Traverse Ridge Retaining Wall Repair Contract Documents
This is a Request for Bids and associated contract documents issued by Draper City Corporation's Engineering Division for the Traverse Ridge Retaining Wall Repair Project. The project encompasses repair of two retaining walls along Traverse Ridge Road in Draper, Utah, including labor, materials, tools, and equipment necessary to complete all work according to project plans and specifications. The East Wall repair includes stormwater pollution prevention, traffic control, clearing and grubbing, debris removal, installation of 342 square feet of retaining wall blocks, 2,610 square feet of geogrid, 143.9 cubic yards of granular borrow, block sealing, chemical surface treatment, clay soil filling, and landscape restoration. The West Wall repair includes stormwater pollution prevention, traffic control, debris removal, concrete waterway removal and replacement, installation of 381 square feet of retaining wall blocks, chemical surface treatment, and landscape restoration. Electronic bid submissions through the Utah Public Procurement Place (U3P) are due by 2:00 p.m. on July 30, 2026, with questions accepted through 5:00 p.m. on July 28, 2026. No pre-bid conference has been scheduled. Bids will be opened electronically with results posted within 24 hours. Work must commence within ten days of the Notice to Proceed and be completed within 60 calendar days, with liquidated damages of $2,000 per day assessed for late completion.
All bids must be accompanied by a photocopy of a 5% bid bond payable to Draper City or an equivalent certified check. Upon award, contractors must provide performance and payment bonds, each in the amount of 100% of the contract price, along with certificates of insurance within ten calendar days of the Conditional Notice of Award. The contract price includes all costs for bonds, insurance, permits, fees, and required testing. Bid prices must include sales tax and all applicable taxes and fees. The contractor is responsible for obtaining all necessary building permits, as the walls are considered structural, though Draper's building department waives permit fees. No subcontractor may be awarded work exceeding 50% of the contract price without prior written approval from the City. The City retains the right to reject any and all bids and waive irregularities or informalities deemed in the city's best interest. The City is not responsible for expenses incurred by bidders prior to award by the City Council. Award of the contract will be based on the lowest responsible bidder, considering factors such as contractor experience, previous performance with the city, contract change orders, schedule adherence, workmanship quality, and any claims or legal issues.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Claim of Business Confidentiality Updated.pdf.pdf | ||
| 2-TraverseRetainingWall Plans West Wall 26.07.16.pdf | ||
| 4-TraverseRetainingWall Plans East Wall 26.07.17.pdf | ||
| 3-TraverseRetainingWall Specs 26.07.16.pdf | ||
| 3-Attachment A Terms and Conditions.docx | DOCX document | |
| 2-Vendor Prerequisites - RFP Agency.pdf | ||
| 5-Attachment C Evaluator Score Sheet.xls | XLS spreadsheet | |
| 4-Attachment B Scope of Work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAPER CITY CORPORATION
ENGINEERING DIVISION
DRAPER, UTAH 84020
TELEPHONE: (801) 576-6585
FACSIMILE: (801) 576-6388
www.draperutah.gov
JULY 16, 2026
CONTRACT DOCUMENTS FOR THE
TRAVERSE RIDGE RETAINING WALL
REPAIR PROJECT
TRAVERSE RIDGE RETAINING WALL REPAIR
TABLE OF CONTENTS
SECTION I LEGAL AND PROCEDURAL DOCUMENTS
Invitation to Bid
Bidder Information
a. Bid Submittal
b. Site Examination
c. Required Bonds
d. Contract Award
e. Notification
f. Subcontractors
g. Standard Form Construction Agreement
h. Sources of Information
i. Confidentiality
j. Pre-Bid Conference
k. Question Submission Period
Additional Instructions to Bidders
Bidder Terms and Conditions
Bid Schedule
Measurement and Payment
Questionnaire and Statement of Qualifications
Bid Bond
Payment Bond
Performance Bond
Conditional Notice of Award
Construction Agreement Example
Notice to Proceed
Change Order
Preconstruction Conference Agenda
Full and Final Release
Project Acceptance for Maintenance
Final Project Acceptance
SECTION II SPECIFICATIONS
SECTION GC-A – GENERAL CONDITIONS – CONSTRUCTION PROJECTS
Part 1 – General Terms GC-A – 1 Part 2 – Control of the Work GC-A – 9 Part 3 – Control of Materials GC-A – 16 Part 4 – Legal Relations and Responsibilities to the Public GC-A – 19 Part 5 – Prosecution and Progress GC-A – 23 Part 6 – Measurement and Payment GC-A – 28 Part 7 – Disputes and Appeals GC-A – 29
STANDARD SPECIFICATIONS
DIVISION 1 – GENERAL REQUIREMENTS
Section 01035 – Field Survey Referencing Procedures 01035 – 1 Section 01041 – Project Coordination 01041 – 1 Section 01050 – Construction Surveying and Field Engineering 01050 – 1 Section 12 – Traffic Control 12 – 1 Section 15 – Detour Construction and Facilities 15 – 1 Section 01515 – Watering 01515 – 1 Section 01620 – Storage and Protection 01620 – 1 Section 01705 – Contract Closeout Procedures 01705 – 1 Section 01720 – Project Record Documentation 01720 – 1 Section 01820 – Material Testing 01820 – 1
DIVISION 2
Section 02016 – Protecting and Relocating Utilities 02016 – 1 Section 02020 – Clearing and Grubbing 02020 – 1 Section 02115 – Concrete and Asphalt Pavement Removal 02115 – 1 Section 02121 – Structures and Obstructions Removal 02121 – 1 Section 02214 – Shoring and Bracing Trenches 02214 – 1 Section 02220 – Excavation 02220 – 1 Section 02230 – Granular Materials, Flowable Fill, and Topsoil 02230 – 1 Section 02240 – Backfill, Compaction, and Embankment 02240 – 1 Section 02433 – Non-Pressure Pipe Installation 02433 – 1 Section 02438 – Structures to Finish Grade 02438 – 1 Section 02447 – Monuments 02447 – 1 Section 25 – Tack Coat 25 – 1 Section 02503 – Bituminous Paving Course 02503 – 1 Section 02511 – Asphalt Pavement Crack Sealing 02511 – 1 Section 02513 – Bituminous Concrete Paving Materials 02513 – 1 Section 02577 – Pavement Marking – At Grade 02577 – 1 Section 0264200 – Impressed Current Cathodic Protection 02744S – 1 Section 02740S – Highly Modified Asphalt Mix 02740S – 1 Section 02744D – Stone Matrix Asphalt (SMA) 02744S – 1 Section 02768 – Pavement Marking Materials 02768 – 1 Section 02800 – Irrigation and Planting of Streetscapes & Parks 02800 – 1 Section 02805 – Design Standards 02800 – 1 Section 02810 – Pressurized Irrigation Systems 02810 – 1 Section 02910 – Grading for Landscapes 02910 – 1 Section 02915 – Protection of Trees, Lawns, and Landscapings 02915 – 1 Section 02920 – Seed, Turf Seed, and Turf Sod 02920 – 1 Section 02925 – Topsoil 02925 – 1 Section 02930 – Trees, Shrubs, and Ground Covers 02930 – 1 Section 02935 – Vegetation Establishment Period 02935 – 1 Section 02961 – Rotomilling 02961 – 1
DIVISION 3
Section 03000 – Concrete Work 03000 – 1 Section 03050 – Concrete Curb, Gutter, Sidewalk, and Drive Approaches 03050 – 1 Section 03100 – Concrete Formwork 03100 – 1
Section 0313700 – RipRap or Rock Lining 0313700 Section 03200 – Concrete Reinforcement 03200 – 1 Section 0320113.61 – Slurry Seal 0320113.61 – 1 Section 0320113.65S – Scrub Seal 0320113.65S Section 0320113.69 – Micro-Surface Seal 0320113.69 – 1 Section 0321124S – Pulverized Pavement Base Course 03211124S – 1 Section 0321205 – Bituminous Concrete 0321205 – 1 Section 0321216.13 – Plant-Mix Bituminous Paving 0321216.13 – 1
Section 03250 – Concrete Curing Compound and Joint Fillers 03250 – 1 Section 03300 – Cast-in-Place Concrete 03300 – 1 Section 0334105 – Ductile Iron Pipe 0334105 – 1 Section 03350 – Catch Basins and Inlets 03350 – 1 Section 03400 – Storm Drain Manholes 03400 – 1 Section 03450 – Structural Precast Concrete 03450 – 1 Section 0400564 – Butterfly Valves 0400564 – 1
SECTION III PROJECT DRAWINGS
SECTION I
LEGAL AND PROCEDURAL DOCUMENTS
DRAPER CITY CORPORATION
ENGINEERING DIVISION
1020 EAST PIONEER ROAD
DRAPER, UTAH 84020
TELEPHONE: (801) 576-6546
FACSIMILE: (801) 576- 6388
www.draperutah.gov
July 16, 2026
REQUEST FOR BIDS
FOR THE TRAVERSE RIDGE RETAINING WALL REPAIR
PROJECT
The scope of this project will be to provide all the labor, materials, tools and equipment necessary to repair two walls along Traverse Ridge Road as described in the project plans and specifications and these contract documents.
Bid documents and specifications will be posted to the Utah Public Procurement Place (U3P), PURCHASING.UTAH.GOV on or before Thursday, July 16th, 2026 at 2:00 PM. A 5% Bid Bond will be required.
The Engineering Division will receive electronic responses on PURCHASING.UTAH.GOV until 2:00
PM on Thursday, July 30th, 2026. Responses received after this time will not be accepted.
Responses will be opened by Draper City staff and will be promptly posted to the Utah Public
Procurement Place (U3P) website within 24 hours of the above-stated time and date, with only the names of the firms submitting responses and their total bid amounts being presented.
Preliminary bid results will be located within the Q&A section of the said project on U3P.
Questions concerning the scope of work, response submittal, or process should be directed to us electronically through U3P before 5:00 PM on Tuesday, July 28th, 2026.
The City is not responsible for expenses incurred prior to award by the City Council. Draper City reserves the right to reject any and all responses and to waive any irregularities, informalities, or technicalities deemed in the best interest of the City.
We look forward to receiving your response.
Respectfully, Dillon Bliler, Project Manager
Bidder Information
A.BID SUBMITTAL
✓ Submit the bid through UTAH PUBLIC PROCUREMENT PLACE (U3P)
✓ Submission Deadline: 2:00 PM on Thursday, July 30th, 2026
✓ Bids received after the deadline will not be considered.
✓ Bids will be opened electronically and the names of the bidders responding to the Request for Bids will be available online immediately thereafter. Bids and Bid
Bonds will then be checked by the Engineer.
B. SITE EXAMINATION
Bidders should carefully examine the drawings and specifications including addenda prior to the formal bid opening. Bidders should also visit the site of the work to become fully informed of all existing conditions and limitations. Any interpretation of the proposed documents will only be made by addenda duly issued and a copy of such addenda will be made available prior to bid opening to each plan holder.
C. REQUIRED BONDS
Bids must be accompanied by the photocopy of a bid bond payable to Draper City
(OWNER) for five percent of the total amount of the bid. An original copy of the bid bond will be requested from the lowest responsible bidder. When the contract is executed, and the OWNER receives the performance, payment, and all other required bonds, the bid bond of the successful bidder will be returned. A certified check made payable to OWNER may be used in place of the bid bond.
A performance and payment bond, each in the amount of 100 percent of the contract price, with a corporate surety approved by the owner, will be required to ensure faithful performance of the contract. The duration of the performance and payment bond shall be one year after the anticipated completion date of the project.
Attorneys-in-fact whom sign the bid bond and performance and payment bond must file with each bond a certified and effective dated copy of their power of attorney signed with original signatures or facsimile.
The party to whom the contract is awarded will be required to provide the performance, payment and all other required bonds (including certificates of insurance), within ten calendar days from the date when Notice of Award is delivered to the bidder.
The party to who the contract is awarded will be required to execute the agreement within ten calendar days from the date when the Construction Agreement is delivered to the bidder. If bidder fails to execute the contract, the owner may consider the bidder in default, in which case the bid bond accompanying the bid shall become property of the owner.
D. CONTRACT AWARD
It is the intent of Draper City to award the contract based upon the lowest and most responsible bidder provided that the bid has been submitted in accordance with the requirements stated in the solicitation documents. The experience and responsibility of the contractor will ultimately be a determining factor in the contract award.
Furthermore, a contractor's previous experience with the city, including but not limited to contract change orders, failure to meet deadlines, relationships with the public, workmanship and materials, and/or claims or legal issues, will also be included in the consideration of the lowest bid when awarding the contract.
E. NOTIFICATION
After formal award of the project, verification of the bonds, and execution of the agreement, the contractor will then receive the Notice to Proceed, which will establish the date that work will begin under the contract. The work on this Project shall commence within 10 days of receipt of the Notice to Proceed. The work shall be completed within a maximum of 60 calendar days of Notice to Proceed. All work stoppages due to inclement weather conditions and other factors must be verified by the Project Manager. Work stoppages due to equipment failure will not be the responsibility of Draper City. Failure to comply with the project schedule will result in liquidated damages as specified in the agreement.
F. SUBCONTRACTORS
The bid submittal shall include a list of subcontractors to be used on the project. This list shall be binding upon the contractor, however, Draper City has the right to reject any or all subcontractors listed which the City feels is unqualified to do the work.
G. STANDARD FORM CONSTRUCTION AGREEMENT
An example form of the standard construction agreement to be executed has been attached to these bid documents. The agreement is only an example for informational purposes and is subject to change based on the circumstances of this particular project.
H. SOURCES OF INFORMATION
For information concerning Request for Bid procedures and regulations (i.e., submission deadline, forms required, etc.), or Americans with Disabilities (ADA) accommodations, interested parties may contact Dillon Bliler: 801-576-6336; email:
Dillon.bliler@draperutah.gov.
I. CONFIDENTIALITY
All responses, inquiries, and correspondence relating to this Request for Bids and all reports, charts, displays, schedules, exhibits, and other documentation produced by the bidder that is submitted to Draper City, as part of the bid or otherwise, shall become the property of Draper City when received by Draper City and may be considered public information under applicable law. Draper City is subject to the disclosure requirements of the Government Records Access and Management Act, (“GRAMA”)Title 63, Chapter
2, Utah Code Annotated. Draper City generally considers bids and all accompanying material to be public and subject to disclosure. Any material considered by the bidder to be proprietary must be accompanied by a written claim of confidentiality and a concise written statement of reasons supporting the claim as required by GRAMA §§63-
2-304 and 308. Blanket claims that the entire Request for Bids is confidential will be denied. Draper City cannot guarantee that any information will be held confidential. If the bidder makes a claim of confidentiality, Draper City, upon receipt of a request for disclosure, will determine whether the material should be classified as public or protected, and will notify the bidder of such determination.
The bidder is entitled under the GRAMA to appeal an adverse determination.
Draper City is not obligated to notify the bidder of a request, and will not consider a claim of confidentiality, unless the bidder’s claim of confidentiality is made in a timely basis and in accordance with the GRAMA.
REPRESENTATION REGARDING ETHICAL STANDARDS FOR DRAPER CITY OFFICERS
AND EMPLOYEES AND FORMER DRAPER CITY OFFICERS AND EMPLOYEES
The bidder certifies that it has not: (1) provided an illegal gift or payoff to a Draper City officer or employee or former Draper City officer or employee, or his or her relative or business entity; (2) retained any person to solicit or secure this contract upon an agreement or understanding for a commission, percentage, brokerage or contingent fee, other than bona fide employees or bona fide commercial selling agencies for the purpose of securing business; or (3) knowingly influenced, and hereby promises that it will not knowingly influence, any Draper City officer or employee or former Draper City officer or employee to breach any ethical standards set forth in Draper City’s conflict of interest policy or any of the provisions of Utah code title 67 Chapter 16.
J. Pre-Bid Conference A pre-bid conference has not been scheduled for this project.
K. Question Submission Period
All questions regarding this project must be submitted electronically through U3P on or before 5:00 PM on Tuesday, July 28th, 2026.
Draper City reserves the right to reject any or all bids and to waive minor technicalities and irregularities in bids received, and/or to accept any portion of the offer if deemed in the best interest of Draper City. Failure of bidder to provide, in its bid, any information requested in the Request for Bids may result in rejection for non-responsiveness.
ADDITIONAL INSTRUCTIONS TO BIDDERS
1. West Wall Location. Follow this link for the location to the west wall:
https://maps.app.goo.gl/8eBL6g4eEuHVsDpu6 (40°29'00.2"N
111°50'46.5"W)
2. East Wall Location. Follow this link for the location to the west wall:
https://maps.app.goo.gl/RZDveR6nDsrv2gEK6 (40°29'01.7"N 111°50'14.5"W)
3. Building Department Permit(s): Building permit(s) will be required on this project because the walls are considered to be structural. The general contractor is responsible for this application and requesting any necessary inspections at the appropriate intervals. Draper’s building department will waive permit fees.
4. Limits of Disturbance. Contractor shall make their best effort to minimize the area disturbed above both retaining walls, and must restore any disturbed area as per the corresponding bid item. The bid item is a lump sum and shall cover all disturbed area. The area shown on the West Wall exhibit is approximate.
5. Interpretation of Specifications. If the intent or meaning of the technical specifications is unclear or requires further clarification and/or additional information please submit a written request for information by fax or email.
Specifications have been updated from the previous published version.
6. Quality Assurance - Material Testing. In Section 01820, “Material Testing”, Part 1.03 B, of the Standard Specifications, the City chooses to perform the
“Acceptance Testing” at the City’s expense. All remaining applicable specifications in Section 01820 “Material Testing” will be the Contractor’s responsibility.
7. Quality Control – Material Testing. Contractor is to provide quality control testing for the asphalt paving process. The technician must use a thin-lift nuclear moisture density gauge or approved equivalent.
8. Geotechnical Inspections. Contractor must request inspections at the intervals indicated in the East Wall plan set.
9. Traffic Control Specification. Section 12 – Traffic Control included in these
Contract Documents replaces Section 01554 “Traffic Control” of the
Draper City Standard Specifications. The project will likely require a lane closure for the work on each wall.
https://maps.app.goo.gl/8eBL6g4eEuHVsDpu6 https://maps.app.goo.gl/RZDveR6nDsrv2gEK6
10. Project Dates and Liquidated Damages. Work is to begin no later than
August 20th, 2026. Liquidated Damages for late completion are $2,000 per day.
11. Construction Staking. No construction staking is anticipated to be needed for this project
BIDDER TERMS AND CONDITIONS
1. The undersigned Bidder proposes and agrees, if this bid is accepted, to enter into an Agreement with Owner in the form included in the Contract
Documents to complete all Work as specified or indicated in the Contract
Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the Contract Documents.
2. Bidder accepts all of the terms and conditions of the Bidder Information.
Bidder accepts responsibility for all control, testing and acceptance of materials as per Draper City Specifications
Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work on time.
3. The terms used in this Bid which are defined in the provisions of the
Construction Agreement or General Conditions included as part of the
Contract Documents have the meanings assigned to them in the
Construction Agreement or General Conditions.
Include in lump sum or unit price all labor, materials, tools, equipment, and required testing for the work described in the plans and specifications. Bids shall include sales tax and all other applicable taxes and fees. All work shall conform to the Draper City Standard Specifications and Details for Municipal
Construction, latest edition
BID SCHEDULE
The Bid Schedule contains the schedule of prices that will be incorporated into the Agreement by reference. BIDDER agrees to perform all the work described in the CONTRACT DOCUMENTS for the indicated unit prices or lump sum prices. Measurement shall be made in the units or lump sums shown on the bid schedule.
Bid Item
Description Quantity Unit Unit Cost Item Total
Schedule A - East Wall
1 Stormwater Pollution Prevention (SWPP) 1.0 LS
2 Traffic Control 1.0 LS
3 Clearing and Grubbing 1.0 LS
4 Remove Debris / Damaged Blocks 1.0 LS
5 Replace or Install Retaining Wall Blocks 342.0 SF
6 Geogrid 2,610.0 SF
7 Granular Borrow 143.9 CY
8 Seal Cracked Blocks 1.0 LS
9 Chemical Surface Treatment 1.0 LS
10 Fill Gap at Base of Wall with Clay Soil 1.0 LS
Landscaping Restoration - Blankets and Broadcast Seed 1.0 LS
Schedule A Total TOTAL
Description Quantity Unit Unit Cost Item Total
Schedule B - West Wall
1 Stormwater Pollution Prevention (SWPP) 1.0 LS
2 Traffic Control 1.0 LS
3 Remove Debris / Damaged Blocks 1.0 LS
Remove and Replace Concrete Waterway 1.0 LS
5 Replace or Install Retaining Wall Blocks 381.00 SF
6 Chemical Surface Treatment 1.00 LS
Broadcast Seed 1.00 LS
Schedule B Total
Grand Total
ENTER PRICES FOR EACH LINE ITEM AS INSTRUCTED ON U3P. DO NOT SUBMIT THIS
BID SCHEDULE.
MEASUREMENT AND PAYMENT
A. Measurement and calculation of quantities for payment to be as indicated in this section.
B. Unit prices or lump sum amounts to include full compensation for furnishing all labor, materials, products, tools, equipment, transportation, services and incidentals; erection, application or installation of an item of the Work; overhead and profit, and doing all work shown on the
Drawings, defined in the Specifications, and/or stipulated herein.
C. Payment covers the cost of incidental work which includes: progress schedule; QC program; Permitting; mobilization; temporary facilities;
erosion control measure during construction; construction surveying;
materials testing; saw cutting, removal and disposal of existing trench pavement; unclassified excavation; pot hole excavations; trench excavations; trench shoring or trench boxes as applicable; removal and disposal of waste materials; trench dewatering; miscellaneous dewatering; pipe zone material; select import fill material (where needed); compaction of trench backfill materials; compaction density testing; construction water; dust control; traffic control; managing storm water runoff during construction; removing and replacing fencing impacted by construction; constructing needed temporary access to construction areas; monument restoration; road base restoration;
repairing existing utilities damaged upon construction; protecting cast-in-place concrete from extreme weather; replacing top soil on trench area in unimproved areas; repairing existing clay curtain if disturbed during construction; removal and replacement of landscape materials irrigation systems equal to or better than existing if damaged by the
CONTRACTOR’S operations and all other damages to existing improvements resulting from the completion of the specified Contract
Work; supporting existing utilities extending through trench section;
coordinating utility relocations to be performed by others;
demobilization; site cleanup; and all other necessary work, to install the
Work complete in place.
D. BID ITEM DESCRIPTIONS
SCHEDULE A – EAST WALL
1. Storm Water Pollution Prevention (SWPP)
A. Specification Reference: Draper City Storm Water
Management Plan
B. Method of Measurement / Basis for Payment:
a. The contract lump sum price paid for storm water pollution prevention plan shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in developing and implementing the SWPPP as specified herein and as directed by the Engineer.
b. Payment will be made on percentage basis as follows.
Percent of Original
Contract Amount Earned
Percent of Amount Bid to be Paid
33 33
66 33
100 34
C. Payment Includes:
a. Storm Water Pollution Prevention Plan shall consist of work and operations, including but not limited to, all work involved in developing and implementing a storm water pollution prevention plan (SWPPP)
b. The implementation of construction site best management practices (BMP’s) for sediment control, tracking control, non-storm water management, waste management, and materials pollution control and all other methods used to control water pollution effectively during construction as identified in the
SWPPP.
c. The SWPPP shall include temporary concrete washout, inlet protection, and any BMP’s the Contractor deems necessary above and beyond those items cited in this description.
D. Additional Notes / Requirements:
a. Within five (5) calendar days of the Conditional Notice of Award, the Contractor shall provide the Engineer with the proposed SWPPP and proof of the Notice of Intent
(NOI) filed with the State of Utah.
i. The Engineer will have two (2) working days to review the SWPPP and return it with an approval or denial. If denied, the Contractor will then have one (1) calendar day to re-submit the SWPPP.
ii. If necessary, after the allotted time set forth herein, each re-submittal and review will be allotted one calendar day until a written approval is provided by the Engineer.
2. Traffic Control System
A. Specification Reference:
a. Traffic control system shall conform to the provisions in
Section 12, “Traffic Control,” of these contract documents, and Section 01575, “Detour Construction and Facilities,” of the Standard Specifications. Traffic
Control System shall consist of work and operations, including but not limited to, all work involved in developing and implementing a Traffic Control Plan.
B. Method of Measurement / Basis for Payment:
a. Lump Sum
Percent of Amount Bid to be Paid
33 33
a. The contract lump sum price paid for traffic control system shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in traffic control system as specified in the Standard Specifications and as directed by the Engineer.
D. Additional Notes / Requirements:
a. Within ten (10) calendar days of the Conditional Notice of Award, the Contractor shall provide the Engineer with the proposed Traffic Control Plan.
i. The Engineer will have two (2) working days to review the Traffic Control Plan and return it with an approval or denial.
ii. If denied, the Contractor will then have one (1) calendar day to re-submit the Traffic Control plan.
If necessary, after the allotted time set forth herein, each re-submittal and review will be
3. Clearing and Grubbing
a. Clearing and Grubbing shall conform to the provisions in Section 02220, “Excavation,” and Section 02020, “Clearing and Grubbing,” of the Standard
Specifications and these special provisions.
B. Method of Measurement / Basis for Payment:
a. Lump Sum
C. Payment Includes:
a. Clearing and Grubbing shall include removal of all landscaping features, associated topsoil, trash, objectionable material and structures not identified and quantified on other bid items.
b. Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in Clearing and Grubbing.
c. Hauling and disposal of removed material as needed, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
D. Additional Notes / Requirements:
4. Remove Debris / Damaged Blocks
a. Shall conform to the provisions in Section 02220, “Excavation,” and Section 02020, “Clearing and
Grubbing,” of the Standard Specifications and these special provisions.
B. Method of Measurement / Basis for Payment:
a. Lump Sum
C. Payment Includes:
a. Shall include removal of any debris, deleterious material, damaged or deteriorated blocks, associated topsoil, trash, objectionable material and structures not identified and quantified on other bid items.
b. Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in removing debris, damaged blocks, and other deleterious or interfering materials.
c. Hauling and disposal of removed material as needed, as specified in the Standard Specifications and these
5. Replace or Install Retaining Wall Blocks
a. Shall conform to the provisions in Section 02220, “Excavation,” and Section 02020, “Clearing and
Grubbing,” of the Standard Specifications and these special provisions.
B. Method of Measurement / Basis for Payment:
a. Square Foot of retaining wall face repaired / replaced
/ installed.
C. Payment Includes:
a. This item includes necessary labor, tools, equipment, and necessary material to repair the retaining wall according to the original plan set. Each excavated course of retaining wall is to be inspected by the engineer to determine the necessary scope of the repair. New keystone (or approved equivalent) retaining wall masonry units are to be used
b. Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in installing blocks per the manufacturer’s specifications and these provisions.
c. Keystone Compac II Tri-Plane Blocks with ½” x 5-1/4” fiber alignment pins, or approved equivalent. Only one brand of block shall be used.
d. PL 500 Landscape Construction Adhesive by Loctite, or approved equivalent must be used to adhere blocks to connecting courses.
6. Geogrid
a. Shall conform to the provisions in the Standard
Specifications and these special provisions.
B. Method of Measurement / Basis for Payment:
a. Square Foot of geogrid installed / replaced to repair the retaining wall.
C. Payment Includes:
a. This item includes necessary labor, tools, equipment, and necessary material to install Tensar UX1100MSE according to the plan set, or approved equivalent. New geogrid is to be used.
b. Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in installing geogrid per the manufacturer’s specifications and these provisions.
7. Granular Borrow
a. Granular borrow shall be UDOT 2056 Classification A-1-a and conform to the provisions in Section 02230, “Granular Materials, Flowable Fill, and Topsoil”, and
Section 02240, “Backfill, Compaction, and
Embankment”, of the Standard Specifications and these special provisions.
B. Method of Measurement / Basis for Payment:
a. Quantities of granular borrow to be paid for by the cubic yard will be calculated on the basis of the dimensions shown on the plans adjusted by the amount of any change ordered by the Engineer. No allowances will be made for granular borrow placed outside those dimensions unless otherwise ordered by the Engineer.
C. Payment Includes:
a. The contract price paid per cubic yard for granular borrow shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in hauling and constructing granular borrow, complete in place, as shown on the plans, as specified in the Standard
Specifications and these special provisions, and as directed by the Engineer.
D. Additional Notes / Requirements:
a. Intended as wall backfill material.
b. In-situ material may be used upon testing, review and approval.
8. Seal Cracked Blocks
a. Shall conform to the manufacturer’s product guidelines, the Standard Specifications, and these special provisions.
B. Method of Measurement / Basis for Payment:
a. Lump Sum for sealing all cracked blocks as required.
C. Payment Includes:
a. Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in applying Sikaflex + Concrete Fix crack sealant (or approved equivalent).
9. Chemical Surface Treatment
a. Shall conform to the manufacturer’s product guidelines, the Standard Specifications, and these special provisions.
B. Method of Measurement / Basis for Payment:
a. Lump Sum for sealing / treating the entire exposed surface area and top of the wall.
C. Payment Includes:
a. Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in applying Siloxa-Tek 8500 by Ghostshield
(or approved equivalent) over the entire face of the wall after installing new blocks, including the top of the top course of blocks.
10. Fill Gap at Base of Wall with Clay Soil
a. Shall conform to the Standard Specifications, plan set requirements, and these special provisions.
B. Method of Measurement / Basis for Payment:
a. Lump Sum for filling the gap at the base of the wall with clay soil.
C. Payment Includes:
a. Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in filling the gap at the base of the wall with clay soil to the satisfaction of the inspector.
D. Additional Notes / Requirements:
a. Material must be approved based on required classification described in the plan set.
11. Landscape Restoration – Blankets and Broadcast Seed
a. Revegetation shall conform to the provisions in Section
02920, “Seed, Turf Seed, and Turf Sod” and Section
02935, “Vegetation Establishment Period,” of the
Standard Specifications and these special provisions.
B. Method of Measurement / Basis for Payment:
a. Lump Sum
C. Payment Includes:
a. The lump sum price shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in
Landscape Restoration of any areas disturbed as part of the construction work or repair operation, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
b. Erosion Blanket Acquisition and installation.
D. Additional Notes / Requirements:
a. Contractor will use the Slope Seed Mix.
b. Contractor to minimize disturbed area.
SCHEDULE B – WEST WALL
1. Storm Water Pollution Prevention (SWPP)
A. Specification Reference: Draper City Storm Water
Management Plan
B. Method of Measurement / Basis for Payment:
a. The contract lump sum price paid for storm water pollution prevention plan shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in developing and implementing the SWPPP as specified herein and as directed by the Engineer.
Percent of Amount Bid to be Paid
33 33
a. Storm Water Pollution Prevention Plan shall consist of work and operations, including but not limited to, all work involved in developing and implementing a storm water pollution prevention plan (SWPPP)
b. The implementation of construction site best management practices (BMP’s) for sediment control, tracking control, non-storm water management, waste management, and materials pollution control and all other methods used to control water pollution effectively during construction as identified in the
SWPPP.
c. The SWPPP shall include temporary concrete washout, inlet protection, and any BMP’s the Contractor deems necessary above and beyond those items cited in this description.
D. Additional Notes / Requirements:
a. Within five (5) calendar days of the Conditional Notice of Award, the Contractor shall provide the Engineer with the proposed SWPPP and proof of the Notice of Intent
(NOI) filed with the State of Utah.
i. The Engineer will have two (2) working days to review the SWPPP and return it with an approval or denial. If denied, the Contractor will then have one (1) calendar day to re-submit the SWPPP.
ii. If necessary, after the allotted time set forth herein, each re-submittal and review will be
2. Traffic Control System
a. Traffic control system shall conform to the provisions in
Section 12, “Traffic Control,” of these contract documents, and Section 01575, “Detour Construction and Facilities,” of the Standard Specifications. Traffic
Control System shall consist of work and operations, including but not limited to, all work involved in developing and implementing a Traffic Control Plan.
B. Method of Measurement / Basis for Payment:
a. Lump Sum
Percent of Amount Bid to be Paid
33 33
a. The contract lump sum price paid for traffic control system shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in traffic control system as specified in the Standard Specifications and as directed by the Engineer.
b. Includes full compensation for all labor, materials, tools, equipment and incidentals to temporarily move the jersey barriers for complete wall repair and surface sealing.
D. Additional Notes / Requirements:
a. Within ten (10) calendar days of the Conditional Notice of Award, the Contractor shall provide the Engineer with the proposed Traffic Control Plan.
i. The Engineer will have two (2) working days to review the Traffic Control Plan and return it with an approval or denial.
ii. If denied, the Contractor will then have one (1) calendar day to re-submit the Traffic Control plan.
If necessary, after the allotted time set forth herein, each re-submittal and review will be
3. Remove Debris / Damaged Blocks
a. Shall conform to the provisions in Section 02220, “Excavation,” and Section 02020, “Clearing and
Grubbing,” of the Standard Specifications and these special provisions.
B. Method of Measurement / Basis for Payment:
a. Lump Sum
C. Payment Includes:
a. Shall include removal of any debris, deleterious material, damaged or deteriorated blocks, associated topsoil, trash, objectionable material and structures not identified and quantified on other bid items.
b. Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in removing debris, damaged blocks, and other deleterious or interfering materials.
c. Hauling and disposal of removed material as needed, as specified in the Standard Specifications and these
4. Remove and Replace Concrete Waterway
a. Concrete Waterway shall conform to the provisions in
Section 02115, “Concrete and Asphalt Pavement
Removal”, and Section 03050, “Concrete Curb, Gutter, Sidewalk, and Drive Approaches,” of the Standard
Specifications and these special provisions.
B. Method of Measurement / Basis for Payment:
a. Quantities of remove and replace concrete waterway to be paid for will be determined by the linear foot measured along the centerline of the waterway removed and replaced.
C. Payment Includes:
a. The contract price paid per linear foot of concrete waterway shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in constructing the concrete waterways, including excavation and backfill, placing and compacting a minimum of six (6) inches of untreated base course below, as shown on the plans, and placing 5 inches of concrete and grading the waterway properly as specified in the Standard
Specifications and these special provisions, and as directed by the Engineer.
b. Legal hauloff and disposal of old concrete waterway.
5. Replace or Install Retaining Wall Blocks
a. Shall conform to the provisions in Section 02220, “Excavation,” and Section 02020, “Clearing and
Grubbing,” of the Standard Specifications and these special provisions.
B. Method of Measurement / Basis for Payment:
a. Square Foot of retaining wall face repaired / replaced
/ installed.
C. Payment Includes:
a. This item includes necessary labor, tools, equipment, and necessary material to repair the retaining wall according to the original plan set. Each excavated course of retaining wall is to be inspected by the engineer to determine the necessary scope of the repair. New keystone (or approved equivalent) retaining wall masonry units are to be used
b. Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in installing blocks per the manufacturer’s specifications and these provisions.
c. Keystone Compac II Tri-Plane Blocks with ½” x 5-1/4” fiber alignment pins, or approved equivalent. Only one brand of block shall be used.
d. PL 500 Landscape Construction Adhesive by Loctite, or approved equivalent must be used to adhere blocks to connecting courses.
6. Chemical Surface Treatment
a. Shall conform to the manufacturer’s product guidelines, the Standard Specifications, and these special provisions.
B. Method of Measurement / Basis for Payment:
a. Lump Sum for sealing / treating the entire exposed surface area and top of the wall.
C. Payment Includes:
a. Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in applying Siloxa-Tek 8500 by Ghostshield
(or approved equivalent) over the entire face of the wall after installing new blocks, including the top of the top course of blocks.
7. Landscape Restoration – Blankets and Broadcast Seed
a. Revegetation shall conform to the provisions in Section
02920, “Seed, Turf Seed, and Turf Sod” and Section
02935, “Vegetation Establishment Period,” of the
Standard Specifications and these special provisions.
B. Method of Measurement / Basis for Payment:
a. Lump Sum
C. Payment Includes:
a. The lump sum price shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in
Landscape Restoration of any areas disturbed as part of the construction work or repair operation, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
b. Erosion Blanket Acquisition and installation.
a. Contractor will use the Slope Seed Mix.
b. Contractor to minimize disturbed area.
QUESTIONNAIRE AND STATEMENT OF QUALIFICATIONS
1. General Company Information:
Company Name:
Type of Corporation:
Company Owner or CEO:
Main Business Contact:
Main Business Contact’s Email Address:
Business Address:
Business Phone Numbers (general & FAX lines):
Number of Years in the General Construction Business:
2. Contractor License Information:
Utah Number:
Date of Issue:
License Holder:
Type of License:
$ State and explain any disciplinary actions taken by the State of Utah to revoke or suspend the above license or attempts to investigate the license holder for business or construction related reasons (include on a separate and attached sheet of paper).
3. Company Similar Project Work Experience: List a minimum of three projects constructed by your company within the last 10 years with an equal or larger scope of work as compared with the Project described herein. Include a complete accounting of 1) total construction cost including all change order allowances; 2) name and phone number of project engineer; 3) name and phone number of project owner; 4) calendar days to complete from notice to proceed to final closeout; 5) name of each project manager or superintendent; and 6) dates of individual project completion.
Project 1.
Project 2.
Project 3.
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned
____________________________ as Principal, and____________________________ as Surety, are hereby held and firmly bound unto __________________________ as Owner in the penal sum of _____________ for the payment of which, well and truly be made, we hereby jointly and severally bind ourselves, successors and assigns.
Signed the ________ day of _________________, 20_____.
The Condition of the above obligation is such that whereas the Principal has submitted to ____________ a certain Bid, attached hereto, and hereby made a part hereof to enter into a contract in writing, for the_________________________________________________________
NOW THEREFORE,
(a) If said Bid shall be rejected, or in the alternative,
(b) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the FORM of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a bond for his faithful performance of said contract, and for the payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the agreement created by the acceptance of said Bid, then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated.
The Surety for value received, hereby stipulates and agrees that the obligations of said Surety and its bond shall be in no way impaired or affected by any extension of the time within which the Owner may accept such Bid; and said Surety does hereby waive notice of any such extension.
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of them as are incorporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above.
Principal
Surety
BY: _________________________
STATE OF UTAH )
: SS. SURETY
County of Salt Lake)
______________________________, being first duly sworn on oath, deposes and says: that s/he is the Attorney-in-Fact of _______________________________, a corporation organized under the laws of the State of _______________ and that s/he is duly authorized to execute and deliver the foregoing obligation; that the said _______________________ is authorized to execute the same, and has complied in all respects with the laws of the
State of Utah, in reference to becoming sole surety upon bonds, undertakings and obligations.
Attorney-in-Fact
SUBSCRIBED and SWORN to before me this _______________ day of _____________________, 20____.
NOTARY PUBLIC
My Commission Expires: ________________________
Residing in: __________________________________
(Attach Power of Attorney)
STATE OF UTAH)
: ss. (Complete if Principal
County of Salt Lake) is an
Individual)
On this ________, day of ___________, 20_____, personally appeared before me
___________________________, signer (s) of the foregoing instrument, who duly acknowledged to me that s/he (they) executed the same.
My Commission Expires: __________________________________
Residing in: ____________________________________________
STATE OF UTAH) (Complete if Principal
: ss. is a
County of Salt Lake) Corporation)
On this _________; day of _______________, 20___, personally appeared before me
________________, who being by me duly sworn, did say s/he is the _____________________ of ___________________________________, a ____________________ corporation, and that the foregoing instrument was signed in behalf of said corporation by authority of its Board of Directors, and s/he acknowledged to me that said corporation executed the same.
My Commission Expires: _________________________
Residing in: ___________________________________
STATE OF UTAH) (Complete if Principal
: ss. is a
County of Salt Lake) Partnership)
On this ______________, day of ______________, 20___, personally appeared before me
__________________, who being by me duly sworn, did say that s/he is the
___________________of _________________________, a partnership, and that the foregoing instrument was signed in behalf of said partnership and that said instrument was signed in behalf of said partnership and that said partnership executed the same.
My Commission Expires: _____________________________
Residing in:________________________________________
THE AMERICAN INSTITUTE OF ARCHITECTS
Copied from original AIA Document A312
P A Y M E N T B O N D
Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable.
CONTRACTOR (Name and Address):
SURETY (Name and Principal Place of Business):
OWNER (Name and Address):
CONSTRUCTION CONTRACT
DATE:
AMOUNT:
(Description (Name and Location):
BOND
Date (Not earlier than Construction Contract Date):
Amount:
Modifications to this Bond: ( ) None ( ) See Page 6
CONTRACTOR AS PRINCIPAL SURETY
Company: (Corporate Seal) Company: (Corporate Seal)
Signature: __________________ Signature: _________________
Name and Title: Name and Title: (Any additional signatures appear on page 6)
(FOR INFORMATION ONLY - Name, Address and Telephone) AGENT or BROKER:
OWNER'S REPRESENTATIVE (Architect, Engineer or other party):
1. The Contractor and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner to pay for labor, materials and equipment furnished for use in the performance of the
Construction Contract, which is incorporated herein by reference.
2. With respect to the Owner, this obligation shall be null and void if the
Contractor:
2.1 Promptly makes payment, directly or indirectly, for all sums due
Claimants, and
2.2 Defends, indemnifies and holds harmless the Owner from all claims, demands, liens or suits by any person or entity who furnished labor, materials or equipment for use in the performance of the
Construction Contract, provided the Owner has promptly notified the Contractor and the Surety (at the address described in
Paragraph 12) of any claims, demands, liens or suits and tendered defense of such claims, demands, liens or suits to the Contractor and the Surety, and provided there is no Owner Default.
3. With respect to Claimants, this obligation shall be null and void if the
Contractor promptly makes payment, directly or indirectly, for all sums due.
4. The Surety shall have no obligation to Claimants under this Bond until:
4.1 Claimants who are employed by or have a direct contract with the Contractor have given notice to the Surety (at the address described in Paragraph 12) and sent a copy, or notice thereof, to the Owner, stating that a claim is being made under this Bond and, with substantial accuracy, the amount of the claim.
4.2 Claimants who do not have a direct contract with the
Contractor:
.1 Have furnished written notice to the Contractor and sent acopy, or notice thereof, to the Owner, within 90 days after having last performed labor or last furnished materials or equipment included in the claim stating, with substantial accuracy, the amount of the claim and the name of the party to whom the materials were furnished or supplied or for whom the labor was done or performed; and
.2 Have either received a rejection in whole or in part from the
Contractor, or not received within 30 days of furnishing the above notice any communication from the Contractor by which the Contractor has indicated the claim will be paid directly or indirectly; and
.3 Not having been paid within the above 30 days, have sent a written notice to the Surety (at the address described in
Paragraph 12) and sent a copy, or notice thereof, to the
Owner, stating that a claim is being made under this Bond and enclosing a copy of the previous written notice furnished to the
Contractor.
5. If a notice required by Paragraph 4 is given by the Owner to the Contractor or to the Surety, which is sufficient compliance.
6. When the Claimant has satisfied the conditions of Paragraph 4, the Surety shall promptly and at the Surety's expense take the following actions:
6.1 Send an answer to the Claimant, with a copy to the Owner, within 45 days after receipt of the claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed.
6.2 Pay or arrange for payment of any undisputed amounts.
7. The Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by the Surety.
8. Amounts owed by the Owner to the Contractor under the Construction
Contract shall be used for the performance of the Construction Contract and to satisfy claims, if any, under any Construction Performance Bond. By the
Contractor furnishing and the Owner accepting this Bond, they agree that all funds earned by the Contractor in the performance of the Construction
Contract are dedicated to satisfy obligations of the Contractor and the Surety under this Bond, subject to the Owner's priority to use the funds for the completion of the work.
9. The Surety shall not be liable to the Owner, Claimants or others for obligations of the Contractor that are unrelated to the Construction Contract.