10-18218 Geotech FINAL 20260220 Bore Logs at 400 E Crossing.pdf
PDF 10 MB Posted
- Solicitation number
- 26-275
- Issued by
- Washington County, Utah
About this file
This is a geotechnical boring log and photographic rock core summary document prepared for the Utah Department of Transportation (UDOT) in support of the I-15 widening project from Exit 6 to Exit 8 (Project No. F-I15-1(136)6, PIN 18218). The document contains field study locations and borehole data collected at the 400 East crossing, including photographic documentation of rock core samples extracted from multiple test holes and cone penetration test (CPT) soundings. The bore logs detail subsurface geological conditions at depths ranging from approximately 20 feet to 100 feet, with specific documentation of test holes 24-S-07, 24-S-08, and 25-TH-55, providing visual records of rock strata, composition, and core recovery at various depth intervals to inform the design of the proposed guided horizontal directional drill (HDD) operation.
The geotechnical investigation provides essential subsurface information necessary for the City of St. George to evaluate contractor proposals for the HDD operation beneath I-15 at 400 East, which will install underground power conduits to replace existing overhead distribution facilities. The bore logs establish baseline geological conditions and drilling parameters that qualified contractors must consider when submitting bids. The photographic documentation of rock cores demonstrates the soil and rock characteristics encountered during drilling, enabling bidders to assess drilling difficulty, anticipated penetration rates, and equipment requirements. This geotechnical data serves as a critical supporting exhibit for the invitation for bid (IFB) process and helps establish the technical specifications and site conditions that will govern contract performance and bid bond requirements.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
!UA
!UA
*#9 *#9 *#9
*#9
*#9 *#9
*#9!.
!UA
!UA
!UA!UA
!UA
!UA
!UA!UA
*#9 *#9
!UA
!UA
!UA
*#9
*#9
*#9!.
!UA
!UA
!UA
24-E-10 (62')
25-W-09 (55')
24-S-08 (80')
24-S-06 (80')
24-S-05 (80')
24-E-02 (54')
25-E-01 (62')
25-TH-56 (52')
25-TH-55 (71')
24-S-07b (46')
24-S-07a (49')24-S-07 (100')
24-S-05c (51')
24-S-05b (52') 24-S-05a (42')
25-CPT-07b (32') 25-CPT-07a (33')
25-W-CPT-13 (54')
25-W-CPT-11b (50') 25-W-CPT-11a (30')
25-W-CPT-04c (21')
25-W-CPT-04b (20') 25-W-CPT-04a (21')
25-W-CPT-03d (20')
25-W-CPT-03c (21') 25-W-CPT-03b (20')
25-W-CPT-03a (20')
25-W-DMT-13 (29')
25-W-DMT-04 (11')
Field Study Locations (2 of 4)
Figure 3-2I-15; Widening from Exit 6 to Exit 8 Project No.: F-I15-1(136)6 / PIN 18218 ±
0 150 30075 Feet
Explanation
!UA Drilled Test Hole Locations (Depth)
*#9 CPT Sounding Locations (Depth) !. Flat Plate Dilatometer Test Locations (Depth) !UA Existing Drilled Test Hole Locations (Depth)
Retaining Walls Layout Noise Walls Layout Structures Layout
§̈¦15
§̈¦15
900 South
1160 South
0 E as t
Flo od
St ree t
F 977
R 978A
R 978B
24-S-07a (49')
25-W-DMT-11 (26')
koby.dutson Rectangle koby.dutson Rectangle weston.nelson Rectangle weston.nelson Rectangle weston.nelson Rectangle weston.nelson PolyLine weston.nelson Engineer Approximate Borehole Location weston.nelson Engineer 400 East weston.nelson Rectangle
This photo log is for information purposes only. It is intended to assist in showing features discussed in the attached field logs.
1.
Notes:
PHOTOGRAPHIC SUMMARY OF ROCK CORE
I-15; Widening from Exit 6 to Exit 8
UDOT Project No. F-I15-1(135)6, PIN 18218
50-61Depth (ft):1-3Run(s):1Box Number:24-S-07 Test Hole
Location:
f t f t f t f t
1.
Notes:
PHOTOGRAPHIC SUMMARY OF ROCK CORE
I-15; Widening from Exit 6 to Exit 8
UDOT Project No. F-I15-1(135)6, PIN 18218
61-70Depth (ft):3-4Run(s):2Box Number:24-S-07 Test Hole
Location:
f t f t
1.
Notes:
PHOTOGRAPHIC SUMMARY OF ROCK CORE
I-15; Widening from Exit 6 to Exit 8
UDOT Project No. F-I15-1(135)6, PIN 18218
70-78Depth (ft):5-6Run(s):3Box Number:24-S-07 Test Hole
Location:
f t f t
1.
Notes:
PHOTOGRAPHIC SUMMARY OF ROCK CORE
I-15; Widening from Exit 6 to Exit 8
UDOT Project No. F-I15-1(135)6, PIN 18218
78-80Depth (ft):6Run(s):4Box Number:24-S-07 Test Hole
Location:
f t
1.
Notes:
PHOTOGRAPHIC SUMMARY OF ROCK CORE
I-15; Widening from Exit 6 to Exit 8
UDOT Project No. F-I15-1(135)6, PIN 18218
80-90Depth (ft):7-8Run(s):5Box Number:24-S-07 Test Hole
Location:
.0 f t
.0 f t
.0
1.
Notes:
PHOTOGRAPHIC SUMMARY OF ROCK CORE
I-15; Widening from Exit 6 to Exit 8
UDOT Project No. F-I15-1(135)6, PIN 18218
90-99.5Depth (ft):9-10Run(s):6Box Number:24-S-07 Test Hole
Location:
.0 f t f t
.5
1.
Notes:
PHOTOGRAPHIC SUMMARY OF ROCK CORE
I-15; Widening from Exit 6 to Exit 8
UDOT Project No. F-I15-1(135)6, PIN 18218
59-73.5Depth (ft):1-3Run(s):1Box Number:24-S-08 Test Hole
Location:
f t f t f t
.5
1.
Notes:
PHOTOGRAPHIC SUMMARY OF ROCK CORE
I-15; Widening from Exit 6 to Exit 8
UDOT Project No. F-I15-1(135)6, PIN 18218
73.5-80.0Depth (ft):3-4Run(s):2Box Number:24-S-08 Test Hole
Location:
.5 f t
.0 f t
.0
1.
Notes:
PHOTOGRAPHIC SUMMARY OF ROCK CORE
I-15; Widening from Exit 6 to Exit 8
UDOT Project No. F-I15-1(135)6, PIN 18218
62.5-70.5Depth (ft):1-3Run(s):1Box Number:25-TH-55 Test Hole
Location:
.5 f t
.5 f t
.5
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 134 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 135 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 136 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 137 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 138 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 139 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 140 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 141 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 142 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 143 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 144 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 145 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 146 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 147 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 148 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 149 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 150 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 151 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 152 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 153 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 154 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 155 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 156 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 157 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 158 |
| 18218_F976_F977_R978A_R978B_R978C_Report_Geotech_FINAL_20260220 159 |
File details come from the government source that posted it. Updated .