1-Substitution_Request_(1).pdf
PDF 40 KB Posted
- Attached to
- Culinary Arts Modernization Project
- Solicitation number
- WSH2511A
- Issued by
- Los Angeles County, San Francisco City, California
About this file
This document is a Substitution Request form for the Hart High School Infrastructure - Phase 2A project, issued by the William S. Hart Union High School District with project number WSH18-01. The form provides a structured process for contractors to propose alternative materials or products in place of those originally specified in the project documents. The form requires detailed documentation about the proposed substitution, including product descriptions, specifications, drawings, photographs, and performance data. Contractors must certify that the proposed substitution meets or exceeds the original specification in function, appearance, and quality, and that they will assume responsibility for any additional costs or modifications required.
The substitution request includes a comprehensive warranty section where the contractor, subcontractor, and manufacturer must agree to assume full responsibility for the performance of the substituted materials. This includes covering costs for any necessary modifications to building design, coordination with other trades, and ensuring that the substitute product will perform satisfactorily under the conditions specified in the project drawings and specifications. The form emphasizes that testing costs, if required, will be paid by the General Contractor, and all parties must provide signatures and potentially affix a corporate seal to validate the substitution request.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FE 12
Project Forms
SUBSTITUTION REQUEST
TO:
PROJECT:
BID PACKAGE:
SPECIFIED ITEM: ____________________________________________________________________
SPECIFICATION SECTION PAGE PARAGRAPH DESCRIPTION
The undersigned requests for your consideration the following product instead of the specified item above:
PROPOSED SUBSTITUTION(S):
REASON FOR PROPOSED SUBSTITUTION:
Attached data includes product description, specifications, drawings, photographs, and performance and test data adequate for evaluation of the request. Applicable portions of the data are clearly identified.
Attached data also includes a description of changes to the Contract Documents which the proposed substitution will require for its proper installation.
The undersigned certifies that the following paragraphs, unless modified by attachments are correct.
1. The proposed substitution does not affect dimensions shown on drawings:
2 The undersigned will pay for changes to the building design, including Architect’s and engineering design, detailing, and construction costs caused by the requested substitution.
3. The proposed substitution will have no adverse effect on other trades, the construction schedule or specified warranty requirements.
4. Maintenance and service parts will be locally available for the proposed substitution.
5. Attach all cost data with explanations if different from Specified or Drawing item. Include in that explanation a discussion on quality or proposed substitution and cost differential.
6. The undersigned will pay for any subsequent changes in incorporating the proposed substitution that were not apparent at the time of approval into the Work, including compensation to the Architect as described in item 2 above.
The undersigned further states that the function, appearance, and quality of the proposed substitution are equivalent or superior to the specified item.
Submitted by: For use by the design consultant:
Signature: Accepted Accepted as noted
Firm: Not Accepted Received too late
Address: By:
Remarks:
Date:
Date:
Telephone:
Fax:______________________________
Attachments: _____________________________
William S. Hart Union High School District Project Number
HART HIGH SCHOOL INFRASTRUCTURE - PHASE 2A
William S. Hart Union High School District Project Number WSH18-01
FE 12
Project Forms
SUBSTITUTION REQUEST
(continued)
SUBSTITUTION WARRANTY
In addition to other requirements, the General Contractor shall warrant in writing that substituted materials shall perform as specified, and assume complete responsibility for same, including responsibility and costs required for modifications to building or other materials or equipment, and any additional coordination with work of other trades. Testing, if required, shall be paid by the General Contractor. The following is an example of the type of Substitution warranty, which shall be executed by the Contractor, on his own letterhead.
SUBSTITUTION WARRANTY
We propose to provide
(Describe items being proposed for substitution) for _______________________________________________________ in lieu of and as (List project name) an equivalent to _________________________________________________________.
(Describe specified product)
As indicated on the drawings and described in Section ____________________________of the Specifications.
We agree to assume the cost of any modifications to other portions of the work as necessary to accommodate our material (s) and system(s).
We hereby warrant that ___________________________________________________ (Provide description) is the equivalent of ________________________________________________________ (Specified product)
In every respect and will perform satisfactorily under the conditions and use indicated on the Drawings and described in the Specifications
Signed: ________________________________ Date __________________________ (Manufacturer/Supplier/Other)
(Subcontractor)
(Contractor)
NOTE: Affix Corporate Seal over Signatures.
| SPECIFIED ITEM 1: |
| SPECIFIED ITEM 2: |
| SPECIFIED ITEM 3: |
| SPECIFIED ITEM 4: |
| SPECIFIED ITEM 5: |
| PROPOSED SUBSTITUTIONS: |
| Firm: |
| Address: |
| By: |
| undefined_2: |
| Date: |
| Date_2: |
| Telephone: |
| Remarks 1: |
| Remarks 2: |
| Attachments: |
| is the equivalent of: |
| Signed: |
| Date_3: |
| Signed_2: |
| Date_4: |
| Signed_3: |
| Date_5: |
| Text4: |
| Project Name: |
| Text7: |
| Check Box11: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Bid Package No: |
File details come from the government source that posted it. Updated .