHER PCF POUNDS PER CUBIC FOOT STL STEEL WPP WOOD PANELING PAINTED
CR
FEC FIRE EXTINGUISHER CABINET KIT KITCHEN PERF PERFORATED STO STORAGE WPS WOOD PANELING STAINED
CORR
CHAIR RAIL FFE FINISH FLOOR ELEVATION KO KNOCKOUT PERI PERIMETER STRUCT STRUCTURAL WS WATER STOP
CPT
CORRIDOR FHC FIRE HOSE CABINET PFL POUNDS PER LINEAR FOOT SV SHEET VINYL WSCT WAINSCOT
CPTB
CARPET FHVC FIRE HOSE VALVE CABINET L LENGTH/LONG PL PLATE SVB SHEET VINYL COVED BASE WT WEIGHT
CT
CARPET BASE FE FINISHED END LAB LABORATORY PLAM PLASTIC LAMINATE SYM SYMMETRICAL WWF WELDED WIRE FABRIC
CTB
CERAMIC TILE FLR FLOOR LAM LAMINATE PLAS PLASTER SYS SYSTEM
CTW
CERAMIC TILE BASE FOC FACE OF CONCRETE LH LEFT HAND PLYWD PLYWOOD
CERAMIC TILE WALL FOF FACE OF FINISH LI LINOLEUM PP PORCELAIN PAVER
CTSK COUNTERSINK FOM FACE OF MASONRY LIB LINOLEUM COVED BASE PPB PORCELAIN PAVER BASE
CYD CUBIC YARD FOS FACE OF STUDS LIT LINOLEUM TILE PPW PORCELAIN PAVER WALL
FPRF FIREPROOFING LL LIVE LOAD PR PAIR
CONT CONTINUOUS
NEW CONSTRUCTION
EXISTING CONSTRUCTION
DEMOLITION
HIDDEN LINE
BRICK
CONCRETE
CONCRETE BLOCK
EARTH
INSULATION, BATT
INSULATION, RIGID
METAL
PLYWOOD
FINISH GRADE
HARDWOOD
WOOD FRAMING
THROUGH MEMBER
WOOD FRAMING
INTERRUPTED MEMBER
PARTITION TYPES
DOOR NUMBER
KEY NOTE (NEW)
KEY NOTE (DEMO)
EQUIPMENT / ACCESSORY
WINDOW TAG
COLUMN GRID
ELEVATION HEIGHT
REVISION
INTERIOR
ELEVATION
SECTION
NORTH
ROOM NAME
A.F.F.
0'-0"
N
A123
NAME
ROOM NUMBER
REFER TO ROOM NUMBER
FOR TYPICAL INFORMATION
1t
SIM
MATCHLINE
EXTERIOR
ELEVATION
EXTERIOR WALL TYPES-
Revisions:
A us tin Sa n A nt on io Ho us to n
Ba rto n Sp rin gs
R oa d , S ui te
, A us tin , T ex as
B ro ad w ay
, S ui te
, S an A nt on io , T ex as
F an in
S tre et , S ui te
, H ou st on
, T ex as p:
.4
.7 f
2.
8.
p:
.2
.6 f
0.
4.
p:
.4
.1 f
3.
7.
C :\U se rs
\k go ss et t\D oc um en ts \2
7.
_2
5_ El gi n
ES
_A
R C
H _C en tra l_ kg os se ttU G
3Y U
.rv t
9/
/2
3:
:2
PM
EL
G
IN
E
LE
M
EN
TA
RY
S
C
HO
O L
M
EP
U
PG
RA
DE
S
PH
A
SE
W
N
D S
T, E
LG
IN
, T
EX
A S, EL
G
IN
IN
D
EP
EN
D
EN
T
SC
HO
O L
D
IS
TR
IC
T
09/25/25 Project No. 2167.09
CONTRACT DOCUMENTS
ARCHITECTURAL NOTES,
SYMBOLS, AND
ABBREVIATIONS
A1.1
O 'C
O N
N
EL
L
RO
BE
RT
SO
N
, I N
C
O 'C
O N
N
EL
L
RO
BE
RT
SO
N
, I N
C
BASTROP COUNTY MAP CITY OF ELGIN MAP ELGIN ELEMENTARY SCHOOL
GENERAL PROJECT
NOTESARCHITECTURAL ABBREVIATIONS
ARCHITECTURAL
LINETYPES
ARCHITECTURAL
MATERIALS
ARCHITECTURAL
SYMBOLS
2 Stories, 28 Feet (Gymnasium) Building Height 1 Story, 20 Feet (School Building)
Existing Gymnasium 6,260 SF Existing Schoool Building 57,501 SF Existing Building Gross Square Footage 63,761 SF
Building Construction Type IIB
PROJECT SUMMARY
Existing Building Code 2021 International Existing Building Code with Local Amendments March 1, 2022
Accessibility Codes 2012 Texas Accessibilities Standards
Energy Conservation Code 2021 International Energy Conservation Code
Fuel Code 2021 Fuel Gas Code with Local Amendments March 1, 2022
Fire Code 2021 International Fire Prevention Code
Mechanical Code 2021 International Mechanical Code with Local Amendments March 1, 2022
Plumbing Code 2021 International Plumbing Code with Local Amendments March 1, 2022
Electrical Code 2020 National Electrical Code
Building Code 2021 International Building Code with Local Amendments March 1, 2022
APPLICABLE CODES AND STANDARDS
JURISDICTION: City of Elgin TX LOCATION: 1005 W 2nd St, Elgin TX 78261 PROJECT: Elgin ES MEP Upgrades
OR PROJECT NUMBER: 2167.09
OWNER: Elgin ISD
BUILDING CODE ANALYSIS
09/24/2025
COMMONS
COMMONS
M
IN
. C
LR
'-0
8' -0
M
IN
. C
LR
5' -0
MIN. CLR.
5'-0"
MIN. CLR.
5'-0"
GATE WIDTH
5'-0" 4'-0"
20'-0"
8'-0"
Revisions:
A us tin Sa n A nt on io Ho us to n
Ba rto n Sp rin gs
R oa d , S ui te
, A us tin , T ex as
B ro ad w ay
, S ui te
, S an A nt on io , T ex as
F an in
S tre et , S ui te
, H ou st on
, T ex as p:
.4
.7 f
2.
8.
p:
.2
.6 f
0.
4.
p:
.4
.1 f
3.
7.
C :\U se rs
\k go ss et t\D oc um en ts \2
7.
_2
5_ El gi n
ES
_A
R C
H _C en tra l_ kg os se ttU G
3Y U
.rv t
9/
/2
3:
:2
PM
EL
G
IN
E
LE
M
EN
TA
RY
S
C
HO
O L
M
EP
U
PG
RA
DE
S
PH
A
SE
W
N
D S
T, E
LG
IN
, T
EX
A S, EL
G
IN
IN
D
EP
EN
D
EN
T
SC
HO
O L
D
IS
TR
IC
T
09/25/25 Project No. 2167.09
CONTRACT DOCUMENTS
EQUIPMENT YARD PLANS
A1.2
O 'C
O N
N
EL
L
RO
BE
RT
SO
N
, I N
C
O 'C
O N
N
EL
L
RO
BE
RT
SO
N
, I N
C
SCALE: 1/8" = 1'-0"
DEMOLITION SITE PLAN - EQUIPMENT YARD1 SCALE: 1/8" = 1'-0"
SITE PLAN - EQUIPMENT YARD2
KEYNOTE LEGEND
140 6'-0" HIGH BLACK ORNAMENTAL STEEL FENCE WITH
GATE, WIDTH AS DIMENSIONED ON PLANS-
MANUFACTURER: AMERISTAR MODEL MONTAGE PLUS,
OR APPROVED EQUAL. PROVIDE ALL ITEMS
NECESSARY FOR COMPLETE INSTALLATION. INSTALL
WITH CONCRETE PIERS PER MANUFACTURER'S
RECOMMENDATIONS.
153 NEW CONCRETE TRANSFORMER PAD
154 NEW DISCONNECT SWITCHES
270 REMOVE AND DEMOLISH BRICK SCREEN AND EXISTING
METAL GATES
271 EXISTING HOUSEKEEPING PAD TO BE DEMOLISHED
272 EXISTING TRANSFORMER TO BE REMOVED AND
RELOCATED BY UTILITY PROVIDER
273 REMOVE AND DEMOLISH EXISTING DISCONNECT
SWITCHES
AB
C2
KEY PLAN
D
A2
C
3.
4.
5.
6.
7.
8.
9.
THE CONTRACTOR SHALL FURNISH ALL LABOR,
MATERIALS, TOOLS, EQUIPMENT AND RELATED ITEMS
REQUIRED TO COMPLETE THE DEMOLITION WORK AS
INDICATED BY THE CONTRACT DOCUMENTS
THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE
WORK, USING HIS BEST SKILL AND ATTENTION. HE
SHALL BE SOLELY RESPONSIBLE FOR ALL DEMOLITION
MEANS, METHODS, TECHNIQUES, SEQUENCES AND
PROCEDURES. AND FOR COORDINATING ALL PORTIONS
OF THE WORK UNDER THE CONTRACT.
THE CONTRACTOR SHALL PAY FOR ALL PERMITS, FEES
AND INSPECTIONS REQUIRED FOR THE EXECUTION OF
THE WORK
SERVICE CONNECTIONS SHALL BE SAFELY REMOVED,
CAPPED OR PLUGGED IN COMFORMITY WITH LOCAL
LAWS AND ORDINANCES, REQUIREMENTS OF LOCAL
UTILITY COMPANIES, AND THE NATIONAL BOARD OF
FIRE UNDERWRITERS, AND IN SUCH MANNER AS TO
NOT TO INTERFERE WITH USE OF THE OCCUPIED
SPACES IN THE BUILDING
REMOVE ALL MISCELLANEOUS DEVICES AS REQUIRED
TO INSTALL NEW FINISHES, INCLUDED BUT NOT LIMITED
TO PLUMBING FIXTURES, SIGNAGE, SWITCH PLATES,
TELEVISION BRACKETS, WALL OUTLET COVERS, ETC.
SAVE FOR REINSTALLATION AFTER COMPLETION OF
FINISH WORK
ANY QUESTIONS CONCERNING OWNERSHIP OF
SALVAGEABLE MATERIAL SHALL BE ANSWERED BY THE
OWNER, OR THE OWNER'S REPRESENTATIVE
INSTALL TEMPORARY DUST PARTITIONS WITH DOORS
FOR CONSTRUCTION ACCESS AROUND AREAS OF
WORK SO THAT OPERATIONS IN EXISTING ADJACENT
AREAS REMAIN DUST FREE. MAINTAIN IN PLACE UNTIL
COMPLETION OF CONSTRUCTION
SEAL ALL PENETRATIONS, NEW AND EXISTING, ABOVE
CEILING AT FIRE RATED AND SMOKE PARTITIONS IN
AREAS OF WORK AS REQUIRED TO MAINTAIN RATING
PATCH AND PREP FOR NEW FINISHES. EXISTING
PARTITIONS TO REMAIN UNAFFECTED BY DEMOLITION.
TRUE NORTH PLAN NORTH
N N
ADMIN
126ADMIN
ADMIN
ADMIN
ADMIN
HALL
ADMIN
ADMIN
ADMIN
CLOSET
CLOSET
TLT
TLTTLT CLOSET
TLT
ADMIN
ADMIN
MECH
MECH
ADMIN
LIBRARY
STOR STOR
ADMIN
ADMIN
CORRIDOR
TLT TLT
ADMIN
WORKROOM
ADMIN
ADMIN
CORRIDOR
HALL
HALL
HALL
214 214
TLT
215215215
213 215
215213
213 213
215 215
TLT TLT
CLASSROOM
CLASSROOM
TLT TLT
CLASSROOM
CLASSROOM
TLT TLT
CLASSROOM
TLT TLT
CLASSROOM
CLASSROOM
TLT TLT
CLASSROOM
CLASSROOM
TLT TLT
CLASSROOM
CLASSROOM
CLASSROOM
CORRIDOR
215215215215215215
215 215 215 215 215 215
213214214214214214
214 214 214 214 214 213
COMMONS
VESTIBULE
215214
214 215
KITCHEN
OPEN TO STRUCTURE U.N.O.
2' X 2' ACT
GYP. BOARD
2' X 4' ACT
1.
2.
3.
4.
5.
NEW CEILING HEIGHTS TO MATCH EXISTING. MATCH
CEILING HEIGHT TO EXISTING EDGE METAL FASTENER
LOCATIONS.
CEILING TYPES INDICATED IN LEGEND.
PAINT DESIGNATIONS AT GYP CEILINGS AND FURR
DOWNS APPLY TO ALL EXPOSED GYP U.N.O. COLOR
SELECTION TO MATCH EXISTING.
NOT ALL CEILING DEVICES ARE SHOWN ON THE
ARCHITECTURAL REFLECTED CEILING PLAN, DEVICES
ARE SHOWN TO REPRESENT THE DESIRED LOCATION
AND IMPACT ON DESIGN INTENT.
CEILING DEVICES MAY BE SHOWN IN MULTIPLE
DOCUMENTS FOR COORDINATION.
Revisions:
A us tin Sa n A nt on io Ho us to n
Ba rto n Sp rin gs
R oa d , S ui te
, A us tin , T ex as
B ro ad w ay
, S ui te
, S an A nt on io , T ex as
F an in
S tre et , S ui te
, H ou st on
, T ex as p:
.4
.7 f
2.
8.
p:
.2
.6 f
0.
4.
p:
.4
.1 f
3.
7.
C :\U se rs
\k go ss et t\D oc um en ts \2
7.
_2
5_ El gi n
ES
_A
R C
H _C en tra l_ kg os se ttU G
3Y U
.rv t
9/
/2
3:
:3
PM
EL
G
IN
E
LE
M
EN
TA
RY
S
C
HO
O L
M
EP
U
PG
RA
DE
S
PH
A
SE
W
N
D S
T, E
LG
IN
, T
EX
A S, EL
G
IN
IN
D
EP
EN
D
EN
T
SC
HO
O L
D
IS
TR
IC
T
09/25/25 Project No. 2167.09
CONTRACT DOCUMENTS
DEMOLITION REFLECTED
CEILING PLANS
A2.1
O 'C
O N
N
EL
L
RO
BE
RT
SO
N
, I N
C
O 'C
O N
N
EL
L
RO
BE
RT
SO
N
, I N
C
GENERAL
DEMOLITION NOTES
KEYNOTE LEGEND
203 DEMOLISH EXISTING WALL
213 REMOVE AND DEMOLISH EXISTING CEILING TILES AND
GRID IN THEIR ENTIRETY IN THIS ROOM.
214 REMOVE AND SALVAGE EXISTING CEILING TILES AND
GRID IN THIS ROOM AS NEEDED FOR MECHANICAL
SCOPE, REF. MECHANICAL PLANS
215 REMOVE AND SALVAGE EXISTING LIGHT FIXTURES,
OCCUPANCY SENSORS, SMOKE DETECTORS,
SPEAKERS, WAPS, ETC. PROTECT AND STORE FOR
RE-USE. REF. ELECTRICAL PLANS FOR SPECIFIC
SCOPE AT EACH INDIVIDUAL DEVICE.
AB
C2
KEY PLAN
D
A2
C
SCALE: 1/8" = 1'-0"
DEMOLITION REFLECTED CEILING PLAN - AREA A1
SCALE: 1/8" = 1'-0"
DEMOLITION REFLECTED CEILING PLAN - AREA B3
SCALE: 1/8" = 1'-0"
DEMOLITION REFLECTED CEILING PLAN - AREA C2
RCP LEGEND
GENERAL RCP NOTES
3.
4.
5.
6.
7.
8.
9.
THE CONTRACTOR SHALL FURNISH ALL LABOR,
MATERIALS, TOOLS, EQUIPMENT AND RELATED ITEMS
REQUIRED TO COMPLETE THE DEMOLITION WORK AS
INDICATED BY THE CONTRACT DOCUMENTS
THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE
WORK, USING HIS BEST SKILL AND ATTENTION. HE
SHALL BE SOLELY RESPONSIBLE FOR ALL DEMOLITION
MEANS, METHODS, TECHNIQUES, SEQUENCES AND
PROCEDURES. AND FOR COORDINATING ALL PORTIONS
OF THE WORK UNDER THE CONTRACT.
THE CONTRACTOR SHALL PAY FOR ALL PERMITS, FEES
AND INSPECTIONS REQUIRED FOR THE EXECUTION OF
THE WORK
SERVICE CONNECTIONS SHALL BE SAFELY REMOVED,
CAPPED OR PLUGGED IN COMFORMITY WITH LOCAL
LAWS AND ORDINANCES, REQUIREMENTS OF LOCAL
UTILITY COMPANIES, AND THE NATIONAL BOARD OF
FIRE UNDERWRITERS, AND IN SUCH MANNER AS TO
NOT TO INTERFERE WITH USE OF THE OCCUPIED
SPACES IN THE BUILDING
REMOVE ALL MISCELLANEOUS DEVICES AS REQUIRED
TO INSTALL NEW FINISHES, INCLUDED BUT NOT LIMITED
TO PLUMBING FIXTURES, SIGNAGE, SWITCH PLATES,
TELEVISION BRACKETS, WALL OUTLET COVERS, ETC.
SAVE FOR REINSTALLATION AFTER COMPLETION OF
FINISH WORK
ANY QUESTIONS CONCERNING OWNERSHIP OF
SALVAGEABLE MATERIAL SHALL BE ANSWERED BY THE
OWNER, OR THE OWNER'S REPRESENTATIVE
INSTALL TEMPORARY DUST PARTITIONS WITH DOORS
FOR CONSTRUCTION ACCESS AROUND AREAS OF
WORK SO THAT OPERATIONS IN EXISTING ADJACENT
AREAS REMAIN DUST FREE. MAINTAIN IN PLACE UNTIL
COMPLETION OF CONSTRUCTION
SEAL ALL PENETRATIONS, NEW AND EXISTING, ABOVE
CEILING AT FIRE RATED AND SMOKE PARTITIONS IN
AREAS OF WORK AS REQUIRED TO MAINTAIN RATING
PATCH AND PREP FOR NEW FINISHES. EXISTING
PARTITIONS TO REMAIN UNAFFECTED BY DEMOLITION.
TRUE NORTH PLAN NORTH
N N
CLASSROOM
CLASSROOM
CORRIDOR
CLASSROOM
GIRLS
RR
BOYS
RR
CLASSROOM
CLASSROOM
CLASSROOM
214 214 214
214214214
215 215 215
215215215
JANITOR
SUPPLY
ROOM
215214
215213
214 215
MECH
GIRLS
RR
BOYS
RRCLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
HALL
CORRIDOR
MECH
213 214 214 214
214214214
213214214
215 215 215 215
215215215
215215215
OPEN TO STRUCTURE U.N.O.
2' X 2' ACT
GYP. BOARD
2' X 4' ACT
1.
2.
3.
4.
5.
NEW CEILING HEIGHTS TO MATCH EXISTING. MATCH
CEILING HEIGHT TO EXISTING EDGE METAL FASTENER
LOCATIONS.
CEILING TYPES INDICATED IN LEGEND.
PAINT DESIGNATIONS AT GYP CEILINGS AND FURR
DOWNS APPLY TO ALL EXPOSED GYP U.N.O. COLOR
SELECTION TO MATCH EXISTING.
NOT ALL CEILING DEVICES ARE SHOWN ON THE
ARCHITECTURAL REFLECTED CEILING PLAN, DEVICES
ARE SHOWN TO REPRESENT THE DESIRED LOCATION
AND IMPACT ON DESIGN INTENT.
CEILING DEVICES MAY BE SHOWN IN MULTIPLE
DOCUMENTS FOR COORDINATION.
SCALE: 1/8" = 1'-0"
DEMOLITION REFLECTED CEILING PLAN - AREA C - ALTERNATE 11
SCALE: 1/8" = 1'-0"
DEMOLITION REFLECTED CEILING PLAN - AREA A - ALTERNATE 22
Revisions:
A us tin Sa n A nt on io Ho us to n
Ba rto n Sp rin gs
R oa d , S ui te
, A us tin , T ex as
B ro ad w ay
, S ui te
, S an A nt on io , T ex as
F an in
S tre et , S ui te
, H ou st on
, T ex as p:
.4
.7 f
2.
8.
p:
.2
.6 f
0.
4.
p:
.4
.1 f
3.
7.
C :\U se rs
\k go ss et t\D oc um en ts \2
7.
_2
5_ El gi n
ES
_A
R C
H _C en tra l_ kg os se ttU G
3Y U
.rv t
9/
/2
3:
:3
PM
EL
G
IN
E
LE
M
EN
TA
RY
S
C
HO
O L
M
EP
U
PG
RA
DE
S
PH
A
SE
W
N
D S
T, E
LG
IN
, T
EX
A S, EL
G
IN
IN
D
EP
EN
D
EN
T
SC
HO
O L
D
IS
TR
IC
T
09/25/25 Project No. 2167.09
CONTRACT DOCUMENTS
DEMOLITION REFLECTED
CEILING PLANS -
ALTERNATES
A2.2
O 'C
O N
N
EL
L
RO
BE
RT
SO
N
, I N
C
O 'C
O N
N
EL
L
RO
BE
RT
SO
N
, I N
C
GENERAL
DEMOLITION NOTES
KEYNOTE LEGEND
213 REMOVE AND DEMOLISH EXISTING CEILING TILES AND
GRID IN THEIR ENTIRETY IN THIS ROOM.
214 REMOVE AND SALVAGE EXISTING CEILING TILES AND
GRID IN THIS ROOM AS NEEDED FOR MECHANICAL
SCOPE, REF. MECHANICAL PLANS
215 REMOVE AND SALVAGE EXISTING LIGHT FIXTURES,
OCCUPANCY SENSORS, SMOKE DETECTORS,
SPEAKERS, WAPS, ETC. PROTECT AND STORE FOR
RE-USE. REF. ELECTRICAL PLANS FOR SPECIFIC
SCOPE AT EACH INDIVIDUAL DEVICE.
AB
C2
KEY PLAN
D
A2
C
RCP LEGEND
GENERAL RCP NOTES
CEILING AS SCHEDULED
MECH. ROOM
V.
I.F
EXISTING STRUCTURAL
CLAY TILE
5/8" GYP BOARD
METAL STUD W/
BATT INSULATION
5 3/4"
CEILING AS SCHEDULED
MECH. ROOM
V.
I.F
EXISTING STRUCTURAL
CLAY TILE
5/8" GYP BOARD
3 3/4"
METAL STUD W/
BATT INSULATION
CEILING AS SCHEDULED
MECH. ROOM
N
EW
D U
C T
H T.
V.
I.F
EXISTING STRUCTURAL
CLAY TILE
3 5/8" METAL STUD W/
BATT INSULATION
5/8" GYP BOARD
3 3/4"
CONT. FIRESTOP SPRAY 1/8"
THICK, LAP OVER GYP BD &
STEEL DECK MIN. 1/2"
CENTERLINE OF SCREW FASTENER
FILL JOINT SOLID W/4 pcf
DENSITY MINERAL WOOL-
FLUSH W/ WALLBOARD,TYP
CONT. 20 GA. METAL
TRACK W/ 1 1/2" FLANGE
SOUND ATTENUATION
BATTS AS SPECIFIED
DEFLECTION CLIP AT
EACH STUD
FLOOR/ROOF CONSTRUCTION
A7.3
TYP
4"
1/ 2"
G
AP
CENTERLINE OF SCREW
FASTENER
CONT. 20 GA. METAL
TRACK W/ 1 1/2" FLANGE
FILL JOINT SOLID WITH 4 pcf
DENSITY MINERAL WOOL-
FLUSH W/ WALLBOARD,TYP
CONT. FIRESTOP SPRAY
1/8" THICK, LAP OVER GYP
BD & STEEL DECK-TYP.
FILL FLUTES SOLID WITH 4 pcf
DENSITY MINERAL WOOL,
FLUSH W/ WALL BOARD, TYP.
SOUND ATTENUATION
BATTS AS SPECIFIED
DEFLECTION CLIP
AT EACH STUD
FLOOR/ROOF CONSTRUCTION
A7.3
TYP
1/ 2"
G
AP 4"
CONT. 20 GA. METAL
TRACK W/ 1 1/2"
FLANGE
TOP OF METAL TRACK
TOP OF GYP BDDEFLECTION
CLIP
METAL STUD
CONT STEEL PLATE
FLOOR/ROOF DECK
CONT. FIRE STOP SPRAY
MINERAL WOOL INSULATION
METAL DECK FLUTE
A7.3
DEFLECTION
CLIP
CONT. 20 GA. METAL
TRACK W/ 1 1/2" FLANGE
TOP OF METAL TRACK
METAL STUD
FLOOR/ROOF DECK
FILL VOID SOLID W/4 pcf
DENSITY MINERAL
WOOL- FLUSH W/
WALLBOARD,TYP
TOP OF GYP BD
CONT. FIRE STOP SPRAY
A7.3
CEILING AS SCHEDULED
MECH. ROOM
V.
I.F
EXISTING STRUCTURAL
CLAY TILE
1'-0"
EXISTING GYP WALL
5/8" GYP BOARD
3 5/8" METAL STUD W/
BATT INSULATION
SCALE: 1 1/2" = 1'-0"
PARTITION D EXTENSION DETAIL3
SCALE: 1 1/2" = 1'-0"
PARTITION PERPENDICULAR TO DECK5 SCALE: 1 1/2" = 1'-0"
PARTITION PARALLEL TO DECK6 SCALE: 3" = 1'-0"
SECTION AT TOP OF WALL
PARALLEL TO FLOOR/ROOF DECK8SCALE: 3" = 1'-0"
SECTION AT TOP OF WALL
PERPENDICULAR TO FLOOR/ROOF DECK7
SCALE: 1" = 1'-0"
PARTITION A INFILL DETAIL1 SCALE: 1" = 1'-0"
PARTITION C INFILL DETAIL2 SCALE: 1" = 1'-0"
PARTITION F INFILL DETAIL4
Revisions:
A us tin Sa n A nt on io Ho us to n
Ba rto n Sp rin gs
R oa d , S ui te
, A us tin , T ex as
B ro ad w ay
, S ui te
, S an A nt on io , T ex as
F an in
S tre et , S ui te
, H ou st on
, T ex as p:
.4
.7 f
2.
8.
p:
.2
.6 f
0.
4.
p:
.4
.1 f
3.
7.
C :\U se rs
\k go ss et t\D oc um en ts \2
7.
_2
5_ El gi n
ES
_A
R C
H _C en tra l_ kg os se ttU G
3Y U
.rv t
9/
/2
3:
:3
PM
EL
G
IN
E
LE
M
EN
TA
RY
S
C
HO
O L
M
EP
U
PG
RA
DE
S
PH
A
SE
W
N
D S
T, E
LG
IN
, T
EX
A S, EL
G
IN
IN
D
EP
EN
D
EN
T
SC
HO
O L
D
IS
TR
IC
T
09/25/25 Project No. 2167.09
CONTRACT DOCUMENTS
PARTITION DETAILS
A7.3
O 'C
O N
N
EL
L
RO
BE
RT
SO
N
, I N
C
O 'C
O N
N
EL
L
RO
BE
RT
SO
N
, I N
C
STOR STOR
MECH
MECH
ADMIN
LIBRARY
CORRIDOR
HALL
CORRIDOR
ADMIN
ADMIN
ADMIN
ADMIN
ADMIN
CLOSET
WORKROOM
TLT
TLTCLOSETTLT
TLTTLT
ADMIN
ADMIN
TLT TLT
ADMIN
HALL
ADMIN
ADMIN
HALL
HALL
ADMIN
ADMIN
ADMIN
ADMIN
ADMIN
CLOSET
802 802 802
802 802
802802
803803803
803 803
802 802804 804
V.I.F.
4'-10"
V.I.F.
2'-3"
V.
I.F
3'
-1 0"
V.
I.F
1'
-1 1"
V.I.F.
3'-0"
V.I.F.
3'-4"
V.I.F.
1'-4"
V.I.F.
4'-8"
OPEN TO STRUCTURE U.N.O.
2' X 2' ACT
GYP. BOARD
2' X 4' ACT
1.
2.
3.
4.
5.
NEW CEILING HEIGHTS TO MATCH EXISTING. MATCH
CEILING HEIGHT TO EXISTING EDGE METAL FASTENER
LOCATIONS.
CEILING TYPES INDICATED IN LEGEND.
PAINT DESIGNATIONS AT GYP CEILINGS AND FURR
DOWNS APPLY TO ALL EXPOSED GYP U.N.O. COLOR
SELECTION TO MATCH EXISTING.
NOT ALL CEILING DEVICES ARE SHOWN ON THE
ARCHITECTURAL REFLECTED CEILING PLAN, DEVICES
ARE SHOWN TO REPRESENT THE DESIRED LOCATION
AND IMPACT ON DESIGN INTENT.
CEILING DEVICES MAY BE SHOWN IN MULTIPLE
DOCUMENTS FOR COORDINATION.
TRUE NORTH PLAN NORTH
N N
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CORRIDOR
TLTTLTTLTTLTTLTTLT
TLT TLT TLT TLT TLT TLT
802 802 802 802 802 802
802 802 802 802 802 802
803803803803803
803 803 803 803 803
COMMONS
VESTIBULE
803802
KITCHEN
Revisions:
A us tin Sa n A nt on io Ho us to n
Ba rto n Sp rin gs
R oa d , S ui te
, A us tin , T ex as
B ro ad w ay
, S ui te
, S an A nt on io , T ex as
F an in
S tre et , S ui te
, H ou st on
, T ex as p:
.4
.7 f
2.
8.
p:
.2
.6 f
0.
4.
p:
.4
.1 f
3.
7.
C :\U se rs
\k go ss et t\D oc um en ts \2
7.
_2
5_ El gi n
ES
_A
R C
H _C en tra l_ kg os se ttU G
3Y U
.rv t
9/
/2
3:
:3
PM
EL
G
IN
E
LE
M
EN
TA
RY
S
C
HO
O L
M
EP
U
PG
RA
DE
S
PH
A
SE
W
N
D S
T, E
LG
IN
, T
EX
A S, EL
G
IN
IN
D
EP
EN
D
EN
T
SC
HO
O L
D
IS
TR
IC
T
09/25/25 Project No. 2167.09
CONTRACT DOCUMENTS
REFLECTED CEILING
PLANS AND DETAILS
A9.1
O 'C
O N
N
EL
L
RO
BE
RT
SO
N
, I N
C
O 'C
O N
N
EL
L
RO
BE
RT
SO
N
, I N
C
SCALE: 1/8" = 1'-0"
REFLECTED CEILING PLAN - AREA A1
RCP LEGEND
GENERAL RCP NOTES
KEYNOTE LEGEND
302 INFILL PARTITION AROUND NEW DUCTWORK TO
MATCH EXISTING CONSTRUCTION WITH PARTITION
TYPE C.
303 INFILL PARTITION AROUND NEW DUCTWORK TO
MATCH EXISTING CONSTRUCTION WITH PARTITION
TYPE A.
802 REINSTALL SALVAGED AND STORED EXISTING
LIGHTING, OCCUPANCY SENSORS, SMOKE
DETECTORS, SPEAKERS, WAPS, ETC. TO MATCH
ORIGINAL EXISTING CONDITION. CLEAN LIGHT LENSES
BEFORE RE-INSTALLATION.
803 REINSTALL SALVAGED EXISTING CEILING MATERIAL TO
MATCH ORIGINAL EXISTING CONDITION. USE
SPECIFIED UNIT PRICE FOR NEW CEILING MATERIAL
AS NEEDED TO REPLACE DAMAGED NON-REUSABLE
CEILING MATERIAL.
804 NEW CEILING TO BE INSTALLED
SCALE: 1/8" = 1'-0"
REFLECTED CEILING PLAN - AREA B3
SCALE: 1/8" = 1'-0"
REFLECTED CEILING PLAN - AREA C2
AB
C2
KEY PLAN
D
A2
C
SUPPLY ROOM
BOYS
RR
CLASSROOM
JANITOR
MECH
GIRLS
RR
CLASSROOM
CORRIDOR
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
802 802 802
802 802 802
803 803 803
803803803
802 803
V.
I.F
4'
-0
V.
I.F
2'
-2
V.I.F.
3"
V.I.F.
4'-0"
OPEN TO STRUCTURE U.N.O.
2' X 2' ACT
GYP. BOARD
2' X 4' ACT
1.
2.
3.
4.
5.
NEW CEILING HEIGHTS TO MATCH EXISTING. MATCH
CEILING HEIGHT TO EXISTING EDGE METAL FASTENER
LOCATIONS.
CEILING TYPES INDICATED IN LEGEND.
PAINT DESIGNATIONS AT GYP CEILINGS AND FURR
DOWNS APPLY TO ALL EXPOSED GYP U.N.O. COLOR
SELECTION TO MATCH EXISTING.
NOT ALL CEILING DEVICES ARE SHOWN ON THE
ARCHITECTURAL REFLECTED CEILING PLAN, DEVICES
ARE SHOWN TO REPRESENT THE DESIRED LOCATION
AND IMPACT ON DESIGN INTENT.
CEILING DEVICES MAY BE SHOWN IN MULTIPLE
DOCUMENTS FOR COORDINATION.
TRUE NORTH PLAN NORTH
N N
CLASSROOM
CLASSROOM
CLASSROOM
305 GIRLS
RR
BOYS
RR
CLASSROOM
CLASSROOM
CLASSROOM
CORRIDOR
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
HALL
CLASSROOM
MECH
802 802 802
802802
802 802
802802802802
804 803 803 803
803803803804
804803803
V.
I.F
2'
-6
V.
I.F
1'
-5
V.I.F.
2'-0"
V.I.F.
5'-0"
V.
I.F
3'
-4
V.
I.F
7"
Revisions:
A us tin Sa n A nt on io Ho us to n
Ba rto n Sp rin gs
R oa d , S ui te
, A us tin , T ex as
B ro ad w ay
, S ui te
, S an A nt on io , T ex as
F an in
S tre et , S ui te
, H ou st on
, T ex as p:
.4
.7 f
2.
8.
p:
.2
.6 f
0.
4.
p:
.4
.1 f
3.
7.
C :\U se rs
\k go ss et t\D oc um en ts \2
7.
_2
5_ El gi n
ES
_A
R C
H _C en tra l_ kg os se ttU G
3Y U
.rv t
9/
/2
3:
:3
PM
EL
G
IN
E
LE
M
EN
TA
RY
S
C
HO
O L
M
EP
U
PG
RA
DE
S
PH
A
SE
W
N
D S
T, E
LG
IN
, T
EX
A S, EL
G
IN
IN
D
EP
EN
D
EN
T
SC
HO
O L
D
IS
TR
IC
T
09/25/25 Project No. 2167.09
CONTRACT DOCUMENTS
REFLECTED CEILING
PLANS AND DETAILS -
ALTERNATES
A9.2
O 'C
O N
N
EL
L
RO
BE
RT
SO
N
, I N
C
O 'C
O N
N
EL
L
RO
BE
RT
SO
N
, I N
C
SCALE: 1/8" = 1'-0"
REFLECTED CEILING PLAN - AREA A - ALTERNATE 22
RCP LEGEND
GENERAL RCP NOTES
KEYNOTE LEGEND
300 INFILL PARTITION AROUND NEW DUCTWORK TO
MATCH EXISTING CONSTRUCTION WITH PARTITION
TYPE F.
301 EXTEND EXISTING PARTITION TYPE D TO ROOF DECK,
WITH PENETRATIONS FOR NEW DUCTWORK. RE:
MECHANICAL PLANS
302 INFILL PARTITION AROUND NEW DUCTWORK TO
MATCH EXISTING CONSTRUCTION WITH PARTITION
TYPE C.
802 REINSTALL SALVAGED AND STORED EXISTING
LIGHTING, OCCUPANCY SENSORS, SMOKE
DETECTORS, SPEAKERS, WAPS, ETC. TO MATCH
ORIGINAL EXISTING CONDITION. CLEAN LIGHT LENSES
BEFORE RE-INSTALLATION.
803 REINSTALL SALVAGED EXISTING CEILING MATERIAL TO
MATCH ORIGINAL EXISTING CONDITION. USE
SPECIFIED UNIT PRICE FOR NEW CEILING MATERIAL
AS NEEDED TO REPLACE DAMAGED NON-REUSABLE
CEILING MATERIAL.
804 NEW CEILING TO BE INSTALLED
AB
C2
KEY PLAN
D
A2
C
SCALE: 1/8" = 1'-0"
REFLECTED CEILING PLAN - AREA C - ALTERNATE 11
HVAC EQUIPMENT
AC AIR CONTROL
ACC AIR COOLED CHILLER
AP ACCESS PANEL
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
BV BALANCING VALVE
CH CHILLER
CC DX COOLING COIL
CHP CHILLED WATER PUMP
CRU CONDENSATE RETURN UNIT
CT COOLING TOWER
CU CONDENSING UNIT
CV CONSTANT VOLUME TERMINAL UNIT
CWP CONDENSER WATER PUMP
DHP DUCT HEAT PIPE
EDH ELECTRIC DUCT HEATER
EF EXHAUST FAN
ESG ELECTRIC STEAM GENERATOR
ET EXPANSION TANK
FCU FAN COIL UNIT
FCV FLOW CONTROL VALVE
FF FILTER FEEDER
FH FUME HOOD
GEF GENERAL EXHAUST FAN
H HUMIDIFIER
HCU HUMIDITY CONTROL UNIT
HC HEATING COIL
HP HEAT PUMP
HRU HEAT RECOVERY UNIT
HWP HEATING WATER PUMP
KEF KITCHEN EXHAUST FAN
KH KITCHEN EXHAUST HOOD
KSF KITCHEN SUPPLY FAN
L LOUVER
MAU MAKE-UP AIR UNIT
MASF MAKE-UP AIR SUPPLY FAN
ML MIXING LATERAL
OAI OUTSIDE AIR INTAKE
OAU OUTSIDE AIR UNIT
OAF OUTSIDE AIR FAN
PCHP PRIMARY CHILLED WATER PUMP
PF PURGE FAN
PTHP PACKAGED TERMINAL HEAT PUMP
PTAC PACKAGED TERMINAL AIR CONDITIONING UNIT
PV PENTHOUSE VENTILATOR
RH RADIANT HEATER
RF RELIEF FAN
RPZ REDUCED PRESSURE BACK FLOW PREVENTER
RTU SINGLE PACKAGED (ROOFTOP) AIR CONDITIONING UNIT
SCHP SECONDARY CHILLED WATER PUMP
SEF SMOKE EVACUATION FAN
SF SUPPLY FAN
SPF SMOKE PURGE FAN
PACU PACKAGED AIR CONDITIONING UNIT
UH UNIT HEATER
V / VAV VARIABLE VOLUME AIR TERMINAL UNIT
WSHP WATER SOURCE HEAT PUMP
NOT ALL WILL
APPEAR ON
THE DRAWINGS
BDD BACKDRAFT DAMPER
ERU ENERGY RECOVERY UNIT
ERV ENERGY RECOVERY VENTILATOR
FFU FAN FILTER UNIT
IU VARIABLE REFRIGERANT FLOW INDOOR UNIT
OU VARIABLE REFRIGERANT FLOW OUTDOOR UNIT
LEF LAB EXHAUST FAN
MB MIXING BOX
SAF SUPPLY AIR FAN
VFD VARIABLE FREQUENCY DRIVE
RAF RETURN AIR FAN
T
SP
SPS
PM
SD
FSD
FD
DD
#H
CO2
CO
NOT ALL WILL
APPEAR ON
THE DRAWINGS
M
20x8 SA
BOTTOM CONNECTION (45° OR 90°)
CAPPED OUTLET (TOP CONNECTION)
GATE VALVE
BALANCING…