This document is a comprehensive project manual and bidding package for the Art Building Renovations Project at Slippery Rock University, part of the Pennsylvania State System of Higher Education. The project involves multiple prime contractors and will include replacement of existing storefront entrances and glazing, primarily focusing on the north vestibule of the building. Key work includes expanding the north vestibule, creating a new accessible entrance, removing and replacing concrete sidewalks, replacing storefront entrances at south and east locations, installing solids interceptors in studio sinks, adding new trough sinks, and improving access control systems. The project is scheduled for bid opening on November 11, 2025, at 2:00 PM EST, with a pre-bid conference and site visit planned for October 15, 2025. The contract is expected to be completed by August 1, 2026, with full completion by August 15, 2026.
The project has been divided into separate prime contracts with estimated cost ranges: General Construction ($120,000-$130,000), Plumbing Construction ($50,000-$60,000), and Electrical Construction ($30,000-$40,000). Bidding will occur through the PennBid Bonfire platform, and the project is subject to Pennsylvania Prevailing Wage Act requirements. The project will be funded through the State System of Higher Education, with the work to be performed according to detailed specifications across multiple divisions including general requirements, existing conditions, concrete, metals, wood, thermal protection, openings, finishes, plumbing, HVAC, electrical, and electronic safety systems. Liquidated damages are set at $250 per calendar day of delay, and performance and payment bonds will be required at 100% of the contract price.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
REPAIRS AND RENOVATIONS
ART BUILDING RENOVATIONS
SLIPPERY ROCK UNIVERSITY
202 CAMPUS DRIVE
SLIPPERY ROCK, PA 16057
LGA PROJECT NO. 25042
CONSTRUCTION DOCUMENTS
OCTOBER 1, 2025
Owner
Slippery Rock University
202 Campus Drive
Slippery Rock, PA 16057
724.738.2964
Architect
LGA Partners, LP
444 Liberty Avenue, Suite 1500
Pittsburgh, PA 15222
412.243.3430
MEPF Engineer
Tower Engineering
115 Evergreen Heights Drive, Suite 400
Pittsburgh, PA 15229
412.931.8888
UP-2025-001 Contract Documents Table of Contents
TABLE OF CONTENTS
Art Building Renovation Project Contract Documents
UP-2025-001
FRONT END CONTRACT DOCUMENTS
Cover Sheet .................................................................... 1 page
Table of Contents ............................................................ 3 pages
Special Instructions to Bidders ........................................ 2 pages
General Instructions to Bidders ....................................... 8 pages
General Construction Bid Form ...................................... 5 pages
Plumbing Construction Bid Form .................................... 5 pages
Electrical Construction Bid Form ..................................... 4 pages
Standard Form of Contract ............................................. 4 pages
Contract Bond Form ........................................................ 7 pages
General Conditions ......................................................... 35 pages
Insurance Rider ............................................................... 3 pages
Prevailing Wage Rates ................................................... 7 pages
Procurement and Contracting Requirements Section 000110 Table of Contents SRU 2025-001 Art Building Renovations Page 1 of 3
SECTION 00 01 10
SPECIFICATIONS
DIVISION 01 -- GENERAL REQUIREMENTS
01 10 00 - Summary of Work
01 22 00 - Unit Prices
01 23 00 - Alternates
01 26 00 - Contract Modification Procedures
01 29 00 - Payment Procedures
01 31 00 - Project Management and Coordination
01 31 19 - Project Meetings
01 32 00 - Construction Progress Documentation
01 33 00 - Submittal Procedures
01 35 00 - Health and Safety
01 45 00 - Quality Control
01 50 00 - Temporary Facilities & Control
01 60 00 - Product Requirements
01 62 00 - Product Options
01 71 23 - Field Engineering
01 73 29 - Cutting and Patching
01 77 00 - Closeout Procedures
01 78 23 – Operations and Maintenance Data
01 78 36 - Warranties
01 78 39 - Project Record Documents
SRU 2025-001 Art Building Renovations Page 2 of 3
DIVISION 02 -- EXISTING CONDITIONS
02 41 00 - Demolition
DIVISION 03 -- CONCRETE
03 30 00 – Cast in Place Concrete
DIVISION 04 -- MASONRY (NOT USED)
DIVISION 05 – METALS
05 12 00 – Structural Steel Framing
05 50 00 – Metal Fabrications
DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
06 10 00 - Rough Carpentry
DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
07 20 00 – Insulation
07 71 00 – Roof Specialties
07 92 00 - Joint Sealants
DIVISION 08 -- OPENINGS
08 43 13 – Aluminum-Framed Storefronts
08 71 00 - Door Hardware
08 71 10 – Door Hardware Schedule
08 71 13 – Power Door Operators
08 80 00 – Glazing
DIVISION 09 -- FINISHES
09 21 16 - Gypsum Board Assemblies
09 90 00 – Painting
DIVISION 12 -- FURNISHINGS
12 48 13 – Entrance Floor Mats and Frames
DIVISION 22 – PLUMBING
22 05 00 – General Provisions and Common Work Results for Plumbing
22 05 13 – Common Motor Requirements for Plumbing Equipment
22 05 19 – Meters and Gauges for Plumbing Piping
22 05 23 – General-Duty Valves for Plumbing Piping
SRU 2025-001 Art Building Renovations Page 3 of 3
22 05 29 – Hangers and Supports for Plumbing Piping and Equipment
22 05 53 – Identification for Plumbing Piping and Equipment
22 07 00 – Plumbing Insulation
22 11 16 – Domestic Water Piping
22 11 19 – Domestic Water Piping Specialties
22 11 23 – Domestic Water Pumps
22 13 16 – Sanitary Waste and Vent Piping
22 13 19 – Sanitary Waste Piping Specialties
22 40 00 – Plumbing Fixtures
DIVISION 23 – HVAC
23 05 00 – Common Work Results for HVAC
23 05 93 – Testing, Adjusting, and Balancing for HVAC
23 07 19 – HVAC Piping Insulation
23 21 13 – Hydronic Piping
23 82 39 – Cabinet Unit Heaters
DIVISION 26 -- ELECTRICAL
26 01 00 – Basic Electrical Requirements
26 05 19 – Low Voltage Electrical Power Conductors and Cables
26 05 26 – Grounding and Bonding for Electrical Systems
26 05 29 – Hangers and Supports for Electrical Systems
26 05 33 – Raceways and Boxes for Electrical Systems
26 05 44 – Sleeves and Seals for Electrical Systems
26 05 53 – Identification for Electrical Systems
26 28 13 – Fuses
26 28 16 – Enclosed Switches and Circuit Breakers
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY INDEX
28 01 00 – Basic Electronic Safety and Security Requirements
28 13 00 – Access Control Intrusion Detection
28 15 00 – Access Control Hardware Devices
END OF TABLE OF CONTENTS
Solicitation for Construction 71-FA-8.2 Special Instructions to Bidders Solicitation No. UP-2025-001 Page 1 of 2
STATE SYSTEM OF HIGHER EDUCATION
COMMONWEALTH OF PENNSYLVANIA
SPECIAL INSTRUCTIONS TO BIDDERS
PROJECT INFORMATION
Project Title: Art Building Renovations Project
Project No: UP-2025-001
Location: Slippery Rock University, Slippery Rock Pennsylvania
Project Scope:
Work for the Project shall be accomplished by Separate Prime Contractors according to Pennsylvania statute. The Lead Prime Contractor shall be the General Contractor. Specific instructions for coordination and responsibilities of the Lead Prime Contractor are contained in Section 01 31 00, Project Management and Coordination, and elsewhere throughout the Contract Documents.
Work included under this Project consists of replacement of existing storefront entrances and glazing, primarily at the north vestibule of the building. The vestibule will be expanded to the north and a new accessible entrance will be created. Concrete sidewalks around the north entrance will be removed and replaced.
Other related work includes replacement of storefront entrances at the south and east entrances, installation of a solids interceptor at a sink in the printmaking studio, new trough sinks at the painting studio, and improvements to access control devices and head-end systems.
Work shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all Construction to the satisfaction of the University, and subject to approval of the Professional and State System of Higher Education.
Contract Time: see standard form of contract.
Prevailing Wages: This Project is subject to the Pennsylvania Prevailing Wage Act, 43 P.S. §
165-1 et seq, as amended. The Prevailing Minimum Wage Determination for this Project is Serial Number 25-05369, determined May 20, 2025, and consisting of 8 pages.
Liquidated Damages: see Standard Form of Contract
Contract Cost Ranges: UP-2025-001.1 General Construction $120,000.00 to $130,000.00 UP-2025-001.3 Plumbing Construction $50,000.00 to $60,000.00 UP-2025-001.4 Electrical Construction $30,000.00 to $40,000.00
Directions : visit : https://www.sru.edu/directions https://www.sru.edu/directions
Solicitation for Construction 71-FA-8.2 Special Instructions to Bidders Solicitation No. UP-2025-001 Page 2 of 2
BIDDING INFORMATION
Issuing Office: PASSHE Regional Procurement Office
Slippery Rock University 1 Morrow Way, Slippery Rock PA 16057
Contracting Officer: Tim Evans, Construction Contracts Manager 724.840.2956 tevans@passhe.edu
Design Professional: LGA Partners LGA Partners
Sean Sheffler Lindsey Reynolds ssheffler@lga-partners.com LReynolds@lga-partners.com
Plans and Specs: available for download at the PennBid Bonfire Bid Event. Bidders must obtain all bid documents from the PennBid Bonfire Bid Event and not other bid exchanges to be eligible to submit a bid proposal.
Bids’ Due Date/Time: November 11, 2025, at 2:00 pm
Method of submission of bids for this IFB (see Sections 1 and 7 of the General Instructions to Bidders):
by upload of electronic documents to PennBid Bonfire Bid Event
Pre-Bid Conference Date/Time: October 15, 2025, at 11:00 am
Mandatory or not: No
Location: Conference Room 100 Building & Grounds Road Slippery Rock, PA 16057
Site Visits: Immediately following the pre-bid meeting.
Point of Contact: Juan Perez
Project Manager, Facilities & Planning 100 Building & Grounds Road Slippery Rock, PA 16057 Office: 724.738.2964 juan.perez@sru.edu
Submit Pre-Bid Questions by posting them at the Message Board
Cut-off Date for Pre-Bid Questions: October 23, 2025, at 2:00 pm
Bid Period: Bids shall be valid for not less than 60 days.
REAAs for Small Diverse Business (SDB) proactive solicitation: None
Bid Security Required: None
Items Required to be Submitted with the Bid: Bid Form
Performance & Payment Bond Required with the Contract: 100% of awarded Contract Price Maintenance Bond required with contract: 10% of awarded contract price mailto:tevans@passhe.edu mailto:ssheffler@lga-partners.com mailto:LReynolds@lga-partners.com mailto:juan.perez@sru.edu
Solicitation for Construction 71-FA-8.2 General Instructions to Bidders Solicitation No. UP-2025-001 Page 1 of 8
GENERAL INSTRUCTIONS TO BIDDERS
1. PennBid Bonfire - Bid Event The System uses the PennBid Bonfire web-based platform for public notice for Invitations for Bids (IFBs).
Specific instructions related to the PennBid Bonfire Bid Event are posted online. The bid documents take precedence over any online instruction.
Detailed information about submission and acceptance of bids is addressed in Section 7 below.
2. Responsibility of the Bidder It is the responsibility of the bidders by careful examination of the Contract Documents to satisfy themselves as to the nature and location of the Work, as well as all environmental conditions that may affect performance of the Work. All bidders should visit the site to thoroughly familiarize themselves with the existing conditions. If any discrepancies should be found between existing conditions and the Contract Documents, prospective bidders shall report these discrepancies to the System for clarification prior to submitting a bid. Requests for interpretation of the Work to be performed shall be submitted in writing to the System or the System's designated representative. Failure of the bidder to visit the site, recognize and take into account in their bid site conditions that affect the Work, shall not be considered sufficient cause for any increase in the agreed-upon contracted amount. If subsurface drilling or other exploration has been performed at the Project site, information resulting from such drilling and/or exploration and provided to the System in forms and/or subsurface drilling reports is included in the Technical Plans and Specifications.
3. Incurring Costs The System is not liable for any cost or expenses incurred by bidders or prospective bidders in the preparation of their bids or for attendance at any conferences, meetings, or site visits related to this IFB.
4. Restriction of Contact From the issue date of this IFB until a final contract award has been made, all contacts with Commonwealth personnel concerning this IFB must be made only through the Issuing Office or other specific representatives identified for the IFB on PennBid Bonfire Bid Event.
5. Addenda to the IFB If it becomes necessary to revise any part of this IFB, Addenda will be issued. If Addenda are issued, all terms and conditions that are not changed remain. Bidders shall acknowledge on the Bid Form all Addenda, identified by the numbers and dates of those Addenda. Bidders are responsible for ensuring they are aware of all Addenda prior to submitting their bid.
6. Questions and Answers to the IFB The PennBid Bonfire Bid Event provides a message board for on-line questions and answers. The System will post answers to questions, as applicable. If there are a significant number of questions and/or complex questions/answers, the answers may be consolidated and provided in an Addendum. Posted answers shall
Solicitation No. UP-2025-001 Page 2 of 8 be considered official, as if included in an Addendum. Answers will be posted in a timely-enough manner for bidders to be able to adequately consider them. Bidders are responsible for ensuring they are aware of all posted answers prior to submitting their bid.
7. Submission and Acceptance of Bids Bids shall be entered on the Bid Form provided elsewhere in this IFB. The completed Bid Form shall be PDF format and uploaded to the PennBid Bonfire Bid Event not later than the bid due date and time to be considered as responsive to the bid requirements. Bidders submitting bids for more than one separate prime contract shall prepare and upload separate Bid Forms.
All other items required to be submitted with the bid shall be PDF format and uploaded in the same manner and at the same time as the Bid Form. Items may be separate PDF files or combined into one PDF file; or may be combined into one PDF file with the Bid Form. If separate PDF files are used, however, they must be gathered into a Zip file for uploading. Bidders submitting bids for more than one separate prime contract shall prepare, scan, and upload separate items for each separate prime contract.
The apparent low bidder may be asked to submit one (1) original hard copy of their Bid Form, and one (1) original hard copy of their bid security, if required for the IFB, with all entries in ink or typewritten and with original signatures, within 48 hours of bid opening date and time. Other items required to be submitted with the bid may also be required to be submitted as original hard copies.
The System will not be responsible if the bidder is not able to upload their scanned PDF Bid Form if the problem is not associated with a failure of PennBid Bonfire itself. Uploaded Bid Forms and other documents which are not readable when accessed by the System will be rejected as non-responsive.
To be considered, bids must be a complete response to the IFB and must contain all elements required to be submitted with the bid. An omission of prices requested on the Bid Form may be sufficient cause for the rejection of the entire bid as non-responsive.
Bidders may submit modifications to their bids at any time before the bid due date and time. Modifications to bids shall be accomplished by withdrawing their bid form and uploading a new bid form. Otherwise, all bids shall be unconditionally accepted without alteration or modification except as authorized in this IFB.
Bids may be withdrawn up to the time of bid opening.
Requests for withdrawal of bids after bid opening based on an erroneous bid and/or a mistake in the bid, in accordance with the Commonwealth Procurement Code 62 P.S. 512(f), must be made within two (2) working days after the date of bid opening.
8. Bid Security If a bid security is required, each bid must be accompanied by a certified check, bank cashier's check, or Bid Bond. Specific bid security required, and the type, for the solicitation is identified on the PennBid Bonfire bid event. Failure to submit bid security, if required, will result in the rejection of the bid as non-responsive.
If a check is allowed, it shall be drawn to the order of the System. If a Bid Bond is used as security, it must be submitted on the System-furnished Bid Bond form, complete with all signatures, seals, and certificate of power of attorney. Failure to use the System Bid Bond form for a bid bond will result in the rejection of the bid as non-responsive. The Bid Bond form is located elsewhere in this IFB.
The bid security will be forfeited if a bid or any part thereof is accepted by the System and the bidder fails to furnish approved performance and payment bonds, if required, and execute the contract within the time frame stated in the Notice of Award.
All bid security not forfeited, except for the two lowest responsive, responsible bidders, shall be released on or before the thirtieth (30th) day after the bid opening. The bid security of the two lowest responsive, responsible bidders, except where forfeiture is involved, will be returned, or released, as appropriate, upon execution of the performance and payment bonds and the contract by the lowest responsive, responsible bidder. In the event no contract is awarded by the System, the bid security of the two lowest responsive, Solicitation No. UP-2025-001 Page 3 of 8 responsible bidders will be returned, or released, as appropriate, on or about sixty (60) days after the bid opening, unless an extension is agreed upon.
9. Business Certification The Bid Form contains a Bidder Business Certification section that bidders must complete.
If the bidder is incorporated or organized in a state other than Pennsylvania, the bidder must be registered to do business in Pennsylvania. If the bidder is operating under an assumed or fictitious name, the bidder must have registered that name in Pennsylvania. No contract will be awarded to a foreign (non-Pennsylvania) corporation, LLC, LLP, or LP, or to an assumed or fictitious name, unless the bidder has complied with the registration requirements of Pennsylvania statutes.
Information on business registration in the Commonwealth of Pennsylvania is available from the Pennsylvania Department of State, Bureau of Corporations and Charitable Organizations, 206 North Office Building, Commonwealth Avenue & North Street, Harrisburg, PA 17120.
10. Submission of Small Diverse Business (SDB) Participation Information If applicable, bidders must submit with their bid the required SDB participation information. The SDB Requirements Instructions, and the required SDB Solicitation Form, are located elsewhere in this IFB.
11. Selection for Award The System intends to award a contract or contracts resulting from this IFB to the responsible bidder(s) who submitted a responsive bid(s) which represents the lowest price to the System based on the bid evaluation plan.
If unit-priced bid items are included on the Bid Form, the System reserves the right to make an award on any item for a quantity less than the estimated quantity offered.
If the Bid Form includes multiple Bid Items, the System reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the System's best interest to do so.
12. Tie Bids When two or more low bids are equal in all respects, a recognized simple "game of chance" will be used to determine which equally-eligible bidder is to be awarded the contract. For two equally-eligible bidders, a coin flip or a drawing of straws or lots may be used. For three or more equally-eligible bidders, a drawing of straws or lots will be used. Equally-eligible bidders will have the opportunity to witness the process, if applicable.
13. Unbalanced Bids The System may reject a bid as non-responsive if it is materially unbalanced as to prices for the basic requirement, any unit prices, and/or any options. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more Bid Form line items is significantly overstated or understated.
A bid may be rejected if the System determines that the lack of balance poses an unacceptable risk to the System.
Solicitation No. UP-2025-001 Page 4 of 8
14. Apparent Clerical and Other Mistakes on the Bid Form For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the Bid Form as submitted by the bidder:
a. Obviously misplaced decimal points will be corrected.
b. For a discrepancy between a unit price and its extended price, the unit price will govern.
c. Apparent errors in extension of unit prices will be corrected.
d. Apparent errors in addition of lump-sum and extended prices will be corrected.
In the case of a discrepancy between written words and numbers, the written words will govern.
15. System’s Right to Reject Bids The System reserves the right to reject any bid if it shows any omission, alteration, addition, or deduction not called for; if it contains substitutions or exceptions; if it is conditional or represents an uninvited alternate bid; or if it contains irregularities of any kind. The System reserves the right, however, to waive technical defects or minor irregularities. Additionally, in the event a bidder fails, refuses, or neglects to provide any requested information or documents within the time stated in this IFB or upon the System's request, the System will have the right to reject their bid as non-responsive.
The System reserves the right to reject at any time all bids received.
16. Anti-Bid-Rigging The bids of any bidder or bidders who engage in collusive bidding shall be rejected. Any bidder who submits more than one bid in such a manner as to make it appear that the bids submitted are on a competitive basis from different parties shall be considered a collusive bidder. The System may reject the bids of any collusive bidder upon bid openings of future projects. By submitting a bid, a bidder is certifying that they are not engaged in collusive bidding or bid rigging relative to this bid. Nothing in this section shall prevent a bidder from superseding a bid by a subsequent bid delivered prior to bid opening which expressly revokes the previous bid.
17. Reciprocal Limitations Act Requirements The Reciprocal Limitations Act (62 P.S. 107) is applicable to contracts of $10,000 and greater.
The Reciprocal Limitations Act requires the System to give bidders a preference against a non-resident bidder from any state that gives or requires a preference to bidders from that state. The amount of the preference shall be equal to the amount of the preference applied by the state of the nonresident bidder.
The following is a list of the states which have been found by the Commonwealth of Pennsylvania to have applied a preference for in-state bidders and the amount of the preference:
Arizona 5% (construction materials from Arizona resident dealers only)
Montana 3%
West Virginia 2.5% (for the construction, repair, or improvement of any buildings)
Wyoming 5%
The Reciprocal Limitations Act also requires the System to give preference to those bidders offering supplies produced, manufactured, mined, or grown in Pennsylvania against those bidders offering supplies produced, manufactured, mined, or grown in any state that gives or requires a preference to supplies produced, manufactured, mined, or grown in that state. The amount of the preference shall be equal to the amount of the preference applied by the other state for that particular supply. The following is a list of states which have
Solicitation No. UP-2025-001 Page 5 of 8 been found by the Commonwealth of Pennsylvania to have applied a preference for in-state supplies and the amount of the preference:
Alaska 7% (applies only to timber, lumber, and manufactured lumber products originating in the state)
Arizona 5% (construction materials produced or manufactured in the state only)
Hawaii 10%
Louisiana 10% (steel rolled in Louisiana)
7% (all other products)
Montana 5% (for residents offering in-state goods, supplies, equipment, and materials)
3% (for non-residents offering in-state goods, supplies, equipment, and materials)
New Mexico 5%
Oklahoma 5%
Washington 5% (fuels mined or produced in the state only)
Wyoming 5%
The Reciprocal Limitations Act also requires the System to not specify, use, or purchase supplies which are produced, manufactured, mined, grown, or performed in any state that prohibits the specification for, use of, or procurement of such supplies in or on its public buildings or other works when such supplies are not produced, manufactured, mined, or grown, or performed in that state. The following is a list of the states which have been found by the Commonwealth of Pennsylvania to have prohibited the use of certain out-of-state supplies:
Georgia forest products only
Indiana coal
New Jersey various products, to include but not limited to: chain link fence, portable sanitation units, glass, glazier supplies, carpet and cushion, shades, upholstery materials and supplies, room air conditioning, electrical supplies, plumbing supplies, hardware supplies, fasteners, lumber, building supplies, audio/visual equipment, fire extinguishers, fire hose, motor oils, fuel oil, Venetian blinds, and drapes
New Mexico construction
The above lists and amounts of preferences are those related to construction contracts only. The complete list of preferences for all contracts, supplies, and services is available from the Commonwealth of Pennsylvania Department of General Services.
18. Nondiscrimination The System is an equal opportunity employment agency with nondiscrimination/sexual harassment requirements, as contained in the General Conditions for the Construction Contract. It is the policy of the System to award and administer contracts for goods and services in a nondiscriminatory manner, to promote the affirmative participation of minority-owned and women-owned businesses in procurement activities and awards, and to integrate into procurement processes the necessary practices and procedures for the procurement of all goods and services for the System to effectively implement the policy.
19. Debarred Contractors Contractors currently under suspension or debarment by the Commonwealth, any other state, or the Federal government, are not eligible for the award of any contract for this Project. By submitting a bid, a bidder is certifying that they are not currently under suspension or debarment by the Commonwealth, any other state, Solicitation No. UP-2025-001 Page 6 of 8 or the Federal government. Additionally, contractors shall not contract with or employ any subcontractors, suppliers, or individuals that are currently under suspension or debarment. A current list of suspended or debarred contractors is available by contacting the Department of General Services, Office of General Counsel, North Office Building Room 603, Harrisburg, Pennsylvania 17125.
20. Delinquent Payments By submitting a bid, a bidder is certifying that, to the best of their knowledge, they are not delinquent in the payment of taxes or other levies to the Pennsylvania Department of Revenue, the Pennsylvania Department of Labor & Industry, or any other Commonwealth Agency or entity.
21. Submission of Contractor Qualification and/or Financial Information Upon request, or if specifically required by the terms of this IFB, the apparent low bidder may be requested to submit a contractor's qualification and/or financial statement within ten (10) calendar days of the bid date, with financial information current within twelve (12) months prior to the bid date, of which statements shall be certified to be true and correct by an affidavit sworn to or affirmed before a notary public or other officer empowered to administer oaths or affirmations.
22. Financial Requirements To be deemed a responsible bidder, the bidder may be required to demonstrate, in relation to the bid price, adequate financial and other resources in order to be able to successfully prosecute the work. Additional information may be requested by the System whenever, in its judgment, such information is necessary to determine the responsibility of the bidder.
23. Contractor Performance Evaluation Systems The System may utilize a contractor performance evaluation system or tool established by the Department of General Services or by another Commonwealth agency, entity, or instrumentality to obtain past performance information on the bidder. Such information may be used in a determination of the bidder’s responsibility.
24. Commonwealth of Pennsylvania Contractor Responsibility Program (CRP) The System may utilize the Commonwealth of Pennsylvania CRP System, as provided for under the Governor's Office's Management Directive 215.9 Amended, Contractor Responsibility Program, dated October 25, 2010, to ensure that the System contracts only with responsible contractors.
25. References and Past Performance The System reserves the right to contact any and all references provided by the bidder, as well as any of the bidder’s past or current clients and/or customers, to glean information on the bidder’s past performance and experience. Such information may be used in a determination of the bidder’s responsibility.
26. Award of Contract The System may, solely at its own discretion, award a contract within sixty (60) days from the date of bid opening. A time extension may be made by written consent of the lowest responsive responsible bidder.
Award will be consummated by a Notice of Award letter mailed to the Contractor.
Solicitation No. UP-2025-001 Page 7 of 8
The System contemplates award of a firm fixed price contract resulting from this IFB. The contract into which the parties are anticipated entering is the System's Standard Form of Contract for Construction, located elsewhere in this IFB.
The System will provide to the contractor the completed Contract for signature with the Notice of Award letter. The Contract will not become effective until executed by all necessary Commonwealth officials as provided by law.
27. Notice to Proceed (NTP) The System will endeavor to issue the NTP within 120 days of the bid opening. Any delays caused by the contractor's failure to provide any required documents within the specified time will cause an equivalent number of days to be added to this 120-day time frame.
28. Performance, Payment, and Maintenance Bonds Should Performance, Payment, and/or Maintenance Bonds be required, the System will provide the Contractor with the Notice of Award letter the blank System Contract Bond form. The Contractor's surety company must be authorized to do business in the Commonwealth of Pennsylvania and must successfully demonstrate in writing prior to award that the amount of bond or reinsurance or other security has been obtained in conformance with the Pennsylvania Insurance Company law of 1921, 40 P.S. 832. If specifically required by the terms of this IFB, as indicated in the Special Instructions to Bidders, the Contractor’s surety company may be required to be rated at a specific level or better by A.M. Best and Company. Failure of the Bidder to execute the required Performance, Payment, and/or Maintenance Bonds within the time specified may result in payment to the System their bid security, in the amount of the difference between their bid and the next lowest responsive responsible bid, or the bid security amount, whichever is less. The System shall have the right to award the contract to the next lowest responsive responsible bidder.
29. PA E-Verify The Commonwealth of Pennsylvania enacted Act 127 of 2012, known as the Public Works Employment Verification Act (‘the Act’), which requires all public work contractors and subcontractors to utilize the Federal Government’s E-Verify system (EVP) to ensure that all employees performing work on public work projects are authorized to work in the United States. The Department of General Services’ (DGS) Public Works Employment Verification Compliance Program is responsible for the administration, education, and enforcement of the Act. Information on the Act and DGS' program are available on DGS' web site.
Contracts resulting from this solicitation will fall under the Act and the associated DGS compliance program.
Contractors will be required to sign and submit to the university, as a pre-condition of being awarded a contract, the Commonwealth of Pennsylvania Public Works Employment Verification Form (the Form). The Form is available on DGS' web site and/or through the university.
30. Investment Activities in Iran The Commonwealth of Pennsylvania enacted Act 149 of 2014, which prohibits entities which engage in certain investment activities in Iran from entering into a contract with the Commonwealth. Contractors may be required to sign and submit to the university, as a pre-condition of being awarded a contract, a certification stating that they are not on the Department of General Services' list of entities whom the Department determined are engaged in investment activities in Iran, as described in Act 149.
31. News Releases News releases and media contacts regarding this Contract and Project will be made by the System only, unless the System directs otherwise in specific instances. In such instances, the System shall receive prior
Solicitation No. UP-2025-001 Page 8 of 8 review and approval of such releases. In any case, Contractors shall not use the name of the System or any University for promotional or marketing purposes without the System’s prior written approval.
32. Pennsylvania Right-to-Know Law Effective January 1, 2009, all responses to this procurement opportunity are subject to the Pennsylvania Right-to-Know Law, 65 P.S. §67.101 et seq., (Act 3 of 2008). The Right-to-Know Law permits any requestor to inspect and/or copy any record prepared and maintained or received in the course of the operation of a public office or agency that is not subject to the enumerated exceptions under the law. If a bidder’s/proposer’s response to the procurement opportunity contains a trade secret or confidential proprietary information, the bidder/proposer should include with their response a separate signed written statement to that effect. Should the response become the subject of a Pennsylvania Right-to-Know Law request, the bidder/proposer will be notified by the procurement office to identify all trade secrets or confidential and proprietary information that is included in your response. The agency will then determine whether the claimed trade secret or confidential and proprietary information is subject to disclosure.
33. Right to Protest A bidder or prospective bidder or prospective contractor who is aggrieved concerning the solicitation or award of a contract may protest, as provided for in the Commonwealth Procurement Code, 62 Pa C.S.
1711.1. Protests shall be made in writing by submitting the protest to the Office of the Chancellor, State System of Higher Education, 2986 North Second Street, Harrisburg PA 17110. A copy of the protest shall be mailed simultaneously to the Contracting Officer identified for the solicitation on the PennBid Bonfire bid event. All protests must be received within seven (7) calendar days after the protestant knew or should have known of the facts giving rise to the protest. If a protest is submitted by a prospective bidder, the protest must be received prior to the bid opening date/time. If a protestant fails to file a protest or files an untimely protest, the protestant shall be deemed to have waived its right to protest the solicitation or award of the contract in any forum. Untimely filed protests will be disregarded. A protest must state all grounds upon which the protestant asserts the solicitation or award of the contract was improper. The protestant may submit with the protest any documents or information it deems relevant to the protest. Upon receipt and evaluation of the protest, the Office of the Chancellor will render a written decision, in accordance with the procedures outlined within the Commonwealth Procurement Code.
Solicitation for Construction 71-FA-8.2 Bid Form Solicitation No. UP-2025-001.1 Page 1 of 5
BID FORM
Note: The Bid Form pricing information is included with the Bidding Documents for Reference. Bidders shall complete the attached manual bid form and the electronic form within PennBid (“Prepare Your Submission” tab), inclusive of all pricing items and required supporting documents as identified. The manual bid form pricing submission information shall take precedent.
BID FOR:
Contract No. UP-2025-001.1 General
Title of Project Art Building Renovations Project
Location Slippery Rock University, Slippery Rock PA
BID FROM:
Firm Name
Federal ID No.
Address
Telephone
Fax
Name of Contact for this Bid
The Bidder agrees to perform the work specified in the Contract Documents, under the terms and conditions specified in the Contract Documents, without exceptions or substitutions, and under any required additional certifications and conditions attached hereto, for the prices proposed on this Bid Form.
The Bidder additionally certifies that requirements in the Instructions to Bidders are met.
The Bidder acknowledges the Addenda hereinafter enumerated, which have been issued during the period of bidding, and agrees that contents of said Addenda shall become incorporated into the Contract.
Addenda No. Date Issued
Solicitation No. UP-2025-001.1 Page 2 of 5
UP-2025-001.1 Art Building Renovations Project General
BASE BID AND BID ALTERNATES
BASE BID
All work complete as shown on the drawings and described in the specifications, for the sum of:
Dollars $
(WRITTEN) (FIGURES)
BID ALTERNATES
BID ADD ALTERNATE NO. 1 - Remaining Storefront Door Replacements
a. Storefront entrance doors and associated hardware at the following locations:
i. interior and exterior sides of the south vestibule at ground floor, marked as
“C001” and “C001B” on the plans and schedules.
ii. interior and exterior sides of the south vestibule first floor, marked as “101” and
“101B” on the plans and schedules.
iii. east entrance to plaza, marked 102B on the plans and schedules
b. Alternate includes selective demolition of existing openings at these locations to accept new storefront.
c. Under the Base Bid, the existing storefront at these locations is to remain.
Bid Alternate prices shall be inclusive of all costs, to include for labor, materials, equipment, supervision, overhead, profit, and bond, in connection with the work described for that Bid Alternate.
The System may accept any or all of the Bid Alternates in any combination with the Base Bid. The System also reserves the right to accept or reject any or all Bid Alternates.
Bid evaluation will be based on the lowest combination of Base Bid and Alternates that can be awarded within the funds budgeted for award.
Solicitation No. UP-2025-001.1 Page 3 of 5
GENERAL UNIT PRICES
Estimated Unit Item No. Description Quantity Unit Price
1 Cast-in-Place Concrete Sidewalk N/A CY $ / CY
Unit Prices being accepted and becoming binding will be indicated on the final Standard Form of Contract.
Bid prices shall be inclusive of all costs, to include for labor, materials, equipment, supervision, overhead, profit, and bond, in connection with the work described for that Bid.
The System may accept any or all of the Bids in any combination with the Base Bid. The System also reserves the right to accept or reject any or all Bids.
Bid evaluation will be based on the lowest combination of Base Bids that can be awarded within the funds budgeted for award.
Low bid to be determined on the basis of the Complete bid price.
Solicitation No. UP-2025-001.1 Page 4 of 5
BIDDER'S BUSINESS CERTIFICATION
TYPE OF BUSINESS (check one of the three options below, and circle the correct entries within)
The Bidder is a Pennsylvania Corporation, LP, LLP, or LLC (circle one), organized and existing under the laws of Pennsylvania, and so is authorized to do business in Pennsylvania by the
Pennsylvania Business Corporation Law of 1988, as amended.
The Bidder is a Foreign Corporation, LP, LLP, or LLC (circle one), organized and existing under the laws of the state of (enter the name of the state), and has or has not (circle one) been granted a certificate of authority, or is or is not (circle one) registered, to do business in
Pennsylvania as required by the Pennsylvania Business Corporation Law of 1988, as amended.
The Bidder is an Individual, Proprietorship, Partnership, or other (circle one), trading under a fictitious or assumed name, and has or has not (circle one) registered under the Pennsylvania Fictitious
Names Act of 1982, as amended.
RESIDENCY (complete one of the two options below)
Does your firm have a street address in Pennsylvania at which it was transacting business when the
Notice to Contractors for this contract was issued?
If "Yes", insert the address, or insert "same as address on page 1."
If "No," insert the address of the office responsible for this bid or insert "same as address on page 1."
(In either case, provide a street address in lieu of a post office box.)
Solicitation No. UP-2025-001.1 Page 5 of 5
BID SIGNATURE PAGE
CERTIFICATIONS
The person(s) signing below certifies that:
− he/she(they) is(are) authorized to represent the Bidder and bind the Bidder to this bid, − and, the information contained in or with this bid is true and correct, and that this information is material and important and will be relied upon by the System in awarding the contract for which this bid is submitted.
If the Bidder is an Individual, Proprietorship, or Partnership:
(one signature and one witness signature required)
(Signature) (Witness)
(Date)
If the Bidder is a Corporation, LP, LLP, or LLC:
(two signatures required)
(President/Vice President) (Secretary/Treasurer)
(CORPORATE SEAL)
Solicitation No. UP-2025-001.3 Page 1 of 5
Note: The Bid Form pricing information is included with the Bidding Documents for Reference. Bidders shall complete the attached manual bid form and the electronic form within PennBid (“Prepare Your Submission” tab), inclusive of all pricing items and required supporting documents as identified. The manual bid form
Contract No. UP-2025-001.3 Plumbing
Name of Contact for this Bid
The Bidder agrees to perform the work specified in the Contract Documents, under the terms and conditions specified in the Contract Documents, without exceptions or substitutions, and under any required additional certifications and conditions attached hereto, for the prices proposed on this Bid Form.
The Bidder additionally certifies that requirements in the Instructions to Bidders are met.
The Bidder acknowledges the Addenda hereinafter enumerated, which have been issued during the period
Solicitation No. UP-2025-001.3 Page 2 of 5
UP-2025-001.3 Art Building Renovations Project Plumbing
BASE BID AND BID ALTERNATES
BID ADD ALTERNATE NO. 1 – Solids Interceptors at Printmaking Studio
a. Furnish and install solids interceptors at the two trough sinks at Printmaking Studio 006.
b. Includes piped connections between drain to interceptor, and interceptor to sanitary line.
c. Under the base bid, no solids interceptors are to be provided at these locations.
BID ADD ALTERNATE NO. 2 – Utility Trough Sinks at Painting Studio
a. Furnish and install two 48” wide stainless-steel trough sinks at Painting Studio 106.
b. Alternate includes demolition of the existing single-bowl sinks, countertops, and base cabinets at these two locations.
c. Under the Base Bid, the two existing sinks are to remain.
BID ADD ALTERNATE NO. 2a - Solids Interceptors at Painting Studio
a. Furnish and install solids interceptors at the two sinks at Painting Studio 106.
b. Includes piped connections between drain to interceptor, and interceptor to sanitary line.
c. Under the base bid, no solids interceptors are to be provided at these locations.
Solicitation No. UP-2025-001.3 Page 3 of 5
Bid Alternate prices shall be inclusive of all costs, to include for labor, materials, equipment, supervision, The System may accept any or all of the Bid Alternates in any combination with the Base Bid. The System also reserves the right to accept or reject any or all Bid Alternates.
Bid evaluation will be based on the lowest combination of Base Bid and Alternates that can be awarded
PLUMBING UNIT PRICES
Estimated Unit Item No. Description Quantity Unit Price
1 Removal/ Replacement of Concrete Slab N/A LF $ / LF
2 Removal/ Replacement of Sanitary Drain N/A LF $ / LF
Unit Prices being accepted and becoming binding will be indicated on the final Standard Form of Contract.
Bid prices shall be inclusive of all costs, to include for labor, materials, equipment, supervision, overhead, Bid evaluation will be based on the lowest combination of Base Bids that can be awarded within the funds
Solicitation No. UP-2025-001.3 Page 4 of 5 one) been granted a certificate of authority, or is or is not (circle one) registered, to do business in fictitious or assumed name, and has or has not (circle one) registered under the Pennsylvania Fictitious
If "No," insert the address of the office responsible for this bid or insert "same as address on page 1."
Solicitation No. UP-2025-001.3 Page 5 of 5
− and, the information contained in or with this bid is true and correct, and that this information is
Solicitation No. UP-2025-001.4 Page 1 of 5
Note: The Bid Form pricing information is included with the Bidding Documents for Reference. Bidders shall complete the attached manual bid form and the electronic form within PennBid (“Prepare Your Submission” tab), inclusive of all pricing items and required supporting documents as identified. The manual bid form
Contract No. UP-2025-001.4 Electrical
Name of Contact for this Bid
The Bidder agrees to perform the work specified in the Contract Documents, under the terms and conditions specified in the Contract Documents, without exceptions or substitutions, and under any required additional certifications and conditions attached hereto, for the prices proposed on this Bid Form.
The Bidder additionally certifies that requirements in the Instructions to Bidders are met.
The Bidder acknowledges the Addenda hereinafter enumerated, which have been issued during the period
Solicitation No. UP-2025-001.4 Page 2 of 5
UP-2025-001.4 Art Building Renovations Project Electrical
BID ADD ALTERNATE NO. 1 - Remaining Storefront Door Replacements (Electrified Hardware)
a. Associated electrified door hardware and access control devices at new storefront entrances at the following locations:
i. interior and exterior sides of the south vestibule at ground floor, marked as “C001” and “C001B” on the plans and schedules.
ii. interior and exterior sides of the south vestibule first floor, marked as “101” and “101B” on the plans and schedules.
iii. east entrance to plaza, marked 102B on the plans and schedules
Bid Alternate prices shall be inclusive of all costs, to include for labor, materials, equipment, supervision, The System may accept any or all of the Bid Alternates in any combination with the Base Bid. The System also reserves the right to accept or reject any or all Bid Alternates.
Bid evaluation will be based on the lowest combination of Base Bid and Alternates that can be awarded
Solicitation No. UP-2025-001.4 Page 3 of 5
Bid prices shall be inclusive of all costs, to include for labor, materials, equipment, supervision, overhead, Bid evaluation will be based on the lowest combination of Base Bids that can be awarded within the funds
Solicitation No. UP-2025-001.4 Page 4 of 5 one) been granted a certificate of authority, or is or is not (circle one) registered, to do business in fictitious or assumed name, and has or has not (circle one) registered under the Pennsylvania Fictitious
If "No," insert the address of the office responsible for this bid or insert "same as address on page 1."
Solicitation No. UP-2025-001.4 Page 5 of 5
− and, the information contained in or with this bid is true and correct, and that this information is
Contract for Construction 71-FA-8.2 Standard Form of Contract Contract No. UP-2025-001 Page 1 of 4
STANDARD FORM OF CONTRACT
FOR
CONSTRUCTION
BETWEEN THE SYSTEM AND THE CONTRACTOR
This Contract is made and entered into this ______ day of June 2025, in Butler County, Pennsylvania, by and between
Slippery Rock University
One Morrow Way Slippery Rock PA 16057 of the State System of Higher Education Commonwealth of Pennsylvania hereinafter called the "System."
and
---Contractor's Name--- ---address--- ---address---a corporation/LP/LLP/LLC/partnership/etc.
organized in the state of ___________
Federal I.D. No. ___________, hereinafter called the "Contractor."
CONTRACT SUM AND DESCRIPTION
The Contractor agrees to perform the scope of work described in the Contract Documents for the sum of [---award amount, in both words and numbers---] and within the time specified in the section Contract Time below.
Contract No. UP-2025-01
Base Bid(s) Awarded Base Bids, Alternates and Unit Prices
Prime Contract General, Plumbing & Electrical Construction
Project Name Art Building Renovations Project
University/Location Slippery Rock University, Slippery Rock Pennsylvania
Contract No. UP-2025-001 Page 2 of 4
EFFECTIVE DATE OF CONTRACT
The parties hereto, intending to be legally bound, hereby do agree that this Contract shall not be effective until executed by all necessary Commonwealth officials as provided by law.
CONTRACT TIME
The date for commencement of the Work is the date of the Notice to Proceed. On-site Work shall commence no later than seven (7) days after the date of the Notice to Proceed.
The Contractor shall prosecute the Work diligently and substantially complete the Work (Substantial Completion) not later than August 1, 2026, Full Completion August 15, 2026.
LIQUIDATED DAMAGES
If the Contractor fails to complete the Work within the Contract Time specified in this Contract, including any and all approved extensions or adjustments thereto that are properly executed under the procedures outlined by the Contract, the Contractor shall pay liquidated damages, not as a penalty, to the System in the amount of $250.00 dollars for each calendar day of delay until the Work is substantially completed and accepted.
PREVAILING WAGE
This Project is subject to the Pennsylvania Prevailing Wage Act, 43 P.S. § 165-1 et seq, as amended. The Prevailing Minimum Wage Determination for this Project is Serial Number 25-05369, determined May 20, 2025, and consisting of 8 pages.
DESIGN PROFESSIONALS
LGA Partners LGA Partners Sean Sheffler Lindsey Reynolds ssheffler@lga-partners.com LReynolds@lga-partners.com
CONSTRUCTION MANAGER
Juan Perez Project Manager, Facilities & Planning 100 Building & Grounds Road Slippery Rock, PA 16057 Office: 724.738.2964 juan.perez@sru.edu
OTHER SYSTEM REPRESENTATIVES
Timothy E. Evans Construction Contracts Manager 724.840.2956 tevans@passhe.edu mailto:ssheffler@lga-partners.com mailto:LReynolds@lga-partners.com mailto:juan.perez@sru.edu mailto:tevans@passhe.edu
Contract No. UP-2025-001 Page 3 of 4
NOTICE
Unless otherwise specifically identified by any provision of this Contract, a notice shall be deemed sufficient if given in writing and delivered personally or sent by registered or certified…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .